Hazards and Risks identified during the School Watching and Hazard Mapping:

1. Flooding of pathways every after heavy rain


2. COVID-19
3. Earthquake
4. etc

SCHOOL DISATER RISK REDUCTION & MANAGEMENT (DRRM)-CLIMATE CHANGE ADAPTATION & MANAGEMENT (CCAM) PLAN
SCHOOL ID / SCHOOL NAME
COMPREHENSIVE
SCHOOL SAFETY R.A. No. 10121 KEY THEMATIC AREAS CLIMATE CHAN
PILLARS
Prevention & Time Time Time Rehabilitation & Time
Preparedness Response Mitigation
Mitigation Frame Frame Frame Recovery Frame
Putting sandbags that RADaR Reporting Elevating and concreting Implementation of
learners and school Before of pathways proper garbage disposa
personnel could step on the (answer to flooding)
(answer to flooding) rainy
Safe Learning season
Facilities
Posting of signage (like
slippery when wet) Date
(answer to flooding)
Improvement of
drainage system Date
(Answer to flooding)
Retrofitting weak Participation in quarterly RADaR Reporting
classrooms and other conduct of NSED
facilities (answer to
earthquake)
Repairing the damages
Improving school Implementation of Provision of PFA
ingress and egress Drafting of COVID1- conplan
Date
(answer to COVID) contingency
School Disaster
Management
School Disaster
Management Implementation of Provision of PFA
Drafting of Earthquake conplan
Date Contingency Plan
(answer to earthquake)
Incorporation of COVID-
Resilience and Risk 19 in classroom lessons
Reduction (answer to COVID)
Education
Conducting of
symposium on the "Big
One" (answer to
earthquake)

Inclusion of flood safety


precautions during
lessons (flooding and
earthquake)

Prepared by: Recommending Approval: Approved by:

Name Name Name


School DRRM Coordinator School Head Public Schools District Superintendent

Copy Furnished: DRRM-SGOD

NOTE:

Prevention and Mitigation and Preparedness are done before the onset of the hazard or disaster. Prev and mit are
typically physical/engineering intervention and preparedness are more like capacity bldg.

Response interventions are undertaken during or in the midst of the hazard or disaster (common error here is writing
preparedness or prevention and mitigation interventions under response). Typical example: First aid
Rehabilitation and Recovery are implemented after the hazards or disaster; maybe similar to prevention and
mitigation and preparedness but the difference is the period when they are undertaken. Example: elevation of the
pathway was not high enough during prevention and mitigation so during the rehab and recovery you elevate further
the pathways.

Ing tutu sir Alvin ala no man binye example ing CO nung makananu ya ing Sch DRRM-CCAM Plan -- ing mung template
na digdagan kung Time Frame column. Piabe-abe kula deng order, memo ampo other document ning DRRMS-CO para
makanini ku pagawa ini. Nung atin kang adagdag , idagdag mu ne sir. Salamat. Ing mas maragul kung pasalamatan
nung mas apaintindi mu kareng school under keka nung makananu yang gawan. Uling eku teacher tagana eku siguru
aexplain masalese :-).

Wa pin pala sir, ing Sch DRRM-CCAM plan ya pin ing mas maragul a planu. Potang milyari ne ing hazard, karin me
operationalize in Con Plan.
CCAM) PLAN

CLIMATE CHANGE

Time
Mitigation
Frame
Implementation of
proper garbage disposal
(answer to flooding)