JobNo..

VSL Amnrtnrfll
22K007
Strand Threading Record Date:

VSLHongKongLtd. <8f6 /ZL(


Project: 2019/04 FANLING BYPALL EASTERN SECT
Stmcture : 1/

Location ASO^ ^) £k^ . Sheet No. :

Tendon No. Size Heat No. Coil No. No. of Strand

3^)1 ^ t^ocyuv^ te^Qoex^Q^l ^/c)^0^^<5. ^

^c^\ ^ ^<yV^ t^^0ooo<>05 T^^OT-^^ ^

3,0)^^ \'}^)r^<y^ t^$?>000605 %^0^t|^- ^


<^Hcr»4x ^
^06^^ (Q^?cy\/v^ ^[^booo^5 (2-

-Rword^iiabyVSL CaeckcdbyVSl; 'Wituessied tey Main1 Witne^Nbythfet'onsulltant /


foi'cinaa EN't^En iueer Coilti^ctflir Bn ineev
;Naine AlJ
Sf natuiFe
' Bate; [&(
Form No.: VSL-HO-CON-SFD-001 Revision: B Page:
JOD NO.: ^ZR.UU/

VSL Tendon Stressing Report


Date: Weather:

VSL Hong Kong Ltd. Start time: Complete time:

ND/2019/04 Fanling North New Development Area. Phase 1:


Project:
Fanling BypassEastern Secft'on
Locaffon; ThreadingRecord Tendon information Jack Information Calculatedby: PageNo.
PierA2-03 Deck B
Coilno. Heatno. No.ofstrand'No. ofstrand:
A2-Deck B
FC2402342 K450000603 27 Area (mmZ):

Tendon; E-Mod.(kN/mm2):
3C01L
Jack.Force(kN):

Location Stressingtoad Gauge pressure Extension

uf anchor cateul. meas. received gross

kN % Bar Bar

2 3 4 5

END A

0 0 0

1412.5 25 117

2825.0 50 234

4237.5 75 352

5650.0 100 470

50 , 3x4 ^
OCCheckingbeforestivsslng (IeAnchorBlockInstellaSon) Mln 66.6 ^10%

Tendon is free to move- Normal / Abnormal / Not Applicable Ideal 74.0 +;<

OC Checkingafterstressing Max 81.4 +10%

END A - Strand Paint Mark condition - Normal / Abnormal


Name:
Checkedby:
VSL Representative
Sign:
Name:
Checkedby:
DCKJVsRepresentative(Main Contractor) Sign:

Name:
Checked by:
AECOM's RepresentaBve (Supefv/sof's Delegate) Sign:
JOD NO. : £S\W11

VSL Tendon Stressing Report


Date: Weather:

VSLHong Kong Ltd. Start time: Complete time:

ND/2019/04 Fanling North New Development Area, Phase 1:


Project:
Fanling Bypass Eastern Section
Location: Threading Record Tendon information Jack Information Cafcutatedby: PageNo.
PierA2-03 Deck B
Coil no. Heat no. No. of strand No. of strand: 27 JackType: ZPE-750
A2-Deck B
AVa
FC240234Z K450000603 27 Area(mm2); 149.0 Jacklength (mm): 1200.0
Checkedby:
Tendon: E-MDd. (kN/mm2): 199.0 Jack tosses (%): Ace. To calibration
3C01R AVa
Jack. Force kN): 5650.0 Area (cm2): 1247.0
Extenston Adjustments Extension Identificationof Idantfflcallonof
Location Stressingload Gauge pressure
Dnaw-ln

recelvad jack draw-In net difference . Anchorheads - Equipment


of anchor calcul. mea;

mm mm mm a- b- mni mm % -Wedges
kN % Bar Bar

7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5

HeadatENDA: JackNo.
END A
jsjioaa
0 0 0

117 WedgesatENDA: GaugeNo.


1412.5 25
TMPMT4
2825.0 50 234

352 HeadatENDB;
4237.5 75

5650.0 100 470 -9

50 , 3x4 ^ Wedges at END B :

QC Checking tefon stressing (Ie Anchor Block Installatton) Mln 66.6 -10%

Tendon is freeto move- Normal/ Abnormal / NotApplicable Ideal 74.0 */-« Comments:

QCCheckingaftersttvsslng Max 81^_ +10%

END A - Strand Paint Mark condition - Normal / Abnormal


Name:
Checked by:
VSL Representative Sign:

Name:
Checked by:
DCKJVs Representative(Main Contractor) Sign:

Name:
Checked by:
AECOM'sRepresentative(Supervisor's Delegate) Sign:
JOD NO. : ZOWUI

VS L Tendon Stressing Report


Date: Weather:

VSL Hong Kong Ltd. Start time: Complete time:

ND/2019/04 Fanling North New Development Area, Phase 1:


Project:
Fanling Bypass Eastern Section

csffon; Threading Record Tendon information Jack Information Cateutatedby: Page No.
PierA2-03 Deck B
Coil no. Haat no. No.ofstrand No.ofstrand: 27 JackType: ZPE-750
A2-Deck B
AVa
FC2402342 K450000603 27 Area(mm2): 149.0 Jacklength (mm): 1200.0
Checked by:
>ndon; E.Mod.(kN/mmZ): 199.0 Jacklosses (%): Ace. To calibration
3C02L
AVa
Jack.Force kN): 5650.0 Area cm2): 1247.0
Extenston IdentifteaUon of Identfflcatton of
Locatton Stressing load Gauge pressure Extenston Adjustments
Draw-ln

received gmss Jack draw-in net difference - Anchorheads - Equlpmant


of anchor calcul. meas. meas.

kN % Bar Bar nnm a- b- mm % -Wedges

5 6 10 11 12 13 14 IS 16 17
1 2 3 4

HeadatENDA: JackNo.
END A
JSJ109S
0 0 0

1412. 5 25 117 Wedgesat ENDA: GaugeNo.

JMP34S9
2825.0 50 234

4237.5 75 352 HeadatENDB:

5650.0 100 470 .9

50 , 3x4 ^ Wedgesat ENDB:

QC Checking before stressing (Ie Anchor Block Installatton) Mln 66.6 ^10%

Tendonis freeto move- Normal/ Abnormal/ NotApplicable Ideal 74.0 *w Comments:

QCCheckingafterstressing Max 81.4 *10%

END A - Strand Paint Mari< condition - Normal / Abnormal


Name:
Checkedby:
VSL Representativa Sign:

Name:
Checkedby:
DCKJVs Representative (Main Contractor) Sign:

Name:
Checked by:
AECOM's Representative (Supervisor's Delegate) Sign:
JOD NO.: ££\WI{

VSL Tendon Stressing Report


Date: Weather:

VSL Hong Kong Ltd. Start Ume: Corn tote time:

ND/2019/04 Fanling North New Development Area. Phase 1:


Project:
Fanling Bypass Eastern Section

icatton: Threading Record Tendon Information Jack Information Cakaitatedby: Page No.
PierA2^)3 Deck B

Coll no. Haat no. No.ofstrand No.ofstrand: 27 JackType: ZPE-750


A2.Deck B
AVa
FC2402342 K450000603 15 Area (mm2): 149^4 Jacklength(mm): 1200.0
Checked by
mcton: 12 E.Mod. (RN/mm2): 199.0 Jacktosses(%): Ace. To calibration
FC2402329 K451XIOOG03
3C02R
AVa
Jack.Force(kN): 5650.0 Area un2): 1247.0
Gaugepressure Extenston AdjustmBtrts Extension IdentBIcaUonof Idflntlfteatlonof
Localton Stressing load
Draw-ln

net difference -Anchorheads -Equipment


of anchor calcul. meas. meas. recBhrad gross Jack draw-In

Bar Bar a- b- mm % -Wedges


kN % inm

6 10 11 12 13 14 15 16 17
1 2 3 4 5

HeadatENDA: JackNo.
END A
JSJ1999
0 0 0

1412.5 25 117 Wedges at ENDA: Gauge No.

THP34r4
2825.0 50 234

4237.5 75 352 HeadatENDB:

5650.0 100 470

50 , 3x4 ^ Wedges at END B:

QC Checking before stressing (Ie Anchor Block InstallaSon) Mln WA -10%

Tendon is free to move- Nomial / Abnomnal / Not Applicable Ideal 73.8 +M Comments:

QCCheckingafterstressing Max 81.1 *1B%

ENDA - Strand PaintMarkcondition - Normal/ Abnomial


Name:
Checked by:
VSL Representative Sign:

Name:
Checked by:
DCKJVsRepresentative (Main Contractor) Sign:

Name:
Checked by:
AECOM's Representative (Supervisor's Delegate) Sign:
Project

VSL
Bridge A2-Deck B
Tendon 3C01L
Coil no. Area E Nos.
FC2402342 149 199 27
0 0 0

0 0 0

Ai xn, +A2 xnz+A, 149 x 27 + 0x0


HI + HZ + HS 27
149

Modified E^: Ei xn, +£z x"2+£3 x"3 = 199 x 27 0x0


"1 + n2 + n3 27+0
199.0

150x195
Modified Extension em=eo AmxEm = 75 x 150 x 195
149 x 199.000
74. 0 mm
Project:

VSL
Bridge A2-Deck B
Tendon 3C01R
Coil no. Area E Nos.

FC2402342 149 199 27


0 0 0

0 0 0

Modified An, : Ai x n, +Az x nz +A, xri3 149 x 27 + 0x0


nl + n2 + n3 27 +

149

Modified Em: £'1 xn, +£z x"2+^3 xng = 199 x 27 0x0


nl + n2 + n3 27+0
199.0

150 x 195
Modified Extension em=eox Amx Em 75 x 150 x 195
149 x 199.000
74. 0 mm
VSL
Bridge A2-Deck B
Tendon 3C02L
Coil no. Area E Nos.
FC2402342 149 199 27
0 0 0

0 0 0

Modified Am: A^xn. +A^'xin^+A^xn^ = 149 x 27 + 0x0 0x0


HI + HZ + HS 27 + 0

149

Modified Em: £'1 xn, +£z x^z+£3 xn3 = 199 x 27 + 0x0 0x0
ni+nz+ns 27+0
199.0

150 x 195
Modified Extension em=eo Amx Em 75 x 150 x 195
149 x 199. 000
74. 0 mm
Project:

VSL
Bridge A2-Deck B
Tendon 3C02R
Coil no. Area E Nos.
FC2402342 149 199 15
FC2402329 150 199 12
0 0 0

Modified Am: Ai x n>+Az x nz +^3 x^ 149 x 15 + 150 x 12


nl + n2 + n3 15 + 12
149

199 x 12 0
Modified Em: £1 xn, +£z xn;+^3 x"3 = 199 x 15 +

"1 + "2 + "3 15 + 12


199.0

150 x 195
Modified Extension em=eox ^^ ^ g^ 75 x150x 195
149. 444 x 199. 000
73.8 mm