Professional Documents
Culture Documents
21413 Kel. Asemrowo Rw 01 Abd Fd Dwg (2)
21413 Kel. Asemrowo Rw 01 Abd Fd Dwg (2)
OUTSIDE PLAN
FIBER TO THE HOME
PROJECT NAME : HP+0 1:2 ROD 2021
ODC AS PLAN NUMBER : 00037.A/APD/SBY/FTTH/GPA/FEEDER ROUTE PLAN/III/22
ODC24.ASM02.01
AS BUILT NUMBER : 000186.A/ABD/SBY/FTTH/GPA/FEEDER ROUTE BUILT/VII/22
JL. ASEM ROWO
DATE : 28 / JULI/ 2022
STANDARD WARNA TUBE
VISUAL WARNA NO. TUBE KAP. KABEL SS-FD-01-ASMR-33
17,5
G
ASM02.01
G
= BIRU = TUBE 1 6 CORE ASM02.01
SS-FD-01-ASMR-01 PORT04. IDLE
PORT03. FO48.T1.C1 JOINT PORT01
= ORANGE = TUBE 2 12 CORE PORT02. FO48 LOOPING PORT01
PORT01. FO48 LOOPING PORT02
PORT01. FO48.T1.C4-C5 JOINT PORT1
= HIJAU = TUBE 3 1
3
4
2
CL48-FD-01-ASMR-01
= COKLAT = TUBE 4 24/48 CORE GPA
65
= ABU = TUBE 5 G
17,5 G
ASM02.01
ASM02.01
SS-FD-01-ASMR-01
JL. ASEM ROWO
SS-FD-01-ASMR-33
ODC
ODC24.ASM02.01
PORT04. IDLE
PORT03. FO48.T1.C1 JOINT PORT01
PORT02. FO48 LOOPING PORT01
PORT01. FO48 LOOPING PORT02
PORT01. FO48.T1.C4-C5 JOINT PORT1
1
3
4
2
CL48-FD-01-ASMR-01
GPA
65
G
ASM02.03
= PUTIH
37,6
= TUBE 6 G
ASM02.04
47,5
G
ASM02.05
54
GANG SEKOLAHAN
VIII
IX
ASM02.06
ASM02.05
JAYA
JAYA
X
JAYA
DEMAK
VII
DEMAK
JAYA
DEMAK
Jl.
TUBE 7
35
= MERAH
DEMAK
Jl.
Jl.
=
Jl.
SS-FD-01-ASMR-02
G
ASM02.07
50
G
ASM02.08
39
G
ASM02.09
= HITAM 96 CORE
42
= TUBE 8 G
ASM02.10
38
SS-FD-01-ASMR-03
S
FD-02-ASMR.01
GPA
34
G
ASM01.03 SPLITER_01_FO.48.T1.C1
GPA SPLITER_02_FO.48.T1.C2
HUAWEI
27,7
SLOT 8 / PORT 7.6
OLT TANDES
256 HP
(02) X 1:8
ASM02.03
G
ASM01.02
GPA
ODC
ODC48.ASM01.01
26
GPA
JL. ASEM ROWO
SS-FD-01-ASMR-04
G
ASM01.01
GPA
,6
= ORANGE = TUBE 10
LEGEND QUANTITY
37
= HIJAU = TUBE 11
= COKLAT = TUBE 12 144 CORE HUB OLT - 2 PON PORT
G
= ABU = TUBE 13 ASM02.04 FIXING SLACK - 4 PCS + 1.EXT
= PUTIH = TUBE 14 1
3
2
JOIN CLOSURE - 1 PCS - 48 CORE
4
,5
-
47
= HITAM = TUBE 16
-
= KUNING = TUBE 17 ODP ODP/FAT/FIBER ACCESS TERMINAL
-
= UNGU = TUBE 18
EXISTING MKM HANDHOLE -
= PINK = TUBE 19 G
ASM02.05 HANDHOLE 150X150X150 CM -
= CYAN = TUBE 20 HANDHOLE 120X120X120 CM -
54
HANDHOLE PIT 60X60X60 CM -
STANDARD WARNA CORE HANDHOLE PIT 40X40X40 CM -
VISUAL WARNA NO. CORE CR
CABLE RISER -
BA RILLING ASPHALT (BORING ASPAL) -
= BIRU = CORE 1 GA
EXCAVATION ASPHALT (GALI ASPAL) -
I
G
VII
ASM02.05
ASM02.06 GT
EXCAVATION LAND (GALI TANAH) -
A
IX
Y
= ORANGE = CORE 2
JA
YA
X
EXCAVATION GRASS (GALI RUMPUT) -
YA
GR
JA
AK
II
AV
JA
EM
AK
POLE 9 METER
K
HIJAU -
EM
= = CORE 3
AY
D
MA
Jl.
35
KJ
D
DE
POLE 7 METER - 1 PCS
Jl.
MA
Jl.
= COKLAT = CORE 4
DE
GALVANIZED PIPE 6 METER -
Jl.
ABU SS-FD-01-ASMR-02 EXISTING MKM POLE - 13 PCS
= = CORE 5
G ANOTHER POLE -
PUTIH CORE 6 ASM02.07 L-KONEKTOR -
= =
T-KONEKTOR -
= MERAH = CORE 7
DUCT FO. -
HITAM CORE 8 DUCT DW. -
= =
50
DROP WIRE -
= KUNING = CORE 9 FIBER 6/2T -
FIBER 12/2T -
= UNGU = CORE 10
FIBER 24/4T -
= PINK = CORE 11 FIBER 48/4T - 644 Meter
G FIBER 72/6T -
CYAN ASM02.08
= = CORE 12 FIBER 96/8T -
FIBER 144/12T -
KETERANGAN: FIBER 264/22T -
39
HOMEPASS -
CITY AREA
42
: SURABAYA
MENYETUJUI
TUBE KABEL
CORE KABEL
JAKET KABEL G
ASM02.10
ODP/FAT
38
ALOKASI CORE:
KAPASITAS CORE KABEL
PPL
NO. TUBE KABEL MENGETAHUI
NO. CORE KABEL
SS-FD-01-ASMR-03
FO.00.T0.C0 S
0 HP JUMLAH HOMEPASS ODP FD-02-ASMR.01
SP.1:8 SPLITER ODP GPA
ODP
LABEL ODP
XXX00.00.00.00
34
INHOUSE/VENDOR PEMASANGAN
PROJECT CONTROL PLANNING AND DESIGN
G
ASM01.03 SPLITER_01_FO.48.T1.C1
GPA SPLITER_02_FO.48.T1.C2
KAPASITAS KABEL, TUBE DAN CORE HUAWEI PROJECT MANAGER
27,
OLT TANDES
B. 12 CORE / 2 TUBE, 1 TUBE = 6 CORE 256 HP NTS
C. 24 CORE / 4 TUBE, 1 TUBE = 6 CORE (02) X 1:8
G FEEDER ROUTE BUILT PAGE
D. 48 CORE / 4 TUBE, 1 TUBE = 12 CORE ASM01.02 ODC
F. 96 CORE / 8 TUBE, 1 TUBE = 12 CORE GPA 1 OF 4
ODC48.ASM01.01
26
CHECKED BY
FTTx PLANNER REG
DRAWN BY
DRAFTER PM. GRHA PRIMA AGUNG
MKM_FRAME_03D_2020 / GRID 500
AS BUILT DRAWING
OUTSIDE PLAN
ODC FIBER TO THE HOME
ODC24.ASM02.01
PROJECT NAME : HP+0 1:2 ROD 2021
JL. ASEM ROWO
AS PLAN NUMBER : 00037.A/APD/SBY/FTTH/GPA/NETWORK TOPOLOGY/III/22
AS BUILT NUMBER : 000186.A/ABD/SBY/FTTH/GPA/NETWORK TOPOLOGY/VII/22
SS-FD-01-ASMR-33 DATE : 28/ JULI/ 2022
STANDARD WARNA TUBE G
ASM02.01
VISUAL WARNA NO. TUBE KAP. KABEL SS-FD-01-ASMR-01 PORT04. IDLE
PORT03. FO48.T1.C1 JOINT PORT01
PORT02. FO48 LOOPING PORT01
PORT01. FO48 LOOPING PORT02
= BIRU = TUBE 1 6 CORE PORT01. FO48.T1.C4-C5 JOINT PORT1
3
1 2
4
SS-FD-01-ASMR-33
ASM02.01
SS-FD-01-ASMR-01 PORT04. IDLE
PORT03. FO48.T1.C1 JOINT PORT01
PORT02. FO48 LOOPING PORT01
PORT01. FO48 LOOPING PORT02
PORT01. FO48.T1.C4-C5 JOINT PORT1
3
1 2
4
CL48-FD-01-ASMR-01
GPA
= ABU = TUBE 5
= PUTIH = TUBE 6
= MERAH = TUBE 7
SS-FD-01-ASMR-02
G
ASM02.06
SPLITER_01_FO.48.T1.C1
SPLITER_02_FO.48.T1.C2
HUAWEI
SLOT 8 / PORT 7.6
OLT TANDES
256 HP
(02) X 1:8
= BIRU
ODC
= TUBE 9
ODC48.ASM01.01
GPA
JL. ASEM ROWO
SS-FD-01-ASMR-04
G
ASM01.01
GPA
= ORANGE = TUBE 10
LEGEND QUANTITY
= HIJAU = TUBE 11
= COKLAT = TUBE 12 144 CORE HUB OLT - 2 PON PORT
= ABU = TUBE 13 FIXING SLACK - 4 PCS + 1.EXT
= PUTIH = TUBE 14 1
3
2
JOIN CLOSURE - 1 PCS - 48 CORE
4
MENYETUJUI
TUBE KABEL
CORE KABEL
JAKET KABEL
ODP/FAT
ALOKASI CORE:
KAPASITAS CORE KABEL
PPL
NO. TUBE KABEL MENGETAHUI
NO. CORE KABEL
FO.00.T0.C0
0 HP JUMLAH HOMEPASS ODP
SS-FD-01-ASMR-03
SP.1:8 SPLITER ODP
S
ODP FD-02-ASMR.01
LABEL ODP GPA
XXX00.00.00.00
INHOUSE/VENDOR PEMASANGAN
PROJECT CONTROL PLANNING AND DESIGN
DRAWN BY
DRAFTER PM. GRHA PRIMA AGUNG
MKM_FRAME_03D_2020 / GRID 500
AS BUILT DRAWING
OUTSIDE PLAN
FIBER TO THE HOME
PROJECT NAME : HP+0 1:2 ROD 2021
AS PLAN NUMBER : 00037.A/APD/SBY/FTTH/GPA/SPLACING SEQUENCE/III/22
AS BUILT NUMBER : 000186.A/ABD/SBY/FTTH/GPA/SPLACING SEQUENCE/VII/22
DATE : 28 / JULI/ 2022
STANDARD WARNA TUBE
VISUAL WARNA NO. TUBE KAP. KABEL
( 01 - 12 )
( 13 - 24 )
( 25 - 36 )
( 37 - 48 )
( 48 - 60 )
( 61 - 72 )
( 73 - 84 )
4
1
2
3
5
6
7
A
7 ( 85 - 96 ) 8
8 ( 97 - 108 ) 9
9 ( 109 -120 ) 10
10 ( 121 - 132 ) 11
11 ( 133 - 144 ) 12
12 ( 145 - 156 ) 13
= PUTIH
13 ( 157 - 168 ) 14
= TUBE 6
14 ( 169 - 180 ) 15
15 ( 181 - 192 ) 16
( 193 - 204 ) 17
( 205 - 216 ) 18
( 217 - 228 ) 19
( 229 - 240 ) 20
( 241 - 252 ) 21
( 253 - 264 ) 22
Existing Backbone
( 22 tube )
= MERAH = TUBE 7 ( 01 - 8 )
A
A ODC48.ASM01.01
OLT
1
8.547 Meter
( 01 - 12 ) 1
( 13 - 24 ) 2
TANDES
( 25 - 36 ) 3
( 37 - 48 ) 4
SLOT 8
= BIRU = TUBE 9
0 ( 01 - 12 ) 1
= ORANGE = TUBE 10 1 ( 13 - 24 ) 2
2 ( 25 - 36 ) 3
LEGEND QUANTITY
= HIJAU = TUBE 11 3 ( 37 - 48 ) 4
4 ( 48 - 60 ) 5
= COKLAT = TUBE 12 144 CORE HUB OLT - 2 PON PORT
5 ( 61 - 72 ) 6
= ABU = TUBE 13 6 ( 73 - 84 ) 7
7 ( 85 - 96 ) 8
FIXING SLACK - 4 PCS + 1.EXT
= PUTIH = TUBE 14 8 ( 97 - 108 ) 9 1
3
2
JOIN CLOSURE - 1 PCS - 48 CORE
4
9 ( 109 -120 ) 10
= MERAH = TUBE 15 10 ( 121 - 132 ) 11 - 1 PCS - 48 CORE
11 ( 133 - 144 ) 12 ODC ODC/FDT/FIBER DISTRIBUSTION TERMINAL
-
= HITAM = TUBE 16 12 ( 145 - 156 ) 13
13 ( 157 - 168 ) 14 -
= KUNING = TUBE 17 ODP ODP/FAT/FIBER ACCESS TERMINAL
14 ( 169 - 180 ) 15 -
15 ( 181 - 192 ) 16
= UNGU = TUBE 18
( 193 - 204 ) 17
EXISTING MKM HANDHOLE -
( 205 - 216 ) 18
= PINK = TUBE 19
( 217 - 228 ) 19 HANDHOLE 150X150X150 CM -
( 229 - 240 ) 20
= CYAN = TUBE 20 HANDHOLE 120X120X120 CM -
( 241 - 252 ) 21
CR
CABLE RISER -
BA RILLING ASPHALT (BORING ASPAL) -
= BIRU = CORE 1 GA
EXCAVATION ASPHALT (GALI ASPAL) -
GT
EXCAVATION LAND (GALI TANAH) -
= ORANGE = CORE 2 GR
EXCAVATION GRASS (GALI RUMPUT) -
= HIJAU = CORE 3 POLE 9 METER -
POLE 7 METER - 1 PCS
= COKLAT = CORE 4 GALVANIZED PIPE 6 METER -
ABU EXISTING MKM POLE - 13 PCS
= = CORE 5 ( 01 - 8 )
ANOTHER POLE -
= PUTIH = CORE 6 L-KONEKTOR -
T-KONEKTOR -
= MERAH = CORE 7
= HITAM = CORE 8
A ODC48.ASM01.01
DUCT FO.
DUCT DW.
-
-
DROP WIRE -
= KUNING = CORE 9 FIBER 6/2T -
FIBER 12/2T -
= UNGU = CORE 10
FIBER 24/4T -
= PINK = CORE 11 1 FIBER 48/4T - 644 Meter
FIBER 72/6T -
= CYAN = CORE 12 FIBER 96/8T -
2 FIBER 144/12T -
KETERANGAN: FIBER 264/22T -
HOMEPASS -
644 Meter
ASM01.48C CABLE
MENYETUJUI
( 4 tube )
JAKET KABEL
A CL 8 (EXT) CL 9 (EXT) CL 10 (EXT) CL 11 (EXT) CL 12 (EXT) CL 13 (EXT) CL48-FD-01.ASMR.01
ODP/FAT
ALOKASI CORE:
KAPASITAS CORE KABEL
PPL
NO. TUBE KABEL MENGETAHUI
NO. CORE KABEL
FO.00.T0.C0
0 HP JUMLAH HOMEPASS ODP
SP.1:8 SPLITER ODP
ODP
LABEL ODP
XXX00.00.00.00
INHOUSE/VENDOR PEMASANGAN
PROJECT CONTROL PLANNING AND DESIGN
CHECKED BY
FTTx PLANNER REG
DRAWN BY
DRAFTER PM. GRHA PRIMA AGUNG