LOCATED IN MCC ROOM AT GROUND FLOOR OF MAIN PLANT BLDG. LOCATED IN BOILER ROOM AT GROUND FLOOR
OPTION-1 : SINGLE FRONT, NO REAR ACCESSIBLE (WALL TOUCH), I/C & O/G ALL TOP CABLE ENTRY
400 kVAR APFC PANEL OPTION-1 : SINGLE FRONT, NO REAR ACCESSIBLE (WALL TOUCH), I/C BOTTOM & OUTGOING ALL TOP CABLE ENTRY
OPTION-2 : DOUBLE FRONT, ALL I/C & O/G TOP & BOTTOM CABLE ENTRY OPTION-2 : DOUBLE FRONT, ALL I/C & O/G ALL TOP CABLE ENTRY
11KV RECEIVING SUB STATION LOCATED IN MAIN ELECT. ROOM AT 11 kV REC'G S/STN.
FRONT ACCESSIBLE SWGR, REAR CAPACITORS, I/C BOTTOM CABLE ENTRY
INCOMMING
ASS
DGVCL OH/UG LINE ASS A
A CT COOLING PUMP - 1
CT RK 1 TRANSFERRED PUMP
80 A TP MCCB-50kA-T/M (25HP, 18.65KW)
A/M
(20HP, 14.92KW)
OFF
OFF
ON
ON
GOD
R 50 A TP MCCB-50kA-T/M PGR-101-01
GOD / DO 50 KVAr
Y ASS
DP STRUCTURE R 60 KVAr CAPACITOR CAPACITOR BANK
MPP H
ASS A
(DGVCL SCOPE) DUTY CONTACTOR
DO
Y B A CT COOLING PUMP - 2
RK 2 TRANSFERRED PUMP
CT 80 A TP MCCB-50kA-T/M (25HP, 18.65KW)
250 A TP (20HP, 14.92KW)
B
MCCB-36kA 50 A TP MCCB-50kA-T/M PGR-101-02
T/M 50 KVAr ASS
METERING CAPACITOR BANK R
CT 60 KVAr CAPACITOR ASS A
TVM DP STRUCTURE V A DUTY CONTACTOR MPP H
A Y CT
(DGVCL SCOPE) COOLING PUMP - 3
PT
POWER CONTROL CENTRE (PCC) CT
RK 3 TRANSFERRED PUMP B
80 A TP MCCB-50kA-T/M (25HP, 18.65KW)
A/M
OFF
OFF
ON
ON
50 A TP MCCB-50kA-T/M (20HP, 14.92KW)
PGR-101-03 ASS
50 KVAr
FROM PCC
LOCATED IN MAIN ELECT. ROOM AT 11 kV REC'G S/STN.
LEGEND:
GOD
ON TRIP
A
SINGLE FRONT, EXTENSIBLE TYPE, REAR CABLE COMPARTMENTS, ALL BOTTOM CABLE ENTRIES 125 A TP 60 KVAr CAPACITOR CAPACITOR BANK ASS
CT
GOD / DO MPP H A COOLING PUMP - 3
DP STRUCTURE MCCB-25KA DUTY CONTACTOR
RK 4 TRANSFERRED PUMP 40 A TP MCCB-50kA-T/M (10HP, 7.46KW)
T/M CT
(CLIENT SCOPE) (20HP, 14.92KW)
800 A TP
DO
A/M
OFF
OFF
50 A TP MCCB-50kA-T/M
ON
ON
PGR-101-04
MCCB-50kA
TMD
125 A TP 60 KVAr CAPACITOR
50 KVAr
CAPACITOR BANK ASS
ASS
A ON = INDICATING LAMP
MPP H MFM A CT COOLING PUMP - 4
MCCB-25KA DUTY CONTACTOR
CT RK 5 TRANSFERRED PUMP
800 A TP MCCB-50kA-MPR, LSIG T/M RS485
(20HP, 14.92KW) 40 A TP MCCB-50kA-T/M (10HP, 7.46KW)
FROM PCC
OFF = INDICATING LAMP
A/M
ON TRIP 50 A TP MCCB-50kA-T/M
OFF
OFF
ON
ON
400 kVAR APFC PANEL PGR-101-05
R 12 STAGE ASS
FROM PCC
B WITH :
MCCB-25KA DUTY CONTACTOR MPP H
OUTDOOR TYPE > MEASUREMENT OF INDIVIDUAL
CURRENT AND VOLTAGE HARMONIC
T/M MCCB-36kA
MPR
CT
50 A TP MCCB-50kA-T/M
(20HP, 14.92KW) ON TRIP 40 A TP MCCB-50kA-T/M (10HP, 7.46KW)
PGR-101-06
A/M
(THD) UP TO 15TH ORDER
OFF
OFF
ON
ON
> CAPACITOR FAILURE INDICATION
CAPACITOR BANK
CAPACITOR BANK
400 A TP MCCB-36kA-T/M 50 KVAr 630 A TP CT
ASS
MCC - 1A (PRODUCTION)
VCB
VCB
25 KVAr
PGR-201-01
A/M
OFF
OFF
ON
ON
25 KVAr ASS
630 A TP MCCB-50kA-MPR CAPACITOR BANK A 25 A TP MCCB = MOLDED CASE CIRCUIT BREAKER
FUTURE
TRANSFORMER
A/M
OFF
OFF
ON
ON
ASS
25 KVAr A
TRANSFORMER 630 A TP MCCB-50kA-MPR
MCC - 1C (PRODUCTION)
63 A TP MCB-10kA 33.3 KVAr CAPACITOR
MPP H
CAPACITOR BANK
25 A TP
CT COOLING TOWER FAN - 1
ACB = AIR CIRCUIT BREAKER
63 A TP SFU
63 A TP SFU
A/M
PCL-200-01
OFF
OFF
ON
ON
TRIP
OFF
ON
RS485 ASS
630 A TP MCCB-50kA-MPR
40 A TP MCB-10kA 25 KVAr CAPACITOR
15 KVAr
CAPACITOR BANK 63 A TP MCCB-25kA-T/M
CAGE HOIST (CGL-01) CT
A
COOLING TOWER FAN - 2 MPCB = MOTOR PROTECTION CIRCUIT BREAKER
MCC - 2 (BOILER AREA) (10HP, 7.46KW) (12.5HP, 9.33KW)
NEU.
TNC
CT CT ON TRIP
DUTY CONTACTOR MPP H
40 A TP MCCB-50kA-T/M WITH SHORT CIRCUIT + OVER LOAD PROTECTION
1600 A FP
TR. CL.
A/M
OFF
OFF
ON
ON
MATERIAL HOIST - 1 (ML-01)
R G A A.C.B-50kA 63 A TP MCCB-25kA-T/M (3.5HP, 2.61KW)
250 A TP MCCB-36kA-T/M 15 KVAr
EDO-LSING
1000 KVA
11 KV/433 V
TCH SC MCC - 3 (RM SHED) 40 A TP MCB-10kA 25 KVAr CAPACITOR
DUTY CONTACTOR MPP H
CAPACITOR BANK
MATERIAL HOIST - 2 (ML-02) 63 A TP MCCB-36kA-T/M
AIR COMPRESSOR - 1
(20HP, 14.92KW) SELECTOR SWITCH
ON TRIP
TRANSFORMER 63 A TP MCCB-25kA-T/M (3.5HP, 2.61KW)
A/M
OFF
OFF
ON
ON
Dyn11, ONAN, OLTC 250 A TP MCCB-36kA-T/M
ASS
MCC - 4 (FUTURE)
10 KVAr
CAPACITOR BANK CT
A
FG 1 CIRCULATION PUMP DRYER-1 A AMMETER
25 A TP MCB-10kA 12.5 KVAr CAPACITOR
ON TRIP DUTY CONTACTOR MPP H
40 A TP MCCB-50kA-T/M
(10HP, 7.46KW)
PGR-301-01
16 A FP MCB-10kA (3HP, 2.24KW) DIGITAL AMMETER
A/M
OFF
OFF
ON
ON
160 A TP MCCB-36kA-T/M ASS
A
MAIN LIGHTING PANEL
25 A TP MCB-10kA 12.5 KVAr CAPACITOR
10 KVAr
CAPACITOR BANK CT FG 2 CIRCULATION PUMP )
(10HP, 7.46KW)
AIR COMPRESSOR - 2 MFM MFM = MULTI-FUNCTION METER
ON TRIP MPP H 40 A TP MCCB-50kA-T/M 63 A TP MCCB-36kA-T/M (20HP, 14.92KW) RS485
DUTY CONTACTOR PGR-301-02
PARAMETERS : V, A, F, PF, KW, KVA, KVAR, KWH, KVAH, KVARH,
200 A TP MCCB-36kA-T/M ASS
A CT RUNHOURS, ON HOURS, THD, PHASE ANGLE, NEUTRAL CURRENT
MEANS STATE ELECTRICITY POWER & DG POWER
CT DRYER-2
(10HP, 7.46KW)
ELECTRICAL & MECHANICAL INTER-LOCK
ON TRIP
40 A TP MCCB-50kA-T/M 16 A FP MCB-10kA (3HP, 2.24KW)
PGR-301-03
63 A TP MCCB-36kA-T/M ASS
CONTACTOR
1600 A, 440V, 50 Hz., TPN Alu. BUS BARS
100 A TP MCCB-36kA-T/M OPTION-1 : SINGLE FRONT, NO REAR ACCESSIBLE (WALL TOUCH), I/C & O/G ALL TOP CABLE ENTRY
OPTION-2 : DOUBLE FRONT, ALL I/C & O/G TOP & BOTTOM CABLE ENTRY
OFF = PUSH BUTTON
HVAC
LIQUID FILLING M/C-1 25 A TP
ON TRIP FO TANK HEATER (FOT)
(3HP, 2.24KW) CONT. (5HP, 3.73KW)
200 A TP MCCB-36kA-T/M
16 A FP MCB-10kA
FLM-301-01
10 A TP MPCB-50kA
EDO = ELECTRICAL DRAW-OUT
SPARE 18 A TP
A
ON
RS485
CT
500 KVA 25 A TP SPARE CT VACUUM PUMP - 2 (VP-2)
DG SET-1 ON TRIP 16 A DP MCB-10kA CONT. RM UNLOADING PUMP - 1 50 A TP MCCB-50kA-T/M (20HP, 14.92KW) (15HP, 11.19KW)
50 A TP MCCB-50kA-T/M
10 A TP MPCB-50kA (5HP, 3.73KW)
NEU. CT 63 A TP DG-1 AUX. PCL-401-01
TR. CL.
TNC 1600 A FP
R G A A.C.B-50kA 16 A DP MCB-10kA MFM 25 A TP ASS
MCCB-36kA 25 A TP SPARE
EDO-LSING RS485
RM UNLOADING PUMP - 2 CONT. A
FROM PCC
T/M DG-2 AUX. CONT. 13 A TP MPCB-50kA (7.5HP, 5.6KW)
TCH SC ON TRIP 10 A TP MPCB-50kA (5HP, 3.73KW) CT SPARE
PCL-401-02 80 A TP MCCB-50kA-T/M (25HP, 18.6KW)
800 A TP 16 A DP MCB-10kA
A.C.B-50kA,EDO 200 A TP CT
RMU AUX. 18 A TP ASS
MCCB-36kA 25 A TP SPARE
500 KVA CONT. RM UNLOADING PUMP - 3 6.3 A TP MPCB-50kA
CONT.
(3HP, 2.24KW)
A
DG SET-2 32 A FP MCB-10kA T/M 10 A TP MPCB-50kA (5HP, 3.73KW) CT SPARE
PCL-401-03 40 A TP MCCB-50kA-T/M (10HP, 7.5KW)
SPARE
FUTURE ASS SPARE
A 160 A TP MCCB-36kA-T/M
CT RM UNLOADING PUMP - 4
25 A TP SPARE
50 A TP MCCB-50kA-T/M (15HP,11.19KW)
CONT. (7.5HP, 5.6KW)
25 A TP
CONT. RM UNLOADING PUMP - 5
25 A TP SPARE
10 A TP MPCB-50kA (5HP, 3.73KW)
PLANT FLP RECEPTACLES CONT. (5HP, 3.75KW)
PCL-401-05 10 A TP MPCB-50kA
63 A TP MCCB-25kA-T/M
25 A TP
CONT. RM UNLOADING PUMP - 6 PLANT FLP RECEPTACLES 18 A TP SPARE
10 A TP MPCB-50kA (5HP, 3.73KW) 63 A TP MCCB-25kA-T/M CONT. (3HP, 2.25KW)
PCL-401-06 6.3 A TP MPCB-50kA
ASS
A
MAIN LIGHTING PANEL 10 A TP MPCB-50kA
25 A TP
CONT. RM UNLOADING PUMP - 7
(5HP, 3.73KW)
CT
50 A TP MCCB-50kA-T/M
FILTER PUMP - 3
(20HP, 14.92KW) PLANT NON-FLP RECEPTACLES
LOCATED IN MAIN ELECT. ROOM AT 11 kV REC'G S/STN. PGR-201-03 40 A FP MCB-10kA
PCL-401-07 FUTURE
SINGLE FRONT, REAR CABLE COMPARTMENTS, ALL BOTTOM CABLE ENTRIES
SUB LTG. PANEL - 1 (PRODUCTION) ASS
A
ASS
A
LOCATED IN MCC ROOM AT GROUND FLOOR OF MAIN PLANT BLDG. CT CT FILTER PUMP - 4
RM UNLOADING PUMP - 8 (20HP, 14.92KW) SPARE
SINGLE FRONT, WALL MOUNTED, ALL BOTTOM CABLE ENTRIES (15HP,11.19KW) 50 A TP MCCB-50kA-T/M 25 A FP MCB-10kA
50 A TP MCCB-50kA-T/M PGR-201-04
200 A, 440V, 50 Hz.,
125 A TP MCCB-25kA-T/M
R PCL-401-08
TPN Cu. BUSBARS
(15HP, 11.19KW)
FROM MAIN LTG. PNL.
B 50 A TP MCCB-50kA-T/M FUTURE
LDB - 1 (BARREL PACKAGING SHED) PCL-401-09
40 A FP RCBo-30mA
25 A TP 50 A TP MCCB-50kA-T/M FUTURE
CONT. SPARE FUTURE
10 A TP MPCB-50kA (5HP, 3.75KW)
80 A TP MCCB-25kA-T/M 25 A TP
PCL-401-13 PRIMARY PUMP - 1
CT SUB LIGHTING PANEL - 2 (RM SHED) CONT.
160 A TP MATERIAL HOIST - 3 (ML-03) 10 A TP MPCB-50kA (5HP, 3.73KW)
MCCB-36kA 63 A TP MCCB-25kA-T/M (3.5HP, 2.61KW) FUTURE
63 A FP MCB-10kA 18 A TP
200 A, 440V, 50 Hz.,
SUB LIGHTING PANEL - 4 (FUTURE EXPANSION - PRODUCTION) 6.3 A TP MPCB-50kA (3HP, 2.25KW) ASS
PCL-400-01 A RK 7 TRANSFERRED PUMP 25 A TP
PRIMARY PUMP - 2
200 A, 440V, 50 Hz., TPN Cu. BUSBARS
63 A TP MCCB-25kA-T/M CT CONT.
OFFICE LTG. 40 A FP RCBo-30mA (20HP, 14.92KW) 10 A TP MPCB-50kA (5HP, 3.73KW)
SUB LTG. PANEL - 3 (ADMIN) SPARE 50 A TP MCCB-50kA-T/M PGR-101-07 FUTURE
KWH
RS485
ON TRIP FUTURE
ASS
WELDING MCHINE
32 A FP MCB-10kA 63 A FP MCB-10kA (20HP, 14.92KW) ASS A
CT CHILLER COMPRESSOR - 1
CT SPARE A
CT
RK 8 TRANSFERRED PUMP (15HP, 11.19KW)
SEALING ARRANGMENT FOR 63 A TP MCCB-36kA-T/M
63 A FP MCB-10kA (20HP, 14.92KW)
kWH + CTs AS PER UGVCL 50 A TP MCCB-50kA-T/M FUTURE
SPARE PGR-101-08
FOR REPACKING FUTURE
40 A FP MCB-10kA (10HP, 7.46KW)
25 A TP
HOT WATER PUMP - 1
CONT. (5HP, 3.73KW)
10 A TP MPCB-50kA
FUTURE
A/M
24 HRS./7DAYS
TIMER SUB LTG. PANEL - 2 (RM SHED) 10 A FP MCB-10kA
DOCK LEVELER - 1 (DL1)
(2HP, 1.49KW)
40 A FP LOCATED AT GROUND FLOOR OF RM SHED 25 A TP
HOT WATER PUMP - 2
STREET LTG. CKTS. SINGLE FRONT, WALL MOUNTED, ALL BOTTOM CABLE ENTRIES CONT.
200 A, 440V, 50 Hz.,
MCB-10kA 40 A FP FUTURE
CONTACTOR DOCK LEVELER - 2 (DL2)
EXT. LTG. R 10 A FP MCB-10kA (2HP, 1.49KW)
40 A FP MCB-10kA
24 HRS./7DAYS Y
KWH
LCDB-1
RS485
TIMER
FROM MAIN LTG. PNL.
40 A FP
A/M
B
40 A FP MCB-10kA
MCC- 1C (PRODUCTION)
FLOOD LTG. CKTS. MFM DOCK LEVELER - 3 (DL3)
CT MCB-10kA 10 A FP MCB-10kA (2HP, 1.49KW) LOCATED IN MCC ROOM AT FIRST FLOOR OF MAIN PLANT BLDG.
40 A FP RS485 LCDB-2
SEALING ARRANGMENT FOR CONTACTOR
kWH + CTs AS PER UGVCL
63 A FP MCB-10kA (PROVIDE DETAIL QUOTE BUT MAY NOT BE EXECUTED)
24 HRS./7DAYS CT SUB LIGHTING PANEL - 5 (FUTURE SHED - UTILITY) SINGLE FRONT, FRONT & REAR ACCESSIBLE, REAR CABLE ALLEY, BOTTOM / TOP CABLE ENTRY
80 A TP
40 A FP
A/M TIMER
MCCB-25kA 40 A FP MCB-10kA
PLANT FLP RECEPTACLES
(NOT TO BE QUOTE) REV: DESCRIPTION: BY: DATE:
200 A, 440V, 50 Hz.,
63 A FP MCB-10kA
TPN Cu. BUSBARS
BINDUKUMAR A. BHATT
RS485
ASS 100 A TP MCCB-50kA-T/M
A DRK-101-06
ON TRIP
CT RK 9 STIRRER
SUB LTG. PANEL - 3 (ADMIN) 25 A FP MCB-10kA
SPARE 40 A TP MCB-10kA
(15HP, 11.19KW)
DRK-101-09
LOCATED AT GROUND / FIRST FLOOR OF ADM 630 A TP CT ASS
A
SINGLE FRONT, WALL MOUNTED, ALL BOTTOM CABLE ENTRIES MCCB-36kA ASS BLENDER STIRRER MOTOR 1
B
FUTURE CT
A BLENDER STRRIER MOTOR 2
40 A FP MCB-10kA CT RK 11 STIRRER 63 A TP MCB-10kA (20HP, 14.92KW)
MFM 25 A TP (15HP, 11.19KW)
RM UNLOADING PUMP - 11
RS485 ACDB-1 10 A TP MPCB-50kA
CONT.
(5HP, 3.73KW)
PCL-401-11
40 A TP MCB-10kA DRK-101-11
M: 9825377173 | Email: binduabhatt@gmail.com
40 A FP MCB-10kA FUTURE ASS
A
CPDB-1 RK 12 STIRRER
63 A TP CT 25 A TP
RM UNLOADING PUMP - 12
CT
(15HP, 11.19KW)
CONT.
MCCB-25kA 40 A TP MCB-10kA DRK-101-12 CLIENT:
200 A, 440V, 50 Hz.,
(5HP, 3.73KW)
10 A TP MPCB-50kA
MCC- 1A (PRODUCTION) (EXISTING NOT TO QUOTE)
VISION PRODUCTS
63 A FP MCB-10kA
TPN Cu. BUSBARS
T/M SPARE
PCL-401-12
FUTURE ASS
A LOCATED IN MCC ROOM AT FIRST FLOOR OF MAIN PLANT BLDG.
32 A FP MCB-10kA 25 A TP CT
RM UNLOADING PUMP - 13 BLENDER STIRRER MOTOR 1
SPARE CONT. 63 A TP MCB-10kA (20HP, 14.92KW)
10 A TP MPCB-50kA (5HP, 3.73KW) ASS
PCL-401-13 DBL+201-03
A
FUTURE ASS CT RK 1 STIRRER
A R (40HP, 29.84KW)
25 A TP CT 100 A TP MCCB-50kA-T/M
BLENDER STRRIER MOTOR 2 Y DRK-101-01
CONT. RM UNLOADING PUMP - 14
63 A TP MCB-10kA (20HP, 14.92KW)
10 A TP MPCB-50kA (5HP, 3.73KW) B ASS
PCL-401-14 A
ASS RK 2 STRRER
FUTURE CT
(40HP, 29.84KW) ARCHITECT:
VYOM CONSULTANTS
A
CT 100 A TP MCCB-50kA-T/M DRK-101-02
25 A TP BLENDER STIRRER MOTOR 1 MFM
CONT.
LDO CHARGING PUMP (FOT)
(5HP, 3.73KW) 63 A TP MCB-10kA (20HP, 14.92KW) RS485
10 A TP MPCB-50kA
FROM PCC
DBL+201-04 ASS
ASS
A
CT
A RK 3 STIRRER
(40HP, 29.84KW)
Mr. Hitesh Vora
CT 400 A TP CT 100 A TP MCCB-50kA-T/M DRK-101-03
BLENDER STRRIER MOTOR 2
63 A TP MCB-10kA (20HP, 14.92KW) MCCB-36kA
DAHEJ
TO ABOVE 20 HP VFD FEEDER FOR FUTURE)
63 A TP MCB-10kA (25HP, 18.65KW)
DBL+201-01
SPARE
ASS
100 A TP MCCB-25kA-T/M
A
CT
BLENDER STRRIER MOTOR 2
TITLE:
63 A TP MCB-10kA (25HP, 18.65KW)
ELECT. MAIN SINGLE LINE DIAGRAM
FOR PCC, APFC, MLP, MCC PANELS
SCALE: DATED: DESIGNED: CHECKED:
2022
N.T.S. 02/11/2020
DRAWING NO:
A1/MSLD/001
JayB Bindu
REVISION:
R2