ZHENGZHOU VICTOR MACHINERY EQUIPMENT CO., LTD.

Mob:0086-187-68871537 Whatsapp:008618768871537
Wechat:0086-187-68871537 Fax:0086-371-56747890
Address:SANQUAN ROAD AND WENHUA ROAD
ZHENGZHOU CITY CHINA
Email:pelletizermill@gmail.com Web:www.pelletizermill.com

3-5 tons/h feed pellet production line

Ⅰ.MILLING SECTION
No.& Power Unit Price Amount
Model Photo Qty Note
Item (kw) (USD) (USD)

High efficiency dust removal


101
equipment,made by -
Pulse dust TBLMF.6 / USD 1452 1 USD 1452
3mm/Q235 plate, flange-
collector
5mm/Q235 material

102
GB grade, impeller dynamic
Drought 4-72No 3.2A 1.5 USD 520 1 USD 520
balance test
fan
103
Hopper Made by -2mm/Q235 sheet
1×1 / / USD 220 1 USD 220
and grating plant
screen

104 Head and bottom δ3.0, middle


Bucket DTG26/13 1.5 USD 1785 1 USD 1785 pipe delta 1.8, plate and strip 6
elevator layers.

105
Tublar TXCT15 / USD 664 1 USD 664 Iron removal rate ≥98%
Magnet

106
Storage 500KG / / USD 563 1 USD 563 For raw materials storage
bin

107
Frequency converting
Automatic LSS20 1.5 USD 986 1 USD 986
control,feeding uniformity
feeder
108 Steel plate making ,high
56×40 37 USD 3420 1 USD 3670
Grinder efficiency

High efficiency dust removal


109
equipment,made by -
Pulse dust TBLMF.9 / USD 2272 1 USD 2272
3mm/Q235 plate, flange-
collector
5mm/Q235 material

110
GB grade, impeller dynamic
Drought 4-72No 3.6A 3 USD 615 1 USD 615
balance test
fan

111
Wind / / / USD 846 1 USD 846 Steel plate
tunnel

112
Special design for grinder
Screw LSS25 2.2 USD 1135 1 USD 1135
discharging
conveyor
113
Bucket DTG36/23 2.2 USD 2394 1 USD 2394 6 layers of strip
elevator

114
Accessory
/ / / USD 85 1 USD 85 Steel plate
feeding
hopper

115
Tublar TXCT15 / USD 664 1 USD 664 Iron removal rate ≥98%
Magnet

116
Ror grindming materials
Storage 1000kg / / USD 687 1 USD 687
storage
bin

Ⅱ.MIXING SECTION
No.& Power Unit Price Amount
Model Photo Qty Note
Item (kw) (USD) (USD)
201 Used for automatic discharge
Pneumatic 42×42 / USD 488 1 USD 488 and closing during material
gate valve transportation.

202
HJJ100 18.5 USD 7278 1 USD 7278 Evenness CV less than 5%
Mixer

203
Ror grindming materials
1000kg / / USD 687 1 USD 687
Storage storage
bin

204
Special design for mixer
Screw LSS25 2.2 USD 1135 1 USD 1135
discharging
conveyor

205
Bucket DTG36/23 2.2 USD 2964 1 USD 2964 6 layers of strip
elevator
206
Pneumatic TBDQ2×25× Joint magnetic valve with
/ USD 487 1 USD 487
three - 25 magnetic switch
way

207
Powder 1000kg / / USD 687 1 USD 687 /
storage bin

Ⅲ.PELLET SECTION
No.& Power Unit Price Amount
Model Photo Qty Note
Item (kw) (USD) (USD)

301
Storage 1000kg / / USD 687 1 USD 687 Ready for pelleting
bin

The overload protection device


is used in the electrical part to
protect the main motor.The raw
302
37+2.2+0. materials feeding parts add a
Pellet SZLH 32C USD 11769 1 USD 11769
75 single layer steam conditioning
machine
device and a speed regulating
motor to control the feeding, the
pellet quality getting better
303 Head and bottom δ3.0, middle
Bucket DTG26/23 1.5 USD 1813 1 USD 1813 pipe delta 1.8, plate and strip 6
elevator layers.

Ⅳ.COOLING SECTION PACKING SECTION


No.& Power Unit Price Amount
Model Photo Qty Note
Item (kw) (USD) (USD)

401
SKLN 2.0 0.75×2 USD 3945 1 USD 4195 For press pellet cooling
Cooler

402
/ / / USD 85 1 USD 85 /
Hopper

403
Cyclone / / / USD 956 1 USD 956 /
and tunnel
404
GFZ.4 0.75×2 USD 670 1 USD 670 /
Ventilator

405
GB grade, impeller dynamic
4-72No5A 7.5 USD 560 1 USD 560
Drought balance test.
fan

406
SSLG15×80 5.5 USD 3640 1 USD 3890 Unqualified pellet grinding
Pellet
grinder

407
Head and bottom δ3.0, middle
DTG26/23 1.5 USD 1942 1 USD 1942 pipe delta 1.8, plate and strip 6
Bucket
layers.
elevator

408
New type belt drive and does
SFJZ80×2 2.2 USD 3560 1 USD 3810 not need lubricating oil
Rotary
lubrication.
siever
409
Pellet 1000kg / / USD 687 2 USD 1374 Ready for packing
storage bin

410
Computer control pellet packing
Automatic / / USD 9980 1 USD 9980
25~50kg/bag 400~800bag/h
package
machine

Ⅴ.Other parts for feed plant


Power
/ / / USD 3267 / USD 3267 Beand :DELIXI
Distributor

Auxiliary
/ / / USD 2310 / USD 2310 /
materials

/ Electric cable / / USD 2840 / USD 2840 /

/ Electric wire / / USD 1524 / USD 1524 /

Air
/ / / USD 764 / USD 764 /
compressor

/ Paint / / USD 1147 / USD 1147 /


Pneumatic
/ / / USD 669 / USD 669 /
components

Standard
/ / / USD 573 / USD 573 /
parts

/ Hammer / / USD 80 5 USD 400 /

/ Sifter / / USD 25 20 USD 500 /

The column is a diameter 75


welded pipe, 12# channel steel,
/ Frame / / USD 6881 1 USD 6881 5# angle steel, plate -
2mm/Q235,the guardrail is 4
points welded pipe.

Total
36 SETS 132.2KW
Amount

FOB Tianjin USD 94890


SAY U.S DOLLARS NINETY-EIGHT THOUSAND AND NINE
Total FOB amount
HUNDRED NINETY ONLY

Need space: 12*6*8.5m

REMARKS
1.This quotation is valid within 30 days
2.Payment term:35% T/T as deposit ,the rest should be against when delivery
3.Lead time: the machine will be sent to port within 30 days after deposit
4.Trainning and installation:We can arrange technicians to your country for installation and trainning.The buyer needs bear
air tickets and local accommodation.The salary is USD 100 per day of each one.

5.Responsibility of the Buyer:


1.The buyer to provide all the necessary accessories for the preparation of work involved for the installation of the
production line
2.The Buyer to bear the board and lodging( with satellite TV,Bathroom, Bed room,Refrigerator, Air conditioner,Washer
etc..) and transportation to the Seller's technical service Personnel while working on the the site, and providing the forth
and back fees for technicians. And the buyer to arrange for visa entry of the seller’s personnels.
3.The buyer to provide set of Crane for the installation of the equipments.
4.Total installation/commissioning period shall be 15~20 days
5.The buyer to provide required electricity and basic mechanical tools
7.The buyer has to pay each worker USD100 each day during the installation. The total amount of money has to be paid
by T/T into the seller's company bank account.
8.The buyer has the responsibility of making sure the sellers' workers life safety.
9.The buyer supplies installation tools, including climbing ladder,platform,supporting frame,water, etc.