KLEF

DEPARTMENT OF MECHANICAL ENGINEERING


B.Tech III Year II Sem, Academic Year 2023-24
Home Assignment – 4

Subject: Production Technology Maximum Marks: 10


Subject Code: 21ME3217 Last Date of Submission: 27-03-2024
1) There are five jobs, each of which must go through machines A and B in
the order AB. Processing Times in minutes are given in the table below. Find
the sequence that minimizes the total elapsed time required to complete jobs
and also find idle time for machines A and B.
Processing Time
Job
Machine-A Machine-B
1 4 2
2 3 5
3 5 1
4 7 3
5 8 6

2) There are six jobs, each of which must go through machines A and B in the
order AB. Processing Times in minutes are given in the table below. Find the
sequence that minimizes the total elapsed time required to complete jobs and
also find idle time for machines A & B.
Processing Time
Job
Machine-A Machine-B
1 8 10
2 12 7
3 7 11
4 10 6
5 11 12
6 9 8

3) There are five jobs, each of which must go through machines A, B and C in
the order ABC. Processing Times in minutes are given in the table below. Find
the sequence that minimizes the total elapsed time required to complete jobs
and also find idle time for machines A, B and C.
Processing Time
Job
Machine-A Machine-B Machine-C
1 6 6 7
2 9 3 8
3 4 2 6
4 5 4 9
5 3 5 8
4) There are eight jobs, each of which must go through machines A, B and C
in the order ABC. Processing Times in minutes are given in the table below.
Find the sequence that minimizes the total elapsed time required to complete
jobs and also find idle time for machines A, B & C.
Processing Time
Job
Machine-A Machine-B Machine-C
A 4 6 8
B 8 4 7
C 5 7 9
D 9 1 7
E 3 4 9
F 4 2 8
G 9 5 9
H 6 2 7

5) There are four jobs, each of which must go through machines A, B, C, D


and E in the order ABCDE. Processing Times in minutes are given in the table
below. Find the sequence that minimizes the total elapsed time required to
complete jobs and also find idle time for machines A, B, C, D and E.
Processing Time
Job
Machine-A Machine-B Machine-C Machine-D Machine-E
1 7 5 2 3 9
2 6 6 4 5 10
3 5 4 5 6 8
4 8 3 3 2 6