THIS DRAWING IS THE PROPERTY OF M/s. AURA ENGINEERING CONSULTANTS.

AND MUST NOT BE COPIED WITHOUT THEIR WRITTEN CONSENT, NOR MADE KNOWN TO THE THIRD PARTY

GENERAL NOTES:
REMOVAL OF FORM WORK (SHUTTERING):
THE FOLLOWING MINIMUM PERIOD (AFTER FINAL POUR)
NAME MID SPAN END SUPPORT NAME MID SPAN END SUPPORT SHALL BE ALLOWED BEFORE REMOVAL OF SHUTTERING AS PER
CLAUSE 11.3.1 OF IS456 : 2000
A. VERTICAL SIDE OF SHUTTERING OF COLUMNS,
3-Y25(TO) 3-Y25(TO)+ 3-Y20(TO) 3-Y20(TO)+ WALLS AND & BEAMS ---------------------------24 HOURS.
3-Y25(EXT) 3-Y20(EXT) B. BOTTOM SHUTTERING OF SLABS
(KEEP THE PROPS UNDER) -----------------------3 DAYS.
C. BOTTOM SHUTTERING OF BEAMS
Y10 @ 7" C/C Y10 @ 5" C/C Y10 @ 7" C/C Y10 @ 5" C/C (KEEP THE PROPS UNDER) -----------------------7 DAYS.
B5

1'-6"

1'-6"
(0'-9" X 1'-6") D. BOTTOM PROPS TO SLAB
B2
2'-0"

2'-0"
i) SPANNING UP TO 4.50M -----------------------7 DAYS.
(1'-0" X 2'-0") ii) SPANNING OVER 4.50M -----------------------14 DAYS.
E. BOTTOM PROPS TO BEAMS
3-Y20(TO)+ 3-Y20(TO) i) SPANNING UP TO 6.00M -----------------------14 DAYS.
3-Y20(EXT) ii) SPANNING OVER 6.00M -----------------------21DAYS.

9" 9" LAP JOINTS FOR REINFORCEMENT BARS:


3-Y25(TO)+ 3-Y25(TO) I). AT ANY CROSS SECTION OF A MEMBER NOT MORE THAN
3-Y25(EXT) 50% OF THE BARS SHALL BE LAPPED.
II). LAPS SHALL BE STAGGERED WITH A MINIMUM CENTRE TO
1'-0" 1'-0" 3-Y12(TO) 3-Y12(TO) 3-Y16(TO) CENTRE DISTANCE OF 1.3 TIMES THE LAP LENGTH OF THE
BAR FOR TENSION AND COMPRESSION MEMBERS.
III). LAPS IN COLUMNS SHALL BE PROVIDED AT MID HEIGHT OF
3-Y16(TO) 3-Y16(TO)+ FLOOR AND NOT AT SLAB LEVEL.
2-Y16(EXT)
Y8 @ 6" C/C Y8 @ 6" C/C Y8 @ 6" C/C IV). LAPS IN BEAM AND SLAB SHALL BE PROVIDED AT THE

1'-3"

1'-3"

1'-3"
POINT OF CONTRAFLEXURE.
V). WELDING OF BARS SHALL BE DONE AS A STITCH WELD FOR
Y8 @ 7" C/C Y8 @ 5" C/C 5 TIMES THE DIAMETER OF BAR AND A GAP OF 5 TIMES OF
B4
1'-6"

1'-6"
BAR AND AGAIN WELDING FOR ANOTHER 5 TIMES DIAMETER
(0'-9" X 1'-6") 3-Y12(TO) 3-Y16(TO) 3-Y16(TO) OF BAR USING ARC WELDING AND SPECIAL ELECTRODES
AFTER GETTING PRIOR WRITTEN APPROVAL FROM THE
STRUCTURAL CONSULTANT.
9" 9" 9" VI). DETAILING OF REBARS SHALL CONFIRM TO SP-34 & IS 13920.
3-Y16(TO)+ 3-Y16(TO)
2-Y16(EXT)
C.S. OF BEAM "B1" C.S. OF BEAM "B3" C.S. OF BEAM "B6" GENERAL NOTES:
(0'-9" X 1'-3") (0'-9" X 1'-3") (0'-9" X 1'-3") 1. ALL DIMENSIONS ARE IN FOOT UNITS.
9" 9"
2. CONCRETE GRADE SHALL BE M25
BEAM SCHEDULE CONFIRMING TO IS 456:2000

SL.NO NAME SIZE 3. GRADE OF REINFORCEMENT MARKED THUS (Y)


SHALL BE Fe 500 CONFIRMING TO IS 1786-2008
01 B1 0'-9" x 1'-3"
4. CLEAR COVER FOR REINFORCEMENT
02 B2 1'-0" x 2'-0"
03 B3 0'-9" x 1'-3" A) BEAM = 1" B) SLAB = 3/4"

COLUMN 04 B4 0'-9" x 1'-6" 5. THIS DRG. READ IN CONJECTION WITH ARCH.DRGS.


Ld+10db BEAM 05 B5 0'-9" x 1'-6" 6. STRUCTURAL ENGINEER RESPONSIBILITY IS LIMITED TO
SPACER BARS SHALL BE SECONDARY BEAM DESIGN & ISSUAL OF STRUCTURAL DRAWING ONLY
MAX. DIA. OF TOP ROD. 2-Y16 (TYP.) 06 B6 0'-9" x 1'-3"
HANGER BARS
7.ONUS OF CONSTRUCTION LIES WITH CONTRACTOR/OWNER
D

ALL STIRRUPS ARE 2 LEGGED 6 TOP LAP SHOULD BE @


60° 00 ISSUE FOR CONSTRUCTION M.R R.M 21.05.24
UNLESS OTHERWISE SPECIFIED. typ" MIDDLE SPAN OF BEAM
MAIN BEAM Ld REV. DESCRIPTIONS DRN CHK DATE
135° END HOOKS ALTERNATELY
2" MAX PLACED AS PER IS 13920 : 1993
PROJECT :-
Ld+10db SPACER BARS SHALL BE 2" 2"
D - DEPTH OF THE BEAM MAX. DIA. OF BOTTOM ROD. TYP. DET. OF HANGER BARS IN MAIN BEAM
db - DIAMETER OF THE BAR PROPOSED RESIDENTIAL BUILDING
AT SECONDARY BEAM JUNCTION @ VANUVAMPET
(VARY DEPTH) 6" BOTTOM LAP SHOULD BE @
TYP. EXTERNAL JOINT DETAIL AT NEAR SUPPORT BEAM
TYP. DETAIL DRAWING TITLE :-
BEAM-COLUMN JUNCTION TYP. LAP SPLICE IN BEAM
R.C DETAILS OF GROUND
FLOOR ROOF BEAMS
IF DIA OF RODS CHANGED THEN
MAX DIA OF EXTRA BAR SHOULD BE DATE SCALE JOB.NO DRG.NO
2-Y16(TYP) EXTENT
TOP HANGER BAR 21.05.24 1" : 9' ------- 005
0.25L1 THROUGH OUT 0.3L1 0.3L2 TOP 0.3L2 0.3L3 2-Y16 (TYP.) SECONDARY BEAM
THROUGH OUT HANGER BARS ARCHITECT / CONSULTANTS :-
EXTRA EXTRA EXTRA
6"
(TYP)
EXTRA

60
EXTRA
STRUCTURAL CONSULTANTS :-

°
2" 2"
0.1L1 BOTTOM 0.1L1 0.1L2 BOTTOM 0.1L2 MAIN BEAM
THROUGH OUT(TO) THROUGH OUT
L1 L2 L3 TYP. DET. OF HANGER BARS IN
SECONDARY BEAM MAIN BEAM AT SECONDARY BEAM JUNCTION
TYPICAL L.S OF ROOF BEAM
A3