Professional Documents
Culture Documents
ICPU 2019 EFR-19-003040(1)
ICPU 2019 EFR-19-003040(1)
Voie Romaine
F-57280 Maizières-lès-Metz INSPECTION REPORT
Tél : +33 (0)3 87 51 11 11
Fax : +33 (0)3 87 51 10 58
Holder KLIMAOPREMA
Gradna 78A
HR – 10430 SAMOBOR
REPORT
Page 2 of 22
EFR-19-003040 INSPECTION REPORT
Evaluated (E) /
Topic Comments (if any)
Non Evaluated (NE)
Organisation and management
Responsibilities et Authority E -
Direction review E -
Production
Processes and Methods: job description and
provisions (methods, equipment,
E -
environment, material, means), observation
and interview
Means : maintenance of tools and
E -
equipments
Means : validity of tools and equipments E -
Production Control
Provisions and results of components and
raw materials reception controls (including
E -
collection of material certificates, certificate
of compliance of incoming materials...)
Provisions and results of controls carried out
E -
during manufacture
Provisions and results of checks on finished
E -
products
Personnel
Skills of management E -
Skills of support personnel (metrology,
E -
maintenance, ...)
Skills of production personnel E -
Metrology
Processes and Methods: description of the
tasks and provisions regarding the
E -
management of measurement, control and
testing equipments
Validity of measurement, control and testing
E -
equipments
Conception
Provisions regarding the control of the
design means (configuration, performance E -
management, derivatives and options, ...)
Validity of design means E -
Page 3 of 22
EFR-19-003040 INSPECTION REPORT
Evaluated (E) /
Topic Comments (if any)
Non Evaluated (NE)
Records and documentation of the
quality management system
Description of rules for document
management (approval, modification, new E -
documents’ distribution, ...)
Description of rules regarding records
management (duration and location of
E -
storage, external documents’ management,
...)
Products’ preservation
Provisions regarding storage, delivery,
E -
handling, traceability
Purchasing, subcontracting
Provisions regarding purchasing /
E -
components’ subcontracting
Non-compliances and Claims
Provisions regarding non-compliances’ and
E -
claims’ management
Essential external documentation
Presence of the potential certification rules,
E -
and of the technical specifications in force
Analyze and inclusion of the developments
E -
of the relevant external documentation
Compliance of the inspected product to
E FD40 and FDC25
the type testing
Referential NF EN 15650
Article § 6.3 Appendix E
Disposition
√ √
checked
Page 4 of 22
EFR-19-003040 INSPECTION REPORT
Page 5 of 22
EFR-19-003040 INSPECTION REPORT
Possible comments on the evaluated documents : The allocated time didn’t permit to check the dispositions
concerning the distributors: following of FPC testing of the distributed products, checking of the sending and
treatment of FPC results, and stamping of the sending products
DEVIATIONS
See the end of Factory Production Control (FPC) Inspection form in Appendix 2 of this report.
Comment: deviation not presenting particular risk towards the FPC, but which must be taken into account
before the continuous surveillance of the FPC.
Minor deviation: deviation not presenting effective risk towards the FPC if corrective actions are engaged
into a limited period.
Major deviation: deviation presenting an immediate influence towards the functioning and effectiveness of
the FPC so that a non conformity product could be placed on the market, and/or with a requirement.
Page 6 of 22
EFR-19-003040 INSPECTION REPORT
Strengths:
- Manufacturing processes,
- Communication to the operators concerning the new design of the product (change of the
intumescent seals, see classification report updated)
- Quantity of cycling and sealing tests upper than required in the standard
CONCLUSIONS
During the inspection, the following deviations were found (see details on appendix):
Deviation n°
Process of activity
MAJOR deviation MINOR deviation Comment
Organisation and management - - -
Production - - -
Production control - - -
Personnel - - -
Metrology - - -
Design - - -
Records, documentation of the quality
- - -
system
Products’ preservation - - -
Purchasing, subcontracting - - -
Claims and non-compliances - - -
Number of deviations (by type) 0 0 0
Total number of deviations 0
Page 7 of 22
EFR-19-003040 INSPECTION REPORT
The factory production control system of the ranges listed in §1 of this report is conform to the requirements
of the harmonized technical specifications mentioned in chapter 1 under the EU Construction Products
Regulation No. 305/2011 (CE marking), and DAP21 certification rules (Certification of products used for the
fire protection of buildings - for application outside EEA).
FOULON Benjamin
FPC Inspector
Page 8 of 22
EFR-19-003040 INSPECTION REPORT
APPENDIX 1
FOLLOW UP OF THE DEVIATIONS FROM THE PREVIOUS INSPECTION
Page 9 of 22
EFR-19-003040 INSPECTION REPORT
Page 10 of 22
EFR-19-003040 INSPECTION REPORT
Page 11 of 22
EFR-19-003040 INSPECTION REPORT
Page 12 of 22
EFR-19-003040 INSPECTION REPORT
Page 13 of 22
EFR-19-003040 INSPECTION REPORT
Page 14 of 22
EFR-19-003040 INSPECTION REPORT
Page 15 of 22
EFR-19-003040 INSPECTION REPORT
Page 16 of 22
EFR-19-003040 INSPECTION REPORT
Page 17 of 22
EFR-19-003040 INSPECTION REPORT
Page 18 of 22
EFR-19-003040 INSPECTION REPORT
Page 19 of 22
EFR-19-003040 INSPECTION REPORT
Page 20 of 22
EFR-19-003040 INSPECTION REPORT
APPENDIX 2
FORM OF END OF THE INSPECTION PURPOSE OF THIS REPORT
Page 21 of 22
EFR-19-003040 INSPECTION REPORT
Page 22 of 22