50Ø GROUT HOLES NOTES:

@ 1200 O.C. ALTERNATE


WITH BOLT HOLES
1. ALL DIMENSIONS ARE IN MILLIMETERS.
BOLT HOLES @ 1200 2. ALL REINFORCING SHOWN IS TYPICAL UNLESS ADDITIONAL OR LARGER

1200
SEE PLANS 12Ø HOLES FOR 10Ø BARS ARE REQUIRED BY DESIGN.
BOLTS. 14Ø HOLES 4
FOR 12Ø BOLTS 3. CONCRETE WORKS INDICATED IN THIS DRAWING SHALL BE PROVIDED
EXPANSION JOINT WITH FILLER PER RC STANDARD SPECIFICATIONS.
EL. AT FIN. CHANNEL TO BE SET
12Ø @ 300 EW GRADE LINE TRUE AND LEVEL 4. DAMPPROOFING/WATERPROOFING OF BELOW GRADE CONCRETE IS NOT
SEE PLANS INDICATED ON RESPECTIVE DETAILS. THE SAME SHALL BE PROVIDED
FINISH FLOOR PLAN PER CONTRACT SPECIFICATIONS, (SEE NOTE 3).

150 MIN.
10Ø X 115 BOLT FOR C4 CHANNEL

20 MIN.
75 X 100 @ 1200 OC 12Ø X 120 BOLT FOR CHANNELS LARGER
THAN C4. BOLTS TO BE REMOVED
ENDS OF 75 X 100 TO BE AFTER CHANNELS ARE GROUTED IN PLACE
WEIGHED DOWN WITH WASHER
1 CEMENT OR SAND BAGS,

300 MIN.
CONC. BLOCKS, ETC. GROUT
1
FOUNDATION

VARIES
90
200 _2
2 -Ø12

12
TYPICAL THREE
SIDES
BLOCKING BETWEEN
CHANNEL & 75 X 100
4 IF REQUIRED 12 25 25 BLOCKING OR SHIM
TACK WELD NUT AS REQD 3MM UNLESS
TO CHANNEL VARIES OTHERWISE REQD BY
ELECTRICAL SECTION
SECTION
RAMP DETAIL 1 LEVELING CHANNELS FOR ELECTRICAL EQUIPMENT
3
_1
SCALE: N.T.S. - SCALE: N.T.S. -

130 SEE STAIR 130


130 508 130 DETAILS
2-20Ø AB, TYPE 1, 2-20Ø AB, TYPE 1,
25 GROUT

T.O.C. EL. L=230 L=230


ALTERNATE ALTERNATE
2-20Ø BOLT WITH 2-20Ø BOLT WITH

150
150
EXPANSION SHIELD EXPANSION SHIELD
FIN. GR.
300

900
20Ø AB, TYPE 1,
L=300, NO SLEEVE
_1
4-12Ø
~
PLAN PLAN
MIN.
600

20 CHAMFER (TYP.) 20 CHAMFER (TYP.)

50 PROJ
3-10Ø TIES
50 PROJ
SQ.

~
300

FIN. GR. FIN. GR.

FOR EL. @ BOTTOM


PLAN ELEVATION FOR EL. @ BOTTOM
OF LADDER BASE
OF LADDER BASE
SEE STRUCTURAL

MIN.
460
MIN.

460
SEE STRUCTURAL STEEL DWGS.
STEEL DWGS.
This Drawing and the design it covers are the property of the

ANGLE POST FOUNDATION 4 Royal Commission for Jubail and Yanbu / Royal Commission
at Yanbu . These drawings are loaned on the borrower's express
SCALE: N.T.S. - agreement that they will not be reproduced, copied, loaned,
exhibited or used except in the limited way,
written consent of the Royal Commission.
if any, permitted by

ELEVATION ELEVATION
NOTE: NOTE:
NOMINAL SLEEVE | +100 FOUNDATION TO BE FIELD LOCATED FOUNDATION TO BE FIELD LOCATED

FOR SLEEVE SIZE


LADDER FOUNDATION 5 STAIRWAY FOUNDATION 6
SCALE: N.T.S. - SCALE: N.T.S. - FEB, 2018
Y:\Projects\RC STANDARD\DOCUMENT'S\Auto CAD Files\RC STANDARD\SE\RC-S-8_97229_04.dwg, 3/20/2018 11:48:32 AM, gangadhar

4 EPS-DU REVISED PER EWR# 97229


SEE STRUCT DWGS.
3 DEC' 13 EPS-DU TITLE BLOCK REVISED AS PER EWR# 89766
2 MARCH'10 INITIAL APPROVED ISSUE PER EWR NO. 82846
1 06OCT08 RM INITIAL APPROVED ISSUE PER EWR NO. 81335
0 15MAR08 SAZ INITIAL APPROVED ISSUE PER EWR NO. 80706
NO. DATE BY DESCRIPTION APPROVED BY :
10 PL (TYP)

KINGDOM OF SAUDI ARABIA


Royal Commission for Jubail and Yanbu
PLAN 3
Royal Commission at Yanbu 3
MADINAT YANBU AL-SINAIYAH
5 50-100
DRAWING TITLE: STANDARD DRAWING
100
T/2

STRUCTURAL CONCRETE DETAILS 2


T

DESIGNED BY : SAZ

SECTION DRAWN BY : ASB/RTC

CHECKED BY : SAZ
ENGINEERING DEPARTMENT
PROJ. ENGR. :

PIPE SLEEVE IN SLAB 7 DU SUPV : RASHAD

SCALE: N.T.S. - _1
A/E APPROVAL : WBS NO. : DRAWING NO. :

R. C. APPROVAL : CONT. NO. : RC-S-8


DATE : 15 MARCH 2008 SCALE : NOT TO SCALE REV. NO. : 4 SHEET OF