Professional Documents
Culture Documents
QMS-PRD-003 Measurement, Analysis and Improvement - OK
QMS-PRD-003 Measurement, Analysis and Improvement - OK
and Improvement
QMS-PRD-003
PT BUKIT BERKAT Document No. QMS-PRD-003
BERSAMA
Revision No. 00
Date 03 Mar 2023
Measurement, Analysis and
Improvement Page Page 1 of 8
Prepared QA & QC
Project Services
Checked
Coordinator
President
Approved
Director
This document has been validated and controlled when it is stamped “ORIGINAL” or
“CONTROLLED COPY”.
TABLE OF CONTENTS
1. Purpose................................................................................................................4
2. Scope....................................................................................................................4
3. Definitions............................................................................................................4
4. Responsibilities...................................................................................................4
4.1 Quality Manager / Management Representative...................................................4
4.2 President Director..................................................................................................4
4.3 Department Managers...........................................................................................4
4.4 Engineers..............................................................................................................4
5. References...........................................................................................................5
6. Procedures...........................................................................................................5
6.1 Objectives and Targets.........................................................................................5
6.2 Monitoring and Measurement................................................................................5
6.3 Review and Analysis.............................................................................................6
6.4 Improvements........................................................................................................7
6.5 Documentation and Records.................................................................................7
7. General Requirements........................................................................................8
8. Related Documents.............................................................................................8
9. Appendices..........................................................................................................8
9.1 Appendix A : Objectives – Monitoring, Measurement & Report Matrix.................8
9.2 Appendix B : Performance Monitoring Sheet........................................................8
9.3 Appendix C : Client Satisfaction Feedback Record...............................................8
9.4 Appendix D : Contractor / Vendor-Supplier Performance Evaluation Sheet.........8
PT BUKIT BERKAT Document No. QMS-PRD-003
BERSAMA
Revision No. 00
Date 03 Mar 2023
Measurement, Analysis and
Improvement Page Page 4 of 8
1. Purpose
2. Scope
3. Definitions
4. Responsibilities
4.4 Engineers
5. References
6. Procedures
6.1.2 BBB Quality Manager and BBB President Director review the input
from the Department Manager and provide further inputs for the
successful execution of plan of actions to fully achieve the quality
improvement aims.
6.2.3 Periodic internal audit is planned and facilitated by the BBB Quality
Manager to:
6.3.4 Audit findings reports and audit close out reports are agenda
material in Management Review Meeting wherein likely causes,
corrective and preventative measures are noted for used in
revision to processes and procedures that will improve the quality
management system.
6.4 Improvements
7. General Requirements
7.2 The means and time frames for achievement of objectives and
target shall be clearly defined.
Measurement of achieved results and its analysis shall be the
basis for the framework of policy changes and plans and actions
for continuous improvement.
8. Related Documents
9. Appendices
Date: Date:
F-QMS-PRD-003-03
What service would you expect BBB to provide for you now or in the
future?
BBB operates a Quality Management System registered as conforming to BS EN ISO 9001. This form is designed
Please tick here if you have attached
to comply with the Client feedback requirements of BS EN ISO 9001 - 2008. Please return the completed form to
comments on separate sheets
the Group Quality Manager or to the President Director.
F-QMS-PRD-003-04
The Service Providers performance shall be evaluated by the Contracts / Procurement Manager with input from other disciplines as appropriate to the scope of supply. See below.
Marking System: 1 Poor 2 Below Average 3 Average 4 Above Average 5 Outstanding Or N/A if not applicable
Please tick one box per line 1 2 3 4 5 Particular comments (continue on a separate page if necessary)
Other (Please state): “After sales service or communications” Client/Purchaser satisfaction survey.
Evaluation agreed by: Project Director / Project Manager / Group Quality Manager (Signature & Date)