Date Description - Revision Subject Prepared by Checked by Approved by Cont Rev JESA Rev
REQUISITION REFERENCE :
QA
ITP PRECAST ELEMENTS
CONTRACTOR Document Number
UMGC-4500008005-QA- G120-00003
N/A
HELP JESA DOCUMENT NUMBERING SYSTEM Project Num Sub Project Area Code Sender Code P.O Number Discipline Code Doc Type Sequence JESA Rev
Please Refer to Annex Q, L &
DC Procedure . Shall you need
Example (Trigram is unique to each contractor) Q36220 00 000 UMGC 4500008005 QA G120 00003 8
INSPECTION AND TEST PLAN
FOR PRECAST ELEMENTS
Project Title: Q36220 -NEW TSP HUB Contract No. : Q36220
1 - General document
1-2 Product data sheet Project contract/ specification Project contract/ specification H H
2 - Material receiving
2-1 Aggregate sand, Rebars, formwork, … Contract Lab & technical control office reports H DR DR Rapport laboratory/Data sheet
2-2 Embedded reinforcement anchors, inserts plates Project Specification quality dossier H DR DR Rapport laboratory/Data sheet
3- Dimension inspection
Report N 005/U
3-1 Dimension inspection of reinforcement IFC Drawing Pre pour Inspection report H DR DR
Report N 005/U
3-2 Concrete formwork dimension Contract / Project Specification Dimension and Visual report H DR DR
4 -DURING FABRICATON
Report N 005/U
4-1 Patter Cleaned from dust and foreign objects Contract / Project Specification Method statement H S
Report N 005/U
4-4 Vibration to be followed during pouring Contract / Project Specification Pre pour Inspection Report H S
4-5 Test of conformity test (compression test) Contract / Project Specification Lab test report H DR DR Rapport laboratory
Report N 005/U
4-6 Curing Project Specification Inspection report H S
Repair work for small holes & Surface inspection (after removal Report N 005/U
4-7 Project Specification Inspection and dimension Report H S
formwork)
Report N 005/U
4-8 Structure release for installation of precast columns IFC Drawings Dimension and survey Report H DR
5- DURING INSTALLATION
Inspection of installation location ( Identification of Survey report
5-1 Contract ITP & method statement H S
element ; position ; cleaning )
Project Specification / Inspection Report / Visual & dimensional survey Survey report
5-2 Verticality, alignment and positioning H H DR
Drawings Report
5-3 Bolting when applicable Drawings Visual & dimensional survey Report H W Torc tightening report
Precast element
Survey report
5-4 Neoprene when applicable Drawings Visual & dimensional survey Report H W
Survey report
5-5 Grouting when applicable Drawings Inspection Report H W
6- AFTER INSTALLATION
6-2 Review for the Final Quality Dossier Site Work Instruction MC Final Quality Dossier / General Review Report H DR
1- Rapport N 005/U
Ref : 005/U
Client : ENTREPRISE
FICHE DE CONTRÔLE
Nettoyage du moule
Alignement du moule
Ferraillage Horizontale
Ferraillage vertical
Hauteur du béton
Etanchéité du moule
Diagonal
Vibration
Slump
Curage
Réparations