Download as pdf or txt
Download as pdf or txt
You are on page 1of 34

NEW ROAD 01 PART II STRUCTURAL DETAIL DESIGN DETAIL DRAWING

PROJECT TITLE

SHEET CONTENT ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES

S/N DRAWING TITLE DRAWING NUMBER SHT. NO. REV DATE GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

1 NEW ROAD 01 Part II UTILITY RELOCATION (SHEET CONTENT) ET23156-CCECC-GNL-DD-SC-GNL-GL-000-03 000 03 April.16.2024
2 NEW ROAD 01 Part II LOCATION MAP ET23156-CCECC-GNL-DD-SC-GNL-GL-001-03 001 03 April.16.2024
REV 01
3 NEW ROAD 01 Part II TYPICAL CROSS SECTION ET23156-CCECC-GNL-DD-SC-GNL-GL-002-03 002 03 April.16.2024 EMPLOYER'S REPRESENTATIVE

4 CONCRETE DITCH DETAIL ET23156-CCECC-GNL-DD-SC-GNL-GL-003-03 003 03 April.16.2024


5 BAR SCHEDULE FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-004-03 004 03 April.16.2024
CHECKED BY

6 BAR QUANTITY FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-005-03 005 03 April.16.2024 FOR EMPLOYER'S REPRESENTATIVE
APPROVAL BY

7 BAR SCHEDULE FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-006-03 006 03 April.16.2024 FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

8 BAR QUANTITY FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-007-03 007 03 April.16.2024


9 BAR SCHEDULE FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-008-03 008 03 April.16.2024
CHECKED BY Luci Li
APPROVED BY Chen Keyun
10 BAR QUANTITY FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-009-03 009 03 April.16.2024
11 BAR SCHEDULE FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-010-03 010 03 April.16.2024
12 BAR QUANTITY FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-011-03 011 03 April.16.2024
13 ET23156-CCECC-GNL-DD-SC-GNL-GL-012-03 012 03 April.16.2024
BAR SCHEDULE FOR CONCRETE DITCH
REV 03
14 BAR QUANTITY FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-013-03 013 03 April.16.2024
03
02
2024-04-16
2024-03-08
SHEET CONTENT
SHEET CONTENT
01 2024-02-27 SHEET CONTENT
00 2024-02-20 SHEET CONTENT

15 BAR SCHEDULE FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-014-03 014 03 April.16.2024


REV. DATE DESCRIPTION

STRUCTURE
16 UNDER GROUND/ABOVE GROUND
BAR QUANTITY FOR CONCRETE DITCH ET23156-CCECC-GNL-DD-SC-GNL-GL-015-03 015 03 April.16.2024
17 BAR SCHEDULE FOR INSPECTION MANHOLE STATION ET23156-CCECC-GNL-DD-SC-GNL-GL-016-03 016 03 April.16.2024
18 BAR QUANTITY FOR INSPECTION MANHOLE STATION ET23156-CCECC-GNL-DD-SC-GNL-GL-017-03 017 03 April.16.2024
19 BAR SCHEDULE FOR INSPECTION MANHOLE STATION ET23156-CCECC-GNL-DD-SC-GNL-GL-018-03 018 03 April.16.2024
20 BAR QUANTITY FOR INSPECTION MANHOLE STATION ET23156-CCECC-GNL-DD-SC-GNL-GL-019-03 019 03 April.16.2024
21 LONGITUDINAL SECTION A-A & PLAN LAYOUT ET23156-CCECC-GNL-DD-SC-GNL-GL-020-03 020 03 April.16.2024
REV 02
22 PLAN LAYOUT FOR INSPECTION MANHOLE COVER ET23156-CCECC-GNL-DD-SC-GNL-GL-021-03 021 03 April.16.2024
23 LAYOUT TO SHOW LEFT SIDE DITCH INVERT ELEVATION ET23156-CCECC-GNL-DD-SC-GNL-GL-022-03 022 03 April.16.2024
24 LAYOUT TO SHOW LEFT SIDE DITCH INVERT ELEVATION ET23156-CCECC-GNL-DD-SC-GNL-GL-023-03 023 03 April.16.2024
25 024 03
REV 03
OPENING DETAIL ET23156-CCECC-GNL-DD-SC-GNL-GL-024-03 April.16.2024
26 INSPECTION MANHOLE DETAIL ET23156-CCECC-GNL-DD-SC-GNL-GL-025-03 025 03 April.16.2024
27 INSPECTION MANHOLE DETAIL ET23156-CCECC-GNL-DD-SC-GNL-GL-026-03 026 03 April.16.2024 SIGN BAR
ARCHITECTURAL
STRUCTURAL
28 FRAME DETAIL ET23156-CCECC-GNL-DD-SC-GNL-GL-027-03 027 03 April.16.2024 ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
29 CURVE DETAIL ET23156-CCECC-GNL-DD-SC-GNL-GL-028-03 028 03 April.16.2024 CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
30 CURVE DETAIL ET23156-CCECC-GNL-DD-SC-GNL-GL-029-03 029 03 April.16.2024 PRINTED ON: A-3
DRAWING TITLE :

31 BAR SCHEDULE FOR CURVE NEW ROAD 01 Part II UTILITY RELOCATION


ET23156-CCECC-GNL-DD-SC-GNL-GL-030-03 030 03 April.16.2024 (SHEET CONTENT)

32 CURVE DETAIL BAR QUANTITY ET23156-CCECC-GNL-DD-SC-GNL-GL-031-03 031 03 April.16.2024


REV 03 DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-000-03
33 CURVE DETAIL BAR QUANTITY ET23156-CCECC-GNL-DD-SC-GNL-GL-032-03 032 03 April.16.2024 Revision No. Sheet No.
03 000
Exit
Garage

Bicycle Parking DETAIL DRAWING


70 Bicycles PROJECT TITLE

+0.30=2324.30
ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING
JOB TITLE :
+0.00=2324

DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES


GROUP HEAD QUARTERS BUILDING PROJECT
Basement
EMPLOYER
Exit

28

27 EMPLOYER'S REPRESENTATIVE

26

25

24

CHECKED BY
23

22 FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY
21

FOR EMPLOYER'S REPRESENTATIVE


20 +1.94=2325.94
CONTRACTOR
19

18
0.2m

17
0.50
car parking
m

16
28 Cars CHECKED BY Luci Li
APPROVED BY Chen Keyun

15

P
14

P
13

P
12

P
11

P
10

P
9
0+060

STRUCTURE Line
0+070
0+080
0+087

STRUCTURE Line

Acces

P
Drainage "U" Ditch
8 03 2024-04-16 LOCATION MAP
Garage
02 2024-03-08 LOCATION MAP
0

01 2024-02-27 REV 01 AS PER ER COMMENT .......

P
05

7
REV. DATE DESCRIPTION
0+

STRUCTURE
R15.0
PT: 0+059.12

P
0 6
EP: 0+087.34

.24

UNDER GROUND/ABOVE GROUND

P
5
51
+0

P
:0

4 KEY PLAN
0
M id

3.3
6 01
0+
P

01 3
Exhaust air out
: 0+
PC
P

2
Exhaust air out
P

0
03
0+
ST
RU
ST
D ra

RU

CT
in a

CT

UR
ge

UR

EL
"U

EL
"D

ine
itch

ine

0
02
0+
STRUCTURE Line STRUCTURE Line
R0.80
STRUCTURE Line
STRUCTURE Line
STRUCTURE Line Drainage "U" Ditch
STRUCTURE Line Drainage "U" Ditch

R12.0 STRUCTURE Line


Bicycle Lane
Bicycle Lane
STRUCTURE Line
0 Drainage "U" Ditch
0 Drainage "U" Ditch

01 R3.00 R6.00 Bicycle Lane


0+

.00
00
+0
:0 0
BP 00
0+

0+120
0+110
0+100
0+090
0+080
1.00

0+070
0+060
0+050
0+010
0+030
0+020
0+010
BP: 0+000.00
0+000

Drainage "U" Ditch


Drainage "U" Ditch
STRUCTURE Line
Drainage "U" Ditch STRUCTURE Line
Drainage "U" Ditch STRUCTURE Line STRUCTURE Line
Drainage "U" Ditch STRUCTURE Line
Drainage "U" Ditch STRUCTURE Line
R12.0 D ra in a g e
"U" Ditch
STRUCTURE Line
STRUCTURE Line
0 CT U RE
Line STRUCTURE Line
STRUCTURE Line
STRUCTURE Line
S TR U
Line STRUCTURE Line
U RE
U CT
S TR SIGN BAR
ARCHITECTURAL

NEW ROAD-01 STRUCTURAL


ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

NEW ROAD 01 PART II LOCATION MAP

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-001-03

Revision No. Sheet No.


03 001
TYPICAL CROSS SECTION DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

0.90 3.50 3.50 3.00


EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

See Detail "B"


See Detail "A" CHECKED BY Luci Li
APPROVED BY Chen Keyun

Asphalt Concrete (Wearing Course) =60mm


AC (Binder /Intermediate Course) = 90mm
03 2024-04-16 NEW ROAD 01 Part II TYPICAL CROSS SECTION DRAWING
02 2024-03-08 NEW ROAD 01 Part II TYPICAL CROSS SECTION DRAWING

Crushed Base course (BC) = 200mm 01


00
REV.
2024-02-27
2024-02-20
DATE
NEW ROAD 01 Part II TYPICAL CROSS SECTION DRAWING
NEW ROAD 01 Part II TYPICAL CROSS SECTION DRAWING
DESCRIPTION

STRUCTURE
Granular Sub base (SB) = 225mm UNDER GROUND/ABOVE GROUND
KEY PLAN

Replacement/improved = 1200mm
subgrade Capping Layer
Note:- Asphalt layer (Wearing Course and Binder course) thickness can be varied based on
the asphalt mix design.

3cm Flamed Granite 3cm Flamed Granite


10cm Concrete Ditch Cover 10cm Concrete Ditch Cover
5cm Thick Sand 5cm Thick Sand
WALK WAY
0.15 0.10

0.10
0.60 0.60 1.00 0.80
0.15 0.15
0.15 variable from 0.95
SIGN BAR

0.42-0.95m 0.15 ARCHITECTURAL

0.15 5cm Thick 0.15 1.20


STRUCTURAL
ELECTRICAL
MECHANICAL
5cm Thick C-15 Lean Concrete DRAWN BY Tsega B.
CHECKED BY Yared Negash
C-15 Lean Concrete
0.15 0.15 APPROVED BY
SCALE:
Mistereselassie.Y
NTS
PRINTED ON: A-3
0.10 0.90 0.75 1.00 0.95 0.10 DRAWING TITLE :

3.00 NEW ROAD 01 Part II TYPICAL CROSS SECTION

Left Side Concrete Ditch Right Side DRAWING NO :

Typical(Detail "B") Concrete Ditch Typical(Detail "B")


ET23156-CCECC-GNL-DD-SC-GNL-GL-002-03

Revision No. Sheet No.


03 002
CONCRETE DITCH DETAILS

3cm Flamed Granite 3cm Flamed Granite


10cm Concrete Ditch Cover
See Detail "C" 5cm Thick Sand 5cm Thick Sand

ROAD WAY WALK WAY See Detail "D"


0.15 0.07
0.19
0.10
0.60
0.60 0.80
1.00
"U" variable from
0.15 0.15 0.15
0.15
0.15 Ditch 0.15 0.42-0.95m
0.95
5cm Thick 1.20
5cm Thick
C-15 Lean Concrete
C-15 Lean Concrete
0.15 0.15
0.10 0.90
0.10 0.75 1.00 0.95 0.10
3.00
Concrete Ditch Detail
Concrete Ditch Detail Section B-B
Section B-B Left side
10mm Expansion Joint between 10cm Concrete Ditch Cover
Precast Concrete Cover & wall Fiber Optic Cables
WALK WAY Inside Cable Channel
0.02 0.01
ROAD WAY
0.17 0.10
0.01
0.60
0.06 Future Utility

0.95 Future Utility


0.15 "U"
5cm Thick Ditch Future Utility
0.15
C-15 Lean Concrete
Detail "C"
0.10 3.00 0.10
10mm Expansion Joint between
Precast Concrete Cover & wall
Concrete Cable Channel Detail
0.07
0.10
RIGHT SIDE
0.08 NOTE:- 1. All dimensions are in m unless it's described.
2. The cubic compressive strength of concrete shall be 25mpa.
3. The start point of New road 01 part II ditch on left
0.15 side is 13.53m back to existing road from km 0+000.00
and for the right side at km 0+015.84.
Detail "D" 4. The end point is at km 0+085.71 on both side.

ET23156-CCECC-GNL-DD-SC-GNL-GL-003-03
DETAIL DRAWING
PROJECT TITLE

Reinforcement detail for New road 01 ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING
JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES

part II right side at km 0+015.84-0+085.71 GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

Pre-cast 1 Pre-cast 2 Pre-cast 3


S3
0.72
A S3 S3
EMPLOYER'S REPRESENTATIVE

S1
0.67
S1 S1-1 S1-2 S4-2 6# CHECKED BY
0.98
S4-1 S4 S1Ø8
S4 FOR EMPLOYER'S REPRESENTATIVE
APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

S5 S5 CONTRACTOR

S7 5# S3Ø8

A
32# Pre-Cast 1 CHECKED BY
APPROVED BY
Luci Li
Chen Keyun

S8 S6
Section B-B S3
1.14

0.05 S1-1
0.05 1.15 1.09
0.05 0.67 6# 03 2024-04-16 BAR SCHEDULE FOR CONCRETE DITCH

1*160# S4-2Ø8 c/c 200 L=1.20 0.98 02 2024-03-08 BAR SCHEDULE FOR CONCRETE DITCH

S1-1Ø8 01
00
2024-02-27
2024-02-20
BAR SCHEDULE FOR CONCRETE DITCH
BAR SCHEDULE FOR CONCRETE DITCH
6*32# S1Ø8 c/c 200 L=0.77 REV. DATE DESCRIPTION

J J STRUCTURE
UNDER GROUND/ABOVE GROUND
0.05
0.05 1.09
KEY PLAN

L L 7# S3Ø8
L
6*32# S1-1Ø8 c/c 200 L=1.19 S5Ø8 c/c 200 L=35.47 (j=0.30) 32# Pre-Cast 2
0.05 J J
0.05 0.88 S3
0.93
6*32# S1-2Ø8 c/c 200 L=0.98 L L
L
S1-2
0.93 S6Ø8 c/c 200 L=35.47 (j=0.30) 0.88
6#
S3Ø8 c/c 200 L=0.93 0.98
S1-2Ø8
0.05 2.95
0.05
1.05
175# S7Ø8 c/c 200 L=2.95
6*160# S4Ø8 c/c 200 L=1.15 5# S3Ø8
0.10
0.05
1.15
0.10 2.95 32# Pre-Cast 3 SIGN BAR

175# S8Ø8 c/c 200 L=3.15 ARCHITECTURAL

1*160# S4-1Ø8 c/c 200 L=1.20 STRUCTURAL

Pre-cast ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.

NOTE:- CHECKED BY Yared Negash

concrete cover
APPROVED BY Mistereselassie.Y

1. All dimensions are in meters (m) except reinforcement SCALE:


PRINTED ON:
NTS
A-3
DRAWING TITLE :
diameter and spacing, which are specified in (mm).
2. The cubic compressive strength of concrete shall be 25mpa bar detail for BAR SCHEDULE FOR CONCRETE DITCH

DRAWING NO :

right side ET23156-CCECC-GNL-DD-SC-GNL-GL-004-03

Revision No.
03
Sheet No.
004
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

CHECKED BY Luci Li
APPROVED BY Chen Keyun

03 2024-04-16 BAR QUANTITY FOR CONCRETE DITCH


02 2024-03-08 BAR QUANTITY FOR CONCRETE DITCH
01 2024-02-27 BAR QUANTITY FOR CONCRETE DITCH
00 2024-02-20 BAR QUANTITY FOR CONCRETE DITCH
REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

BAR QUANTITY FOR CONCRETE DITCH

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-005-03

Revision No. Sheet No.


03 005
DETAIL DRAWING

Reinforcement detail for New road 01


PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

part II left side from connection point to 0+010 EMPLOYER

Pre-cast 1

S3 A EMPLOYER'S REPRESENTATIVE

S4-2
S1 S4-1 CHECKED BY

S4 S7-1 S5 FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

S8-1 S6 A
CHECKED BY Luci Li
APPROVED BY Chen Keyun

Section B-B
J J
0.05
0.05 0.67
L L
S3 S1Ø8 c/c 200 L=0.77 L 03 2024-04-16 BAR SCHEDULE FOR CONCRETE DITCH

0.72 S5Ø8 c/c 200 L=23.83 (j=0.30)


REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
S1 0.93 J J KEY PLAN

0.67
6#
S3Ø8 c/c 200 L=0.93
0.98 0.05 L L
S1Ø8
0.05 L
0.52
S6Ø8 c/c 200 L=23.83 (j=0.30)
S4Ø8 c/c 200 L=0.62
5# S3Ø8
0.05 0.85
Pre-Cast 1 0.62 S7-1Ø8 c/c 200 L=0.85
S4-1Ø8 c/c 200 L=0.67 0.10
0.10 0.85
0.05
Pre-cast 0.62 S8-1Ø8 c/c 200 L=1.05
S4-2Ø8 c/c 200 L=0.67
concrete cover ARCHITECTURAL
SIGN BAR

NOTE:- STRUCTURAL

bar detail for left 1. All dimensions are in meters (m) except reinforcement
ELECTRICAL
MECHANICAL
DRAWN BY
CHECKED BY
Tsega B.
Yared Negash
APPROVED BY Mistereselassie.Y
diameter and spacing, which are specified in (mm).
side 2. The cubic compressive strength of concrete shall be 25mpa.
SCALE:
PRINTED ON:
DRAWING TITLE :
NTS
A-3

BAR SCHEDULE FOR CONCRETE DITCH


3. Opening depth of drainage is 0.42m. DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-006-03

Revision No. Sheet No.


03 006
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

CHECKED BY Luci Li
APPROVED BY Chen Keyun

03 2024-04-16 BAR QUANTITY FOR CONCRETE DITCH


REV. DATE DESCRIPTION

UTILITY
UNDER GROUND/ABOVE GROUND
KEY PLAN

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

BAR QUANTITY FOR CONCRETE DITCH

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-007-03

Revision No. Sheet No.


03 007
DETAIL DRAWING
Reinforcement detail for New road 01 PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :

part II left side from km 0+010 - 0+020 DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

Pre-cast 1

S3 A EMPLOYER'S REPRESENTATIVE

S1
S4-2 S4 CHECKED BY

S5 S4-1 FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

S7-1 CONTRACTOR

S8-1 S6 A CHECKED BY
APPROVED BY
Luci Li
Chen Keyun

Section B-B
0.05
0.05 0.67
S3 S1Ø8 c/c 200 L=0.77 L 03
REV.
2024-04-16
DATE
BAR SCHEDULE FOR CONCRETE DITCH
DESCRIPTION
0.72 S5Ø8 c/c 200 L=10.00 STRUCTURE
UNDER GROUND/ABOVE GROUND
S1 0.93 KEY PLAN

0.67
6#
S3Ø8 c/c 200 L=0.93
0.98 0.05
S1Ø8
0.05 L
varies
S6Ø8 c/c 200 L=10.00
S4Ø8 c/c 200
5# S3Ø8
0.05 0.85
Pre-Cast 1 varies S7-1Ø8 c/c 200 L=0.85
S4-1Ø8 c/c 200 0.10
0.10 0.85
0.05
Pre-cast varies S8-1Ø8 c/c 200 L=1.05
S4-2Ø8 c/c 200
concrete cover ARCHITECTURAL
STRUCTURAL
ELECTRICAL
SIGN BAR

NOTE:-
bar detail for left
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash

1. All dimensions are in meters (m) except reinforcement APPROVED BY


SCALE:
Mistereselassie.Y
NTS

side diameter and spacing, which are specified in (mm). PRINTED ON: A-3
DRAWING TITLE :

BAR SCHEDULE FOR CONCRETE DITCH


2. The cubic compressive strength of concrete shall be 25mpa.
DRAWING NO :

3. Opening depth of drainage varies from 0.42-0.65m. ET23156-CCECC-GNL-DD-SC-GNL-GL-008-03

Revision No. Sheet No.


03 008
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

CHECKED BY Luci Li
APPROVED BY Chen Keyun

0303 2024-04-16
2024-04-16 BAR
BAR
QUANTITY
QUANTITY
FOR
FOR
CONCRETE
CONCRETE
DITCH
DITCH
REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

BAR QUANTITY FOR CONCRETE DITCH

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-009-03

Revision No. Sheet No.


03 009
DETAIL DRAWING
Reinforcement detail for New road 01 PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :

part II left side from km 0+020 - 0+030


DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

Pre-cast 1

S3 A EMPLOYER'S REPRESENTATIVE

S4-2 S1 CHECKED BY

S4 S4-1 FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

S5
S7-1
CHECKED BY Luci Li
APPROVED BY Chen Keyun

S8-1 S6 A

0.05
Section B-B
0.05 0.67
S3 S1Ø8 c/c 200 L=0.77 L 03
REV.
2024-04-16
DATE
BAR SCHEDULE FOR CONCRETE DITCH
DESCRIPTION

0.72 S5Ø8 c/c 200 L=10.00 STRUCTURE


UNDER GROUND/ABOVE GROUND
S1 0.93 KEY PLAN

0.67
6#
S3Ø8 c/c 200 L=0.93
0.98 0.05
S1Ø8
0.05 L
varies
S6Ø8 c/c 200 L=10.00
S4Ø8 c/c 200
5# S3Ø8
0.05 0.85
Pre-Cast 1 varies S7-1Ø8 c/c 200 L=0.85
S4-1Ø8 c/c 200 0.10
0.10 0.85
0.05
Pre-cast varies S8-1Ø8 c/c 200 L=1.05
S4-2Ø8 c/c 200
concrete cover ARCHITECTURAL
STRUCTURAL
SIGN BAR

NOTE:- ELECTRICAL

bar detail for left 1. All dimensions are in meters (m) except reinforcement
MECHANICAL
DRAWN BY
CHECKED BY
APPROVED BY
Tsega B.
Yared Negash
Mistereselassie.Y
SCALE: NTS

diameter and spacing, which are specified in (mm).


side 2. The cubic compressive strength of concrete shall be 25mpa.
PRINTED ON:
DRAWING TITLE :

BAR SCHEDULE FOR CONCRETE DITCH


A-3

3. Opening depth of drainage varies from 0.65-0.85m. DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-010-03

Revision No. Sheet No.


03 010
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

CHECKED BY Luci Li
APPROVED BY Chen Keyun

03 2024-04-16 BAR QUANTITY FOR CONCRETE DITCH


REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

BAR QUANTITY FOR CONCRETE DITCH

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-011-03

Revision No. Sheet No.


03 011
DETAIL DRAWING
Reinforcement detail for New road 01 PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :

part II left side from km 0+030 - 0+040 DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

Pre-cast 1

S3 A
EMPLOYER'S REPRESENTATIVE

S4-2 S1
CHECKED BY

S4 S4-1 FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

S5 FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

S7-1
CHECKED BY Luci Li
APPROVED BY Chen Keyun

S8-1 S6 A

Section B-B
0.05
0.05 0.67
03 2024-04-16 BAR SCHEDULE FOR CONCRETE DITCH

S3 S1Ø8 c/c 200 L=0.77 L REV. DATE DESCRIPTION

0.72 STRUCTURE
S5Ø8 c/c 200 L=10.00 UNDER GROUND/ABOVE GROUND

S1 0.93
KEY PLAN

0.67
6#
S3Ø8 c/c 200 L=0.93
0.98 0.05
S1Ø8
0.05 L
varies
S4Ø8 c/c 200 S6Ø8 c/c 200 L=10.00
5# S3Ø8
0.05 0.85
Pre-Cast 1 varies S7-1Ø8 c/c 200 L=0.85
S4-1Ø8 c/c 200 0.10
0.10 0.85
0.05
Pre-cast varies S8-1Ø8 c/c 200 L=1.05
S4-2Ø8 c/c 200
concrete cover ARCHITECTURAL
STRUCTURAL
SIGN BAR

NOTE:-
bar detail for left
ELECTRICAL
MECHANICAL

1. All dimensions are in meters (m) except reinforcement DRAWN BY


CHECKED BY
APPROVED BY
Tsega B.
Yared Negash
Mistereselassie.Y

diameter and spacing, which are specified in (mm).


side 2. The cubic compressive strength of concrete shall be 25mpa.
SCALE:
PRINTED ON:
DRAWING TITLE :

BAR SCHEDULE FOR CONCRETE DITCH


NTS
A-3

3. Opening depth of drainage varies from 0.85-0.95m. DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-012-03

Revision No. Sheet No.


03 012
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

CHECKED BY Luci Li
APPROVED BY Chen Keyun

03 2024-04-16 BAR QUANTITY FOR CONCRETE DITCH


REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

BAR QUANTITY FOR CONCRETE DITCH

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-013-03

Revision No. Sheet No.


03 013
DETAIL DRAWING
Reinforcement detail for New road 01
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES

part II left side from km 0+040.00 - 0+085.71 GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

Pre-cast 1

S3 A EMPLOYER'S REPRESENTATIVE

S4-2 S1 CHECKED BY

S4 S4-1 FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

S5 CONTRACTOR

S7-1
CHECKED BY Luci Li
APPROVED BY Chen Keyun

S8-1 S6 A

Section B-B
J J
0.05 03 2024-04-16 BAR SCHEDULE FOR CONCRETE DITCH

0.05 0.67
REV. DATE DESCRIPTION

STRUCTURE
L L UNDER GROUND/ABOVE GROUND
S3 S1Ø8 c/c 200 L=0.77 L
0.72 S5Ø8 c/c 200 L=101.64 (j=0.30)
KEY PLAN

S1 0.93 J J
0.67
6#
S3Ø8 c/c 200 L=0.93
0.98 0.05 L L
S1Ø8
0.05 L
1.05
S6Ø8 c/c 200 L=101.64 (j=0.30)
S4Ø8 c/c 200 L=1.15
5# S3Ø8
0.05 0.85
Pre-Cast 1 1.15 S7-1Ø8 c/c 200 L=0.85
S4-1Ø8 c/c 200 L=1.20 0.10
0.10 0.85
0.05
Pre-cast 1.15 S8-1Ø8 c/c 200 L=1.05 SIGN BAR

S4-2Ø8 c/c 200 L=1.20


concrete cover
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
NOTE:-
bar detail for left 1. All dimensions are in meters (m) except reinforcement
CHECKED BY
APPROVED BY
SCALE:
PRINTED ON:
Yared Negash
Mistereselassie.Y
NTS
A-3
DRAWING TITLE :

diameter and spacing, which are specified in (mm).


side 2. The cubic compressive strength of concrete shall be 25mpa.
BAR SCHEDULE FOR CONCRETE DITCH

DRAWING NO :

3. Opening depth of drainage is 0.95m. ET23156-CCECC-GNL-DD-SC-GNL-GL-014-03

Revision No. Sheet No.


03 014
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

CHECKED BY Luci Li
APPROVED BY Chen Keyun

03 2024-04-16 BAR QUANTITY FOR CONCRETE DITCH


REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

BAR QUANTITY FOR CONCRETE DITCH

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-015-03

Revision No. Sheet No.


03 015
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING

REINFORCEMENT DETAIL ON JOB TITLE :


DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

CONCRETE COVER STATIONS


EMPLOYER

Pre-cast 2 Pre-cast 3
0.19 0.19
EMPLOYER'S REPRESENTATIVE

S3 D3 S3 S3
1.00 0.70 0.80

D S5(a) CHECKED BY

S1 D1 D2 S1-1 S1-2 FOR EMPLOYER'S REPRESENTATIVE


S4-2 APPROVAL BY

S4 S4-1
S4-1 S4 S4 S4 FOR EMPLOYER'S REPRESENTATIVE
S4(a) CONTRACTOR

S5 S4-2(a)
S5 S5 S5
S7 S7 CHECKED BY
APPROVED BY
Luci Li
Chen Keyun

S8 S6 S8 S6
Section bar arrangement detail on inspection Section Bar arrangement detail on Inspection
manhole cover for utility manhole cover for Drainage 03
02
2024-04-16
2024-03-08
BAR SCHEDULE FOR INSPECTION MANHOLE STATION
BAR SCHEDULE FOR INSPECTION MANHOLE STATION
01 2024-02-27 BAR SCHEDULE FOR INSPECTION MANHOLE STATION
00 2024-02-20 BAR SCHEDULE FOR INSPECTION MANHOLE STATION
REV. DATE DESCRIPTION

0.05 STRUCTURE
0.05 0.12 UNDER GROUND/ABOVE GROUND
1.05
0.93 0.06 KEY PLAN

(2*5)# S4Ø8 c/c 200 L=1.15m


(4)# DØ8 c/c 200 L=0.93m
0.05
0.05 0.24
1.22 0.15
0.12
(3*5)# S4(a)Ø8 c/c 200 L=1.32m 0.07

(2*5)# D2Ø8 c/c 200 L=0.57m


0.05
0.20
1.15
(1*5)# S4-1Ø8 c/c 200 L=1.20m 0.37
0.08
0.05 0.15
0.05 1.25 0.25
0.15
(1*5)# S4-2(a)Ø8 c/c 200 L=1.35m (5)# D1Ø8 c/c 200 L=0.71m
(5)# D3Ø8 c/c 200 L=0.68m
SIGN BAR
0.93 NOTE:- ARCHITECTURAL
STRUCTURAL

(5)# S5(a)Ø8 c/c 200 L=0.93m 1. All dimensions are in meters (m) except reinforcement diameter and spacing are in mm. ELECTRICAL
MECHANICAL

2. The cubic compressive strength of concrete shall be 25mpa. DRAWN BY


CHECKED BY
Tsega B.
Yared Negash
APPROVED BY Mistereselassie.Y

3. For drainage manhole except no need for additional bar, SCALE:


PRINTED ON:
NTS
A-3

but for arrangement follow the above drawing. DRAWING TITLE :

BAR SCHEDULE FOR INSPECTION MANHOLE


4. For utility manhole, bars like (S5,S6,S7 & S8) no changes follow details of STATION
DRAWING NO :

km 0+015.84-0+085.71 for the other bars follow the above drawing. ET23156-CCECC-GNL-DD-SC-GNL-GL-016-03
5. Number of reinforcement indicated on the drawing is for one meter. Revision No. Sheet No.
03 016
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

CHECKED BY Luci Li
APPROVED BY Chen Keyun

03 2024-04-16 BAR QUANTITY FOR INSPECTION MANHOLE STATION


02 2024-03-08 BAR QUANTITY FOR INSPECTION MANHOLE STATION
01 2024-02-27 BAR QUANTITY FOR INSPECTION MANHOLE STATION
00 2024-02-20 BAR QUANTITY FOR INSPECTION MANHOLE STATION
REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

BAR QUANTITY FOR INSPECTION MANHOLE


STATION
DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-017-03

Revision No. Sheet No.


03 017
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING

SECTION BAR ARRANGEMENT DETAIL ON INSPECTION JOB TITLE :


DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

MANHOLE COVER FOR UTILITY EMPLOYER

0.19 0.19 0.19


1.00 0.70 D3 0.70 1.00 1.00 0.70 D3

S5(a) D D S5(a) EMPLOYER'S REPRESENTATIVE

D2 D1 S4(a) S4(a) D1 D2
0.60 1.00 0.80
S4(b) S4 S4-1 S4 S4(b)
0.91 1.31 S4(b) S4(b)
1.11 S4-2(a) S5 S5 S4-2(a) CHECKED BY

1.31 S5 S5
1.21 FOR EMPLOYER'S REPRESENTATIVE
APPROVAL BY
S7-3 S5(a) S7-1 S7-1 S5(a) S7-3
FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

0.40 S6 S8-3 S7-2 S6 S8-1 S8-1 S6 S7-2 S8-3 S6

CHECKED BY Luci Li
1.30 S8-2 S6-1 S6-1 S8-2 APPROVED BY Chen Keyun

LEFT SIDE RIGHT SIDE


0.05
0.05 0.12
1.05 1.25 0.07
(1*5)# S4Ø8 c/c 200 L=1.15m (5*1)# S7-2Ø8 c/c 200 L=1.25m
03 2024-04-16 BAR SCHEDULE FOR INSPECTION MANHOLE STATION
0.05 02 2024-03-08 BAR SCHEDULE FOR INSPECTION MANHOLE STATION

0.05 1.45 0.90 01


00
2024-02-27
2024-02-20
BAR SCHEDULE FOR INSPECTION MANHOLE STATION
BAR SCHEDULE FOR INSPECTION MANHOLE STATION
0.37 REV. DATE DESCRIPTION

(5*1)# S7-3Ø8 c/c 200 L=0.90m STRUCTURE


(1*5)# S4(a)Ø8 c/c 200 L=1.55m
0.10 0.15 UNDER GROUND/ABOVE GROUND
0.05
0.05 1.62 0.10 0.70
KEY PLAN

(5)# D1Ø8 c/c 200 L=0.71m


(3*5)# S4(b)Ø8 c/c 200 L=1.72m (5*1)# S8-1Ø8 c/c 200 L=0.90m
0.12
0.06
0.05 0.10
0.05 1.25 0.10
1.25
(2*5)# S4-2(a)Ø8 c/c 200 L=1.35m (5*1)# S8-2Ø8 c/c 200 L=1.45m 0.24
0.15
0.10
1.31
0.93 0.10 (2*5)# D2Ø8 c/c 200 L=0.57m
0.90
(13)# S5(a)Ø8 c/c 200 L=0.93m 0.20
(5*1)# S8-3Ø8 c/c 200 L=1.10m
0.08
0.93
0.93 0.40
(14)# S6-1Ø8 c/c 200 L=0.93m 0.25
Ø110mm Pipes
(4)# DØ8 c/c 200 L=0.93m 0.15

0.70 (5)# D3Ø8 c/c 200 L=0.68m


(5*1)# S7-1Ø8 c/c 200 L=0.70m NOTE:- SIGN BAR
ARCHITECTURAL

1. All dimensions are in meters (m) except reinforcement diameter and spacing are in (mm). STRUCTURAL
ELECTRICAL
2. The cubic compressive strength of concrete shall be 25mpa. MECHANICAL
DRAWN BY Tsega B.
3. For drainage manhole no need for additional bar, but for arrangement follow the above drawing. CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
4. For utility manhole, bars like (S5 & S6) no changes follow details of km 0+015.84-0.085.71 SCALE: NTS
PRINTED ON: A-3
for the other bars follow the above drawing. DRAWING TITLE :

5. Number of reinforcement indicated on the drawing is for one meter. BAR SCHEDULE FOR INSPECTION MANHOLE
STATION
6. Station for this specific manhole is 0+0.060.00. DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-018-03

Revision No. Sheet No.


03 018
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

CHECKED BY Luci Li
APPROVED BY Chen Keyun

03 2024-04-16 BAR QUANTITY FOR INSPECTION MANHOLE STATION


02 2024-03-08 BAR QUANTITY FOR INSPECTION MANHOLE STATION
01 2024-02-27 BAR QUANTITY FOR INSPECTION MANHOLE STATION
00 2024-02-20 BAR QUANTITY FOR INSPECTION MANHOLE STATION
REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

BAR QUANTITY FOR INSPECTION MANHOLE


STATION
DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-019-03

Revision No. Sheet No.


03 019
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


3cm Flamed Granite
Expansion Joint between Precast Concrete Cover JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT
5cm Thick Sand EMPLOYER

B B

EMPLOYER'S REPRESENTATIVE

1.25m 1.33m CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

B B CHECKED BY Luci Li

85.71 APPROVED BY Chen Keyun

Longitudinal Section A-A


CURB STONE

03 2024-04-16 LONGITUDINAL SECTION & PLAN LAYOUT


02 2024-03-08 LONGITUDINAL SECTION & PLAN LAYOUT
01 2024-02-27 LONGITUDINAL SECTION & PLAN LAYOUT
00 2024-02-20 LONGITUDINAL SECTION & PLAN LAYOUT
REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

LEFT SIDE
85.71m

FLAMED GRANITE
3.00m FLAMED GRANITE 0.90m

SIGN BAR
ARCHITECTURAL

85.71m STRUCTURAL
ELECTRICAL
MECHANICAL

RIGHT SIDE DRAWN BY


CHECKED BY
Tsega B.
Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

Plan Lay-Out to Show Arrangement of Flamed Granite (Finishing level) LONGITUDINAL SECTION A-A & PLAN LAYOUT

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-020-03

Revision No. Sheet No.


03 020
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

Plan Lay-Out to Show Arrangement of Inspection Manhole EMPLOYER

& Flamed Granite (finishing level)


Angle iron with granite EMPLOYER'S REPRESENTATIVE

Concrete curb stone Angle iron with granite


Manhole Cover for
to protect the fill material and Manhole Cover for
utility Inspection
flamed granite utility Inspection CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

0.70 0.70 0.70


CHECKED BY Luci Li
APPROVED BY Chen Keyun

FLAMED GRANITE FLAMED GRANITE


03 2024-04-16 PLAN LAYOUT FOR INSPECTION MANHOLE COVER

3.00m
02 2024-03-08 PLAN LAYOUT FOR INSPECTION MANHOLE COVER
01 2024-02-27 PLAN LAYOUT FOR INSPECTION MANHOLE COVER

1.00 1.00 00
REV.
2024-02-20
DATE
PLAN LAYOUT FOR INSPECTION MANHOLE COVER
DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
0.99 1.01 0.99 KEY PLAN

1.00
1.00 1.00
0.99 0.99

0.80 0.80

Angle iron with granite 10.00m Angle iron with granite


Manhole Cover for Manhole Cover for
utility Inspection NOTE:- utility Inspection
1. For New road 01 part II the utility inspection manholes exact stations are c/c
(0+010.00, 0+080.00), for more information refer electrical relocation plan.
SIGN BAR

2. For New road 01 part II the drainage inspection manholes starts from km 0+010 ARCHITECTURAL
STRUCTURAL

with 10m interval along the road up to km 0+085.71. ELECTRICAL


MECHANICAL
DRAWN BY Tsega B.

3. All dimensions are in meters (m). CHECKED BY


APPROVED BY
Yared Negash
Mistereselassie.Y

4. The location of curb stone shown in the drawing is end of walk way. SCALE:
PRINTED ON:
NTS
A-3
DRAWING TITLE :

5. For additional layout for flamed granite and inspection manhole covers refer PLAN LAYOUT FOR INSPECTION MANHOLE COVER

road furniture drawings (it will be submitted separately). DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-021-03

Revision No. Sheet No.


03 021
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE
Lay-out to show Left side ditch Invert elevation and
opening depth difference

CHECKED BY

0+030.00
Road edge 0+020.00 0+010.00 FOR EMPLOYER'S REPRESENTATIVE
APPROVAL BY
2323.23 level Road edge Road edge FOR EMPLOYER'S REPRESENTATIVE
2323.00 level level CONTRACTOR

0.85 2322.73
0.31% 0.65
0.45% 0.42
2322.39 2322.35 2322.31
Invert Invert CHECKED BY Luci Li

level Invert APPROVED BY Chen Keyun


level
level

0+010.00
0+005.00 0+000.00
Road edge
level Road edge
2322.73 2322.72 2322.71 level
03 2024-04-16 LAY-OUT TO SHOW INVERT ELEVATION
0.42 0.42 0.30% 0.30% REV. DATE DESCRIPTION

2322.31 2322.30 STRUCTURE


0.42 2322.29
Invert Invert UNDER GROUND/ABOVE GROUND
level level KEY PLAN

1.49

13.53m length from 0+000


4.58m length from 0+000 11.10m length from 0+000 to the existing road(connection point)
to the existing road to the existing road
0+000.00 Road edge
Road edge
level
2322.68 level
2322.64
0.30% 0.50% 0.42 2322.65
0.42
0.42 2322.26 2322.23 2322.22
Invert
level Invert
level

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

LAYOUT TO SHOW LEFT SIDE DITCH


INVERT ELEVATION
DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-022-03

Revision No. Sheet No.


03 022
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

Lay-out to show Left side ditch Invert elevation and


opening depth difference
CHECKED BY

0+085.71 Road edge Road edge


0+080.00 Road edge
FOR EMPLOYER'S REPRESENTATIVE
level 0+070.00 level APPROVAL BY

2323.95 2323.91 level 2323.85 FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

0.95 0.95 0.95


0.63% 0.67%
2323.00 2322.96 2322.90 CHECKED BY Luci Li

Invert Invert Invert


APPROVED BY Chen Keyun

level level level

0+070.00 Road edge Road edge


Road edge 0+050.00 level
2323.85 level 0+060.00
2323.76 level 2323.62

0.95 0.95 03 2024-04-16 LAY-OUT TO SHOW INVERT ELEVATION

0.90% 0.95 REV. DATE DESCRIPTION

1.33% STRUCTURE
2322.90 UNDER GROUND/ABOVE GROUND
2322.81Invert
Invert 2322.67
level KEY PLAN

level Invert
level

Road edge
0+050.00 level
2323.62 0+040.00 Road edge Road edge
2323.45 level level
0+030.00
2323.23
0.95
0.95
1.74% 0.85
2322.67 1.16%
2322.50
Invert 2322.39
level Invert
level Invert
level

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

LAYOUT TO SHOW LEFT SIDE DITCH


INVERT ELEVATION
DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-023-03

Revision No. Sheet No.


03 023
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

Inlet for Ditch with Angle iron with granite OPENING DETAILS
10m Interval along the Road Manhole Cover for Angle iron with granite Angle iron with granite EMPLOYER'S REPRESENTATIVE

utility Inspection Manhole Cover for Manhole Cover for


B
ROAD WAY 0.15 utility Inspection utility Inspection
0.80 0.19 0.19
ROAD WAY
Grill 0.10 0.07 0.79 1.00 0.70
CHECKED BY

0.06
FOR EMPLOYER'S REPRESENTATIVE
1.00 0.80 0.10 0.10 0.10 0.10 0.08
0.60 APPROVAL BY

0.15
0.15 0.10 0.10
0.15 FOR EMPLOYER'S REPRESENTATIVE
1.07 0.95 0.60 0.10 0.10
CONTRACTOR
1.20 0.15
0.15
A 1.31
0.90 0.90
5cm Thick 0.15

C-15 Lean Concrete 0.15 0.15 5cm Thick CHECKED BY Luci Li


APPROVED BY Chen Keyun

0.10 0.75 1.00 0.95 0.10 0.15 0.15


C-15 Lean Concrete
3.00
0.10 0.75 1.00 0.95 0.10
Section to show Inlet 3.00

and opening for "U" ditch Section to show an opening


Angle iron with for Utility ditch 03 2024-04-16 Opening Detail

Concrete wall act as Angle iron 02


01
2024-03-08
2024-02-27
REV 02 AS PER ER COMMENT...
REV 01 AS PER ER COMMENT...
granite cover 00 2024-02-20 Opening Detail

a curb stone REV. DATE DESCRIPTION

0.99 0.035 Inlet for Ditch with STRUCTURE


Angle iron with granite UNDER GROUND/ABOVE GROUND
0.13 10m Interval along the Road
0.79 0.11 Manhole Cover for KEY PLAN

Inlet for side ditch utility Inspection


ROAD WAY
SIDE VIEW FOR INLET 0.80
Grill
0.01
0.13 0.05
0.11
0.60
0.08 (x) 0.15
Varies from
0.21 0.23 0.29 0.23 0.54-1.07m
0.79 0.15 0.15
0.10
3cm Thick Flat Iron Grill 5cm Thick
0.05
detail for Inlet C-15 Lean Concrete
0.005 DETAIL 'B' 0.15
0.005 0.035
0.01 0.10 0.90 0.10
0.08 0.10
0.14

0.08 0.16
NOTE:- 1. All dimensions are in m unless it's described.
2. The cubic compressive strength of concrete shall be 25mpa.
0.10
3. For the inspection manholes the dimensions are clearly stated on the detail drawings.
0.15 4. Use 40m interval for utility inspection manhole and 10m interval
DETAIL 'A' for drainage inspection manhole. SIGN BAR
ARCHITECTURAL

5. The inlet iron grill shall be fixed with chemical anchoring epoxy with depth of 8cm STRUCTURAL
ELECTRICAL

6. The size of the storm water inlet opening is based on the hydraulic calculation. MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

OPENING DETAIL

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-024-03

Revision No. Sheet No.


03 024
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
INSPECTION MANHOLE COVER DETAIL GROUP HEAD QUARTERS BUILDING PROJECT

30*30*3cm Flamed granite EMPLOYER

for finish level Openable Openable


1.00 Angle Iron Angle Iron
0.35 0.30 0.35

0.35
EMPLOYER'S REPRESENTATIVE

0.30 Angle Iron support 0.005


0.03 under plate
0.30 1.00 0.30 1.00 CHECKED BY

0.035 FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY
0.35
FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

0.035
Plan view to show finished Plan view to show angle iron
Angle Iron support
level with granite support under the plate CHECKED BY
APPROVED BY
Luci Li
Chen Keyun

30*30*3cm Flamed granite 0.80 0.30 0.30 0.20


0.005 0.005
for finish level 0.035
0.30 0.30
0.035 1.00
0.30 1.00 0.30 1.00 Angle Iron with plate
Flamed granite 03 2024-04-16 INSPECTION MANHOLE DETAIL
02 2024-03-08 REV 02 AS PER ER COMMENTS (INSPECTION MANHOLE DETAIL)

0.30 1.00 01 2024-02-27 REV 01 AS PER ER COMMENTS (INSPECTION MANHOLE DETAIL)

0.03
REV. DATE DESCRIPTION

STRUCTURE
Angle iron support UNDER GROUND/ABOVE GROUND
0.09 Angle iron with plate KEY PLAN
under plate
Plan view to show finished Plan view to show angle iron For power cables
level with granite support for flamed granite Flamed granite

30*30*3cm Flamed granite 0.30 0.30 0.10 Angle iron 0.80


0.70 0.03
for finish level Angle iron support
0.30 0.30 Angle iron
under plate
For drainage
1.00 0.30 1.00 Flamed granite
0.30 0.70
0.03
0.30
Angle iron support
Angle iron with plate
under plate
0.70 0.09 0.70 For optical cables
Plan view to show finished Plan view to show angle iron
level with granite support under the plate
SIGN BAR

NOTE:- 1. All dimensions are in m unless it's described. ARCHITECTURAL


STRUCTURAL
ELECTRICAL

2. On all inspection manholes use 5mm thick chequered plate under granite to prevent MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash

water to get inside the ditch, and the plate shall be properly welded to the angle iron. APPROVED BY
SCALE:
Mistereselassie.Y
NTS

3. Use Hot dip galvanized steel/Stainless steel material for angle iron. PRINTED ON:
DRAWING TITLE :
A-3

INSPECTION MANHOLE DETAIL


4. Angle iron shall be properly welded with sufficient thickness.
DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-025-03

Revision No. Sheet No.


03 025
DETAIL DRAWING
ISOMETRIC VIEW PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

plate EMPLOYER'S REPRESENTATIVE

1.00 1.00
CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

Angle iron with plate Angle iron support under plate


CHECKED BY Luci Li

FOR STRUCTURE INSPECTION MANHOLES APPROVED BY Chen Keyun

03 2024-04-16 INSPECTION MANHOLE DETAIL


02 2024-03-08 REV 02 AS PER ER COMMENTS (INSPECTION MANHOLE DETAIL)
01 2024-02-27 REV 01 AS PER ER COMMENTS (INSPECTION MANHOLE DETAIL)
REV. DATE DESCRIPTION

variable STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

1.00

Angle iron support under plate


Length of angle iron varies
from 0.65m, 0.745m to 0.950m

NOTE:- 1. All dimensions are in m unless it's described.


2. On all inspection manholes use 5mm thick chequered plate under granite to prevent ARCHITECTURAL
SIGN BAR

STRUCTURAL

water to get inside the ditch, and the plate shall be properly welded to the angle iron. ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.

3. The length of angle iron is variable since we have different length of inspection CHECKED BY
APPROVED BY
Yared Negash
Mistereselassie.Y
SCALE: NTS

manhole. but for one meter side all three have the same 0.95m length. PRINTED ON:
DRAWING TITLE :
A-3

INSPECTION MANHOLE DETAIL


4. Use Hot dip galvanized steel/Stainless steel material for angle iron.
DRAWING NO :

5. Angle iron shall be properly welded with sufficient thickness. ET23156-CCECC-GNL-DD-SC-GNL-GL-026-03

Revision No. Sheet No.


03 026
DETAIL DRAWING

FRAME DETAIL
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES

0.005
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

0.040
0.025 1.01 CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

0.030 CONTRACTOR

1.02
Angle Iron section Isometric view
CHECKED BY
APPROVED BY
Luci Li
Chen Keyun

1.02 0.82 0.72 03


02
2024-04-16
2024-03-08
FRAME DETAIL
REV 02 AS PER ER COMMENT (FRAME DETAIL)
01 2024-02-27 REV 01 AS PER ER COMMENT (FRAME DETAIL)
REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

1.01 1.01 1.01

For power cables For drainage For optical cables


SIGN BAR
ARCHITECTURAL
STRUCTURAL

NOTE:- 1. All dimensions are in m unless it's described. ELECTRICAL


MECHANICAL
DRAWN BY Tsega B.

2. Cast the concrete with the frame or use bolt to make it firm. CHECKED BY
APPROVED BY
SCALE:
Yared Negash
Mistereselassie.Y
NTS

3. Use Hot dip galvanized steel/Stainless steel material for angle iron. PRINTED ON:
DRAWING TITLE :

FRAME DETAIL
A-3

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-027-03

Revision No. Sheet No.


03 027
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

New road 01 part II Curve detail


Right side EMPLOYER'S REPRESENTATIVE

CHECKED BY

34.67
R32.90
R33.00
FOR EMPLOYER'S REPRESENTATIVE
1.00
1.00
APPROVAL BY
0.93

R31.96
0.93
0.97 FOR EMPLOYER'S REPRESENTATIVE
0.97
CONTRACTOR
1.14

1.14 R30.81
0.94
0.94

R30.09 0.72

0.72 0.91 R30.00


0.91
CHECKED BY Luci Li
APPROVED BY Chen Keyun

31.52

0.93

1.00

1.14 0.97

0.72

0.94
03 2024-04-16 Curve Detail
02 2024-03-08 Curve Detail
0.91 01 2024-02-27 Curve Detail
00 2024-02-20 Curve Detail
34.67 REV. DATE DESCRIPTION

0.88
R33.00 STRUCTURE
Pre-Cast 3(A) Pre-Cast 3(A)
0.88 UNDER GROUND/ABOVE GROUND
KEY PLAN

1.09
Pre-Cast 2(A) Pre-Cast 2(A)
1.09

0.67
Pre-Cast 1(A)
Pre-Cast 1(A)
0.67

31.52
R30.00

0.88

Plan to show Layout and Bar details Pre-Cast 3(A)

1.09

for Precast Concrete Cover Pre-Cast 2(A)

0.67

Pre-Cast 1(A)

S3
S 3 - 18
S 3 - 17
S 3 - 16
S -1
S 3 3-1 5
S -12 4S
S 3-1 3-
S 3 3-1 1 13
0
S 3 -9
S 3 -8 SIGN BAR
S 3 -7
S 3 -5 S ARCHITECTURAL
S 3 -4 3-
S 3 -3
6 STRUCTURAL
-2
ELECTRICAL
S3
-1 MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

CURVE DETAIL

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-028-03

Revision No. Sheet No.


03 028
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

New road 01 part II curve detail


right side

EMPLOYER'S REPRESENTATIVE
34.67
R33.00

-2
S4
0.80 R32.85

R32.05

S4
R31.90
1.00 CHECKED BY

R30.90 FOR EMPLOYER'S REPRESENTATIVE

S4
R30.75
APPROVAL BY
0.60 0.80
R30.15

R30.00 FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

S4
1.00
31.52

S 4-1
0.60

CHECKED BY Luci Li
APPROVED BY Chen Keyun

34.67
R33.00

S8
R32.97 S
03 2024-04-16 Curve Detail
2.95 S5 5- 02 2024-03-08 Curve Detail
R32.77 -7 8
R32.57 01 2024-02-27 Curve Detail
2.95
R32.37 00 2024-02-20 Curve Detail
R32.17 S REV. DATE DESCRIPTION
S5 5-
R31.97 -5 6
R31.78
R31.57
STRUCTURE
R31.38
R31.17 R30.00
S
S5 5-
-3 4
UNDER GROUND/ABOVE GROUND
R30.98
R30.78 S KEY PLAN
S5 5-2
R30.58 -1
31.52
R30.37
R30.17
R30.03

2.95

Plan to show Bar details for


Concrete Ditch Bottom Slab

S6
S6 -16
S6 -15
S6 -14
S6 -13
S -12
S6 6-11
S6 -10
S6 -9
S6 -8
S6 -7
S6 -6
S6 -5
S6 -4
S -3
S6 6-2
-1

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

CURVE DETAIL

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-029-03

Revision No. Sheet No.


03 029
Pre-cast 1 DETAIL DRAWING
Pre-cast 2 Pre-cast 3 PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING

S3 S3 JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

S1 S1-1 S1-2 S4-2


S4-1 S4 S4
S5 S5 EMPLOYER'S REPRESENTATIVE

S7
CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


S8 S6 APPROVAL BY

Section B-B FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

S1
R32.90 1.00
0.05 0.05
CHECKED BY
APPROVED BY
Luci Li
Chen Keyun

S3 0.05 0.67 1.15


0.93 (6*35)# S1Ø8 c/c 200 L=0.77m (1*175)# S4-1Ø8 c/c 200 L=1.20m
0.05 0.05
R31.97 0.05 1.09 1.15
0.97 (1*175)# S4-2Ø8 c/c 200 L=1.20m
03
02
2024-04-16
2024-03-08
BAR SCHEDULE FOR CURVE
BAR SCHEDULE FOR CURVE

(6*35)# S1-1Ø8 c/c 200 L=1.19m 01


00
2024-02-27
2024-02-20
BAR SCHEDULE FOR CURVE
BAR SCHEDULE FOR CURVE
REV. DATE DESCRIPTION

35# Pre-Cast 3(A) 0.05


L STRUCTURE
UNDER GROUND/ABOVE GROUND
S1 0.05 0.88 KEY PLAN

R31.96 0.97 S5Ø8 c/c 200 L=Variable


(6*35)# S1-2Ø8 c/c 200 L=0.98m
S3 L
L

1.14 S6Ø8 c/c 200 L=Variable


S3Ø8 c/c 200 L=Variable

0.05 2.95
R30.82 0.05
1.05
0.94 (175)# S7Ø8 c/c 200 L=2.95m
(6*175)# S4Ø8 c/c 200 L=1.15m
35# Pre-Cast 2(A) 0.10
0.10 2.95
S1
R30.81 0.94 (175)# S8Ø8 c/c 200 L=3.15m
NOTE:-
SIGN BAR

S3 1. All dimensions are in meters (m) except reinforcement ARCHITECTURAL


STRUCTURAL

0.72 diameter and spacing, which are specified in (mm). ELECTRICAL


MECHANICAL

2. The cubic compressive strength of concrete shall be 25mpa. DRAWN BY


CHECKED BY
Tsega B.
Yared Negash

R30.09 3. For the radius of the reinforcement refer curve plan drawings. APPROVED BY
SCALE:
Mistereselassie.Y
NTS

0.91 4. Outer & inner length of the curve are 34.67m & 31.52m respectively.
PRINTED ON:
DRAWING TITLE :
A-3

BAR SCHEDULE FOR CURVE

35# Pre-Cast 1(A) DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-030-03

Revision No. Sheet No.


03 030
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

CHECKED BY Luci Li
APPROVED BY Chen Keyun

03 2024-04-16 Curve Detail Bar Quantity


02 2024-03-08 Curve Detail Bar Quantity
01 2024-02-27 Curve Detail Bar Quantity
00 2024-02-20 Curve Detail Bar Quantity
REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE: NTS
PRINTED ON: A-3
DRAWING TITLE :

CURVE DETAIL BAR QUANTITY

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-031-03

Revision No. Sheet No.


03 031
DETAIL DRAWING
PROJECT TITLE

ETHIOPIAN AIRLINES GROUP HEAD QUARTERS BUILDING


JOB TITLE :
DESIGN, BUILD AND COMMISSIONING OF ETHIOPIAN AIRLINES
GROUP HEAD QUARTERS BUILDING PROJECT

EMPLOYER

EMPLOYER'S REPRESENTATIVE

CHECKED BY

FOR EMPLOYER'S REPRESENTATIVE


APPROVAL BY

FOR EMPLOYER'S REPRESENTATIVE

CONTRACTOR

CHECKED BY Luci Li
APPROVED BY Chen Keyun

03 2024-04-16 Curve Detail Bar Quantity


02 2024-03-08 Curve Detail Bar Quantity
01 2024-02-27 Curve Detail Bar Quantity
00 2024-02-20 Curve Detail Bar Quantity
REV. DATE DESCRIPTION

STRUCTURE
UNDER GROUND/ABOVE GROUND
KEY PLAN

SIGN BAR
ARCHITECTURAL
STRUCTURAL
ELECTRICAL
MECHANICAL
DRAWN BY Tsega B.
CHECKED BY Yared Negash
APPROVED BY Mistereselassie.Y
SCALE:
PRINTED ON:
DRAWING TITLE :

CURVE DETAIL BAR QUANTITY

DRAWING NO :

ET23156-CCECC-GNL-DD-SC-GNL-GL-032-03

Revision No. Sheet No.


03 032