Professional Documents
Culture Documents
Mac Ritchie Student Trail
Mac Ritchie Student Trail
Mac Ritchie Student Trail
Introduction 2
Human Impact 18
Reflections on Water 19
Marina Barrage 24
Copyright © PUB, Singapore’s national water agency 2011. Revised 2017. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or by any means,
electronic or mechanical, including photocopying, recording, or any information storage
and retrieval system, without prior written permission from the publishers.
Hello! Welcome to MacRitchie Reservoir, Singapore’s oldest reservoir, which holds a special place in the
hearts of Singaporeans.
MacRitchie Reservoir has undergone a makeover under the Active, Beautiful, Clean Waters (ABC Waters)
Programme, an island-wide initiative by PUB, the national water agency, to transform our network of
drains, canals and reservoirs into beautiful and clean streams, rivers and lakes that are well-integrated
with surrounding parks and green spaces. The ABC Waters Programme creates new community
spaces for recreation and bonding, enhances our quality of life and above all, helps to realise Singapore’s
vision as a “City of Gardens and Water”.
The makeovers at MacRitchie Reservoir were carried out in 2009 and in 2011. These saw the inclusion
of features such as a new amenities centre, a two-storey carpark, bioretention planter boxes, a landscape
retention pond, and improvements within the park such as a hilltop food and beverage kiosk and
submerged boardwalk.
We would like to thank our partners, Hwa Chong Institution, the National Parks Board and the Ministry of
Education for co-creating this trail with us. This trail would not be possible without their valuable feedback.
We hope to make MacRitchie Reservoir an enjoyable place for outdoor learning. As you learn about our
waters and the diversity of life it supports, we hope that you will cherish and take care of this precious
resource.
1
Introduction
Turn on the tap and clean, drinkable (potable) water flows. How is this possible?
Today we will “get our feet wet” and explore Singapore’s first reservoir – MacRitchie Reservoir.
We will discover:
Water
Sustainability ABC Waters Biodiversity
and the Four Learning Trail and
National Taps at MacRitchie Conservation
Reservoir
2
MacRitchie Reservoir in History
1867
1864 The reservoir was completed
– it was called the Impounding
Approval and funds Reservoir. The name was later
were granted for changed to Thomson Road
the construction Reservoir in 1907.
of a dam to collect
(impound) water.
1877
1857 The supporting
pumps and
The Straits Chinese merchant distribution
Tan Kim Seng donated $13 000 network were
for the improvements of the completed.
waterworks in Singapore, but
this amount was still insufficient
1922
to start the project. The reservoir was renamed
1891 MacRitchie Reservoir to recognise
James MacRitchie’s work.
The Thomson Road
1852 Reservoir was
J.T. Thomson proposed expanded to meet
that a reservoir be built increasing water
from the headwaters of demands under
the Singapore Creek. supervision of the
Water was However, there was no Municipal Engineer
obtained from government support and James MacRitchie.
rivers and wells. public interest.
1800s 1950
0s
185 1900s
1947
1824 1931 Population
Population Population 938,144
10,683 1860 557,745
Population
1819 1840 81,734
Signing of the Population 1891 1942 -1945
Singapore 35,389 Japanese Occupation
Treaty Population
181,602
Population
about 1,000
Source: Cheng Lim Keak, Social Change and the Chinese in Singapore, 1985, 7; Singapore Facts and Pictures, 1988, 3;
and Singapore Bulletin [Singapore], April 1989, 15.
3
Navigate MacRitchie Reservoir
Study the maps to find out where MacRitchie Reservoir is; what surrounds it and where the checkpoints
of this trail are. Indicate what the land around the reservoir is used for on the map below:
Lower Seletar
Western
Catchment Punggol Tekong
Reservoirs Upper Seletar
Serangoon
Sarimbun
Kranji
Murai
Poyan Lower
Tengeh Upper Peirce
Peirce MacRitchie
Where is
Reservoir
Jurong Pandan your school
Lake
located?
Bedok
N
Marina
Up
pe
rail r
tang T Th
k Teren om
rac so
eT n
Sim
R
oa
re Trail
ie Natu
d
ch
MacRit
Land Use:
Go
lf L
ink
Pr
unu
Trail
s
Petai Trail
MacRitchie Reservoir
Ch
Land Use: em
per
ai T
Lornie Trail rail
ail MacRitchie
Tr Reservoir Park
ri ng
Je
Si
d
me
oa
Ro N LEGEND
e R
ad
rni
Road
PI
Lo
Trail
E
Boardwalk
4
Central Catchment
Nature Reserve
Central Catchment
Nature Reserve
Prunus Trail
Kayak
Platform
Forest
Fringe
Paddle
Lodge
Shed for
Canoes
3
Dam
Amenities
Centre
2 Reservoir
Deck Bus Stop
Lim Bo Seng
Memorial
Zig Zag
Bridge Promenade 6 N
Trellis
Walk
Forest Bandstand
1 Hill Top
Fringe F&B
d LEGEND
Submerged ark Roa
rp ie
Dykes and Boardwalk n Ca rn
Road
Reed Beds ee Lo Path
Gr Boardwalk
Gravel Swales Learning
Trail Route
100 m
5
MacRitchie Reservoir’s Secrets
Right in the heart of Singapore is a beautiful nature sanctuary. Take a deep breath and smell the fresh
air. From this vantage point, let’s observe what can be found here in the reservoir park. Tick those
you can spot.
Amenities Centre
6
Boardwalk
Reservoir and Dam
PUB has opened up designated areas for sport At the top of the hill, a new F&B area has been designed
fishing to promote more recreational activities with a partial glass roof. Visitors can enjoy dining under
for public enjoyment. the night sky in a more open and natural environment.
Gravel swales along the reservoir service roads help Recreational water activities are becoming more popular
to filter coarse sediments so cleaner rainwater flows after the installation of proper infrastructure such as
into the drains and eventually into Marina Reservoir. kayak lanes, a larger canoe shed and launching
They also beautify the surrounding landscape. platforms at the floating pontoon.
7
Our Water Story
By investing in water technology and adopting an integrated approach to water management over the last
50 years, Singapore has developed a diversified and sustainable water supply system known as the Four
National Taps.
8
Reservoirs in Singapore
Urban catchment is the collection of rainwater that falls on our urban environment which is then channelled
to our reservoirs. With the completion of Marina, Punggol and Serangoon Reservoir, two-thirds of Singapore
is now water catchment. There are currently 17 reservoirs, 32 major rivers and more than 7000km of
canals and drains.
Therefore, it is important to have an
Lower Seletar
Western effective rainwater management
Catchment Punggol Tekong
Reservoirs Upper Seletar system to capture and treat rainwater
Serangoon
Sarimbun runoff so that cleaner water flows into
Kranji
Murai our reservoirs for our water supply.
Poyan Lower
Tengeh Upper Peirce
Peirce
MacRitchie
Jurong Pandan
Lake
Bedok
Marina
Spillway
EVAPORATION PRECIPITATION
The spillway is a section of a dam
that allows water to overflow from
the reservoir, during rainy seasons.
This protects the dam and helps
control flooding.
Kallang River
Water Treatment Plant
Pumping Here, water is treated using physical and chemical Homes
Station methods (including membrane technology) and
disinfected. It is then distributed through a network Schools and
to all parts of Singapore. Public Buildings
Industries
9
ABC Waters Programme
GREEN
The ABC Waters Programme aims to integrate Singapore’s (ecology)
parks (green), reservoirs and waterways (blue), and
the community (orange). The use of ABC Waters design
features such as bioretention planter boxes help to keep sustainable
our waters clean. These features are natural systems urban
which detain and treat rainwater on site before allowing environment
the water to flow naturally into the reservoirs. They also BLUE ORANGE
form ecological habitats that benefit from the proximity (hydrology) (community)
to water sources. New community spaces are created
allowing people to get closer to our waters.
Recreation Education
Research Others
10
MacRitchie Reservoir has a wealth of natural,cultural and historical features. Look around you,
select one that interests you and do a fast sketch of it. Remember to add a title, a scale and
some annotated notes.
11
Sustainable ABC Waters Design Features
at MacRitchie Reservoir
Simulating a
filtration system
found in nature.
Dam
Reservoir
Deck
Vegetation
Filtration the natural way
Filtration ark
rp
n Ca
ee
Gr
Sedimentation
Biological uptake
What are the benefits of having wetland plants in the landscape pond and landscape retention
pond?
12
Many of these sustainable features have been creatively
Green Roof of the Amenities Centre
developed here at MacRitchie Reservoir. You can find
these features around the Amenities Centre.
o ad
ieR
rn
Lo
Rainwater
Bioretention Planter Boxes
Rainwater flows
Rainwater flows
down pipe
down pipe
13
Water Quality Testing
Good water quality is essential for living things to thrive. The most common standards used to assess
water quality relate to the health of ecosystems. Collect some water at two different locations of
MacRitchie Reservoir and test for the following parameters. Record your readings and
observations in the space below.
SIGNIFICANCE
DEBRIS Observe and smell the water. This can give you basic information about water quality. On its
own, water does not have any smell. The smell of the collected water can give you a rough
AND SMELL indication of pollution sources.
SIGNIFICANCE
COLOUR The colour of the water can give some clues as to what may be in the water. There may be dissolved
pollutants or bacteria. Coloured water, however, does not necessarily mean the water is polluted.
OBSERVATION ANALYSIS
LOCATION
1 2
Turbid or murky brown – soil particles in water, resuspension
from the bottom or banks of the reservoir.
Others
SIGNIFICANCE
Turbidity is the level of “murkiness” of the water. It refers to the amount of particles such as soil,
TURBIDITY sediments, algae or organic matter that are suspended in the water.
Turbidity affects the amount of light that can penetrate through the water, which determines
the amount of light reaching the different depths of the reservoir. This in turn has an effect on
aquatic plant life.
OBSERVATION
ANALYSIS
Which is the faintest number you can see on the
turbidity disc?
LOCATION 1 1 2 3 4 5
LOCATION 2 1 2 3 4 5
14
SIGNIFICANCE
The temperature of the water will vary with the weather and time of sampling. The temperature
TEMPERATURE of water in the reservoir could range between 20 - 30oC which affects the amount of dissolved
oxygen. The temperature is higher nearer the surface of the water and lowest near the bottom
of a water body.
READING ANALYSIS
The temperature
of the water is: o o
C C
SIGNIFICANCE
DISSOLVED This refers to the amount of oxygen dissolved in a given volume of water, at a given
temperature and atmospheric pressure. It can be measured in milligrams per litre (mg/l)
OXYGEN or parts per million (ppm). The minimum amount of dissolved oxygen needed to sustain
fish life is about 4mg/l.
READING ANALYSIS
SIGNIFICANCE 8.2
)
pH
5-
(6.
ar
er
6.8 ir
idi (4 da
( 4)
eg
5 - rvo
an
He .6) - 5.3
Ba ake - 4.
ia
o
Vin
s
Ra anas 4.5)
cle
S
es
gg
(6. ese
)
c l .2
e,
(5 .0
gn
e,
a
mo id
ea ter
ain
r, E
Ac juic
Su acid
od
in (5
uic
Mi hy R
ac
Ma
nia
a
Ac ain
dr
gs
ate
yw
nj
ge
ric
ch
ry
of
mo
r
uid
kin
aw
alt
an
id
tte
lfu
ap
lk
lk
n
Am
Liq
Ba
Or
So
Ba
Mi
Se
Le
pH 0 Bl 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Most fishes die Most fishes die
5 - 9 Tolerable range for most fishes
Acidic Basic
Neutral
READING ANALYSIS
The pH of
the water is:
Other Properties There are other properties of water that you can test, such as electrical conductivity,
hardness of water, amount of nitrates, phosphates and ammonia. Discuss the
of Water: importance of these properties and how they can be measured.
15
The Meeting of the Habitats
At MacRitchie Reservoir, two main habitats meet - the freshwater reservoir and the tropical rainforest. Look
around you as you walk a section of the Prunus Trail and record the aquatic and forest life you see.
Red-eared Slider
Trachemys scripta elegans
Pond Skater
Ranatra sp.
Animals
Tadpoles
Carpenter Bee
Xylocopa sp.
Singapore Rhododendron
Melastoma malabathricum
White-breasted Waterhen
Amaurornis phoenicurus
Malayan Water
Monitor Lizard
Varanus salvator Little Heron
Butorides striatus
Reservoir
Water’s Edge
16
Tembusu White-bellied Fish Eagle Greater Racket-tailed Drongo
Fragraea fragrans Haliaeetus leucogaster Dicrurus paradiseus
Cicada
Purana sp. No. Plants, Algae, Fungi
(Try to hear them!.)
Animals
Long-tailed Macaque
Macaca fascicularis Plantain Squirrel
Callosciurus notatus
Cricket
Nisitrus vittatus
17
Human Impact
Like it or not, human activities impact our environment. Observe the people, facilities, signage and
activities happening around you. What are some of these human activities at MacRitchie Reservoir
and what potential impact can these have on terrestrial and aquatic habitats?
Nature Walks
Jogging
Kayaking
Fishing
18
Reflections on Water
19
How can you encourage other visitors
to care for MacRitchie Reservoir and
other reservoirs and waterways?
20
How will you spread the water
conservation message to others?
21
A Problem=-based Learning Activity
2. The questions for each “stand” are to help you organise your thoughts and ideas, but are definitely
not exhaustive. Be creative and imaginative. Come up with more aspects to include in your plan.
4. Each team makes a 5-minute presentation followed by a 1-2 minute question and answer session.
After all the teams have presented, rank the presentation (content, argument and delivery) of each
team from 1-5 (“1” being the most compelling and “5” least compelling).
1 2
Your team’s stand is to develop MacRitchie Your team’s stand is to preserve MacRitchie
Reservoir as a tourist attraction, rivalling the Reservoir as an area for water catchment
Zoo in its numbers. and conservation.
Make a presentation of your team’s plan to Make a presentation of your team’s plan to
highlight: highlight:
What are the features that will be your main Why is it important to preserve MacRitchie
draw? Reservoir?
What new features, facilities or activities How will you ensure continued good water
(e.g. sports, entertainment) will your team quality?
develop to increase visitorship? How much human usage will your new plan
Any other considerations to ensure the allow and what are these? Are there any
success of your project - e.g. accessibility new activities your team will introduce? Are
of venue, increased amenities like toilets, there any existing activities your team will
etc. remove because of its impact?
What will the impact on MacRitchie What are some new facilities/ activities/
Reservoir/ the surrounding area/ the features your team plan to enhance at
environment be, should your team’s plan MacRitchie Reservoir for its main goals?
be implemented? Is this level of impact What will the impact on MacRitchie
“acceptable”? Why? Reservoir/ surrounding area/ environment
be, should your team’s plan be implemented?
Is this level of impact “acceptable”? Why?
22
NEWater Visitor Centre
Can we use each drop of water more than once? Yes! Singapore’s answer to that question is NEWater.
As one of the Four National Taps that ensures a diversified and sustainable water supply for Singapore,
NEWater is treated used water that is further purified. Is water that is used before drinkable? How does
reverse osmosis create ‘new’ water? Why do we need to recycle water this way? Visit the NEWater Visitor
Centre to find out more. You will be edu-tained by multimedia presentations and games, and witness the
operation of advanced technologies in the production of NEWater.
23
Marina Barrage
Marina Reservoir is Singapore’s first reservoir built in this millennium, bringing to fruition former Minister
Mentor Lee Kuan Yew’s 20-year vision to dam the Marina Channel to create a freshwater lake. The project
materialised around the time PUB had made a paradigm shift in water management, calling on the public
to look at water as a shared resource and to develop a joint ownership of our blue spaces.This new-age
reservoir, formed by building Marina Barrage across the mouth of the Marina Channel, therefore fulfils
more than its promised triple benefits of water supply, flood control and lifestyle activities.
By integrating its core functions together with features designed to attract the public, Marina Barrage
helps to advance PUB’s strategic objective to bring people closer to water. Its unique open concept is
rare for public infrastructure and is a reflection of PUB’s new approach in water management. There
are no gates or fenced-up areas. The public can wander around the open grounds and learn about the
Singapore Water Story.
For more information, visit www.pub.gov.sg/marinabarrage
24
Acknowledgements
Ministry of Education, Curriculum Planning and Development Division,
Humanities Branch and Sciences Branch
PUB is the national water agency that manages Singapore’s water supply,
water catchment and used water network in an integrated way. PUB won
the 2007 Stockholm Industry Water Award and was named Water Agency
of the Year at the Global Water Awards 2006.
www.pub.gov.sg/getinvolved