1. PURPOSE
Purpose of the Monthly Progress Report is to describe all aspects of the execution of
the Works taken into account the works performed up to and including the last day of
the month to which the Monthly Progress Report relates.
2. SCOPE
This document is applicable for Duhai (EPE) to Modipuram section of Delhi-Meerut
RRTS Corridor for submission of Monthly Progress Report.
No issue yet
Site has been prepared for starting construction activities.
Report on Underground Utility Survey using GPR for 25kV & 33kV Cable from
Muradnagar RSS to Viaduct has been approved on 01.02.2021.
Revised Geotechnical Investigation Report for Murad Nagar RSS submitted on
7. DESIGN STATUS
b) Compiled input data for Traction simulation and HV-MV load flow studies submitted
on 12.02.2021 and the same has been validated by GC/NCRTC on 13.02.2021.
c) Modelling for Traction simulation and HV-MV load flow studies already completed.
Simulation is in progress.
d) Interface data for design coordination being exchanged with M/s Bombardier.
Planned Tenders:
Dry Type 33kV /415V 05.03.21 25.03.21
Auxiliary Transformer
Modular Cantilever and 09.03.21 01.04.21
Dropper Assemblies
25kV GIS 12.03.21 04.04.21
11. DOCUMENTATION
Original Hard Copy (3 Nos. with proper binding) and one Electronic Copy of the Contract
Agreement submitted on 06.01.2021
SN Name Designation/Role
i) Sh. Sanjay Gupta CPM
ii) Sh. Anil Kumar Mathur PM
iii) Sh. Ajit Kumar Rai PM
iv) Sh. Yash Raj Yadav Coordination with local
authorities
v) Sh. Amit Kumar Verma DPM
vi) Sh. Ashwani Vyas DPM
vii) Sh. Ravi Sharma Engineer/IT&C
viii) Sh. Ashutosh Panigrahi Engineer/IT&C
End of Document
PSI
EQUIPMENT LAYOUT FOR 220KV RSS AT MURAD
1 06.01.2021 19.02.2021 Approved
NAGAR
TYPICAL 220 kV CABLE CROSS SECTION LAID IN To be submitted for specific identified
9 15.02.2021 17.02.2021
WALLS location/section of the Cable route
TYPICAL 220 kV UG CABLE CROSS-SECTION FOR RAIL To be submitted for specific identified
10 15.02.2021 17.02.2021
TRACK CROSSING location/section of the Cable route
TYPICAL 220 kV UG CABLE CROSS SECTION DIRECT To be submitted for specific identified
12 15.02.2021 17.02.2021
BURIED IN FLAT FORMATION location/section of the Cable route
TYPICAL 220 kV CABLE CROSS SECTION LAID IN To be submitted for specific identified
15 15.02.2021 17.02.2021
ABUTMENT CROSSING AND NALLAH CROSSING location/section of the Cable route