Professional Documents
Culture Documents
eryyhy
eryyhy
eryyhy
12390-3
Number of Test Report 166
Project CONGO – BIOFUEL 1st AGRI HUB - INDUSTRIAL START-UP
Contractor ZEROCK CONSTRUCTION CONGO
Origin of Concrete Zerock Concrete Batching Plant in Loudima
2nd line Production; Silo; Water tank / Trench; Seed Cleaner; Footing /TR13_F24-F23 wall; TR21_F22-F19E Wall;
TR11_F18-F13C Wall; TR11_F30-F31 Base; F7Base; F4(6pcs); TR17_F3-Base; Silo 2 Wall; Water tank 2
30A100_RFI_184 EXT
Number notification Date of receipt 10/2/2023
Name
Signature
Date
Name
Signature
Date