Details of Surveys completed during the last 10 years as on 26.08.

2014
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
1 Khandwa - Nardana via Khargone, NL CR MP MAH 2004-05 225 520 -2.46 Completed & project shelved
Sendhwa
2 Solapur-Tuljapur-Osmanabad NL CR MAH 2004-05 80 189 -4.45 Completed & project shelved
3 Jeypore-Malkangiri NL ECOR ORI 2004-05 130 562 10.27 Completed & project shelved
4 Ponduru-Rajam NL ECOR AP 2004-05 19 53 4.64 Completed & project shelved
5 Aurangabad - Bihta via Anugrah Narain NL ECR BIH 2004-05 118 410 -ve Work sanctioned.
Road, Arwal & Paliganj
6 Chatra-Gaya NL ECR JRKD BIH 2004-05 97 416 -12.64 Work sanctioned.
7 Chhapra-Muzaffarpur via Garkha Maker NL ECR BIH 2004-05 85 378 -ve Work sanctioned.
and Rewaghat
8 Dehri-on-Sone to Banjari NL ECR BIH JRKD 2004-05 36 106 -4.15 Work sanctioned.
9 Jhajha-Girdih via Sonuchakai NL ECR JRKD BIH 2004-05 82 629 -9 Work sanctioned.
10 Bandel-Naihati - Bye pass NL ER WB 2004-05 9 30 14.53 Completed & project shelved
11 Bariarpur-Mananpur via Kharagpur, NL ER BIH 2004-05 68 292 -ve Work sanctioned.
Laxmipur, Barhat
12 Pirpainiti to MGR NL ER BIH 2004-05 17 45 -17 Completed & project shelved
13 Sultanganj-Kathuria via Asarganj, NL ER BIH 2004-05 75 331 -8 Work sanctioned.
Tarapore, Belhar
14 Anandnagar to Kaptanganj NL NER UP 2004-05 60 145 -3.83 Completed & project shelved
15 Golagokaran Nath-Shahjanpur via NL NER UP 2004-05 67 172 -14.92 Completed & project shelved
Mohammadi
16 Hathua-Deoria via Line bazar, Salarkhurd, NL NER BIH 2004-05 85 200 -9.38 Work sanctioned.
Phulwaria,k Bathua Bazar,
Pandeuri,Bhagipatti, samhour, Katea
17 Agartala-Sabroom NL NFR TRI NE 2004-05 110 813 -31.94 Work sanctioned.
18 Azra-Byrnihat (Teteliya-Byrnihat) NL NFR ASS MEGH 2004-05 30 223 -19.22 Work sanctioned.
19 Dimapur-Kohima NL NFR ASS NAGA 2004-05 88 912 -26.44 Work sanctioned.
20 Extension of Amguri -Tuli line to Tuli NL NFR ASS NAGA 2004-05 9 44 -4.86 Completed & project shelved
Town(Tuli-Tuli Road)
21 Sivok-Giellikhola(NG) NL NFR WB SIKKIM 2004-05 25 105 -9.87 Completed & project shelved

22 Baramulla - Kupwara NL NR J&K 2004-05 39 359 -8.41 Completed & project shelved
23 Chola-Bulandhshahar NL NR UP 2004-05 16 185 (- Work sanctioned.
)6.75%
24 Parwanoo-Darlaghat NL NR HP 2004-05 92 1290 -25.19 Completed & project shelved
25 Rishikesh-Doiwala NL NR UTRA 2004-05 20 100 -10.45 Completed & project shelved
26 Udhampur/Katra - Bhairawah, Doda to NL NR J&K 2004-05 224 3860 - 22 Completed & project shelved
Kishtwar
27 Phalodi - Balotra via Shergarh, Shaitrawa NL NWR RAJ 2004-05 165 291 -13.59 Completed & project shelved
& Dechhu
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
28 Rewari-Bhiwadi NL NWR HAR RAJ 2004-05 27 105 -8.56 Completed & project shelved
29 Cuddapah-Bangarpet-Bangalore via NL SCR AP KAR 2004-05 255 1000 13.88 Work sanctioned.
Madanapalli
30 Jaggiyapet-Vishnupuram NL SCR AP 2004-05 55 156 21.88 Work sanctioned.
31 Latur Road-Mudkhed NL SCR MAH 2004-05 138 359 -3.36 Completed & project shelved
32 Machlipattnam-Repalli NL SCR AP 2004-05 45 259 1.8 Completed & project shelved
33 Mantralayam Road- Kurnool via NL SCR AP 2004-05 111 241 3.07 Completed & project shelved
Yemmanagar
34 Gotegaon(Sridham)-Ramtek via Seoni NL SECR MP MAH 2004-05 275 775 -3 Completed & project shelved
35 Budge Budge-Uluberia NL SER WB 2004-05 25 910 -ve Completed & project shelved
36 Jhargram-Purulia NL SER WB 2004-05 136 356 -7.17 Completed & project shelved
37 Ranchi-Kandra NL SER JRKD 2004-05 93 300 -5.87 Completed & project shelved
38 Chennai-Sriperumbudur via Poonamalli NL SR TN 2004-05 38 242 -7.57 Completed & project shelved
39 Rameshwaram-Dhanuskoti NL SR TN 2004-05 17 27 -9.73 Completed & project shelved
40 Thanjavur-Chennai Egmore via Ariyalur NL SR TN 2004-05 315 907 -5.57 Completed & project shelved
41 Tindivanam to Cuddalore via Pondichery. NL SR TN 2004-05 77 157 -8.69 Completed & project shelved
42 Tindivanam-Nagari via Vandivash, NL SR AP TN 2004-05 179 456 +1.29 Work sanctioned.
Cheyyar, Arani, Arcot, Ranipet, Walajahpet
Sholinghur, R K Pet, Podatur, Pallipattu

43 Dahod-Banswara NL WR GUJ RAJ 2004-05 120 321 -2.41 Completed & project shelved
44 Goregaon-Borivali NL WR MAH 2004-05 7 128 NA Completed & project shelved
45 Ratlam-Banswara via Dungarpur NL WR RAJ 2004-05 176 983 -2.53 Completed & project shelved
46 Krishnanagar-Nabadwipghat GC ER WB 2004-05 12 36 -ve Completed & project shelved
47 Bhojipura-Pilibhit-Tanakpur GC NER UP 2004-05 102 156 1.49 Work sanctioned.
48 Lucknow-Bhojipura via Sitapur GC NER UP 2004-05 302 474 5 Completed & project shelved
49 Sadulpur-Ratangarh-Bikaner & Ratangarh- GC NWR RAJ 2004-05 364 478 20.69 Work sanctioned.
Degana
50 Chhindwara-Nagpur GC SECR MAH MP 2004-05 150 384 -5 Work sanctioned.
51 Chhindwara-Nainpur GC SECR MAH MP 2004-05 140 228 -5 Completed & project shelved
52 Dindigul-Pollachi-Coimbatore and Pollachi- GC SR KER TN 2004-05 225 290 9.23 Work sanctioned.
Palghat
53 Thanjavur-Tiruchchrappalli GC SR TN 2004-05 50 96 19.27 Completed & project shelved
54 Kolar-Chickballapur GC SWR KAR 2004-05 85 102 -57 Work sanctioned.
55 Mhow to Ratlam & Fatehebad-Ujjain GC WR MP 2004-05 169 360 7.2 Completed & project shelved
56 Pratapnagar-Chotaudepur GC WR GUJ 2004-05 99 149 3.39 Work sanctioned.
57 Ratlam-Mhow GC WR MP 2004-05 146 360 7.2 Work sanctioned.
58 Panvel-Pen-Roha DL CR MAH 2004-05 76 144 6.82 Work sanctioned.
59 Titlagarh-Raipur DL ECOR ORI CHTS 2004-05 203 614 14.33 Work sanctioned.
60 Kiul-Nawadah-Gaya DL ECR BIH 2004-05 123 345 -ve Completed & project shelved
61 Bhagalpur-Barharwa DL ER BIH JRKD 2004-05 129 325 2.88 Work sanctioned.
62 Howrah- Bandel 4th line DL ER WB 2004-05 39 113 -36 Completed & project shelved
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
63 Howrah-Sealdah 3rd line between DL ER WB 2004-05 3 7 Work sanctioned.
Belanagar-Bally and additional loop at
Dumdum, Baranagar and Bali
64 Lalgola-Krishnanagar with electrification DL ER WB 2004-05 127 420 -13 Work sanctioned.
65 Tughlakabad-Palwal 4th line DL NCR HAR 2004-05 39 60 16.6 Work sanctioned.
66 Jakhal-Bhatinda DL NR HAR PUN 2004-05 96 192 13.12 Completed & project shelved
67 Jaipur-Bandikui DL NWR RAJ 2004-05 90 180 22.5 Work sanctioned.
68 Jaipur-Dausa DL NWR RAJ 2004-05 61 99 23.3 Work sanctioned.
69 Krishna Canal- Guntur-Tenali DL SCR AP 2004-05 53 121 15.41 Work sanctioned.
70 Secunderabad- Dronachallam via DL SCR AP 2004-05 297 534 15.41 Completed & project shelved
Mehbubnagar,Gadwal, Kurnool
71 Vijaywada-Gudivada-Bhimavaram- DL SCR AP 2004-05 221 1010 11.46 Work sanctioned.
Narasapur and Gudivada-Machlipatnam
72 Kharagpur-Midnapore via Girimaidan DL SER WB 2004-05 8 44 18.21 Completed & project shelved
73 Panskura-Kharagpur 3rd line DL SER WB 2004-05 45 195 10.3 Work sanctioned.
74 Rajgoda-Durga Chak & Durga Chak Haldia DL SER WB 2004-05 54 246 29.59 Completed & project shelved

75 Ernakulam-Kayankulam via Alleppy DL SR KER 2004-05 100 184 -2.93 Work sanctioned.
76 Ernakulam-Kayankulam via Kottayam DL SR KER 2004-05 115 211 5.1 Work sanctioned.
77 Virar-Ahmedabad DL WR GUJ MAH 2004-05 504 1851 -3.57 Work sanctioned.
78 Bargarh–Nawapara Road NL ECOR ORI 2005-06 136 416 18.32 Completed & project shelved
79 Puri–Konark NL ECOR ORI 2005-06 35 100 -3.02 Completed & project shelved
80 Bihariganj-Simribakhtiarpur NL ECR BIH 2005-06 54 139 -5.78 Completed & project shelved
81 Kusheswarasthan-Darbhanga NL ECR BIH 2005-06 70 253 -4.6 Work sanctioned.
82 Laxmipur-Nawada via Jhajha NL ECR BIH 2005-06 137 621 --10.16 Work sanctioned.
83 Motihari to Sitamarhi via Shivhar NL ECR BIH 2005-06 77 211 -11.10 Work sanctioned.
84 Tori-Chatra NL ECR JRKD 2005-06 66 278 -ve Completed & project shelved
85 Canning-Sonakhalii NL ER WB 2005-06 17 126 -12 Completed & project shelved
86 Chowrigacha-Kandi NL ER WB 2005-06 16 106 -24 Completed & project shelved
87 Chhitauni-Tamkhui Road NL NER BIH 2005-06 59 264 -7.03 Work sanctioned.
88 Etah-Kasganj, NL NER UP 2005-06 29 132 -4.95 Completed & project shelved
89 Nautanwa-Bhairahwa NL NER UP NEPAL 2005-06 15 176 -4.14 Completed & project shelved
90 Padrauna-Kushinagar NL NER UP 2005-06 28 110 -5.08 Completed & project shelved
91 Araria-Galgalia NL NFR BIH WB 2005-06 101 365 -11.04 Work sanctioned.
92 Balurghat-Hilly NL NFR WB 2005-06 30 105 -7.61 Completed & project shelved
93 Bedeti-Itanagar NL NFR ASS ARUNA 2005-06 42 490 -7.45 Completed & project shelved

94 Bhairabi-Sairang/Aizwal NL NFR ASS MIZ 2005-06 52 619 -5.89 Work sanctioned.


95 Samsi-Chanchal-Harishchandrapur NL NFR WB 2005-06 28 91 -11.49 Completed & project shelved
96 Amethi to Sahaganj via Sultanpur/Qadipur NL NR UP 2005-06 110 296 -15.87 Completed & project shelved
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
97 Byepass line connecting Delhi Cantt. to NL NR DLI 2005-06 3 49 2.03 Work sanctioned.
avoid Patel nagar and Brar square
98 Chandigarh-Baddi NL NR HP PUN 2005-06 33 328 -6.91 Work sanctioned.
99 Hissar to Sirsa via Agroha & Fatehabad NL NR HAR 2005-06 92 240 -7.24 Completed & project shelved
100 Qadian to Beas NL NR PUN 2005-06 40 142 -8.27 Completed & project shelved
101 Yamuna Nagar to Patiala via Kurukshetra NL NR HAR PUN 2005-06 142 530 -8.77 Completed & project shelved

102 Jaisalmer-Barmer NL NWR RAJ 2005-06 144 263 -ve Completed & project shelved
103 Manoharabad-Kothapalli NL SCR AP 2005-06 148 308 0.49 Work sanctioned.
104 Medak-Akkanapeth NL SCR AP 2005-06 18 46 -7.94 Completed & project shelved
105 Cuddalore-Jolarpettai via Tindivanum NL SR TN PONDI 2005-06 236 563 -6.28 Work sanctioned.
106 Erumeli-Punalur- Trivandrum NL SR KER 2005-06 136 999 -3.68 Completed & project shelved
107 Jolarpettai-Hossur with link line from NL SR TN 2005-06 159 447 -5.08 Completed & project shelved
Krishnagiri to Dharmapuri
108 Madurai-Kottayam NL SR KER TN 2005-06 234 1331 -3.77 Completed & project shelved
109 Tindivanam to Jolarpettai via NL SR TN 2005-06 168 406 -5.38 Work sanctioned.
Tiruvannamalai and Gingee
110 Tirur-Angadipuram NL SR KER 2005-06 41 233 -8.9 Completed & project shelved
111 Chhotaudaipur- Dhar NL WR GUJ MP 2005-06 156 608 -3.39 Work sanctioned.
112 Jaisalmer to Kandla NL WR RAJ GUJ 2005-06 562 991 -0.95 Completed & project shelved
113 Kharaghoda-Santhalpur NL WR GUJ 2005-06 111 199 -3.46 Completed & project shelved
114 Achalpur-Murtajapur-Yavatmal,Pulgaon- GC CR MAH 2005-06 221 462 -5% Completed & project shelved
Arvi
115 Barddhaman-Katwa GC ER WB 2005-06 53 202 +9 Work sanctioned.
116 Katwa-Ahmedpur GC ER WB 2005-06 53 178 -ve Completed & project shelved
117 Aluabari-Siliguri via Galgalia GC NFR WB BIH 2005-06 76 220 - Work sanctioned.
17.60%
118 Baraigram-Kumarghat GC NFR ASS TRI 2005-06 75 94 Work sanctioned.
119 Pathankot-Joginder nagar, GC NR PUN HP 2005-06 189 1316 -22.04 Completed & project shelved
120 Chengalpattu-Villupuram GC SR TN 2005-06 103 247 13.19 Work sanctioned.
121 Ankleswar-Rajpipla GC WR GUJ 2005-06 63 122 -1.47 Work sanctioned.
122 Pune-Miraj-Kolhapur DL CR MAH 2005-06 326 813 -1.55 Completed & project shelved
123 Bandel-Katwa DL ER WB 2005-06 83 294 -10.5 Completed & project shelved
124 Barabanki-Chhapra DL NER UP BIH 2005-06 179 386 13.02 Work sanctioned.
125 Laksar-Haridwar-Dehradun DL NR UTRA 2005-06 79 368 -6.93 Work sanctioned.
126 Meerut-Saharanpur DL NR UP 2005-06 114 238 -7.83 Work sanctioned.
127 Padampahar-Banspani DL SER ORI 2005-06 33 100 26.60 Work sanctioned.
128 Chengalpattu-Tuticorin DL SR TN 2005-06 513 1863 7.23 Work sanctioned.
129 Trivandrum-Kanniyakumari DL SR KER TN 2005-06 86 526 .77 Completed & project shelved
130 Hospet-Hubli-Alnawar-Londa-Vaso-de- DL SWR KAR GOA 2005-06 352 2127 Work sanctioned.
gama
131 Bhopal-Bina 3rd line DL WCR MP 2005-06 139 429 11.5 Work sanctioned.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
132 Udhna- Jalgaon DL WR GUJ MAH 2005-06 307 715 13.71 Work sanctioned.
133 Wardha-Nandedl via Pusad and Yavatmal NL CR MAH 2006-07 270 697 (-) 8.63 Work sanctioned.

134 Nawadah-Giridih via Satgawan NL ECR BIH JRKD 2006-07 136 580 -3.95 Completed & project shelved
135 Budge Budge-Pujali NL ER WB 2006-07 11 37 -16 Work sanctioned.
136 Hansdiha to Godda NL ER JRKD 2006-07 29 140 -11.0 Completed & project shelved
137 Prantik-Siuri NL ER WB 2006-07 34 98 -6 Completed & project shelved
138 Barhaj Bazar to Faizabad via Dohrighat NL NER UP 2006-07 194 782 (- Completed & project shelved
)6.06%
139 Masrakh-Rewaghat via Taraiya and NL NER BIH 2006-07 30 109 1.59 Work sanctioned.
Amnour
140 Nepalganj Road(India)- Nepalganj(Nepal) NL NER UP NEPAL 2006-07 12 149 -3.81 Completed & project shelved
141 Tanakpur-Bageshwar NL NER UTRA 2006-07 155 2252 -4.63% Completed & project shelved
142 Barsoi-Chanchal NL NFR WB BIH 2006-07 33 131 -0.91 Completed & project shelved
143 Kaliaganj-Buniadpur NL NFR WB 2006-07 33 131 -2.5 Completed & project shelved
144 Kishanganj-Jalalgarh NL NFR BIH 2006-07 50 283 4.34 Work sanctioned.
145 Mekhliganj and Haldibari and extension NL NFR WB 2006-07 26 186 -4.51 Completed & project shelved
from Mekhliganj to Chanderabhanga
146 Murkongselek-Pasighat NL NFR ASS NE 2006-07 30 165 -8.01 Completed & project shelved
147 Naginimora- Amguri NL NFR ASS NAGA 2006-07 30 206 -4.29 Completed & project shelved
148 Anandpur Sahib-GarhShankar NL NR PUN 2006-07 45 532 -16.6 Completed & project shelved
149 Bhanupali-Bilaspur-Beri NL NR HP 2006-07 63 1047 -2.07 Work sanctioned.
150 Bhattu Kalan – Jakhal via Fatehabad and NL NR HAR 2006-07 92 448 -4.34 Completed & project shelved
Ratia .
151 Muzaffarnagar to Roorkee NL NR UP UTRA 2006-07 27 106 1.68 Work sanctioned.
152 Muzaffarnagar to Haridwar via Roorkee NL NR UTRA 2006-07 51 281 -3.01 Work sanctioned.
153 Rama Mandi-Maur Mandi via Talwandi NL NR PUN HAR 2006-07 32 115 -12.39 Completed & project shelved
Sabo
154 Bilara-Bar NL NWR RAJ 2006-07 52 139 -0.13 Completed & project shelved
155 Loharu-Bhiwani NL NWR HAR RAJ 2006-07 64 100 -9.46 Completed & project shelved
156 Phalodi-Nagaur NL NWR RAJ 2006-07 147 214 9.82 Completed & project shelved
157 Bhadrachallam-Bavannapalem (Sattupalli) NL SCR TLN 2006-07 56 338 23.42 Work sanctioned.

158 Jaggayyerpeta-Malacherru and NL SCR AP 2006-07 40 95 21.88 Work sanctioned.


Vishnupuram-Janpahad
159 Amta-Bongaon NL SER WB 2006-07 16 65 19.69 Work sanctioned.
160 Attipattu-Putur(Including Periyapalayan- NL SR TN AP 2006-07 145 635 1.89 Work sanctioned.
Tiruvallur)double line between Attipattu &
Periyapalayam and rest single line
161 Chennai-Cuddalore via Mahabalipuram NL SR TN 2006-07 179 524 -6.15 Work sanctioned.
and Pondicherry
162 Erode-Palani via Dharapura NL SR TN 2006-07 92 289 1.913 Work sanctioned.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
163 Kayankulum-Kottakara via Adoor NL SR KER 2006-07 48 276 -5.37 Completed & project shelved
164 Kollengode-Trichur NL SR TN KER 2006-07 59 301 -8.45 Completed & project shelved
165 Mayiladuturai-Tirukkaidaiyar- NL SR TN 2006-07 47 186 11.50 Completed & project shelved
Taramgambadi-Tirunallar-Karaikal
166 Nagapattinam-Tiruturaipundi NL SR TN 2006-07 33 91 -0.345 Work sanctioned.
167 Satyamangalam- Mettur NL SR TN 2006-07 90 326 -5.6 Completed & project shelved
168 Rayadurg-Tumkur via Kalyandurg NL SWR AP KAR 2006-07 212 887 7.79 Work sanctioned.
169 Damoh to Kundalpur NL WCR MP 2006-07 35 58 -0.98 Completed & project shelved
170 Bhavnagar-Tarapore NL WR GUJ 2006-07 135 411 -1.86 Completed & project shelved
171 Loharu-Sikar-Churu-Ringus-Jaipur GC NWR RAJ HAR 2006-07 320 602 2.83 Work sanctioned.
172 Udaipur City-Himmatnagar-Ahmedabad GC NWR GUJ RAJ 2006-07 299 743 15.91 Work sanctioned.
173 Madurai - Bodinayakkanur GC SR TN 2006-07 90 283 1.12 Work sanctioned.
174 Mayiladuturai-Tiruvarur-Tiruturaipurdi- GC SR TN 2006-07 224 441 7.53 Work sanctioned.
Karaikudi and Tiruturaipurdi-Agastiyampalli

175 Botad-Ahmedabad GC WR GUJ 2006-07 170 362 4.71 Completed & project shelved
176 Igatpuri-Bhusaval 3rd line DL CR MAH 2006-07 308 720 0 Completed & project shelved
177 Santipur-Kalinarayanpur DL ER WB 2006-07 16 73 -8 Work sanctioned.
178 Panki-Mughalsarai 3rd line DL NCR UP 2006-07 356 964 14.39 Completed & project shelved
179 New Jalpaiguri-New Alipurduar DL NFR WB ASS 2006-07 168 631 14.93 Completed & project shelved
180 Burnpur-Asansol DL SER WB 2006-07 5 20 51.83 Completed & project shelved
181 Ramanagaram-Mysore DL SWR KAR 2006-07 92 239 7.32 Work sanctioned.
182 Salem-Bangalore DL SWR TN KAR 2006-07 218 504 5.85 Survey completed and Report
under examination.
183 Manmad -Indore via Malegaon & Dhule NL CR MAH MP 2007-08 339 2257 9.53% Survey completed and Report
under examination.
184 Ara-Bhabua Road NL ECR BIH 2007-08 122 490 -ve Work sanctioned.
185 Araria-Supaul NL ECR BIH 2007-08 92 304 -4.91 Work sanctioned.
186 Bihariganj-Kursela via Rupauli, Dhamdaha NL ECR BIH 2007-08 35 193 (-)12.71 Work sanctioned.

187 Darbhanga-Muzaffarpur NL ECR BIH 2007-08 66 281 (- Work sanctioned.


)9.45%
188 Dauram Madhepura to Pratapnagar via NL ECR BIH 2007-08 94 306 - Completed & project shelved
Singheshwar Asthan,Bhimnagar and 22.68%
Triveniganj
189 Gaya to Daltonganj via Rafiganj NL ECR BIH JRKD 2007-08 135 445 (-)8.47 Work sanctioned.
190 Madhubani-Sitamarhi-Bairgnia via Shivpur, NL ECR BIH 2007-08 50 Survey completed and Report
Pakri Dayal, Dhaka, under examination.
191 Muzaffarpur-Janakpur via Katra, Orai NL ECR BIH 2007-08 66 228 (- Work sanctioned.
)6.15%
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
192 Sitamarhi-Janakpur Road (Bhuttai- NL ECR BIH 2007-08 188 679 (- Work sanctioned.
Sonbarsa-Sursand-Mittanrod-Charaut- )6.77%
Bassopatti-Jaynagar-Ladania-Laukoha-
Laukchi-Nirmali)
193 Sitamarhi-Jayanagar via Susand, NL ECR BIH 2007-08 80 320 Work sanctioned.
Mithamod
194 Budge Budge-Namkhana-Frazerganj NL ER WB 2007-08 132 499 -11 Completed & project shelved
195 Park Circus(Piyali) to Dhamakhali NL ER WB 2007-08 36 417 -12 Completed & project shelved
196 Aligarh-Kasganj NL NER UP 2007-08 64 292 3.62 Completed & project shelved
197 Deoria-Kushinagar NL NER UP 2007-08 40 151 -0.93 Completed & project shelved
198 Banarhat-Samtse (Bhutan) NL NFR WB BHUTA 2007-08 23 423 (-) 4% Survey completed and Report
N under examination.
199 Hashimara, Phuentsholing (Bhutan) NL NFR WB BHUTA 2007-08 18 Survey completed and Report
N under examination.
200 Jiribam-Imphal NL NFR ASS MANIP 2007-08 125 2565 -7.08 Work sanctioned.
UR
201 Jogbani-Biratnagar(Nepal) NL NFR BIH NEPAL 2007-08 18 239 -3.6 Work sanctioned.
202 Kokrajhar-Gelephu-(Bhutan) NL NFR ASS BHUTA 2007-08 58 554 2.09% Survey completed and Report
N under examination.
203 Pathsala-Nanglam (Bhutan) NL NFR ASS BHUTA 2007-08 51 1015 11.90% Survey completed and Report
N under examination.
204 Rangiya-Samdrupjongkhar via Darranga NL NFR ASS BHUTA 2007-08 48 901 0.78% Survey completed and Report
(Bhutan) N under examination.
205 Sivok-Rangpo NL NFR WB SIKKIM 2007-08 44 1329 -7.44 Work sanctioned.

206 Lalganj-Bachhrawan via Gurubakshganj NL NR UP 2007-08 39 412 -12.6 Completed & project shelved
207 Ajmer-Kota NL NWR RAJ 2007-08 145 587 -4.93 Completed & project shelved
208 Anupgarh to Kolayat via Khajuwala NL NWR RAJ 2007-08 200 441 -5.37 Completed & project shelved
209 Anupgarh-Khajuwala -Jaisalmer-Ramgarh NL NWR RAJ 2007-08 485 914 -5.3 Completed & project shelved

210 Pushkar-Merta road NL NWR RAJ 2007-08 59 234 -6.55 Completed & project shelved
211 Tonk-Deoli NL NWR RAJ 2007-08 62 210 -4.72 Completed & project shelved
212 Donakonda-Bitragunta NL SCR AP 2007-08 197 622 -0.97 Survey completed and Report
under examination.
213 Jadcherla-Nandyal New Line NL SCR AP TLN 2007-08 182 566 -10.39 Completed & project shelved
214 Nadikudi-Sri Kalahasti NL SCR AP 2007-08 308 1170 15.5 Completed & project shelved
215 Ongole-Donakonda NL SCR AP 2007-08 87 294 -1.01 Completed & project shelved
216 Katangi–Tirodi NL SECR MP 2007-08 15 52 -8.7 Work sanctioned.
217 Bhowaichandi-Khana NL SER WB 2007-08 30 96 Work sanctioned.
218 Champadanga-Tarakeswer NL SER WB 2007-08 8 25 -8.9 Work sanctioned.
219 Digha–Jaleswar NL SER WB 2007-08 40 182 -5.04 Completed & project shelved
220 Kandra-Namkom NL SER JRKD 2007-08 106 508 9.52 Completed & project shelved
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
221 Erode to Satyamanglam NL SR TN 2007-08 63 430 -0.87 Completed & project shelved
222 Morappur-Dharmapuri via Mukkanur NL SR TN 2007-08 36 146 -6.68 Completed & project shelved
223 Nanjangud-Nilambur via Sultan Bathery NL SR KAR KER TN 2007-08 238 3384 -5.90 Completed & project shelved
224 Needmangalam-Pattukottai via NL SR TN 2007-08 54 294 4.394 Work sanctioned.
Mannargudi, Madukkur
225 Sabarimala-Chenganur NL SR KER 2007-08 64 612 -11.89 Completed & project shelved
226 Bagalkot-Kudachi NL SWR KAR 2007-08 111 816 11.27 Work sanctioned.
227 Gunji-Kulem NL SWR KAR 2007-08 113 959 14.32 Completed & project shelved
228 Ranjitpura-Yeshwantnagar NL SWR KAR 2007-08 11 98 18.6 Completed & project shelved
229 Ujjain-Jhalawar-Ramganj Mandi NL WCR RAJ MP 2007-08 190 860 (-) 2.76 Completed & project shelved
230 Dahod-Indore via Dhar NL WR MP GUJ 2007-08 201 679 +3.63 Work sanctioned.
231 Modasa-Shamlaji NL WR GUJ 2007-08 23 56 -3.2 Work sanctioned.
232 Suratpura-Hannumangarh-Sriganganagar GC NWR RAJ 2007-08 240 403 10.5 Work sanctioned.
233 Raipur–Dhamtari, including Abhanpur- GC SECR CHTS 2007-08 89 218 (+)12.1 Completed & project shelved
Rajim(Dhamtari-Kendri GC and NL from 3%
Kendri to Mandrihsand
234 Bhuj-Naliya with extn to Baranda GC WR GUJ 2007-08 126 318 (+)12.2 Work sanctioned.
/Koteswar 6%
235 Dhasa-Jetalsar GC WR GUJ 2007-08 104 217 +9.98 Completed & project shelved
236 Miyagam-Dabhoi-Samlaya GC WR GUJ 2007-08 97 440 9.3 Work sanctioned.
237 Ratlam to Akola incl. Fatahabagh- GC WR MP MAH 2007-08 475 1421 11.25 Work sanctioned.
chandrawati-Ujjain
238 Mehsana -Taranga Hill (GC)wih ext. upt GC WR GUJ 2007-08 108 491 -1.40 Work sanctioned.
Ambaji (NL)
239 Bhadrak-Nergundi 3rd line DL ECOR ORI 2007-08 105 567 28.84 Completed & project shelved
240 Khurda Road-Puri (Delang -Puri) DL ECOR ORI 2007-08 29 134 -ve Work sanctioned.
241 Samastipur-Darbhanga DL ECR BIH 2007-08 37 170 -6.5 Completed & project shelved
242 Valmikinagar-Narkatiaganj-Muzaffarpur DL ECR BIH 2007-08 210 513 14.15 Completed & project shelved
243 Baruipur and Sealdah(Ballygunge) (3rd line DL ER WB 2007-08 20 121 -10.00 Completed & project shelved
)
244 Lucknow-Varanasi via Rae Bareilly and DL NR UP 2007-08 281 796 -5.69 Completed & project shelved
Amethi
245 Alwar-Digawara DL NWR RAJ 2007-08 27 86 18.5 Work sanctioned.
246 Phulera to Merta Rd DL NWR RAJ 2007-08 153 283 11.43 Completed & project shelved
247 Jharsuguda-Champa 3rd line DL SECR CHTS ORI 2007-08 165 872 30.84 Work sanctioned.
248 3rd line between Dongraposi-Pendrasali DL SER JRKD 2007-08 75 237 32.11 Work sanctioned.
and extention opto Rajkharswan
249 Yelahanka-Penukonda DL SWR KAR AP 2007-08 120 858 18.73% Survey completed and Report
under examination.
250 Bhopal-Itarasi 3rd line DL WCR MP 2007-08 106 521 14 Work sanctioned.
251 Guna-Ruthiyai DL WCR MP 2007-08 20 69 18 Work sanctioned.
252 Viramgram-Surender Nagar DL WR GUJ 2007-08 65 271 +17.77 Work sanctioned.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
253 Chinchwad - Roha NL CR MAH 2008-09 95 601 -4.94 Completed & project shelved
254 Shirpur-Mhow NL CR MAH MP 2008-09 185 1450 10.31 Completed & project shelved
255 Jaynagar to Jamtala NL ER WB 2008-09 20 106 -14 Completed & project shelved
256 Khurja-Raya new line via Mat, Surir, Bajna NL NCR UP 2008-09 90 640 -5.94% Completed & project shelved

257 Byrnihat-Shillong NL NFR NE MEGH 2008-09 108 4083 -8.34 Work sanctioned.
258 Dangri-Dhola NL NFR ASS 2008-09 6 34 -ve Completed & project shelved
259 Gunjaria to Gazole via Ithar , Raiganj NL NFR WB 2008-09 107 562 -7.29 Work sanctioned.
260 New Jalpaiguri-Kakrabitta(Nepal) NL NFR WB NEPAL 2008-09 46 358 -3.6 Completed & project shelved
261 Rail-cum-Road bridge between NL NFR BIH 2008-09 12 1043 -4.72 Completed & project shelved
Tejnarayanpur-Sahibganj
262 Rangpo-Gangtok NL NFR SIKKI NE 2008-09 69 4165 -11.6 Completed & project shelved
M
263 Tejnarayanpur-Bhaluka Road NL NFR BIH WB 2008-09 24 151 -8.49 Completed & project shelved
264 Jammu to Poonch via NL NR J&K 2008-09 223 10458 -4.24 Completed & project shelved
Akhnur,Rajaori,Bajalta.
265 Khemkaran-Firozpur NL NR PUN 2008-09 31 168 -13.20 Completed & project shelved
266 Meerut-Panipat NL NR UP HAR 2008-09 95 635 4.58 Completed & project shelved
267 Rama Mandi-Maur Mandi via Talwandi NL NR PUN HAR 2008-09 32 123 -3.3 Work sanctioned.
Sabo
268 Rishikesh-Karnaprayag NL NR UTRA 2008-09 125 4295 -6.34 Work sanctioned.
269 Sambhal Hatim Sarai-Gajraula NL NR UP 2008-09 43 175 -7.44 Completed & project shelved
270 Una - Hoshiarpur NL NR HP PUN 2008-09 44 480 -6.3 Completed & project shelved
271 Jhunjhunu-Pilani NL NWR RAJ 2008-09 18 55 -6.5 Completed & project shelved
272 Rewari-Bhiwari NL NWR RAJ 2008-09 27 163 -13.5 Completed & project shelved
273 Manuguru-Ramagundam . NL SCR TLN 2008-09 200 770 4.45 Completed & project shelved
274 Barwadih-Chirmiri NL SECR JRKD CHTS 2008-09 182 715 9.05 Completed & project shelved
275 Wadsa-Amrohi-Gadchiroli NL SECR MAH 2008-09 50 183 -7.46 Work sanctioned.
276 Burhamara-Chakulia NL SER ORI WB 2008-09 50 355 20.03 Work sanctioned.
277 Extension of Rupsa–Bangriposi to NL SER ORI 2008-09 42 273 17.72 Completed & project shelved
Gurumahishani
278 Jhargram-Purulia NL SER WB 2008-09 136 566 10 Completed & project shelved
279 Lohardega-Gumla, and extension to NL SER JRKD 2008-09 54 700 -5.24 Completed & project shelved
Simdega
280 5th & 6th line on Chennai-Villivakkam (9 NL SR TN 2008-09 153 1353 -9.58 Completed & project shelved
km) and New line for Villivakkam-Katpadi
(154 km)
281 Jolarpettai-Hossur via Krishnagiri NL SR TN 2008-09 101 558 0.6 Completed & project shelved
282 Madurai-Karaikkudi va Melur,Tiruppattur NL SR TN 2008-09 91 382 -7.302 Completed & project shelved
283 Thalassery-Mysore via Kodagu NL SR KAR KER 2008-09 298 2946 -5.606 Completed & project shelved
284 Thanjavur to Ariyalur via Tirumanur & NL SR TN 2008-09 50 279 2.556 Completed & project shelved
Valampuri
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
285 Tiruvannamalai-Jolarpettai NL SR TN 2008-09 85 357 -6.56 Completed & project shelved
286 Tumkur-Davangiri NL SWR KAR 2008-09 199 600 12.10 Completed & project shelved
287 Rewa-Mirzapur, NL WCR MP UP 2008-09 170 796 2.29 Completed & project shelved
288 Bhavnagar-Mahua NL WR GUJ 2008-09 118 355 -4.41 Completed & project shelved
289 Harij-Mahsana-Radhanpur NL WR GUJ 2008-09 108 233 -1.20 Completed & project shelved
290 Ningala-Gadhad-Babra-Khijadia Jn. NL WR GUJ 2008-09 68 198 -3.19 Completed & project shelved
291 Porbandar-Porbandar Port NL WR GUJ 2008-09 5 20 6.74 Completed & project shelved
292 Ratlam-Banswara-Dungarpur NL WR RAJ MP 2008-09 176 1184 -2.35 Completed & project shelved
293 Dholpur-Sirmuttra with extension upto GC NCR RAJ 2008-09 144 622 +14..17 Work sanctioned.
Gangapur City.
294 Lucknow-Pilibhit-Shahjahanpur & Mailani- GC NER UP 2008-09 552 1171 2.62 Completed & project shelved
Dudhwa-Nanpara-Bahraich
295 Mavli to Bari Sadari GC NWR RAJ 2008-09 82 133 -1.73 Completed & project shelved
296 Chhindwara-Nainpur to Mandla Fort GC SECR CHTS 2008-09 182 436 -3.2 Completed & project shelved
297 Bhuj-Nallia (101.35 km) GC with extn. To GC WR GUJ 2008-09 125 375 +12.26 Work sanctioned.
Vayour (24.65 km)
298 Kosamba-Umarpada GC WR GUJ 2008-09 65 185 -1.53 Completed & project shelved
299 GC from Jaynagar to Bijalpura(Nepal) and GC ECR BIH NEPAL 2008-09 69 470 -6.1 Work sanctioned.
NL to Bardibas.
300 Gwalior-Shivpur kalan GC & ext. uoto Kota GC NCR MP RAJ 2008-09 284 1176 -0.21 Work sanctioned.
NL
301 Itarsi-Nagpur-Wardha-Ballarshah 3rd line DL CR MP MAH 2008-09 505 2180 9.89 Work sanctioned.
&12.83
%
302 Koraput-Kirandul (256 km) DL ECOR ORI CHTS 2008-09 150 826 15.15 Work sanctioned.
303 Sambalpur-Talcher DL ECOR ORI 2008-09 174 679 28.91 Work sanctioned.
304 Jirat-Katwa DL ER WB 2008-09 83 360 -4 Completed & project shelved
305 Aunrihar-Varanasi-Manduadih DL NER UP 2008-09 39 161 4.54 Work sanctioned.
306 Guwahati- 2nd rail bridge over Saraighat DL NFR ASS NE 2008-09 7 300 1.88 Completed & project shelved
307 Lohta-Jhangai DL NR UP 2008-09 75 203 +15.36 Work sanctioned.
308 Ballarshah-Kazipet 3rd Line DL SCR MAH TLN 2008-09 234 1443 22 Completed & project shelved
309 Kazipet-Vijaywada - Gudur 3rd line DL SCR AP TLN 2008-09 555 2477 19.97 & Work sanctioned.
16.08

310 Secunderabad ( Maula Ali)-Bhongir 3rd line DL SCR TLN 2008-09 38 194 23.52% Survey completed and Report
under examination.
311 Adityapur-Rajkharshwan 3rd line DL SER JRKD 2008-09 37 164 46.56 Work sanctioned.
312 Bimlagarh-Dumitra DL SER ORI 2008-09 40 264 34.06 Work sanctioned.
313 Extension of Narkher-Badnera NL upto NL CR MAH 2009-10 122 559 Survey completed and Report
Washim via Dhanaj, Karanja, and under examination.
Mangrulpir
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
314 Karad-Chiplun NL CR MAH 2009-10 112 928 -4.37 Survey completed and Report
under examination.
315 Pandharpur-Lonand NL CR MAH 2009-10 109 251 -5 Survey completed and Report
under examination.
316 Pune-Nasik NL CR MAH 2009-10 265 1899 4.11% Completed & project shelved
317 Rotegaon-Puntamba NL CR MAH 2009-10 27 97 -5 Survey completed and Report
under examination.
318 Veer-Harihareshwar NL CR MAH 2009-10 50 448 -5.19 & Survey completed and Report
revised- under examination.
4.75%
319 Gaya-Natesar NL ECR BIH 2009-10 36 134 Work sanctioned.
320 Arambagh-Khana NL ER WB 2009-10 31 206 -4.74% Work sanctioned.
321 Canning-Gosaba via Basanti NL ER WB 2009-10 24 431 -15 Work sanctioned.
322 Dumdum to Garia via Rajerhat NL ER WB 2009-10 33 1565 -45% Survey completed and Report
under examination.
323 Ghatakpukur-Minakhan NL ER WB 2009-10 25 292 -20 Work sanctioned.
324 Kaliaganj-Buniadpur NL ER WB 2009-10 33 205 -10.5 Work sanctioned.
325 Krishna Nagar-Behrampore via Chhapra, NL ER WB 2009-10 119 932 -7 Work sanctioned.
Karimpur
326 Krishnanagar-Nabadwipghat extension to NL ER WB 2009-10 21 251 -16 Work sanctioned.
BB loop
327 Namkhana-Bakkhali NL ER WB 2009-10 17 148 -9 Work sanctioned.
328 Sainthia-Chowrigacha via Kandi NL ER WB 2009-10 40 227 -14 Work sanctioned.
329 Tarakeshwar-Magra restoration NL ER WB 2009-10 52 445 -0.48 Work sanctioned.
330 Kasganj-Khurja via Atrauli NL NCR UP 2009-10 89 624 0.51% Survey completed and Report
under examination.
331 Balurghat-Hilli NL NFR WB 2009-10 29 171 -9.13 Work sanctioned.
332 Chalsa-Jhaldhaka NL NFR WB 2009-10 21 502 -9.37 Work sanctioned.
333 Rupai-Parashuramkund via Mahadevpur, NL NFR ASS NE 2009-10 98 1036 -6.45 Completed & project shelved
Namsai, Chingkham
334 Salona to Khumtai NL NFR ASS 2009-10 98 2640 -8.98 Completed & project shelved
335 Bilaspur to Leh (via Kullu& Manali)(498Km) NL NR HP 2009-10 498 32739 (- Survey completed and Report
)4.38% under examination.
336 Dehradun to Kalsi NL NR UTRA 2009-10 47 676 -4.08 Completed & project shelved
337 Ellanabad-Sirsa via Raniyal NL NR HAR 2009-10 45 215 -8.04 Survey completed and Report
under examination.
338 Ferozepur-Patti NL NR PUN 2009-10 25 216 -8.67% Work sanctioned.
339 Ghanauli-Baddi NL NR HP 2009-10 26 541 -3.44 Survey completed and Report
under examination.
340 Joginder Nagar to Mandi NL NR HP 2009-10 48 1301 -5.46 Completed & project shelved
341 Kathua-Basoli-Bhadarwah-Kishtwar NL NR J&K 2009-10 259 9776 -4.92 Survey completed and Report
under examination.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
342 Amarpura(Jorasi) to Chirawa via Tathwari NL NWR RAJ 2009-10 50 162 -5.40 Survey completed and Report
and Singhana under examination.
343 Ringus-Didwana via Khatu Shyamji NL NWR RAJ 2009-10 105 311 -5.8 Completed & project shelved
344 Bhadrachallam-Kovvur NL SCR AP TLN 2009-10 151 923 28.8 Completed & project shelved
345 Cuddapah-Bangarpet NL SCR AP KAR 2009-10 258 1796 14.51 Work sanctioned.
346 Cuddapah-Kolar NL SCR AP KAR 2009-10 260 1789 14.55 Work sanctioned.
347 Cumbum to Proddatur NL SCR AP 2009-10 142 902 14.94% Work sanctioned.
348 Nadikudi-Srikalahasti NL SCR AP 2009-10 309 1314 21.18 Work sanctioned.
349 Raigarh-Mand Colliery to Bhupdeopur NL SECR CHTS 2009-10 63 310 22.58 Completed & project shelved
350 Bishnupur-Mukutmonipur NL SER WB 2009-10 58 496 -5.05 Work sanctioned.
351 Bongaon-Bagdaha NL SER WB 2009-10 25 160 -14 Work sanctioned.
352 Dankuni-Jorgalpara-Furfura Sharif- NL SER WB 2009-10 20 148 -4.4 Work sanctioned.
Jangipara-Bargachia
353 Digha-Jaleswar NL SER WB ORI 2009-10 41 240 18.77 Work sanctioned.
354 Panskura- Ghattal NL SER WB 2009-10 105 800 10.15 Work sanctioned.
-Chandrakona & Ghatal-Arambagh
355 Rajkharswan-Ranchi NL SER JRKD ORI 2009-10 124 1154 -5.2 Survey completed and Report
under examination.
356 Salboni-Jhargram via Lalgarh-Belpahari NL SER WB 2009-10 55 377 -4.7 Work sanctioned.
357 Angadippuram-Kozhikode NL SR KER 2009-10 77 823 -3.38 Completed & project shelved
358 Avadi-Sriperumbadur NL SR TN 2009-10 25 225 -9.13 Completed & project shelved
359 Bodinayakanur-Kottayam NL SR TN KER 2009-10 120 1229 -5.96 Completed & project shelved
360 Chidambaram-Attur via Ariyalur, NL SR TN 2009-10 167 1050 -1.07 Survey completed and Report
Perambalur under examination.
361 Kanhangad-Panathur NL SR KER 2009-10 41 385 2.02 Survey completed and Report
under examination.
362 Madurai-Tuticorin NL SR TN 2009-10 144 601 16.81 Work sanctioned.
363 Madurai-Tuticorin NL SR TN 2009-10 144 601 16.81 Work sanctioned.
364 Sabrimala-Chengannur NL SR KER 2009-10 64 1583 -5.98 Survey completed and Report
under examination.
365 Bangalore-Nangli NL SWR KAR 2009-10 120 341 5.84 Work sanctioned.
366 Chickballapur-Puttapurthy-Sri Satya Sai NL SWR AP KAR 2009-10 103 635 5.18% Work sanctioned.
Nilyam &
9.80%
367 Dharwad-Belgaum NL SWR KAR 2009-10 91 545 7.08 Survey completed and Report
under examination.
368 Krishnaraja Nagar-Kushal Nagar NL SWR KAR 2009-10 59 275 2.96 Survey completed and Report
under examination.
369 Puttaparthy(Satyasai Nilayam) to Kadiri NL SWR AP 2009-10 47 319 -7.15 Survey completed and Report
via Nallamada under examination.
370 Tumkur-Chitradurg via Sira, Hiriyuri NL SWR AP KAR 2009-10 136 560 Work sanctioned.
371 Whitefield-Kolar NL SWR KAR 2009-10 53 341 13.52 Work sanctioned.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
372 Ahmedpur-Katwa GC ER WB 2009-10 52 178 -8 Work sanctioned.
373 New Mal Jn.-Mynaguri Road line GC NFR WB 2009-10 42 215 -11.54 Work sanctioned.
374 Chhindwara-Nainpur to Mandla Fort GC SECR MP 2009-10 182 556 -3.2 Work sanctioned.
375 Circular Railway from Tala- Principghat to DL ER WB 2009-10 14 402 -28 Work sanctioned.
Majerhat
376 Dankuni-Balli 3rd line DL ER WB 2009-10 6 80 6.30% Work sanctioned.
377 Katwa-New Farakka DL ER WB 2009-10 152 971 -9 Work sanctioned.
378 Krishnanagar-Lalgola DL ER WB 2009-10 100 643 -7 Work sanctioned.
379 Rampurhat -Ghumani 3rd line DL ER WB 2009-10 72 531 -7 Work sanctioned.
380 Sahibganj -Bhagalpur DL ER BIH 2009-10 74 361 12.2% Work sanctioned.
381 Tinpahar-Bhagalpur DL DL ER JRKD 2009-10 34 142 +11.2% Work sanctioned.

382 Ajmer-Palanpur DL DL NWR RAJ GUJ 2009-10 354 1380 16.49 Work sanctioned.
383 Bandikui-Alwar (60.37 km) DL DL NWR RAJ 2009-10 60 203 14.28 Completed & project shelved
384 Mudkhed-Parbhani DL SCR MAH 2009-10 81 336 17.06 Work sanctioned.
385 Doubling of Salem(Magnesite)-Omalur- DL SR TN 2009-10 40 214 18.91 Work sanctioned.
Mettur Dam
386 Hospet-Swamihalli (58.97 km) DL DL SWR KAR 2009-10 29 212 +25.33 Survey completed and Report
under examination.
387 Tornagallu-Ranjitpura DL DL SWR KAR 2009-10 23 132 +29.16 Work sanctioned.
388 Bina-Kota DL WCR MP RAJ 2009-10 283 1184 14 Work sanctioned.
389 Viramgam-Samakhiali DL WR GUJ 2009-10 182 685 +15.89 Work sanctioned.
390 Ballarshah to Surjagad(Etapalli) NL CR MAH 2010-11 122 586 -5.19% Survey completed and Report
under examination.
391 Dhule-Amalner NL CR MAH 2010-11 39 216 -7.2% Survey completed and Report
under examination.
392 Khandwa-Dhar via Khargone,Barwani NL CR MP 2010-11 250 2025 -3.43% Survey completed and Report
under examination.
393 Parasnath-Madhuban NL ECR JRKD 2010-11 14 129 (- Survey completed and Report
)31.85 under examination.
%
394 Barabani-Churulia NL ER WB 2010-11 9 68 -16.2 Work sanctioned.
395 Baruipara-Furfura Sharif-Arambagh NL ER WB 2010-11 51 552 -15 Work sanctioned.
396 Bhalukpong Harbour-Budge Budge-Akra NL ER WB 2010-11 40 360 -18.0 Work sanctioned.
397 Bongaon-Kalyani NL ER WB 2010-11 40 321 -15 Work sanctioned.
398 Furfurasharif-Tarakeshwar NL ER WB 2010-11 22 162 -10% Work sanctioned.
399 Hansabad-Samshernagar NL survey NL ER WB 2010-11 53 445 -12 Work sanctioned.
400 Hansdiha-Godda NL ER JRKD 2010-11 30 267 -38% Work sanctioned.
401 Hasnabad-Hingalganj- NL ER WB 2010-11 52 458 -5.0 Work sanctioned.
Pratapadityanagar(Shamsernagar)
402 Ikra-Churuliya-Gurundi NL ER WB 2010-11 22 154 18% Completed & project shelved
403 Joynagar-Raidighi NL ER WB 2010-11 20 140 Work sanctioned.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
404 Kakdwip-Sagar-Kapilmuni NL ER WB 2010-11 32 1508 -11 Work sanctioned.
405 Katwa-Memari NL ER WB 2010-11 70 532 -16% Work sanctioned.
406 Pandabeshwar-Ikra NL ER WB 2010-11 25 162 18 Work sanctioned.
407 Pujali-Uluberia NL ER WB 2010-11 10 296 -17% Work sanctioned.
408 Ranaghat-Dattapulia NL ER WB 2010-11 8 72 -13 Work sanctioned.
409 Sangrampur -Mandir Bazar-Ramganga- NL ER WB 2010-11 59 480 -17 Work sanctioned.
Patherpratima
410 Akbarpur -Sultanpur via Kadipur NL NCR UP 2010-11 46 276 -11.05 Work sanctioned.
411 Aligarh-Chhata NL NCR UP 2010-11 79 736 -5.19 Completed & project shelved
412 Bakulha-Belthara Rd NL survey NL NER UP 2010-11 90 374 -2.32 Completed & project shelved
413 Kapilvastu-Basti via Bansi NL NER UP 2010-11 91 643 1.14 Work sanctioned.
414 Tanakpur-Bageshwar NL NER UTRA 2010-11 155 2791 -1.16 Survey completed and Report
under examination.
415 Barpeta Rd - Tihu. NL NFR ASS NE 2010-11 58 520 -6.60 Survey completed and Report
under examination.
416 Chaparmukh-Dibrugarh NL NFR ASS 2010-11 344 3491 -6.27% Survey completed and Report
under examination.
417 Dangri-Dhola NL NFR ASS 2010-11 6 48 -14.01 Survey completed and Report
under examination.
418 Dullabchhera-Cheragi(NL-17.6km) and NL NFR ASS 2010-11 47 213 -8.3 Work sanctioned.
Baraigram-Dullabcherra(GC-29.4km)
419 Lalabazar-Vairengte NL NFR ASS NE 2010-11 20 364 -12.52 Survey completed and Report
under examination.
420 Lekhapani-Kharsang NL NFR ASS NE 2010-11 31 318 -7.30 Survey completed and Report
under examination.
421 Mirik-Gangtok NL NFR SIKKI WB 2010-11 163 11684 -9.65% Completed & project shelved
M
422 Murkongselek - Passighat NL NFR ASS 2010-11 31 165 -8.02% Work sanctioned.
423 Naginimora- Amguri NL NFR ASS NAGA 2010-11 31 389 -6.74 Survey completed and Report
under examination.
424 Pancharatna(Jogighopa ) to NL NFR ASS 2010-11 437 18181 -8.3 Completed & project shelved
Badarpur(Silchar )
425 Rangpo-Gangtok NL NFR SIKKI NE 2010-11 69 4165 -11 Survey completed and Report
M under examination.
426 Salona to Khumtai NL NFR ASS 2010-11 99 2932 -8.99% Survey completed and Report
under examination.
427 Samsi-Dalkhola NL NFR WB BIH 2010-11 102 745 -8.73 Work sanctioned.
428 Sarthabari to Changasari NL NFR ASS NE 2010-11 59 458 -6.78 Completed & project shelved
429 Siliguri-Sukna NL NFR WB 2010-11 6 110 -8.86% Survey completed and Report
under examination.
430 Tuli line to Tuli Town(Tuli-Tuli Road) NL NFR NE NAGA 2010-11 9 109 -7.08 Survey completed and Report
under examination.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
431 Amethi-Shahganj via Sultanpur. NL NR UP 2010-11 101 596 -6.73 Work sanctioned.
432 Bacharwan-Lalganj NL NR UP 2010-11 37 234 -8.21% Survey completed and Report
under examination.
433 Baddi-Kalka NL NR HP HAR 2010-11 20 385 -3.82% Survey completed and Report
under examination.
434 Bahadurgarh - Jhajjar NL NR HAR 2010-11 33 308 -5.17% Completed & project shelved
435 Baramulla - Kupwara NL NR J&K 2010-11 39 628 -7.48% Survey completed and Report
under examination.
436 Beas-Kapurthala NL NR PUN 2010-11 19 86 -12.47 Completed & project shelved
437 Daurala-Bijnaur via Hastinapur NL NR UP 2010-11 62 756 -4.76 Completed & project shelved
438 Faizabad-Lalganj via Akbarganj, NL NR UP 2010-11 116 654 -8.06% Work sanctioned.
Maharajganj and Raibarely
439 Gajraula-Mainpuri via Sambhal, Rajghat, NL NR UP 2010-11 167 881 -8.71 Survey completed and Report
Badaun, Etah under examination.
440 Govardhan-Kosikalan via Barsana & NL NR UP 2010-11 36 195 -8.91 Survey completed and Report
Nandgaon under examination.
441 Hastinapur-Meerut NL NR UP 2010-11 31 260 -5.12 Survey completed and Report
under examination.
442 Hissar to Sirsa via Agroha & Fatehabad NL NR HAR 2010-11 93 400 -6.74 Work sanctioned.
443 Jammu to Poonch via Akhnur,Rajouri NL NR J&K 2010-11 223 13613 -4.61 Survey completed and Report
under examination.
444 Panipat-Meerut (104 km) NL NR HAR UP 2010-11 104 951 (-) Survey completed and Report
4.70% under examination.
445 Parwanoo-Darlaghat (Kalka-Darlaghat) NL NR HP 2010-11 92 3900 -4.21% Completed & project shelved
446 Patiala - Kurukshetra NL NR HAR PUN 2010-11 88 589 -9.87 Survey completed and Report
under examination.
447 Piran Kaliyar Sharif- Haridwar NL NR UTRA 2010-11 22 177 -5.60 Survey completed and Report
under examination.
448 Qadian to Beas NL NR PUN 2010-11 40 205 -5.15% Work sanctioned.
449 Rishikesh-Doiwala NL NR UTRA 2010-11 19 260 -3.5% Survey completed and Report
under examination.
450 Rohtak-Hansi via Meham NL NR HAR 2010-11 69 407 -5.20 Work sanctioned.
451 Shahganj-Unchahar via Sultanpur, Amethi, NL NR UP 2010-11 174 1000 -7.78 Work sanctioned.
Salon
452 Una - Hoshiarpur NL NR HP PUN 2010-11 40 754 -6.32% Completed & project shelved
453 Una-Jaijon Doaba NL NR HP PUN 2010-11 40 813 -6.30% Completed & project shelved
454 Yamuna Nagar-Chandigarh via Sadhaura, NL NR HAR PUN 2010-11 91 651 - Work sanctioned.
Narayangarh 10.42%
455 Ajmer-Kota (Nasirabad-Jalindri) NL NWR RAJ 2010-11 145 822 -6.88 Work sanctioned.
456 Ajmer-Sawaimadhopur via Tonk NL NWR RAJ 2010-11 165 873 -7.25% Work sanctioned.
457 Bilara-Bar NL NWR RAJ 2010-11 47 205 - Survey completed and Report
10.95% under examination.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
458 Churu-Nohar via Taranagar NL NWR RAJ 2010-11 103 319 -7.79% Survey completed and Report
under examination.
459 Pushkar-Merta NL NWR RAJ 2010-11 59 323 -7.65% Work sanctioned.
460 Ratlam-Banswara-Dungarpur NL NWR MP RAJ 2010-11 176 2082 9 Work sanctioned.
461 Samdari-Phalodi NL NWR RAJ 2010-11 156 515 (-)7.39 Survey completed and Report
under examination.
462 Armoor-Adilabad via Nirmali NL SCR TLN 2010-11 136 700 -10.77 Survey completed and Report
under examination.
463 Bhadrachallam-Kovvur NL SCR AP TLN 2010-11 151 923 20.1 Work sanctioned.
and
28.8
464 Gadwal-Macherla NL SCR AP TLN 2010-11 184 920 -3.98 Survey completed and Report
under examination.
465 Gudur-Durgarajapuram NL SCR AP 2010-11 42 278 -12.72 Work sanctioned.
466 Kinwat-Mahur NL SCR MAH 2010-11 42 210 -12.51 Survey completed and Report
under examination.
467 Kondapalli-Kothagudem NL SCR AP TLN 2010-11 125 723 16.94 Work sanctioned.
468 Manuguru-Ramagundam stn. NL SCR TLN 2010-11 200 1112 7.97% Work sanctioned.
469 Markapur-Shrisailem NL SCR AP 2010-11 56 448 -9.28 Survey completed and Report
under examination.
470 Medak-Akkanapet NL SCR AP 2010-11 17 114 18.41 Work sanctioned.
471 Mellachervu-Janpahad NL SCR AP 2010-11 25 175 32.60 Work sanctioned.
472 Pandurangapuram-Bhadrachalam NL SCR TLN 2010-11 13 79 (- Survey completed and Report
(Sarpaka) )0.27% under examination.
473 Piduguralla to Nairusaraopet NL SCR AP 2010-11 40 234 -0.40% Survey completed and Report
under examination.
474 Tadikalapudi-Koyagudum open cast mines NL SCR AP 2010-11 20 119 17.94% Completed & project shelved

475 Barwadih-Chirmiri NL SECR CHTS 2010-11 182 1137 +8.61 Work sanctioned.
476 Lohardaga - Korba NL SECR JRKD CHTS 2010-11 326 2444 -7.37% Survey completed and Report
under examination.
477 Pendra Rd-Korba/Gevra Rd NL SECR CHTS 2010-11 122 862 22.39% Work sanctioned.
478 Raigarh-Mand Colliery to Bhupdeopur NL SECR CHTS 2010-11 63 344 26.11 Work sanctioned.
479 Raipur-Jharsuguda NL SECR CHTS ORI 2010-11 310 2161 16.70 Work sanctioned.
480 Banspani-Bimlagarh-Barsuan NL SER ORI 2010-11 52 786 10.74 Survey completed and Report
under examination.
481 Barajamda-Tatiba NL SER JRKD 2010-11 8 87 0.03 Survey completed and Report
under examination.
482 Digha-Balichak NL SER WB 2010-11 70 758 (- Completed & project shelved
)5.07%
483 Kandra-Namkom(Ranchi) NL SER JRKD 2010-11 106 864 6.6% Survey completed and Report
under examination.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
484 Kanthi-Belda NL SER WB 2010-11 58 517 -4.6 Work sanctioned.
485 Machlandpur-Swarupnagar NL SER WB 2010-11 15 105 -6.20 Work sanctioned.
486 Singur-Nandigram NL SER WB 2010-11 80 262 -8.12 Work sanctioned.
487 Jolarpettai-Hossur via Krishnagiri NL SR TN 2010-11 101 688 -2.52 Survey completed and Report
under examination.
488 Madurai(Bodinayakanur)-Kottayam NL SR KER TN 2010-11 120 1229 -5.96 Completed & project shelved
489 Rameshwaram-Dhanushkoti NL SR TN 2010-11 17 54 -13.761 Completed & project shelved
490 Anekal Road-Bidadi NL SWR KAR 2010-11 48 426 4.42% Survey completed and Report
under examination.
491 Gadag - Harihar via Harpanahalli NL SWR KAR 2010-11 94 465 -5.0 Completed & project shelved
492 Gadag-Haveri NL SWR KAR 2010-11 53 299 12.3% Survey completed and Report
under examination.
493 Marikuppam-Kuppam NL SWR KAR 2010-11 24 100 3.68% Work sanctioned.
494 Shimoga-Harihar NL SWR KAR 2010-11 79 563 18.42 Work sanctioned.
495 Srinivasapura-Madanapalli NL SWR KAR AP 2010-11 75 466 7.77% Work sanctioned.
496 Talguppa-Honavar NL SWR KAR 2010-11 82 1511 12.27 Survey completed and Report
under examination.
497 Tumkur-Devangere NL SWR KAR 2010-11 199 913 12.10 Work sanctioned.
498 Dohrighat-Indara GC NER UP 2010-11 34 68 -6.01& (- Survey completed and Report
)3.93% under examination.

499 Pathankot-Jogindernagar GC NR HP 2010-11 181 2888 -6.08 Survey completed and Report
under examination.
500 Nagbhir-Nagpur GC SECR MAH 2010-11 116 575 4.83% Work sanctioned.
501 Raipur-Dhamtari via Naya Raipur GC SECR CHTS 2010-11 67 283 12.20% Work sanctioned.
502 Tambram-Chengalpattu GC SR TN 2010-11 30 188 +3.38 Completed & project shelved
503 Ahmedabad-Botad & Dhasa-Jetalsar GC WR GUJ 2010-11 278 944 5.83% Work sanctioned.
504 Gauge conversion of Sardarsahar- GC NWR RAJ 2010-11 157 653 5.32% Work sanctioned.
Ratangarh with NL extension upto
Suratgarh
505 Bhadrak-Nergundi 3rd line DL ECOR ORI 2010-11 80 559 26.55 Work sanctioned.
506 3rd line between Krishnanagar-Naihati DL ER WB 2010-11 62 242 -5.32% Work sanctioned.
507 Bandel-Saktigarh 3rd line DL ER WB 2010-11 56 453 -44 Work sanctioned.
508 Jhansi-Bina 3rd line DL NCR MP UP 2010-11 153 1162 13.12% Survey completed and Report
under examination.
509 Jhansi-Kanpur(Bhimsen) DL NCR UP 2010-11 206 1114 19.27% Work sanctioned.
510 New Jalpaiguri to New Alipurduar DL NFR WB 2010-11 147 1062 -6.86 Work sanctioned.
511 3rd & 4th line between Anand Vihar -Tilak DL NR DLI 2010-11 10 296 -4.26 Work sanctioned.
Bridge
512 Sirhind-Nangaldam DL NR HP PUN 2010-11 104 778 4.83% Survey completed and Report
under examination.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
513 Utretia-Rae Bareli & Rae Bareli-Amethi- DL NR UP 2010-11 161 708 -7.46 & - Work sanctioned.
Partapgarh 2.48%
514 Rewari-Hissar DL NWR HAR 2010-11 142 551 35% Work sanctioned.
515 Bibinagar-Nallapadu DL SCR AP TLN 2010-11 243 821 10.02 Completed & project shelved
516 Dornakal Jn. - Manuguru - Doubling with DL SCR TLN 2010-11 104 450 24.53% Survey completed and Report
electrification (104 km) under examination.
517 Secunderabad - Mahboob Nagar DL SCR TLN 2010-11 98 452 14.52 Completed & project shelved
518 Bhojudih-Mohuda DL SER JRKD 2010-11 23 147 19.99 Work sanctioned.
519 Attipattu-Gumidipundi 3rd & 4th line DL SR TN 2010-11 25 305 0.565% Survey completed and Report
under examination.
520 Jollarpettai-Katpadi-Arakkonam 3rd line DL SR TN 2010-11 145 957 5.77 Survey completed and Report
under examination.
521 Renigunta-Arakkonam 3rd line DL SR TN AP 2010-11 79 418 4.46 Survey completed and Report
under examination.
522 Thanjavur-Ponmaliai (GOC) with byepass DL SR TN 2010-11 48 190 9.2 Work sanctioned.

523 Feasibility study for introducing passenger NL CR MAH 2011-12 26 170 -3.75 Survey completed and Report
services between Pen-Thal under examination.
524 Jalna-Khamgaon via Buldhana NL CR MAH 2011-12 155 1027 (- Survey completed and Report
)4.26% under examination.
525 Rail link from JSW Jaigarh Port to KRCL NL CR MAH 2011-12 200 3462 Survey completed and Report
under examination.
526 Rayagada-Gopalpur NL ECOR ORI 2011-12 258 1618 17.15% Survey completed and Report
under examination.
527 Hasnabad-Machalandapur NL ER WB 2011-12 22 276 -14% Survey completed and Report
under examination.
528 Pirpainti-Jasidih NL ER BIH JRKD 2011-12 127 1183 (-)10% Work sanctioned.
529 Santoshpur-Khiderpur via Metiabruz & NL ER WB 2011-12 9 393 -9 Completed & project shelved
Gardenreach
530 Bhind-Orai-Mahoba NL NCR UP MP 2011-12 217 1748 - Survey completed and Report
12.93% under examination.
531 Hamirpur - Hamirpur Road NL NCR UP 2011-12 5 44 (-) Completed & project shelved
70.06%
532 Orai-Jalaun-Konch NL NCR UP 2011-12 59 392 (- Survey completed and Report
)31.12 under examination.
%
533 Rewari-Palwal-Khurja via Bhiwadi NL NCR UP HAR RAJ 2011-12 145 1194 10.57% Completed & project shelved
534 Anandnagar - Ghugli via Maharajganj NL NER UP 2011-12 50 307 +6.97% Work sanctioned.

535 Burhwal- Bahraich NL NER UP 2011-12 70 529 (- Completed & project shelved
)1.84%
S.No Name of the Project Plan Rly State State
State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
536 Etah-Kasganj, NL NER UP 2011-12 29 213 -4.80% Survey completed and Report
under examination.
537 Manjhi-Lar Road via Raghunathpur, NL NER BIH UP 2011-12 92 742 (-) Survey completed and Report
Darauli & Guthani 0.99% under examination.
538 Ramnagar-Chaukhutiya NL NER UTRA 2011-12 87 1379 -3.03% Survey completed and Report
under examination.
539 Sitapur-Baharaich NL NER UP 2011-12 65 402 (-) Survey completed and Report
4.60% under examination.
540 Agartala-Akhaura NL NFR TRI BANGL 2011-12 15 252 0 Work sanctioned.
ADESH

541 Dimapur-Tizit NL NFR NAGA ASS 2011-12 257 4274 -6.18% Work sanctioned.

542 Haldibari-Mekhliganj and extension from NL NFR WB ASS 2011-12 26 542 -6.30 Survey completed and Report
Mekhliganj to Chandrabanga under examination.
543 Jogighopa to Guwahati via Barpetta- NL NFR ASS 2011-12 136 1298 -11.95 Survey completed and Report
Sarthebari under examination.
544 North Lakhimpur-Along-Silapathar NL NFR ASS NE 2011-12 248 12683 (- Survey completed and Report
)8.20% under examination.
545 Passighat-Tezu-Parsuramkund NL NFR ARUN NE 2011-12 128 2863 (- Survey completed and Report
A )8.79% under examination.
546 Rupai-Parashuramkund via Mahadevpur, NL NFR ASS NE 2011-12 98 1467 (-) Survey completed and Report
Namsai, Chingkham 9.13% under examination.
547 Silghat-Tezpur NL NFR ASS 2011-12 27 1003 -7.43% Survey completed and Report
under examination.
548 Tirap-Lekhapani NL NFR ASS 2011-12 6 52 -5.82 Survey completed and Report
under examination.
549 Anandpur Sahib-Garh Shankar NL NR PUN 2011-12 49 841 -7.38% Completed & project shelved
550 Bilaspur-Rampur Bushahr NL NR HP 2011-12 134 6188 -3.85% Survey completed and Report
under examination.
551 Delhi-Sohna-Nuh-Firozpur Jhirka-Alwar NL NR HAR 2011-12 104 1239 -5.13% Work sanctioned.
552 Ghanoli-Dehradun via Baddi, Nalagarh, NL NR HP HAR UTRA 2011-12 216 3746 (- Survey completed and Report
Jagadhari, Surajpur, Kala Amb, Paonta )0.40% under examination.
Sahib.
553 Haridwar-Kotdwar-Ramnagar NL NR UTRA 2011-12 143 1237 -6.00% Survey completed and Report
under examination.
554 Kaithal –Karnal NL NR HAR 2011-12 65 453 -5.63% Completed & project shelved
555 Katra - Bhairawah, Doda to Kishtwar NL NR J&K 2011-12 224 12040 -5.34 Survey completed and Report
under examination.
556 Patiala - Jakhal/Narwana via Samana NL NR HAR PUN 2011-12 93 499 -6.82% Survey completed and Report
under examination.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
557 Tanda-Hoshiarpur NL NR PUN 2011-12 34 361 (- Survey completed and Report
)6.50% under examination.
558 Dabwali-Kalanwali via Sirsa NL NWR HAR 2011-12 33 187 -7.93% Survey completed and Report
under examination.
559 Jaisalmer to Sanu via Hamira NL NWR RAJ 2011-12 59 237 21.71% Work sanctioned.
560 Nagore-Phalodi NL NWR RAJ 2011-12 147 436 (- Survey completed and Report
)7.76% under examination.
561 New line from Sardarsahar to Sadulpur via NL NWR RAJ 2011-12 104 516 -8.20% Survey completed and Report
Taranagar. under examination.
562 Nokha-Sikar NL NWR RAJ 2011-12 210 819 - 7.43% Survey completed and Report
under examination.
563 Sardar Shahr-Hanumangarh NL NWR RAJ 2011-12 149 404 -8.09 Survey completed and Report
under examination.
564 Kacheguda - Chityal NL SCR TLN 2011-12 87 1067 1.03 Survey completed and Report
under examination.
565 Krishna-Vikarabad NL SCR TLN KAR 2011-12 122 788 6.9% Survey completed and Report
under examination.
566 Nanded-Bidar via Degloor NL SCR MAH KAR 2011-12 157 1180 (- Survey completed and Report
)5.12% under examination.
567 Vishnupuram-Vinukonda NL SCR AP 2011-12 66 555 (- Survey completed and Report
)5.13% under examination.
568 Zaheerabad-Secunderabad NL SCR TLN 2011-12 64 456 8.07% Survey completed and Report
under examination.
569 Dongargarh to Kota (Pendu Road) via NL SECR CHTS 2011-12 223 1088 1.42% Completed & project shelved
Khairaghar-Chhuikhadan-Gandai-
Sahaspur Lohara-Kawarda Bodh-Perndra
Road
570 Ramtek-Gotegaon(Sridham) via Sioni NL SECR MP MAH 2011-12 276 1482 (- Survey completed and Report
)1.75% under examination.
571 Banspani-Barbil NL SER ORI JRKD 2011-12 18 175 29.34% Survey completed and Report
under examination.
572 Gua-Manoharpur NL SER JRKD 2011-12 43 512 14.91% Survey completed and Report
under examination.
573 Keonjhar(Kendujhargarh) – Badampahar NL SER ORI 2011-12 80 619 -4.80% Completed & project shelved
574 Kharagpur-Dankuni NL SER WB 2011-12 16 98 15.68% Work sanctioned.
575 Nanda kumar to Moyna (Bolai Panda) NL SER WB 2011-12 27 287 Work sanctioned.
576 Raniganj–Bankura NL SER WB 2011-12 48 254 1.54 Completed & project shelved
577 Avadi-Sriperambudur-Guduvanchery with NL SR TN 2011-12 60 839 2.01% Work sanctioned.
Spur from sriperambudu to Irrungattakottai & 3.3%
with
cost
sharing
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
578 Karaikal-Peralam NL SR TN 2011-12 23 110 13.33% Work sanctioned.
579 Karaikal-Sarkazi NL SR TN 2011-12 41 187 10.996 Completed & project shelved
580 Karaikudi - Tuticorin via Ramanathapuram NL SR TN 2011-12 215 879 -8.3% Completed & project shelved

581 Ramanathapuram- Kanniyakumari via NL SR TN 2011-12 248 1080 -8.88% Completed & project shelved
Tuticorin (Millavittanam
582 Almatti to Yadgir NL SWR KAR 2011-12 160 1400 8.16 Survey completed and Report
under examination.
583 Almatti-Koppal NL SWR KAR 2011-12 125 904 12.01 % Survey completed and Report
under examination.
584 Bijapur-Shahbad NL SWR KAR 2011-12 157 924 5.70 % Survey completed and Report
under examination.
585 Chikaballapur to Gowribidanur NL SWR KAR AP 2011-12 44 327 3.32 % Work sanctioned.
586 Mulbagal-Nangli-Chittoor NL SWR KAR AP 2011-12 130 1031 2.90% Completed & project shelved
587 Pipraigaon and Lalitpur via Chanderi NL WCR MP 2011-12 80 396 -12.96 Survey completed and Report
under examination.
588 Badi Sadri-Nimach NL WR MP RAJ 2011-12 48 303 (- Survey completed and Report
)3.25% under examination.
589 Bhavnagar-Mahuva-Pipavav-Una-Kodinar NL WR GUJ 2011-12 268 1080 -0.20 Survey completed and Report
under examination.
590 Bhavnagar-Tarapur NL WR GUJ 2011-12 136 745 (- Survey completed and Report
)0.86% under examination.
591 Botad-Gondal via Jasdan NL WR GUJ 2011-12 108 1077 -3.64% Survey completed and Report
under examination.
592 Porbandar-Saradiya-Junagarh NL WR GUJ 2011-12 104 416 -3.23 Work sanctioned.
593 Rail linkage for Delhi-Mumbai industrial NL WR GUJ 2011-12 57 496 3.74% Survey completed and Report
corridor in Gujarat (Dholera-Bhimnath- under examination.
Botad
594 Lucknow-Lakhimpur - Pilibhit via Sitapur GC NER UP 2011-12 263 716 14.49% Work sanctioned.
Gauge Conversion
595 Mavli-Bari Sadri GC NWR RAJ 2011-12 82 311 (- Work sanctioned.
)5.24%
596 Khijadya-Amreli-Visayadar-Junagarh GC WR GUJ 2011-12 146 538 (- Survey completed and Report
)1.51% under examination.
597 Himmatnagar-Khedbrahma with ext. upto GC WR RAJ GUJ 2011-12 144 1197 -2.82% Survey completed and Report
Abu road under examination.
598 Mathura-Palwal 4th line DL NCR UP HAR 2011-12 83 524 19.41% Survey completed and Report
under examination.
599 Guwahati(Digaru) - Lumding- Tinsukhya- DL NFR ASS 2011-12 520 3189 (- Work sanctioned.
Dibrugarh )8.24%
600 New Bongaigaon-Rangiya-Kamakhya DL NFR ASS 2011-12 142 1798 (- Work sanctioned.
)7.75%
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
601 Meerut-Tapri DL NR UP 2011-12 114 567 -6.25% Work sanctioned.
602 Bandikui-Alwar (60.37 km) DL DL NWR RAJ 2011-12 60 246 13.86% Work sanctioned.
603 Palanpur-Samakhiali DL WR GUJ 2011-12 248 1320 17.33 Work sanctioned.
604 Solapur-Jalgaon NL CR MAH 2012-13 454 3161 (- Survey completed and Report
)5.94% under examination.
605 Jeypore-Malkangiri NL ECOR ORI AP 2012-13 130 1189 11.66% Completed & project shelved
606 Navarangpur-Jeypore NL ECOR ORI 2012-13 38 485 (- Survey completed and Report
)7.65% under examination.
607 Basirhat to Machlandapur New Line via NL ER WB 2012-13 30 259 (-)14% Completed & project shelved
Baduriya
608 Ghatakpukur to Malancha to Hasnabad NL ER WB 2012-13 25 292 (-) 15% Survey completed and Report
New Line under examination.
609 Bharatpur-Deeg-Kama-Kosi NL NCR RAJ UP 2012-13 86 726 (- Survey completed and Report
)28.34 under examination.
%
610 Panki-Mandhana NL NCR UP 2012-13 18 289 (- Survey completed and Report
)50.57 under examination.
%
611 Dibrugarh-Dangri via New Tinsukia Town NL NFR ASS 2012-13 92 841 (- Survey completed and Report
)10.12 under examination.
%
612 Lanka-Umkyrpong/Pala- Sutnga(Lanka- NL NFR MEGH ASS 2012-13 150 4145 (- Completed & project shelved
Sakhain) )2.76%
613 Misamari-Tawang (378 km) NL NFR ARUN NE 2012-13 378 24489 (-) Survey completed and Report
A 8.79% under examination.
614 Sivok-Kalingpong NL NFR WB 2012-13 24 1434 (- Survey completed and Report
)10.26 under examination.
%
615 Sivok-Mirik NL NFR ASS 2012-13 60 2509 (- Survey completed and Report
)10.08 under examination.
%
616 Bijwasan-Jhajhar-Charkhidadri NL NR HAR 2012-13 70 535 (- Completed & project shelved
)6.65%
617 Dehradun to Vikasnagar NL NR UTRA 2012-13 38 628 (- Completed & project shelved
)5.21%
618 Yamunanagar-Patiala via Kurukshetra NL NR HAR PUN 2012-13 142 1178 (- Completed & project shelved
)9.86%
619 Anupgarh-Bikaner via Chhatargarh, NL NWR RAJ 2012-13 154 707 (- Survey completed and Report
Motigarh )7.24% under examination.
620 Bhiwani-Loharu-Pilani-Churu NL NWR RAJ HAR 2012-13 137 618 (-) Completed & project shelved
7.07%
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
621 Deoli-Tonk-Sakatpura NL NWR RAJ 2012-13 92 705 (- Completed & project shelved
)7.76%
622 Jaisalmer-Barmer NL NWR RAJ 2012-13 145 518 (-) Survey completed and Report
7.74% under examination.
623 Jashalmer-Kandla (ie. Barmer-Bhabhar) NL NWR RAJ GUJ 2012-13 194 786 (-) Completed & project shelved
7.38%
624 Jodhpur - Agolai - Shergarh - Phalsund NL NWR RAJ 2012-13 116 429 - 8.04 Survey completed and Report
% under examination.
625 Sardarsahar to Suratgarh NL NWR RAJ 2012-13 119 392 -7.59% Survey completed and Report
under examination.
626 Tharad-Vav to Suigam border (Dhenera- NL NWR GUJ 2012-13 81 371 (- Survey completed and Report
Tharad-Vav-Suigam) )7.59% under examination.
627 Mantralayam Road- Kurnool NL SCR AP 2012-13 110 559 (-) Completed & project shelved
16.59%
628 Bagnan -Shyampur NL SER WB 2012-13 26 267 (- Survey completed and Report
)7.61% under examination.
629 Belda-Nayagram-Baripada NL SER WB ORI 2012-13 78 848 (- Completed & project shelved
)4.81%
630 Kannur- Mattannur NL SR KER 2012-13 23 237 (- Completed & project shelved
)3.89%
631 Kozhikode-Beypore NL SR KER 2012-13 8 82 6.17 Survey completed and Report
under examination.
632 Salem-Karaikal via Perambalur, NL SR TN 2012-13 227 1240 2.63% Survey completed and Report
Mayiladuthurai under examination.
633 Thakazhy-Tiruvalla NL SR KER 2012-13 21 213 (- Completed & project shelved
)6.71%
634 Thanjavur-Pattukkottai NL SR TN 2012-13 47 290 14.18% Work sanctioned.
635 Thiruvalla-Ranny-Pamba NL SR KER 2012-13 60 1242 (- Completed & project shelved
)8.70%
636 Almatti-Kupgal NL SWR KAR 2012-13 180 1092 2.31% Survey completed and Report
under examination.
637 Belgaum-Bagalkot-Raichur NL SWR KAR 2012-13 345 2227 (- Completed & project shelved
)2.48%
638 Bijapur-Athani-Shedbal NL SWR KAR 2012-13 113 810 (- Completed & project shelved
)0.80%
639 Mysore-Kushalnagar-Madikere NL SWR KAR 2012-13 84 667 (- Survey completed and Report
)0.80% under examination.
640 Achalpur-Murtajapur-Yavatmal,Pulgaon- GC CR MAH 2012-13 225 1554 (-) Survey completed and Report
Arvi 2.45% under examination.
641 Mathura-Vrindavan GC NCR UP 2012-13 12 79 (- Completed & project shelved
)197.94
%
S.No Name of the Project Plan Rly State State
State Year of Length Cost ROR Current Status
head 1 23 Completion (Km) (crore) (%age)
642 Marwar-Mavli GC NWR RAJ 2012-13 167 1288 (-) Survey completed and Report
0.10% under examination.
643 Muzaffarpur-Hajipur DL ECR BIH 2012-13 53 213 Work sanctioned.
644 New Bongaigaon-Kamakhya via Goalpara DL NFR ASS 2012-13 176 1832 -1.72% Survey completed and Report
under examination.
645 Rohtak-Bhiwani DL NR HAR 2012-13 47 190 (- Completed & project shelved
)6.71%
646 Jodhpur - Jaisalmer DL NWR RAJ 2012-13 290 1032 (- Completed & project shelved
)0.02%
647 Durg-Nagpur 3rd line DL SECR CHTS MAH 2012-13 228 1273 19.17 Survey completed and Report
under examination.
648 Kharagpur-Jharsuguda 3rd line DL SER WB JRKD ORI 2012-13 399 Work sanctioned.
649 Irugur-Podanur DL SR TN 2012-13 11 48 10.187 Completed & project shelved
650 Pen-Alibag NL CR MAH 2013-14 28 364 - Survey completed and Report
1.64%& under examination.
+0.25%
with
50%
cost
sharing
651 Sausar-Pandhurana NL CR MP 2013-14 33 347 -7.57% Survey completed and Report
under examination.
652 Bolangir-Naupada NL ECOR ORI 2013-14 100 787 8.97% Survey completed and Report
under examination.
653 Extension of Naupada –Gunupur line up NL ECOR ORI 2013-14 79 435 13.64% Survey completed and Report
to Theruvali under examination.
654 Junagarh-Amagura via Nabrangpur NL ECOR ORI 2013-14 179 1587 14.78% Survey completed and Report
under examination.
655 Khurda Road-Rajatgarh bye-passing NL ECOR ORI 2013-14 82 644 19,30% Survey completed and Report
Bhubaneshwar under examination.
656 Connecting Giridih rly stn with Parasnath NL ECR JRKD 2013-14 35 308 (-) Survey completed and Report
Madhuban rail line 11.34% under examination.
657 Phaphund-Konch NL NCR UP 2013-14 90 794 1.52% Survey completed and Report
under examination.
658 Makanpur (Araul)-Madarshah Mazar NL NER UP 2013-14 10 72 - Completed & project shelved
17.1675
%
659 Changsari-Tezpur via Sipajhar, NL NFR ASS NE 2013-14 155 2055 (- Completed & project shelved
Mangaldoi,Kharupetia,Dalgaon )14.25
Sialmari,Basimari,Routa & Orang %
660 Furketing - Baghty Valley NL NFR ASS NAGA 2013-14 47 1316 (- Survey completed and Report
)8.77% under examination.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
661 Imphal-Moreh NL NFR MANI NE 2013-14 111 5379 (- Survey completed and Report
PUR )7.43% under examination.
662 Shillong-Chandranathpur NL NFR ASS MEGH 2013-14 223 7210 -4.21% Survey completed and Report
under examination.
663 Dharamkot-Moga NL NR PUN 2013-14 19 287 -6.39% Survey completed and Report
under examination.
664 Karanprayag - Chamoli NL NR UTRA 2013-14 28 1301 -6.54% Survey completed and Report
under examination.
665 Kashipur- Dhampur via Jaspur NL NR UTRA 2013-14 58 576 7.59% Completed & project shelved
666 Patiala-Jakhal NL NR HAR 2013-14 93 466 (- Completed & project shelved
)5.67%
667 Pehowa to Ponta Sahib via Jagadhri- NL NR HAR HP 2013-14 112 1954 (- Survey completed and Report
Yamuna Nagar )3.90% under examination.
668 Rajpura Junction -Chandigarh NL NR PUN 2013-14 32 693 (- Survey completed and Report
)6.05% under examination.
669 Safipur(on Unnao- Pilibhit section)- Bithoor NL NR UP 2013-14 23 445 -4.84% Survey completed and Report
Station under examination.
670 Nathdwara-Kankroli-Gangapur-Bhilwara NL NWR RAJ 2013-14 111 917 (- Completed & project shelved
rail route )6.56%
671 Gadchandur to Adilabad NL SCR MAH TLN 2013-14 70 448 3.59% Completed & project shelved
672 Jaggayyapeta-Miryalguda NL SCR TLN 2013-14 37 222 (- Survey completed and Report
)10.71 under examination.
%
673 Karimnagar-Hassanparthi NL SCR TLN 2013-14 62 464 7.60% Survey completed and Report
under examination.
674 Chirmiri and Nagpur Halt RS. NL SECR CHTS 2013-14 11 69 (+)9.14 Survey completed and Report
% under examination.
675 Construction of new line between Nagpur NL SECR CHTS 2013-14 15 118 4.33% Survey completed and Report
Halt(on Boridand-Ambikapur railline) to under examination.
Paradol(on Bridand Chirmiri Railline).

676 Egra-Belda NL SER WB 2013-14 32 449 (- Survey completed and Report


)4.25% under examination.
677 Nandigram-Hijli Pirbaba via Jelingham NL SER WB 2013-14 34 413 (- Completed & project shelved
)2.28%
678 Chenganur-Thiruvananthapuram NL SR KER 2013-14 101 815 (- Survey completed and Report
)7.61% under examination.
679 Erumeli-Pathanamthitta-Punalur- NL SR KER 2013-14 145 1343 (- Completed & project shelved
Thiruvananthapuram )2.19%
680 Kollengode-Thrisur NL SR KER 2013-14 59 481 -7.67% Completed & project shelved
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
681 Madurai-Ernakulam (Bodinayakkanur- NL SR TN KER 2013-14 126 3966 (- Survey completed and Report
Ernakulam) )10.35 under examination.
%
682 Morappur-Dharmapuri NL SR TN 2013-14 36 239 (- Survey completed and Report
)8.040 under examination.
%
683 Nanjangod-Nilambur Road NL SR KER KAR 2013-14 236 4267 (- Completed & project shelved
)0.90%
684 Thalassery-Mysore NL SR KAR KER 2013-14 299 3379 (- Survey completed and Report
)6.56% under examination.
685 Gadag-Wadi NL SWR KAR 2013-14 252 1922 17.18% Work sanctioned.
686 Baran-Shivpuri NL WCR RAJ MP 2013-14 151 778 (- Survey completed and Report
)11.77 under examination.
%
687 Biyavra Rajgarh - Bina NL WCR MP 2013-14 147 947 (- Survey completed and Report
)1.50% under examination.
688 Guna-Aron-Sironj-Vasoda-Vidisha NL WCR MP 2013-14 120 754 +1.29% Survey completed and Report
under examination.
689 Jabalpur-Udaipura -Sagar NL WCR MP 2013-14 219 2059 - Survey completed and Report
91.71% under examination.
690 Sagar-Chatarpur-Khajuraho-Bhopal NL WCR MP 2013-14 320 1916 -6.70% Survey completed and Report
under examination.
691 Traffic survey for Botad-Gondal via NL WR GUJ 2013-14 108 1058 0.08% Survey completed and Report
Jasdan new line under examination.
692 Vasai Road- Bye pass line between NL WR MAH 2013-14 7 424 (- Survey completed and Report
Naigaon and Diva )2.29% under examination.
(Juchandra) with fly-over
693 Veraval-Porbandar NL WR GUJ 2013-14 133 1232 (- Survey completed and Report
)3.43% under examination.
694 Bilimora-Wagai(GC) with extension to GC WR MAH GUJ 2013-14 254 3538 2.27% Survey completed and Report
Manmad(NL) under examination.
695 Jhaghadia-Netrang(GC) with extension to GC WR GUJ MAH 2013-14 192 1436 (- Survey completed and Report
Nandurbar(NL) via Sagbara-Khopar-Tawda- )3.88% under examination.
Shahda-Dondacha
696 Pratapnagar-Vishwamitri-Jambusar-Samni GC WR GUJ 2013-14 103 792 2.63% Survey completed and Report
& Jambusar-Kavi under examination.
697 Mathura-Jhansi 3rd line DL NCR UP 2013-14 274 2488 21.73% Survey completed and Report
under examination.
698 Manikgarh-Gadchandur DL SCR AP 2013-14 28 203 17.86% Survey completed and Report
under examination.
699 3rd line between Kharagpur and Bhadrak DL SER WB ORI 2013-14 155 1551 20.72% Survey completed and Report
under examination.
S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status
head 1 2 3 Completion (Km) (crore) (%age)
700 Doubling and electrification of Madurai- DL SR TN 2013-14 245 1926 8.09% Survey completed and Report
Tirunelveli-Kanyakumari section. under examination.
701 Doubling work between Trivandrum and DL SR KER TN 2013-14 87 617 7.026% Survey completed and Report
Kanniyakumari. under examination.
702 Gadag-Solapur DL SWR MAH KAR 2013-14 284 1618 19.81% Survey completed and Report
under examination.
703 Satna-Rewa DL WCR MP 2013-14 49 165 15% Survey completed and Report
under examination.
704 Rajkot-Viramgam DL WR GUJ 2013-14 116 1333 17.38% Survey completed and Report
under examination.

Details of abbreviations used


Plan Head States
NL New Line CHTS Chhattisgarh
GC Gauge Conversion DLI Delhi
DL Doubling GUJ Gujarat
Railway HAR Haryana
CR Central Railway HP Himachal Pradesh
ECoR East Coast Railway J&K Jammu & Kashmir
ECR East Central Railway JRKD Jharkhand
ER Eastern Railway KAR Karnataka
NCR North Central Railway KER Kerala
NER North Eastern Railway MAH Maharashtra
NFR Northeast Frontier Railway MIZ Mizoram
NR Northern Railway MEGH Meghalaya
NWR North Western Railway MP Madhya Pradesh
SCR South Central Railway NAGA Nagaland
SECR South East Central Railway NE North Eastern Region
SER South Eastern Railway ORI Odisha
SR Southern Railway PONDI Pondicherry
SWR South Western Railway PUN Punjab
WCR West Central Railway RAJ Rajasthan
WR Western Railway TLN Telengana
States TN Tamilnadu
AP Andhra Pradesh TRI Tripura
ARUNA Arunachal Pradesh UP Uttar Pradesh
ASS Assam UTRA Uttarakhand
BIH Bihar WB West Bengal