ACTIVITIES OUTPUT PE

3 WORKER PRODUCTI
ITEM NO. WORK DESCRIPTION
LOW UNIT

A. FORM WORKS INSTALLATION


WALL ON THE GROUND 0.25 SQ.M.per hour
WALL ABOVER GROUND 0.21 SQ.M.per hour
BEAMS 0.16 SQ.M.per hour
COLUMN 0.21 SQ.M.per hour
SUSPENDED SLAB -
0 TO 18' 0.30 SQ.M.per hour
18' TO 36' UP 0.15 SQ.M.per hour
ELEVATED AND SHORED SLAB FORMING -
FORMING ONLY 0.06 SQ.M.per hour
FORMING AND SHORING 0.05 SQ.M.per hour
WOOD WALL AND PARTITION 1.00 SQ.M.per hour
-
B. FORMWORKS FABRICATION 0.47 SQ.M.per hour
-
C. STRIPPING OF FORMS -
WALL ON GROUND 2.00 SQ.M.per hour
WALL ABOVE 10' 0.39 SQ.M.per hour
BEAMS 0.49 SQ.M.per hour
COLUMNS 0.59 SQ.M.per hour
SUSPENDED SLAB - SQ.M.per hour
0 TO 18' 0.60 SQ.M.per hour
18' TO 36' UP 0.46 SQ.M.per hour
ELEVATED AND SHORED SLAB FORMING - SQ.M.per hour
STRIP OF FORMS 0.14 SQ.M.per hour
FLOOR SLAB AT GRADE STRIP OF FORMS 0.18 SQ.M.per hour
-
D INSTALLION OF CARPENTRY WORKS -
PLYWOOD PARTITION 0.50 PCper hour
T & G FLOORING AND SHORING 3.45 B.F.per hour
CEILING FRAME 3.33 B.F.per hour
SIDING FRAME 1.89 B.F.per hour
FLOORING FRAME 0.52 B.F.per hour
WOODEN POSS ERECTION 1.18 B.F.per hour
TRUSS FABRICATION 1.43 B.F.per hour
TRUSS INSTALLATION 0.63 B.F.per hour
GIRTS INSTALLTION 2.33 B.F.per hour
PLATES INSTALLATION 3.70 B.F.per hour
PURLINS INSTALLATION 1.89 B.F.per hour
FASCIA BOARD INSTALLATION 1.10 B.F.per hour
1/4" or 3/4" thk PLYWOOD -
CUTTING BY MANUAL 0.50 PCper hour
ASSEMBLY 1.20 S.F.per hour
CEILNG: -
FRAME INSTALLATION 0.38 SQ.M.per hour
PLYWOOD INSTALLLATION 0.50 SQ.M.per hour
CABINET BOARDING 3.85 B.F.per hour
CABINET FRAMING 2.78 B.F.per hour
WOOD WALL PARTITION 1.00 SQ.M.per hour
PANEL WALL 0.07 SQ.M.per hour
FORMING WEIGHT ANCHOR BOLT 0.11 SQ.M.per hour
WET FORMING 0.14 SQ.M.per hour
-
E. DOORS AND WINDOWS -
W-PANEL INSTALLATION 1.25 PC.per hour
STEEL WINDOWS INSTALLATION 0.25 PC.per hour
LOUVER WINDOWS INSTALLATION: -
FIXED ASBESTOS 0.11 SQ.M.per hour
FIXED METAL LOUVERS 0.16 SQ.M.per hour
FIXED GI SHEETS 0.11 SQ.M.per hour
FIXED GLASS 0.16 SQ.M.per hour
FIXED WOODEN 0.15 SQ.M.per hour
ALUMINUM FRAME WINDOWS 0.05 EACHper hour
SLIDING GLASS DOOR 0.04 EACHper hour
HOLLOW METAL DOOR 0.05 EACHper hour
ROLLING DOORS 0.02 EACHper hour
FIXED WINDOW 1.59 S.F.per hour
DOOR LOCKSET 0.31 SETper hour
DOOR JAMB FABRICATION 2.27 B.F.per hour
DOOR JAMB INSTALLATION 1.52 B.F.per hour
CYCLONE WIRE INSTALLATION 0.16 SQ.M.per hour
-
F. TRADE MASONRY WORKS -
GROUTING and TOL PLASTERING 0.30 SQ.M.per hour
PEBBLE FINISHED 0.35 SQ.M.per hour
MABLE INSTALLATION 0.25 SQ.M.per hour
1/4" x 2' x 8" RED BRICKS 0.10 SQ.M.per hour
GLAZED TILES 0.05 SQ.M.per hour
UNGLAZED TILES 0.11 SQ.M.per hour
GLAZED TILE WALL 0.17 SQ.M.per hour
CONC. BLOCK INT. WALL 0.11 SQ.M.per hour
CONC. BLOCK EXT. WALL 0.13 SQ.M.per hour
BRICKWORK 1.00 SQ.M.per hour
PLASTER WALL AND CEILING 0.17 SQ.M.per hour
HOLLOW TILE WALL 0.25 SQ.M.per hour
ACOUSTICAL TILE WALL 0.42 SQ.M.per hour
VINYL FLOOR TILE 0.28 SQ.M.per hour
UNGLAZED OR MOSAIC FLOOR TILE 0.06 SQ.M.per hour
LAYING OF CHB & ADOBE 0.44 SQ.M.per hour
CEMENT FINISH 0.70 SQ.M.per hour
CONC. HOLLOW BLOCK LAYING: -
6" CHB 0.31 SQ.M.per hour
4" CHB 0.38 SQ.M.per hour
8" CHB 0.25 SQ.M.per hour
VIT. TILES FLOOR 0.09 SQ.M.per hour
VIT. TILES WALL 0.08 SQ.M.per hour
-
G. TINSMITHING WORK -
CORR GI SHEETS: -
LIFTING 0.46 SQ.M.per hour
INSTALLATION 0.16 SQ.M.per hour
INSTALLATION OF ASBESTOS ROOFING 0.50 SHT.per hour
INSTALLATION OF ALUMINUM GI SHEET 0.63 SHT.per hour
COPPER CLADDING ROOF DECK 0.99 L.M.per hour
FAB, GI GUTTER 0.14 SHT.per hour
GI SHEET ROOFING 0.61 SHT.per hour
FAB OF GI GUTTER 0.95 L.M.per hour
FAB. GI DOWNSPOUT 0.52 L.M.per hour
GUTTER CUT & SHAPE 3.13 L.M.per hour
INST. OF GUTTER 0.56 L.M.per hour
DOWNSPOUT CUT AND SHAPE 1.69 L.M.per hour
DOWNSPOUT INSTALLATION 3.70 L.M.per hour
CORR. GI ROOFING 0.28 SQ.M.per hour
CORR ALUMINUM ROOFING 0.28 SQ.M.per hour
BUILT UP ROOFING 4 PLY 0.06 SQ.M.per hour
PROTECTED METAL 0.25 SQ.M.per hour
CORR. ASBESTOS INST., LIFTING & HAULING 0.29 SQ.M.per hour
LEADERS & GUTTERS 0.83 SQ.M.per hour
-
H CONCRETE AND REBAR WORKS -
PLACING CONCRETE: -
SLAB ON FILL 0.10 CU.M.per hour
SLIP FORM 0.02 CU.M.per hour
FLR FINISH UNHARDENED 0.50 SQ.M.per hour
CONC. FINISH HARDENED 0.35 SQ.M.per hour
REBAR WORKS: -
GROUND FLR. INSTALLATION 7.14 KGSper hour
UPPER FLR. INSTALLATION 6.25 KGSper hour
FABRICATION 5.00 KGSper hour
MIXING MANUAL 0.03 CU.M.per hour
MIXING MACHINE 0.28 CU.M.per hour
MORE THAN 1.80 CU.M. POUR: -
CHUTE FROM TRUCK 0.07 CU.M.per hour
CRANE AND BUCKET 0.04 CU.M.per hour
WHEELING 0.02 CU.M.per hour
FINISHING 0.18 SQ.M.per hour
CONCRETE POUR ON ELEVATED AND SHORED -
SLAB FORMING CHUTE & BUCKET 0.02 CU.M.per hour
PLACEMENT OF REBARS ON FOOTING 0.94 KGSper hour
FIELD FABRICATION OF REBARS 1.52 KGSper hour
-
I. EARTH WORKS -
MACHINE EXCAVATION: -
SAND 0.83 CU.M.per hour
SAND AND MARL 0.63 CU.M.per hour
MARL 0.45 CU.M.per hour
GRANULAR BACKFILL 0.42 CU.M.per hour
GRANULAR SOIL BACKFILL 0.33 CU.M.per hour
MANUAL FOUNDATION EXCAVATION & BACKFILL: -
SAND 0.13 CU.M.per hour
EXCAVATION OF SAND &MARL 0.08 CU.M.per hour
EXCAVATION OF MARL 0.05 CU.M.per hour
BACKFILL OF SAND 0.09 CU.M.per hour
BACKFILL OF SAND &MARL 0.06 CU.M.per hour
BACKFILL OF MARL 0.04 CU.M.per hour
FLOOR SLAB & GRADE: -
GRADING MANUAL 0.38 SQ.M.per hour
EXCAVATION AND BACKFILL 0.03 CU.M.per hour
FINE GRADING & FINISHING -
GRADING MANUAL 1.11 SQ.M.per hour
FINISHING SOIL SURFACE 0.91 SQ.M.per hour
DIKES 0.42 CU.M.per hour
J ROAD WORKS -
BASE COURSE 4.17 SQ.M.per hour
CURBS & GUTTER 0.28 CU.M.per hour
4" THK ROAD 0.38 SQ.M.per hour
6" THK ROAD 0.36 SQ.M.per hour
8" THK ROAD 0.33 SQ.M.per hour
TROWEL FINISH 1.56 SQ.M.per hour
SPECIAL TOPPING 0.42 SQ.M.per hour
4" STONE OR SHELL ROAD 1.56 SQ.M.per hour
6" STONE OR SHELL ROAD 1.19 SQ.M.per hour
8" STONE OR SHELL ROAD 0.96 SQ.M.per hour
ACID PROOFING 0.83 CU.M.per hour
ASPHALT PAVING: -
FINE GRADING & FINISHING 1.19 SQ.M.per hour
PLACE BASE COURSE 2.50 SQ.M.per hour
ASPHALT 2.50 SQ.M.per hour
ACID BLOCK OR PAVING BLOCK: -
FIND GRADING 1.19 SQ.M.per hour
INSTALL BRICK 0.12 SQ.M.per hour
CRUSH STONE OR SHELL SURFACING -
FINE GRADING 1.56 SQ.M.per hour
PLACE SPREAD AND COMPACT STONE TO 4" 1.19 SQ.M.per hour
OVER 9" THK 0.96 SQ.M.per hour
TANK CUSHION -
SAND CUSHION 0.71 CU.M.per hour
APHALT RETAINER RING 2.50 SQ.M.per hour
NON GRANULAR BACKFILL 0.25 CU.M.per hour
EXCAVATION MANUAL: -
COMMON EARTH 0.06 CU.M.per hour
LOAN OF SAND 0.38 CU.M.per hour
CLAY OR HEAVY SOIL ROCK 0.30 CU.M.per hour
ROCK 0.19 CU.M.per hour
MECHANICAL EXCAVATION -
COMMON EARTH 0.07 CU.M.per hour
ROCK W/ JACKHAMMER 0.03 CU.M.per hour
BACKFILLING -
COMMON MANUAL 0.61 CU.M.per hour
GRAVEL FILL MANUAL 0.10 CU.M.per hour
TRENCHING AND BACKFILLING OF UNDERGROUND -
PIPING USING EXCAVATION MATERIALS MANUAL -
FROM 0 TO 2 MTRS. DEPTH 0.40 L.M.per hour
2 TO 3 0.30 L.M.per hour
3 TO 4 0.20 L.M.per hour
4 TO 5 0.15 L.M.per hour
PLACING BINDER GRAVEL 4.76 CU.M.per hour
ESCOMBRO BACKFILLING 2.38 CU.M.per hour
SPREADING, TAMPING AND GRADING 1.04 SQ.M.per hour
MECHANICAL COMPACTION, PLATE COMPACTION 9.09 CU.M.per hour
MANUAL CLEARING AND GRUBBING -
CLEARING UNDERGROWTH AND TREES 12" 10.00 SQ.M.per hour
CLEARING UNDERGROWTH AND SHRUBS 16.67 SQ.M.per hour
DISPOSAL OF SOIL 0.30 CU.M.per hour
MAULING OF SOIL 0.50 CU.M.per hour
GRAVEL FILL 0.24 CU.M.per hour
EXCAVATION CRANE AND CLAMPSHELL -
. WITH 8-MEN AND 2 CARPENTERS 0.47 CU.M.per hour
-
K. TRADE: UNDERGROUND PIPING AND PLUMBING WORKS -
1.00 LAYING ASBESTOS PIPES: -
1//2Ø 0.76 L.M.per hour
3/4" Ø 0.76 L.M.per hour
1 1/4" 0.68 L.M.per hour
1 1/2 TO 2" Ø 0.61 L.M.per hour
2 1/2" Ø 0.51 L.M.per hour
3" Ø 0.46 L.M.per hour
3 1/2" Ø 0.43 L.M.per hour
4" Ø 0.38 L.M.per hour
2.00 CAST IRON PIPE -
2" Ø 0.23 L.M.per hour
4" Ø 0.15 L.M.per hour
6" Ø 0.10 L.M.per hour
8" Ø 0.08 L.M.per hour
10" Ø 0.05 L.M.per hour
12" Ø 0.05 L.M.per hour
14" Ø 0.04 L.M.per hour
16" Ø 0.04 L.M.per hour
18" Ø 0.03 L.M.per hour
20" Ø 0.03 L.M.per hour
24" Ø 0.03 L.M.per hour
30" Ø 0.02 L.M.per hour
3.00 LAYING PVC PIPE -
1/2 TO 3/4" Ø 2.63 L.M.per hour
1 TO 1 1/4" Ø 0.68 L.M.per hour
1 1/2 TO 2" Ø 0.61 L.M.per hour
2 1/2" Ø 0.51 L.M.per hour
3" Ø 0.46 L.M.per hour
4" Ø 0.38 L.M.per hour
5" Ø 0.30 L.M.per hour
6" Ø 0.20 L.M.per hour
4.00 LAYING RCP 8 MEN (1 TEAM) -
24"Ø 0.11 L.M.per hour
36"Ø 0.08 L.M.per hour
48"Ø 0.05 L.M.per hour
6-18"Ø 0.38 L.M.per hour
-
LAVATORY 0.06 EACHper hour
WATER CLOSET 0.04 EACHper hour
URINAL UTILITY STALL 0.02 EACHper hour
URINAL PEDESTRAL TYPE 0.03 EACHper hour
SHOWER AND INSTALL 0.05 EACHper hour
5 MAN GROUP SHOWER 0.01 EACHper hour
BAH TUBS 0.02 EACHper hour
SLOPE SINK 0.04 EACHper hour
HOT WATER HEATER 0.04 EACHper hour
16 PERSON WASH SINK 0.02 EACHper hour
DRINKING FOUNTAIN 0.04 EACHper hour
EYE WASH 0.06 EACHper hour
MISC. FIXTURES 0.25 EACHper hour
PARTITIONS 0.06 EACHper hour
LAYING OF 24"Ø RCP 0.13 PIPEper hour
LAYING OF 36"Ø RCP 0.08 PIPEper hour
LAYING OF 48"Ø RCP 0.05 PIPEper hour
-
L. TRADE INSULATION -
EQUIPMENT INSTALLATION -
VESSEL, EXCHANGE & TANKS -
FIELD FABRICATION INSULATION 0.20 S.M.per hour
FIELD FABRICATION SHEET METAL COVER 0.04 S.M.per hour
APPLY INSULATION 0.10 S.M.per hour
APPLY SHEET METAL COVER 0.10 S.M.per hour
PUMPS, COMPRESSORS & TURBINES -
FABRICATE 0.03 S.M.per hour
APPLY 0.02 S.M.per hour
PIPINGS AND COMPONENT INSULATION -
FIELD FABRICATE 0.13 FLG.per hour
FIELD FABRICATESHEET METAL COVER 0.63 S.M.per hour
APPLY INSULATION 0.19 L.M.per hour
APPLY SHEET METAL COVER OR METAL COVER 0.33 EACHper hour
FABRICATE INSTRUMENT COVER 0.06 EACHper hour
INSTALL INSTRUMENT COVER 0.08 EACHper hour
INSULATE PIPE HANGERS 0.13 EACHper hour
FOR STREAM TRACED LINES 0.14 L.M.per hour
REMOVAL OF OLD OR EXISTING INSTALLATION 0.33 L.M.per hour
-
M. TRADE:FIRE PROOFING -
INSTALL STUDS 1.00 EACHper hour
INSTALL MESH 0.42 S.M.per hour
POURED -
FORMING 0.04 S.M.per hour
STRIP FORMS 0.08 S.M.per hour
POUR CONCRETE 0.01 S.M.per hour
CURING/PATCHING 0.83 S.M.per hour
FINISHING 0.71 S.M.per hour
TROWEL, PLASTERED 0.19 S.M.per hour
PNEUMATIC APPLICATION -
GUNITE 0.42 S.M.per hour
APPLY FINEBRICK OR BLOCK 0.63 PC.per hour
REMOVAL OF EXISTING OR OLD FIREPROOFING 0.20 S.M.per hour
APPLY FIREPROOFING PAINT 0.17 S.M.per hour
FIRE PROTERCTION: -
FIRE PROTECTION EQUIPMENT INSTALLATION: -
MONITOR 0.10 EACHper hour
HOSE REELS AND CARTS 0.03 EACHper hour
FIRE EXTINGUISHERS 0.10 EACHper hour
PERSONAL EQUIPMENT: -
EYE WASH 0.05 EACHper hour
SAFETY SHOWERS 0.05 EACHper hour
BREATHING APPARATUS 0.10 EACHper hour
SPRINKLER SYSTEM -
SPRAY NOZZLES 0.50 EACHper hour
WATER CANNONS 0.10 EACHper hour
-
N. TRADE:PERMANENT FENCING -
INSTALL FENCE 0.42 L.M.per hour
INSTALL GATES 0.17 L.M.per hour
TO RAIL 1.67 L.M.per hour
BARBE WIRE, 3 STRANDS 1.67 L.M.per hour
-
O. TRADE:PAINTING WORKS -
NEW STRUCTURAL STEEL 0.05 TONper hour
OLD STRUCTURAL STEEL 0.91 S.M.per hour
NEW FLAT FLAT PLATES 1.56 S.M.per hour
SURFACE PREPARATION: -
IN TERMS OF WEIGHT 0.06 TONper hour
IN TERMS OF AREA 1.16 S.M.per hour
SAND PREPARATION 0.02 TONper hour
-
P. TRADE:HEATING VENTILATING AND CONDITIONING -
HEAVY PIPING 0.14 L.M.per hour
DUCT WORK INSTALL 0.08 S.M.per hour
DUCT WORK FAB. 0.03 S.M.per hour
PACKAGE UNIT AIR CONDITIONER 0.02 EACHper hour
UNIT HEATER 0.04 EACHper hour
FINNED CONVERTER 0.10 EACHper hour
EXHAUST FAN PROPELLER 0.06 EACHper hour
GRAVITY ROOF PAINT 0.07 L.M.per hour
POWER ROOF VENT 0.02 EACHper hour
ROUND ROOF VENT 0.06 EACHper hour
PLUMBING PIPING 0.14 L.M.per hour
-
Q. MISCELLANEOUS -
WATER STOP INSTALLATION 0.75 L.M.per hour
CAULKING SLAB JOINT 2.50 L.M.per hour
ASPHALTING 0.63 S.M.per hour
GROUTNG AND TOOL PLASTERING 0.30 S.M.per hour
WATER PROOFING RUBBERIZED 0.91 S.M.per hour
COPPER CLADDING ROOF DECK 1.00 L.M.per hour
WATER PROOFING FLINKOTE 1.85 S.M.per hour
DEMOLITION OF ADOBE WALL 0.31 CU.M.per hour
PAINTING 1.47 S.M.per hour
COPPER WATER STOP CUT AND SHAPE 0.09 L.M.per hour
COPPER WATER STOP CUT AND INSTALLATION 0.05 L.M.per hour
SETTING ANCHOR BOLT 0.01 KGper hour
SETTING ANCHOR BOXES 0.27 CU.M.per hour
MANHOUR EQUIVALENT
OUTPUT PER HOUR ₱ 58.68 per hour in area of Region 1
EQUIVALENT LABOR COST
3 WORKER PRODUCTIVITY RATE
AVERAGE UNIT HIGH UNIT LOW PESOS PER AVERAGE PESOS PER

0.50 SQ.M.per hour 0.63 SQ.M.per hour ₱ 234.72 per SQ.M. ₱ 117.36 per SQ.M.
0.43 SQ.M.per hour 0.53 SQ.M.per hour ₱ 275.80 per SQ.M. ₱ 137.90 per SQ.M.
0.32 SQ.M.per hour 0.41 SQ.M.per hour ₱ 361.47 per SQ.M. ₱ 180.74 per SQ.M.
0.43 SQ.M.per hour 0.53 SQ.M.per hour ₱ 275.80 per SQ.M. ₱ 137.90 per SQ.M.
- - ₱ - ₱ -
0.60 SQ.M.per hour 0.75 SQ.M.per hour ₱ 195.99 per SQ.M. ₱ 98.00 per SQ.M.
0.30 SQ.M.per hour 0.38 SQ.M.per hour ₱ 390.81 per SQ.M. ₱ 195.41 per SQ.M.
- - ₱ - ₱ -
0.11 SQ.M.per hour 0.15 SQ.M.per hour ₱ 1,009.31 per SQ.M. ₱ 528.13 per SQ.M.
0.09 SQ.M.per hour 0.11 SQ.M.per hour ₱ 1,290.97 per SQ.M. ₱ 645.49 per SQ.M.
1.67 SQ.M.per hour 2.50 SQ.M.per hour ₱ 58.68 per SQ.M. ₱ 35.21 per SQ.M.
- - ₱ - ₱ -
0.93 SQ.M.per hour 1.16 SQ.M.per hour ₱ 126.16 per SQ.M. ₱ 63.38 per SQ.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
4.00 SQ.M.per hour 5.00 SQ.M.per hour ₱ 29.34 per SQ.M. ₱ 14.67 per SQ.M.
0.78 SQ.M.per hour 0.97 SQ.M.per hour ₱ 151.40 per SQ.M. ₱ 75.70 per SQ.M.
0.97 SQ.M.per hour 1.22 SQ.M.per hour ₱ 120.88 per SQ.M. ₱ 60.44 per SQ.M.
1.18 SQ.M.per hour 1.47 SQ.M.per hour ₱ 99.76 per SQ.M. ₱ 49.88 per SQ.M.
- SQ.M.per hour - SQ.M.per hour ₱ - per SQ.M. ₱ - per SQ.M.
1.20 SQ.M.per hour 1.49 SQ.M.per hour ₱ 98.00 per SQ.M. ₱ 48.70 per SQ.M.
0.93 SQ.M.per hour 1.16 SQ.M.per hour ₱ 126.75 per SQ.M. ₱ 63.38 per SQ.M.
- SQ.M.per hour - SQ.M.per hour ₱ - per SQ.M. ₱ - per SQ.M.
0.29 SQ.M.per hour 0.36 SQ.M.per hour ₱ 410.76 per SQ.M. ₱ 205.38 per SQ.M.
0.36 SQ.M.per hour 0.45 SQ.M.per hour ₱ 328.61 per SQ.M. ₱ 164.31 per SQ.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
1.00 PCper hour 1.25 PCper hour ₱ 117.36 per PC ₱ 58.68 per PC
7.14 B.F.per hour 9.09 B.F.per hour ₱ 17.02 per B.F. ₱ 8.22 per B.F.
2.78 B.F.per hour 3.45 B.F.per hour ₱ 17.60 per B.F. ₱ 21.13 per B.F.
3.70 B.F.per hour 4.76 B.F.per hour ₱ 31.10 per B.F. ₱ 15.84 per B.F.
1.03 B.F.per hour 1.30 B.F.per hour ₱ 113.84 per B.F. ₱ 56.92 per B.F.
2.33 B.F.per hour 2.94 B.F.per hour ₱ 49.88 per B.F. ₱ 25.23 per B.F.
2.86 B.F.per hour 3.57 B.F.per hour ₱ 41.08 per B.F. ₱ 20.54 per B.F.
1.25 B.F.per hour 1.56 B.F.per hour ₱ 93.89 per B.F. ₱ 46.94 per B.F.
4.76 B.F.per hour 5.88 B.F.per hour ₱ 25.23 per B.F. ₱ 12.32 per B.F.
7.69 B.F.per hour 9.09 B.F.per hour ₱ 15.84 per B.F. ₱ 7.63 per B.F.
3.70 B.F.per hour 10.00 B.F.per hour ₱ 31.10 per B.F. ₱ 15.84 per B.F.
2.17 B.F.per hour 2.78 B.F.per hour ₱ 53.40 per B.F. ₱ 26.99 per B.F.
- - ₱ - ₱ -
1.00 PCper hour 1.25 PCper hour ₱ 117.36 per PC ₱ 58.68 per PC
2.38 S.F.per hour 3.03 S.F.per hour ₱ 48.70 per S.F. ₱ 24.65 per S.F.
- - ₱ - ₱ -
0.75 SQ.M.per hour 0.94 SQ.M.per hour ₱ 156.09 per SQ.M. ₱ 78.05 per SQ.M.
1.00 SQ.M.per hour 1.11 SQ.M.per hour ₱ 117.36 per SQ.M. ₱ 58.68 per SQ.M.
7.69 B.F.per hour 10.00 B.F.per hour ₱ 15.26 per B.F. ₱ 7.63 per B.F.
5.56 B.F.per hour 7.14 B.F.per hour ₱ 21.13 per B.F. ₱ 10.56 per B.F.
2.00 SQ.M.per hour 2.50 SQ.M.per hour ₱ 58.68 per SQ.M. ₱ 29.34 per SQ.M.
0.14 SQ.M.per hour 0.18 SQ.M.per hour ₱ 821.53 per SQ.M. ₱ 410.76 per SQ.M.
0.22 SQ.M.per hour 0.28 SQ.M.per hour ₱ 528.13 per SQ.M. ₱ 264.06 per SQ.M.
0.29 SQ.M.per hour 0.36 SQ.M.per hour ₱ 410.76 per SQ.M. ₱ 205.38 per SQ.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
2.50 PC.per hour 3.13 PC.per hour ₱ 46.94 per PC. ₱ 23.47 per PC.
0.50 PC.per hour 0.63 PC.per hour ₱ 234.72 per PC. ₱ 117.36 per PC.
- - ₱ - ₱ -
0.22 SQ.M.per hour 0.27 SQ.M.per hour ₱ 543.38 per SQ.M. ₱ 271.69 per SQ.M.
0.32 SQ.M.per hour 0.40 SQ.M.per hour ₱ 366.17 per SQ.M. ₱ 183.08 per SQ.M.
0.22 SQ.M.per hour 0.27 SQ.M.per hour ₱ 543.38 per SQ.M. ₱ 271.69 per SQ.M.
0.32 SQ.M.per hour 0.40 SQ.M.per hour ₱ 372.03 per SQ.M. ₱ 183.08 per SQ.M.
0.30 SQ.M.per hour 0.37 SQ.M.per hour ₱ 396.68 per SQ.M. ₱ 198.34 per SQ.M.
0.10 EACHper hour 0.13 EACHper hour ₱ 1,173.61 per EACH ₱ 586.81 per EACH
0.08 EACHper hour 0.10 EACHper hour ₱ 1,408.33 per EACH ₱ 704.17 per EACH
0.10 EACHper hour 0.13 EACHper hour ₱ 1,173.61 per EACH ₱ 586.81 per EACH
0.04 EACHper hour 0.05 EACHper hour ₱ 2,934.03 per EACH ₱ 1,467.01 per EACH
3.23 S.F.per hour 4.00 S.F.per hour ₱ 36.97 per S.F. ₱ 18.19 per S.F.
0.63 SETper hour 0.78 SETper hour ₱ 187.78 per SET ₱ 93.89 per SET
4.55 B.F.per hour 5.56 B.F.per hour ₱ 25.82 per B.F. ₱ 12.91 per B.F.
3.03 B.F.per hour 3.85 B.F.per hour ₱ 38.73 per B.F. ₱ 19.36 per B.F.
0.32 SQ.M.per hour 0.40 SQ.M.per hour ₱ 366.17 per SQ.M. ₱ 183.08 per SQ.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
0.60 SQ.M.per hour 0.75 SQ.M.per hour ₱ 195.99 per SQ.M. ₱ 98.00 per SQ.M.
0.70 SQ.M.per hour 0.75 SQ.M.per hour ₱ 167.83 per SQ.M. ₱ 83.91 per SQ.M.
0.50 SQ.M.per hour 0.63 SQ.M.per hour ₱ 234.72 per SQ.M. ₱ 117.36 per SQ.M.
0.20 SQ.M.per hour 0.25 SQ.M.per hour ₱ 586.81 per SQ.M. ₱ 293.40 per SQ.M.
0.09 SQ.M.per hour 0.12 SQ.M.per hour ₱ 1,235.81 per SQ.M. ₱ 617.91 per SQ.M.
0.23 SQ.M.per hour 0.29 SQ.M.per hour ₱ 510.52 per SQ.M. ₱ 255.26 per SQ.M.
0.33 SQ.M.per hour 0.42 SQ.M.per hour ₱ 352.08 per SQ.M. ₱ 176.04 per SQ.M.
0.22 SQ.M.per hour 0.28 SQ.M.per hour ₱ 528.13 per SQ.M. ₱ 264.06 per SQ.M.
0.25 SQ.M.per hour 0.31 SQ.M.per hour ₱ 469.44 per SQ.M. ₱ 234.72 per SQ.M.
2.00 SQ.M.per hour 2.50 SQ.M.per hour ₱ 58.68 per SQ.M. ₱ 29.34 per SQ.M.
0.33 SQ.M.per hour 0.29 SQ.M.per hour ₱ 352.08 per SQ.M. ₱ 176.04 per SQ.M.
0.50 SQ.M.per hour 0.63 SQ.M.per hour ₱ 234.72 per SQ.M. ₱ 117.36 per SQ.M.
0.83 SQ.M.per hour 1.04 SQ.M.per hour ₱ 140.83 per SQ.M. ₱ 70.42 per SQ.M.
0.56 SQ.M.per hour 0.69 SQ.M.per hour ₱ 211.25 per SQ.M. ₱ 105.63 per SQ.M.
0.11 SQ.M.per hour 0.15 SQ.M.per hour ₱ 997.57 per SQ.M. ₱ 557.47 per SQ.M.
0.88 SQ.M.per hour 1.10 SQ.M.per hour ₱ 133.79 per SQ.M. ₱ 66.90 per SQ.M.
1.39 SQ.M.per hour 1.75 SQ.M.per hour ₱ 83.91 per SQ.M. ₱ 42.25 per SQ.M.
- - ₱ - ₱ -
0.63 SQ.M.per hour 0.78 SQ.M.per hour ₱ 187.78 per SQ.M. ₱ 93.89 per SQ.M.
0.75 SQ.M.per hour 0.94 SQ.M.per hour ₱ 156.09 per SQ.M. ₱ 78.05 per SQ.M.
0.50 SQ.M.per hour 0.63 SQ.M.per hour ₱ 234.72 per SQ.M. ₱ 117.36 per SQ.M.
0.19 SQ.M.per hour 0.23 SQ.M.per hour ₱ 625.53 per SQ.M. ₱ 312.77 per SQ.M.
0.17 SQ.M.per hour 0.21 SQ.M.per hour ₱ 700.65 per SQ.M. ₱ 350.32 per SQ.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
- - ₱ - ₱ -
0.93 SQ.M.per hour 1.16 SQ.M.per hour ₱ 126.75 per SQ.M. ₱ 63.38 per SQ.M.
0.33 SQ.M.per hour 0.41 SQ.M.per hour ₱ 359.13 per SQ.M. ₱ 179.56 per SQ.M.
1.00 SHT.per hour 1.25 SHT.per hour ₱ 117.36 per SHT. ₱ 58.68 per SHT.
0.10 SHT.per hour 1.56 SHT.per hour ₱ 93.89 per SHT. ₱ 575.07 per SHT.
1.96 L.M.per hour 2.50 L.M.per hour ₱ 59.27 per L.M. ₱ 29.93 per L.M.
0.29 SHT.per hour 0.36 SHT.per hour ₱ 407.24 per SHT. ₱ 203.62 per SHT.
1.22 SHT.per hour 1.52 SHT.per hour ₱ 96.24 per SHT. ₱ 48.12 per SHT.
1.89 L.M.per hour 2.38 L.M.per hour ₱ 61.61 per L.M. ₱ 31.10 per L.M.
1.03 L.M.per hour 0.56 L.M.per hour ₱ 113.84 per L.M. ₱ 56.92 per L.M.
6.25 L.M.per hour 7.69 L.M.per hour ₱ 18.78 per L.M. ₱ 9.39 per L.M.
0.11 L.M.per hour 1.41 L.M.per hour ₱ 104.45 per L.M. ₱ 528.13 per L.M.
3.33 L.M.per hour 4.17 L.M.per hour ₱ 34.62 per L.M. ₱ 17.60 per L.M.
7.69 L.M.per hour 9.09 L.M.per hour ₱ 15.84 per L.M. ₱ 7.63 per L.M.
0.56 SQ.M.per hour 0.69 SQ.M.per hour ₱ 211.25 per SQ.M. ₱ 105.63 per SQ.M.
0.56 SQ.M.per hour 0.69 SQ.M.per hour ₱ 211.25 per SQ.M. ₱ 105.63 per SQ.M.
0.12 SQ.M.per hour 0.15 SQ.M.per hour ₱ 997.57 per SQ.M. ₱ 498.78 per SQ.M.
0.50 SQ.M.per hour 0.63 SQ.M.per hour ₱ 234.72 per SQ.M. ₱ 117.36 per SQ.M.
0.59 SQ.M.per hour 0.74 SQ.M.per hour ₱ 199.51 per SQ.M. ₱ 99.76 per SQ.M.
1.67 SQ.M.per hour 2.08 SQ.M.per hour ₱ 70.42 per SQ.M. ₱ 35.21 per SQ.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
- - ₱ - ₱ -
0.20 CU.M.per hour 0.25 CU.M.per hour ₱ 586.81 per CU.M. ₱ 293.40 per CU.M.
0.04 CU.M.per hour 0.05 CU.M.per hour ₱ 2,934.03 per CU.M. ₱ 1,467.01 per CU.M.
1.00 SQ.M.per hour 1.25 SQ.M.per hour ₱ 117.36 per SQ.M. ₱ 58.68 per SQ.M.
0.70 SQ.M.per hour 0.88 SQ.M.per hour ₱ 167.83 per SQ.M. ₱ 83.91 per SQ.M.
- - ₱ - ₱ -
14.29 KGSper hour 16.67 KGSper hour ₱ 8.22 per KGS ₱ 4.11 per KGS
12.50 KGSper hour 16.67 KGSper hour ₱ 9.39 per KGS ₱ 4.69 per KGS
10.00 KGSper hour 12.50 KGSper hour ₱ 11.74 per KGS ₱ 5.87 per KGS
0.06 CU.M.per hour 0.08 CU.M.per hour ₱ 1,877.78 per CU.M. ₱ 938.89 per CU.M.
0.56 CU.M.per hour 0.69 CU.M.per hour ₱ 211.25 per CU.M. ₱ 105.63 per CU.M.
- - ₱ - ₱ -
0.14 CU.M.per hour 0.18 CU.M.per hour ₱ 821.53 per CU.M. ₱ 410.76 per CU.M.
0.07 CU.M.per hour 0.09 CU.M.per hour ₱ 1,643.06 per CU.M. ₱ 821.53 per CU.M.
0.04 CU.M.per hour 0.05 CU.M.per hour ₱ 3,168.75 per CU.M. ₱ 1,584.38 per CU.M.
0.36 SQ.M.per hour 0.45 SQ.M.per hour ₱ 328.61 per SQ.M. ₱ 164.31 per SQ.M.
- - ₱ - ₱ -
0.05 CU.M.per hour 0.06 CU.M.per hour ₱ 2,464.58 per CU.M. ₱ 1,232.29 per CU.M.
1.89 KGSper hour 2.38 KGSper hour ₱ 62.20 per KGS ₱ 31.10 per KGS
3.03 KGSper hour 3.85 KGSper hour ₱ 38.73 per KGS ₱ 19.36 per KGS
- - ₱ - ₱ -
- - ₱ - ₱ -
- - ₱ - ₱ -
1.67 CU.M.per hour 2.08 CU.M.per hour ₱ 70.42 per CU.M. ₱ 35.21 per CU.M.
1.25 CU.M.per hour 1.56 CU.M.per hour ₱ 93.89 per CU.M. ₱ 46.94 per CU.M.
0.91 CU.M.per hour 1.14 CU.M.per hour ₱ 129.10 per CU.M. ₱ 64.55 per CU.M.
0.83 CU.M.per hour 1.04 CU.M.per hour ₱ 140.83 per CU.M. ₱ 70.42 per CU.M.
0.67 CU.M.per hour 0.83 CU.M.per hour ₱ 176.04 per CU.M. ₱ 88.02 per CU.M.
- - ₱ - ₱ -
0.25 CU.M.per hour 0.31 CU.M.per hour ₱ 469.44 per CU.M. ₱ 234.72 per CU.M.
0.15 CU.M.per hour 0.19 CU.M.per hour ₱ 762.85 per CU.M. ₱ 381.42 per CU.M.
0.10 CU.M.per hour 0.12 CU.M.per hour ₱ 1,232.29 per CU.M. ₱ 616.15 per CU.M.
0.18 CU.M.per hour 0.23 CU.M.per hour ₱ 645.49 per CU.M. ₱ 322.74 per CU.M.
0.13 CU.M.per hour 0.16 CU.M.per hour ₱ 938.89 per CU.M. ₱ 469.44 per CU.M.
0.08 CU.M.per hour 0.10 CU.M.per hour ₱ 1,408.33 per CU.M. ₱ 704.17 per CU.M.
- - ₱ - ₱ -
0.77 SQ.M.per hour 0.96 SQ.M.per hour ₱ 152.57 per SQ.M. ₱ 76.28 per SQ.M.
0.06 CU.M.per hour 0.07 CU.M.per hour ₱ 2,112.50 per CU.M. ₱ 1,056.25 per CU.M.
- - ₱ - ₱ -
2.22 SQ.M.per hour 2.78 SQ.M.per hour ₱ 52.81 per SQ.M. ₱ 26.41 per SQ.M.
1.82 SQ.M.per hour 2.27 SQ.M.per hour ₱ 64.55 per SQ.M. ₱ 32.27 per SQ.M.
0.83 CU.M.per hour 1.04 CU.M.per hour ₱ 140.83 per CU.M. ₱ 70.42 per CU.M.
- - ₱ - ₱ -
8.33 SQ.M.per hour 10.00 SQ.M.per hour ₱ 14.08 per SQ.M. ₱ 7.04 per SQ.M.
0.56 CU.M.per hour 0.69 CU.M.per hour ₱ 211.25 per CU.M. ₱ 105.63 per CU.M.
0.77 SQ.M.per hour 0.96 SQ.M.per hour ₱ 152.57 per SQ.M. ₱ 76.28 per SQ.M.
0.71 SQ.M.per hour 0.89 SQ.M.per hour ₱ 164.31 per SQ.M. ₱ 82.15 per SQ.M.
0.67 SQ.M.per hour 0.83 SQ.M.per hour ₱ 176.04 per SQ.M. ₱ 88.02 per SQ.M.
3.13 SQ.M.per hour 3.85 SQ.M.per hour ₱ 37.56 per SQ.M. ₱ 18.78 per SQ.M.
0.83 SQ.M.per hour 1.04 SQ.M.per hour ₱ 140.83 per SQ.M. ₱ 70.42 per SQ.M.
3.13 SQ.M.per hour 3.85 SQ.M.per hour ₱ 37.56 per SQ.M. ₱ 18.78 per SQ.M.
2.38 SQ.M.per hour 2.94 SQ.M.per hour ₱ 49.29 per SQ.M. ₱ 24.65 per SQ.M.
1.92 SQ.M.per hour 2.38 SQ.M.per hour ₱ 61.03 per SQ.M. ₱ 30.51 per SQ.M.
1.67 CU.M.per hour 2.08 CU.M.per hour ₱ 70.42 per CU.M. ₱ 35.21 per CU.M.
- - ₱ - ₱ -
2.38 SQ.M.per hour 2.94 SQ.M.per hour ₱ 49.29 per SQ.M. ₱ 24.65 per SQ.M.
5.00 SQ.M.per hour 6.25 SQ.M.per hour ₱ 23.47 per SQ.M. ₱ 11.74 per SQ.M.
5.00 SQ.M.per hour 6.25 SQ.M.per hour ₱ 23.47 per SQ.M. ₱ 11.74 per SQ.M.
- - ₱ - ₱ -
2.38 SQ.M.per hour 2.94 SQ.M.per hour ₱ 49.29 per SQ.M. ₱ 24.65 per SQ.M.
0.24 SQ.M.per hour 0.30 SQ.M.per hour ₱ 492.92 per SQ.M. ₱ 246.46 per SQ.M.
- - ₱ - ₱ -
3.13 SQ.M.per hour 3.85 SQ.M.per hour ₱ 37.56 per SQ.M. ₱ 18.78 per SQ.M.
2.38 SQ.M.per hour 2.94 SQ.M.per hour ₱ 49.29 per SQ.M. ₱ 24.65 per SQ.M.
1.92 SQ.M.per hour 2.38 SQ.M.per hour ₱ 61.03 per SQ.M. ₱ 30.51 per SQ.M.
- - ₱ - ₱ -
1.43 CU.M.per hour 1.79 CU.M.per hour ₱ 82.15 per CU.M. ₱ 41.08 per CU.M.
5.00 SQ.M.per hour 6.25 SQ.M.per hour ₱ 23.47 per SQ.M. ₱ 11.74 per SQ.M.
0.50 CU.M.per hour 0.63 CU.M.per hour ₱ 234.72 per CU.M. ₱ 117.36 per CU.M.
- - ₱ - ₱ -
0.13 CU.M.per hour 0.16 CU.M.per hour ₱ 938.89 per CU.M. ₱ 469.44 per CU.M.
0.76 CU.M.per hour 0.95 CU.M.per hour ₱ 153.74 per CU.M. ₱ 76.87 per CU.M.
0.61 CU.M.per hour 0.76 CU.M.per hour ₱ 192.47 per CU.M. ₱ 96.24 per CU.M.
0.38 CU.M.per hour 0.48 CU.M.per hour ₱ 308.66 per CU.M. ₱ 154.33 per CU.M.
- - ₱ - ₱ -
0.15 CU.M.per hour 0.19 CU.M.per hour ₱ 782.80 per CU.M. ₱ 391.40 per CU.M.
0.06 CU.M.per hour 0.07 CU.M.per hour ₱ 1,956.41 per CU.M. ₱ 978.20 per CU.M.
- - ₱ - ₱ -
1.22 CU.M.per hour 1.52 CU.M.per hour ₱ 96.24 per CU.M. ₱ 48.12 per CU.M.
0.20 CU.M.per hour 0.25 CU.M.per hour ₱ 586.81 per CU.M. ₱ 293.40 per CU.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
0.80 L.M.per hour 1.00 L.M.per hour ₱ 146.70 per L.M. ₱ 73.35 per L.M.
0.60 L.M.per hour 0.43 L.M.per hour ₱ 195.99 per L.M. ₱ 98.00 per L.M.
0.40 L.M.per hour 0.50 L.M.per hour ₱ 293.40 per L.M. ₱ 146.70 per L.M.
0.30 L.M.per hour 0.38 L.M.per hour ₱ 390.81 per L.M. ₱ 195.41 per L.M.
9.09 CU.M.per hour 12.50 CU.M.per hour ₱ 12.32 per CU.M. ₱ 6.45 per CU.M.
4.76 CU.M.per hour 5.88 CU.M.per hour ₱ 24.65 per CU.M. ₱ 12.32 per CU.M.
2.08 SQ.M.per hour 2.63 SQ.M.per hour ₱ 56.33 per SQ.M. ₱ 28.17 per SQ.M.
16.67 CU.M.per hour 25.00 CU.M.per hour ₱ 6.45 per CU.M. ₱ 3.52 per CU.M.
- - ₱ - ₱ -
20.00 SQ.M.per hour 25.00 SQ.M.per hour ₱ 5.87 per SQ.M. ₱ 2.93 per SQ.M.
33.33 SQ.M.per hour 50.00 SQ.M.per hour ₱ 3.52 per SQ.M. ₱ 1.76 per SQ.M.
0.59 CU.M.per hour 0.74 CU.M.per hour ₱ 198.34 per CU.M. ₱ 99.17 per CU.M.
1.00 CU.M.per hour 1.25 CU.M.per hour ₱ 117.36 per CU.M. ₱ 58.68 per CU.M.
0.48 CU.M.per hour 0.60 CU.M.per hour ₱ 242.94 per CU.M. ₱ 121.47 per CU.M.
- - ₱ - ₱ -
0.93 CU.M.per hour 1.16 CU.M.per hour ₱ 125.58 per CU.M. ₱ 62.79 per CU.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
- - ₱ - ₱ -
1.52 L.M.per hour 1.89 L.M.per hour ₱ 77.46 per L.M. ₱ 38.73 per L.M.
1.52 L.M.per hour 1.89 L.M.per hour ₱ 77.46 per L.M. ₱ 38.73 per L.M.
1.35 L.M.per hour 1.69 L.M.per hour ₱ 86.85 per L.M. ₱ 43.42 per L.M.
1.22 L.M.per hour 1.52 L.M.per hour ₱ 96.24 per L.M. ₱ 48.12 per L.M.
1.02 L.M.per hour 1.43 L.M.per hour ₱ 115.60 per L.M. ₱ 57.51 per L.M.
0.93 L.M.per hour 1.16 L.M.per hour ₱ 126.75 per L.M. ₱ 63.38 per L.M.
0.87 L.M.per hour 1.09 L.M.per hour ₱ 134.97 per L.M. ₱ 67.48 per L.M.
0.76 L.M.per hour 0.94 L.M.per hour ₱ 154.92 per L.M. ₱ 77.46 per L.M.
- - ₱ - ₱ -
0.46 L.M.per hour 0.57 L.M.per hour ₱ 257.02 per L.M. ₱ 128.51 per L.M.
0.30 L.M.per hour 0.38 L.M.per hour ₱ 386.12 per L.M. ₱ 193.06 per L.M.
0.20 L.M.per hour 0.25 L.M.per hour ₱ 577.42 per L.M. ₱ 288.71 per L.M.
0.15 L.M.per hour 0.19 L.M.per hour ₱ 771.06 per L.M. ₱ 385.53 per L.M.
0.10 L.M.per hour 0.13 L.M.per hour ₱ 1,156.01 per L.M. ₱ 578.00 per L.M.
0.10 L.M.per hour 0.12 L.M.per hour ₱ 1,209.99 per L.M. ₱ 605.00 per L.M.
0.08 L.M.per hour 0.10 L.M.per hour ₱ 1,414.20 per L.M. ₱ 707.10 per L.M.
0.07 L.M.per hour 0.09 L.M.per hour ₱ 1,606.67 per L.M. ₱ 803.34 per L.M.
0.07 L.M.per hour 0.08 L.M.per hour ₱ 1,800.32 per L.M. ₱ 900.16 per L.M.
0.06 L.M.per hour 0.08 L.M.per hour ₱ 1,928.24 per L.M. ₱ 964.12 per L.M.
0.06 L.M.per hour 0.07 L.M.per hour ₱ 2,120.72 per L.M. ₱ 1,060.36 per L.M.
0.05 L.M.per hour 0.06 L.M.per hour ₱ 2,410.60 per L.M. ₱ 1,205.30 per L.M.
- - ₱ - ₱ -
5.26 L.M.per hour 6.67 L.M.per hour ₱ 22.30 per L.M. ₱ 11.15 per L.M.
1.35 L.M.per hour 1.69 L.M.per hour ₱ 86.85 per L.M. ₱ 43.42 per L.M.
1.22 L.M.per hour 1.52 L.M.per hour ₱ 96.24 per L.M. ₱ 48.12 per L.M.
1.02 L.M.per hour 1.28 L.M.per hour ₱ 115.01 per L.M. ₱ 57.51 per L.M.
0.93 L.M.per hour 1.16 L.M.per hour ₱ 126.75 per L.M. ₱ 63.38 per L.M.
0.76 L.M.per hour 0.95 L.M.per hour ₱ 153.74 per L.M. ₱ 76.87 per L.M.
0.61 L.M.per hour 0.76 L.M.per hour ₱ 192.47 per L.M. ₱ 96.24 per L.M.
0.41 L.M.per hour 0.51 L.M.per hour ₱ 288.71 per L.M. ₱ 144.35 per L.M.
- - ₱ - ₱ -
0.25 L.M.per hour 0.31 L.M.per hour ₱ 528.13 per L.M. ₱ 234.72 per L.M.
0.16 L.M.per hour 0.20 L.M.per hour ₱ 751.11 per L.M. ₱ 375.56 per L.M.
0.09 L.M.per hour 0.12 L.M.per hour ₱ 1,252.24 per L.M. ₱ 626.12 per L.M.
0.75 L.M.per hour 0.94 L.M.per hour ₱ 156.09 per L.M. ₱ 78.05 per L.M.
- - ₱ - ₱ -
0.13 EACHper hour 0.16 EACHper hour ₱ 938.89 per EACH ₱ 469.44 per EACH
0.08 EACHper hour 0.10 EACHper hour ₱ 1,408.33 per EACH ₱ 704.17 per EACH
0.04 EACHper hour 0.05 EACHper hour ₱ 2,816.67 per EACH ₱ 1,408.33 per EACH
0.06 EACHper hour 0.08 EACHper hour ₱ 1,877.78 per EACH ₱ 938.89 per EACH
0.10 EACHper hour 0.13 EACHper hour ₱ 1,173.61 per EACH ₱ 586.81 per EACH
0.03 EACHper hour 0.03 EACHper hour ₱ 4,225.00 per EACH ₱ 2,112.50 per EACH
0.04 EACHper hour 0.05 EACHper hour ₱ 2,816.67 per EACH ₱ 1,408.33 per EACH
0.07 EACHper hour 0.09 EACHper hour ₱ 1,643.06 per EACH ₱ 821.53 per EACH
0.07 EACHper hour 0.09 EACHper hour ₱ 1,643.06 per EACH ₱ 821.53 per EACH
0.04 EACHper hour 0.05 EACHper hour ₱ 3,051.39 per EACH ₱ 1,525.69 per EACH
0.08 EACHper hour 0.10 EACHper hour ₱ 1,525.69 per EACH ₱ 762.85 per EACH
0.11 EACHper hour 0.16 EACHper hour ₱ 938.89 per EACH ₱ 528.13 per EACH
0.50 EACHper hour 0.63 EACHper hour ₱ 234.72 per EACH ₱ 117.36 per EACH
0.13 EACHper hour 0.16 EACHper hour ₱ 938.89 per EACH ₱ 469.44 per EACH
0.25 PIPEper hour 0.31 PIPEper hour ₱ 469.44 per PIPE ₱ 234.72 per PIPE
0.16 PIPEper hour 0.20 PIPEper hour ₱ 751.11 per PIPE ₱ 375.56 per PIPE
0.09 PIPEper hour 0.12 PIPEper hour ₱ 1,251.07 per PIPE ₱ 625.53 per PIPE
- - ₱ - ₱ -
- - ₱ - ₱ -
- - ₱ - ₱ -
- - ₱ - ₱ -
0.40 S.M.per hour 0.50 S.M.per hour ₱ 293.40 per S.M. ₱ 146.70 per S.M.
0.08 S.M.per hour 0.10 S.M.per hour ₱ 1,408.33 per S.M. ₱ 704.17 per S.M.
0.20 S.M.per hour 0.25 S.M.per hour ₱ 586.81 per S.M. ₱ 293.40 per S.M.
0.20 S.M.per hour 0.25 S.M.per hour ₱ 586.81 per S.M. ₱ 293.40 per S.M.
- - ₱ - ₱ -
0.06 S.M.per hour 0.07 S.M.per hour ₱ 1,995.14 per S.M. ₱ 997.57 per S.M.
0.03 S.M.per hour 0.04 S.M.per hour ₱ 3,520.83 per S.M. ₱ 1,760.42 per S.M.
- - ₱ - ₱ -
0.25 FLG.per hour 0.31 FLG.per hour ₱ 469.44 per FLG. ₱ 234.72 per FLG.
1.25 S.M.per hour 1.56 S.M.per hour ₱ 93.89 per S.M. ₱ 46.94 per S.M.
0.37 L.M.per hour 0.46 L.M.per hour ₱ 316.88 per L.M. ₱ 158.44 per L.M.
0.67 EACHper hour 0.83 EACHper hour ₱ 176.04 per EACH ₱ 88.02 per EACH
0.13 EACHper hour 0.16 EACHper hour ₱ 938.89 per EACH ₱ 469.44 per EACH
0.17 EACHper hour 0.21 EACHper hour ₱ 704.17 per EACH ₱ 352.08 per EACH
0.25 EACHper hour 0.31 EACHper hour ₱ 469.44 per EACH ₱ 234.72 per EACH
0.27 L.M.per hour 0.34 L.M.per hour ₱ 434.24 per L.M. ₱ 217.12 per L.M.
0.67 L.M.per hour 0.83 L.M.per hour ₱ 176.04 per L.M. ₱ 88.02 per L.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
2.00 EACHper hour 2.50 EACHper hour ₱ 58.68 per EACH ₱ 29.34 per EACH
0.83 S.M.per hour 1.04 S.M.per hour ₱ 140.83 per S.M. ₱ 70.42 per S.M.
- - ₱ - ₱ -
0.07 S.M.per hour 0.09 S.M.per hour ₱ 1,643.06 per S.M. ₱ 821.53 per S.M.
0.17 S.M.per hour 0.21 S.M.per hour ₱ 704.17 per S.M. ₱ 352.08 per S.M.
0.01 S.M.per hour 0.02 S.M.per hour ₱ 8,215.28 per S.M. ₱ 4,107.64 per S.M.
1.67 S.M.per hour 2.08 S.M.per hour ₱ 70.42 per S.M. ₱ 35.21 per S.M.
1.43 S.M.per hour 1.79 S.M.per hour ₱ 82.15 per S.M. ₱ 41.08 per S.M.
0.37 S.M.per hour 0.46 S.M.per hour ₱ 316.88 per S.M. ₱ 158.44 per S.M.
- - ₱ - ₱ -
0.83 S.M.per hour 1.04 S.M.per hour ₱ 140.83 per S.M. ₱ 70.42 per S.M.
1.25 PC.per hour 1.56 PC.per hour ₱ 93.89 per PC. ₱ 46.94 per PC.
0.40 S.M.per hour 0.50 S.M.per hour ₱ 293.40 per S.M. ₱ 146.70 per S.M.
0.33 S.M.per hour 0.42 S.M.per hour ₱ 352.08 per S.M. ₱ 176.04 per S.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
0.20 EACHper hour 0.25 EACHper hour ₱ 586.81 per EACH ₱ 293.40 per EACH
0.07 EACHper hour 0.08 EACHper hour ₱ 1,760.42 per EACH ₱ 880.21 per EACH
0.20 EACHper hour 0.25 EACHper hour ₱ 586.81 per EACH ₱ 293.40 per EACH
- - ₱ - ₱ -
0.10 EACHper hour 0.13 EACHper hour ₱ 1,173.61 per EACH ₱ 586.81 per EACH
0.10 EACHper hour 0.13 EACHper hour ₱ 1,173.61 per EACH ₱ 586.81 per EACH
0.20 EACHper hour 0.25 EACHper hour ₱ 586.81 per EACH ₱ 293.40 per EACH
- - ₱ - ₱ -
1.00 EACHper hour 0.01 EACHper hour ₱ 117.36 per EACH ₱ 58.68 per EACH
0.20 EACHper hour 0.25 EACHper hour ₱ 586.81 per EACH ₱ 293.40 per EACH
- - ₱ - ₱ -
- - ₱ - ₱ -
0.83 L.M.per hour 1.04 L.M.per hour ₱ 140.83 per L.M. ₱ 70.42 per L.M.
0.33 L.M.per hour 0.42 L.M.per hour ₱ 352.08 per L.M. ₱ 176.04 per L.M.
3.33 L.M.per hour 4.17 L.M.per hour ₱ 35.21 per L.M. ₱ 17.60 per L.M.
3.33 L.M.per hour 4.17 L.M.per hour ₱ 35.21 per L.M. ₱ 17.60 per L.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
1.00 TONper hour 0.11 TONper hour ₱ 1,173.61 per TON ₱ 58.68 per TON
1.82 S.M.per hour 0.02 S.M.per hour ₱ 64.55 per S.M. ₱ 32.27 per S.M.
3.13 S.M.per hour 0.04 S.M.per hour ₱ 37.56 per S.M. ₱ 18.78 per S.M.
- - ₱ - ₱ -
0.13 TONper hour 0.16 TONper hour ₱ 938.89 per TON ₱ 469.44 per TON
0.03 S.M.per hour 2.94 S.M.per hour ₱ 50.47 per S.M. ₱ 1,760.42 per S.M.
- TONper hour 0.04 TONper hour ₱ 3,520.83 per TON ₱ - per TON
- - ₱ - ₱ -
- - ₱ - ₱ -
0.29 L.M.per hour 0.36 L.M.per hour ₱ 410.76 per L.M. ₱ 205.38 per L.M.
0.17 S.M.per hour 0.21 S.M.per hour ₱ 704.17 per S.M. ₱ 352.08 per S.M.
0.06 S.M.per hour 0.07 S.M.per hour ₱ 2,112.50 per S.M. ₱ 1,056.25 per S.M.
0.04 EACHper hour 0.05 EACHper hour ₱ 2,816.67 per EACH ₱ 1,408.33 per EACH
0.08 EACHper hour 0.10 EACHper hour ₱ 1,408.33 per EACH ₱ 704.17 per EACH
0.20 EACHper hour 0.25 EACHper hour ₱ 586.81 per EACH ₱ 293.40 per EACH
0.13 EACHper hour 0.16 EACHper hour ₱ 938.89 per EACH ₱ 469.44 per EACH
0.14 L.M.per hour 0.17 L.M.per hour ₱ 821.53 per L.M. ₱ 428.37 per L.M.
0.04 EACHper hour 0.05 EACHper hour ₱ 2,816.67 per EACH ₱ 1,408.33 per EACH
0.13 EACHper hour 0.16 EACHper hour ₱ 938.89 per EACH ₱ 469.44 per EACH
0.29 L.M.per hour 0.36 L.M.per hour ₱ 410.76 per L.M. ₱ 205.38 per L.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
1.49 L.M.per hour 1.85 L.M.per hour ₱ 78.63 per L.M. ₱ 39.32 per L.M.
5.00 L.M.per hour 6.25 L.M.per hour ₱ 23.47 per L.M. ₱ 11.74 per L.M.
1.25 S.M.per hour 1.56 S.M.per hour ₱ 93.89 per S.M. ₱ 46.94 per S.M.
0.60 S.M.per hour 1.19 S.M.per hour ₱ 195.99 per S.M. ₱ 98.00 per S.M.
1.82 S.M.per hour 3.57 S.M.per hour ₱ 64.55 per S.M. ₱ 32.27 per S.M.
2.00 L.M.per hour 4.00 L.M.per hour ₱ 58.68 per L.M. ₱ 29.34 per L.M.
3.70 S.M.per hour 7.14 S.M.per hour ₱ 31.69 per S.M. ₱ 15.84 per S.M.
0.63 CU.M.per hour 1.25 CU.M.per hour ₱ 187.78 per CU.M. ₱ 93.89 per CU.M.
2.94 S.M.per hour 5.88 S.M.per hour ₱ 39.90 per S.M. ₱ 19.95 per S.M.
0.17 L.M.per hour 33.33 L.M.per hour ₱ 645.49 per L.M. ₱ 352.08 per L.M.
0.09 L.M.per hour 16.67 L.M.per hour ₱ 1,290.97 per L.M. ₱ 645.49 per L.M.
0.02 KGper hour 4.17 KGper hour ₱ 5,692.01 per KG ₱ 2,875.35 per KG
0.55 CU.M.per hour 1.10 CU.M.per hour ₱ 213.60 per CU.M. ₱ 106.80 per CU.M.
LENT
n1
ABOR COST

HIGH PESOS PER

₱ 93.89 per SQ.M.


₱ 110.32 per SQ.M.
₱ 144.35 per SQ.M.
₱ 110.32 per SQ.M.
₱ -
₱ 78.63 per SQ.M.
₱ 156.09 per SQ.M.
₱ -
₱ 403.72 per SQ.M.
₱ 516.39 per SQ.M.
₱ 23.47 per SQ.M.
₱ -
₱ 50.47 per SQ.M.
₱ -
₱ -
₱ 11.74 per SQ.M.
₱ 60.44 per SQ.M.
₱ 48.12 per SQ.M.
₱ 39.90 per SQ.M.
₱ - per SQ.M.
₱ 39.32 per SQ.M.
₱ 50.47 per SQ.M.
₱ - per SQ.M.
₱ 164.31 per SQ.M.
₱ 131.44 per SQ.M.
₱ -
₱ -
₱ 46.94 per PC
₱ 6.45 per B.F.
₱ 17.02 per B.F.
₱ 12.32 per B.F.
₱ 45.18 per B.F.
₱ 19.95 per B.F.
₱ 16.43 per B.F.
₱ 37.56 per B.F.
₱ 9.98 per B.F.
₱ 6.45 per B.F.
₱ 5.87 per B.F.
₱ 21.13 per B.F.
₱ -
₱ 46.94 per PC
₱ 19.36 per S.F.
₱ -
₱ 62.20 per SQ.M.
₱ 52.81 per SQ.M.
₱ 5.87 per B.F.
₱ 8.22 per B.F.
₱ 23.47 per SQ.M.
₱ 328.61 per SQ.M.
₱ 211.25 per SQ.M.
₱ 164.31 per SQ.M.
₱ -
₱ -
₱ 18.78 per PC.
₱ 93.89 per PC.
₱ -
₱ 217.12 per SQ.M.
₱ 146.70 per SQ.M.
₱ 217.12 per SQ.M.
₱ 146.70 per SQ.M.
₱ 158.44 per SQ.M.
₱ 469.44 per EACH
₱ 563.33 per EACH
₱ 469.44 per EACH
₱ 1,173.61 per EACH
₱ 14.67 per S.F.
₱ 75.11 per SET
₱ 10.56 per B.F.
₱ 15.26 per B.F.
₱ 146.70 per SQ.M.
₱ -
₱ -
₱ 78.63 per SQ.M.
₱ 78.63 per SQ.M.
₱ 93.89 per SQ.M.
₱ 234.72 per SQ.M.
₱ 494.09 per SQ.M.
₱ 204.21 per SQ.M.
₱ 140.83 per SQ.M.
₱ 211.25 per SQ.M.
₱ 187.78 per SQ.M.
₱ 23.47 per SQ.M.
₱ 199.51 per SQ.M.
₱ 93.89 per SQ.M.
₱ 56.33 per SQ.M.
₱ 84.50 per SQ.M.
₱ 399.03 per SQ.M.
₱ 53.40 per SQ.M.
₱ 33.45 per SQ.M.
₱ -
₱ 75.11 per SQ.M.
₱ 62.20 per SQ.M.
₱ 93.89 per SQ.M.
₱ 249.98 per SQ.M.
₱ 280.49 per SQ.M.
₱ -
₱ -
₱ -
₱ 50.47 per SQ.M.
₱ 143.77 per SQ.M.
₱ 46.94 per SHT.
₱ 37.56 per SHT.
₱ 23.47 per L.M.
₱ 163.13 per SHT.
₱ 38.73 per SHT.
₱ 24.65 per L.M.
₱ 104.45 per L.M.
₱ 7.63 per L.M.
₱ 41.66 per L.M.
₱ 14.08 per L.M.
₱ 6.45 per L.M.
₱ 84.50 per SQ.M.
₱ 84.50 per SQ.M.
₱ 399.03 per SQ.M.
₱ 93.89 per SQ.M.
₱ 79.81 per SQ.M.
₱ 28.17 per SQ.M.
₱ -
₱ -
₱ -
₱ 234.72 per CU.M.
₱ 1,173.61 per CU.M.
₱ 46.94 per SQ.M.
₱ 66.90 per SQ.M.
₱ -
₱ 3.52 per KGS
₱ 3.52 per KGS
₱ 4.69 per KGS
₱ 751.11 per CU.M.
₱ 84.50 per CU.M.
₱ -
₱ 328.61 per CU.M.
₱ 657.22 per CU.M.
₱ 1,267.50 per CU.M.
₱ 131.44 per SQ.M.
₱ -
₱ 985.83 per CU.M.
₱ 24.65 per KGS
₱ 15.26 per KGS
₱ -
₱ -
₱ -
₱ 28.17 per CU.M.
₱ 37.56 per CU.M.
₱ 51.64 per CU.M.
₱ 56.33 per CU.M.
₱ 70.42 per CU.M.
₱ -
₱ 187.78 per CU.M.
₱ 305.14 per CU.M.
₱ 492.92 per CU.M.
₱ 258.19 per CU.M.
₱ 375.56 per CU.M.
₱ 563.33 per CU.M.
₱ -
₱ 61.03 per SQ.M.
₱ 845.00 per CU.M.
₱ -
₱ 21.13 per SQ.M.
₱ 25.82 per SQ.M.
₱ 56.33 per CU.M.
₱ -
₱ 5.87 per SQ.M.
₱ 84.50 per CU.M.
₱ 61.03 per SQ.M.
₱ 65.72 per SQ.M.
₱ 70.42 per SQ.M.
₱ 15.26 per SQ.M.
₱ 56.33 per SQ.M.
₱ 15.26 per SQ.M.
₱ 19.95 per SQ.M.
₱ 24.65 per SQ.M.
₱ 28.17 per CU.M.
₱ -
₱ 19.95 per SQ.M.
₱ 9.39 per SQ.M.
₱ 9.39 per SQ.M.
₱ -
₱ 19.95 per SQ.M.
₱ 197.17 per SQ.M.
₱ -
₱ 15.26 per SQ.M.
₱ 19.95 per SQ.M.
₱ 24.65 per SQ.M.
₱ -
₱ 32.86 per CU.M.
₱ 9.39 per SQ.M.
₱ 93.89 per CU.M.
₱ -
₱ 375.56 per CU.M.
₱ 61.61 per CU.M.
₱ 76.87 per CU.M.
₱ 123.23 per CU.M.
₱ -
₱ 313.35 per CU.M.
₱ 782.80 per CU.M.
₱ -
₱ 38.73 per CU.M.
₱ 234.72 per CU.M.
₱ -
₱ -
₱ 58.68 per L.M.
₱ 137.31 per L.M.
₱ 117.36 per L.M.
₱ 156.09 per L.M.
₱ 4.69 per CU.M.
₱ 9.98 per CU.M.
₱ 22.30 per SQ.M.
₱ 2.35 per CU.M.
₱ -
₱ 2.35 per SQ.M.
₱ 1.17 per SQ.M.
₱ 79.22 per CU.M.
₱ 46.94 per CU.M.
₱ 97.41 per CU.M.
₱ -
₱ 50.47 per CU.M.
₱ -
₱ -
₱ -
₱ 31.10 per L.M.
₱ 31.10 per L.M.
₱ 34.62 per L.M.
₱ 38.73 per L.M.
₱ 41.08 per L.M.
₱ 50.47 per L.M.
₱ 53.99 per L.M.
₱ 62.20 per L.M.
₱ -
₱ 102.69 per L.M.
₱ 154.33 per L.M.
₱ 231.20 per L.M.
₱ 308.66 per L.M.
₱ 468.27 per L.M.
₱ 484.11 per L.M.
₱ 565.68 per L.M.
₱ 642.55 per L.M.
₱ 720.01 per L.M.
₱ 771.06 per L.M.
₱ 848.52 per L.M.
₱ 964.12 per L.M.
₱ -
₱ 8.80 per L.M.
₱ 34.62 per L.M.
₱ 38.73 per L.M.
₱ 45.77 per L.M.
₱ 50.47 per L.M.
₱ 61.61 per L.M.
₱ 76.87 per L.M.
₱ 115.60 per L.M.
₱ -
₱ 187.78 per L.M.
₱ 300.44 per L.M.
₱ 501.13 per L.M.
₱ 62.20 per L.M.
₱ -
₱ 375.56 per EACH
₱ 563.33 per EACH
₱ 1,126.67 per EACH
₱ 751.11 per EACH
₱ 469.44 per EACH
₱ 1,690.00 per EACH
₱ 1,126.67 per EACH
₱ 657.22 per EACH
₱ 657.22 per EACH
₱ 1,220.56 per EACH
₱ 610.28 per EACH
₱ 375.56 per EACH
₱ 93.89 per EACH
₱ 375.56 per EACH
₱ 187.78 per PIPE
₱ 300.44 per PIPE
₱ 500.55 per PIPE
₱ -
₱ -
₱ -
₱ -
₱ 117.36 per S.M.
₱ 563.33 per S.M.
₱ 234.72 per S.M.
₱ 234.72 per S.M.
₱ -
₱ 798.06 per S.M.
₱ 1,408.33 per S.M.
₱ -
₱ 187.78 per FLG.
₱ 37.56 per S.M.
₱ 126.75 per L.M.
₱ 70.42 per EACH
₱ 375.56 per EACH
₱ 281.67 per EACH
₱ 187.78 per EACH
₱ 173.69 per L.M.
₱ 70.42 per L.M.
₱ -
₱ -
₱ 23.47 per EACH
₱ 56.33 per S.M.
₱ -
₱ 657.22 per S.M.
₱ 281.67 per S.M.
₱ 3,286.11 per S.M.
₱ 28.17 per S.M.
₱ 32.86 per S.M.
₱ 126.75 per S.M.
₱ -
₱ 56.33 per S.M.
₱ 37.56 per PC.
₱ 117.36 per S.M.
₱ 140.83 per S.M.
₱ -
₱ -
₱ 234.72 per EACH
₱ 704.17 per EACH
₱ 234.72 per EACH
₱ -
₱ 469.44 per EACH
₱ 469.44 per EACH
₱ 234.72 per EACH
₱ -
₱ 4,694.44 per EACH
₱ 234.72 per EACH
₱ -
₱ -
₱ 56.33 per L.M.
₱ 140.83 per L.M.
₱ 14.08 per L.M.
₱ 14.08 per L.M.
₱ -
₱ -
₱ 528.13 per TON
₱ 2,581.94 per S.M.
₱ 1,525.69 per S.M.
₱ -
₱ 375.56 per TON
₱ 19.95 per S.M.
₱ 1,408.33 per TON
₱ -
₱ -
₱ 164.31 per L.M.
₱ 281.67 per S.M.
₱ 845.00 per S.M.
₱ 1,126.67 per EACH
₱ 563.33 per EACH
₱ 234.72 per EACH
₱ 375.56 per EACH
₱ 342.69 per L.M.
₱ 1,126.67 per EACH
₱ 375.56 per EACH
₱ 164.31 per L.M.
₱ -
₱ -
₱ 31.69 per L.M.
₱ 9.39 per L.M.
₱ 37.56 per S.M.
₱ 49.29 per S.M.
₱ 16.43 per S.M.
₱ 14.67 per L.M.
₱ 8.22 per S.M.
₱ 46.94 per CU.M.
₱ 9.98 per S.M.
₱ 1.76 per L.M.
₱ 3.52 per L.M.
₱ 14.08 per KG
₱ 53.40 per CU.M.
MANHOUR
EQUIVALENT RATE
(Drop-Down List)
CHOOSE RATE : Region 1
Total Daily Rate Hourly Pay
Position Quantity Rate
Foreman 1 ₱ 650.00 ₱ 650.00 ₱ 81.25
Skilled 3 ₱ 525.00 ₱ 1,575.00 ₱ 196.88
Labor 5 ₱ 400.00 ₱ 2,000.00 ₱ 250.00
Total Rate per Manhour = ₱ 58.68

NOTE :
You can change the quantities of the manpower per position and their
respective rates in the Table.
Table of Rates
Position
Area Foreman Skilled Labor
NCR 926.25 748.13 570.00
CAR 650.00 525.00 400.00 1.3125
Region 1 650.00 525.00 400.00 1.63
Region 2 650.00 525.00 400.00
Region 3 747.50 603.75 460.00
Region 4A 763.75 616.88 470.00
Region 4B 576.88 465.94 355.00
Region 5 593.13 479.06 365.00
Region 6 731.25 590.63 450.00
Region 7 706.88 570.94 435.00
Region 8 609.38 492.19 375.00
Region 9 570.38 460.69 351.00
Region 10 658.13 531.56 405.00
Region 11 719.88 581.44 443.00
Region 12 598.00 483.00 368.00
Region 13 568.75 459.38 350.00
BARMM 554.13 447.56 341.00
ACTIVITIES INPUT HERE

ITEM NO. WORK DESCRIPTION


QUANTITY UNIT
LOW AVERAG
A. FORM WORKS INSTALLATION
WALL ON THE GROUND SQ.M.
WALL ABOVER GROUND SQ.M.
BEAMS SQ.M.
COLUMN SQ.M.
SUSPENDED SLAB -
0 TO 18' SQ.M.
18' TO 36' UP SQ.M.
ELEVATED AND SHORED SLAB FORMING -
FORMING ONLY SQ.M.
FORMING AND SHORING SQ.M.
WOOD WALL AND PARTITION SQ.M.
-
B. FORMWORKS FABRICATION SQ.M.
-
C. STRIPPING OF FORMS -
WALL ON GROUND SQ.M.
WALL ABOVE 10' SQ.M.
BEAMS SQ.M.
COLUMNS SQ.M.
SUSPENDED SLAB SQ.M.
0 TO 18' SQ.M.
18' TO 36' UP SQ.M.
ELEVATED AND SHORED SLAB FORMING SQ.M.
STRIP OF FORMS SQ.M.
FLOOR SLAB AT GRADE STRIP OF FORMS SQ.M.
-
D INSTALLION OF CARPENTRY WORKS -
PLYWOOD PARTITION PC
T & G FLOORING AND SHORING B.F.
CEILING FRAME B.F.
SIDING FRAME B.F.
FLOORING FRAME B.F.
WOODEN POSS ERECTION B.F.
TRUSS FABRICATION B.F.
TRUSS INSTALLATION B.F.
GIRTS INSTALLTION B.F.
PLATES INSTALLATION B.F.
PURLINS INSTALLATION B.F.
FASCIA BOARD INSTALLATION B.F.
1/4" or 3/4" thk PLYWOOD -
CUTTING BY MANUAL PC
ASSEMBLY S.F.
CEILNG: -
FRAME INSTALLATION SQ.M.
PLYWOOD INSTALLLATION SQ.M.
CABINET BOARDING B.F.
CABINET FRAMING B.F.
WOOD WALL PARTITION SQ.M.
PANEL WALL SQ.M.
FORMING WEIGHT ANCHOR BOLT SQ.M.
WET FORMING SQ.M.
-
E. DOORS AND WINDOWS -
W-PANEL INSTALLATION PC.
STEEL WINDOWS INSTALLATION PC.
LOUVER WINDOWS INSTALLATION: -
FIXED ASBESTOS SQ.M.
FIXED METAL LOUVERS SQ.M.
FIXED GI SHEETS SQ.M.
FIXED GLASS SQ.M.
FIXED WOODEN SQ.M.
ALUMINUM FRAME WINDOWS EACH
SLIDING GLASS DOOR EACH
HOLLOW METAL DOOR EACH
ROLLING DOORS EACH
FIXED WINDOW S.F.
DOOR LOCKSET SET
DOOR JAMB FABRICATION B.F.
DOOR JAMB INSTALLATION B.F.
CYCLONE WIRE INSTALLATION SQ.M.
-
F. TRADE MASONRY WORKS -
GROUTING and TOL PLASTERING SQ.M.
PEBBLE FINISHED SQ.M.
MABLE INSTALLATION SQ.M.
1/4" x 2' x 8" RED BRICKS SQ.M.
GLAZED TILES SQ.M.
UNGLAZED TILES SQ.M.
GLAZED TILE WALL SQ.M.
CONC. BLOCK INT. WALL SQ.M.
CONC. BLOCK EXT. WALL SQ.M.
BRICKWORK SQ.M.
PLASTER WALL AND CEILING SQ.M.
HOLLOW TILE WALL SQ.M.
ACOUSTICAL TILE WALL SQ.M.
VINYL FLOOR TILE SQ.M.
UNGLAZED OR MOSAIC FLOOR TILE SQ.M.
LAYING OF CHB & ADOBE SQ.M.
CEMENT FINISH SQ.M.
CONC. HOLLOW BLOCK LAYING: -
6" CHB SQ.M.
4" CHB SQ.M.
8" CHB SQ.M.
VIT. TILES FLOOR SQ.M.
VIT. TILES WALL SQ.M.
-
G. TINSMITHING WORK -
CORR GI SHEETS: -
LIFTING SQ.M.
INSTALLATION SQ.M.
INSTALLATION OF ASBESTOS ROOFING SHT.
INSTALLATION OF ALUMINUM GI SHEET SHT.
COPPER CLADDING ROOF DECK L.M.
FAB, GI GUTTER SHT.
GI SHEET ROOFING SHT.
FAB OF GI GUTTER L.M.
FAB. GI DOWNSPOUT L.M.
GUTTER CUT & SHAPE L.M.
INST. OF GUTTER L.M.
DOWNSPOUT CUT AND SHAPE L.M.
DOWNSPOUT INSTALLATION L.M.
CORR. GI ROOFING SQ.M.
CORR ALUMINUM ROOFING SQ.M.
BUILT UP ROOFING 4 PLY SQ.M.
PROTECTED METAL SQ.M.
CORR. ASBESTOS INST., LIFTING & HAULING SQ.M.
LEADERS & GUTTERS SQ.M.
-
H CONCRETE AND REBAR WORKS -
PLACING CONCRETE: -
SLAB ON FILL CU.M.
SLIP FORM CU.M.
FLR FINISH UNHARDENED SQ.M.
CONC. FINISH HARDENED SQ.M.
REBAR WORKS: -
GROUND FLR. INSTALLATION KGS
UPPER FLR. INSTALLATION KGS
FABRICATION KGS
MIXING MANUAL CU.M.
MIXING MACHINE CU.M.
MORE THAN 1.80 CU.M. POUR: -
CHUTE FROM TRUCK CU.M.
CRANE AND BUCKET CU.M.
WHEELING CU.M.
FINISHING SQ.M.
CONCRETE POUR ON ELEVATED AND SHORED -
SLAB FORMING CHUTE & BUCKET CU.M.
PLACEMENT OF REBARS ON FOOTING KGS
FIELD FABRICATION OF REBARS KGS
-
I. EARTH WORKS -
MACHINE EXCAVATION: -
SAND CU.M.
SAND AND MARL CU.M.
MARL CU.M.
GRANULAR BACKFILL CU.M.
GRANULAR SOIL BACKFILL CU.M.
MANUAL FOUNDATION EXCAVATION & BACKFILL: -
SAND CU.M.
EXCAVATION OF SAND &MARL CU.M.
EXCAVATION OF MARL CU.M.
BACKFILL OF SAND CU.M.
BACKFILL OF SAND &MARL CU.M.
BACKFILL OF MARL CU.M.
FLOOR SLAB & GRADE: -
GRADING MANUAL SQ.M.
EXCAVATION AND BACKFILL CU.M.
FINE GRADING & FINISHING -
GRADING MANUAL SQ.M.
FINISHING SOIL SURFACE SQ.M.
DIKES CU.M.
J ROAD WORKS -
BASE COURSE SQ.M.
CURBS & GUTTER CU.M.
4" THK ROAD SQ.M.
6" THK ROAD SQ.M.
8" THK ROAD SQ.M.
TROWEL FINISH SQ.M.
SPECIAL TOPPING SQ.M.
4" STONE OR SHELL ROAD SQ.M.
6" STONE OR SHELL ROAD SQ.M.
8" STONE OR SHELL ROAD SQ.M.
ACID PROOFING CU.M.
ASPHALT PAVING: -
FINE GRADING & FINISHING SQ.M.
PLACE BASE COURSE SQ.M.
ASPHALT SQ.M.
ACID BLOCK OR PAVING BLOCK: -
FIND GRADING SQ.M.
INSTALL BRICK SQ.M.
CRUSH STONE OR SHELL SURFACING -
FINE GRADING SQ.M.
PLACE SPREAD AND COMPACT STONE TO 4" SQ.M.
OVER 9" THK SQ.M.
TANK CUSHION -
SAND CUSHION CU.M.
APHALT RETAINER RING SQ.M.
NON GRANULAR BACKFILL CU.M.
EXCAVATION MANUAL: -
COMMON EARTH CU.M.
LOAN OF SAND CU.M.
CLAY OR HEAVY SOIL ROCK CU.M.
ROCK CU.M.
MECHANICAL EXCAVATION -
COMMON EARTH CU.M.
ROCK W/ JACKHAMMER CU.M.
BACKFILLING -
COMMON MANUAL CU.M.
GRAVEL FILL MANUAL CU.M.
TRENCHING AND BACKFILLING OF UNDERGROUND -
PIPING USING EXCAVATION MATERIALS MANUAL -
FROM 0 TO 2 MTRS. DEPTH L.M.
2 TO 3 L.M.
3 TO 4 L.M.
4 TO 5 L.M.
PLACING BINDER GRAVEL CU.M.
ESCOMBRO BACKFILLING CU.M.
SPREADING, TAMPING AND GRADING SQ.M.
MECHANICAL COMPACTION, PLATE COMPACTION CU.M.
MANUAL CLEARING AND GRUBBING -
CLEARING UNDERGROWTH AND TREES 12" SQ.M.
CLEARING UNDERGROWTH AND SHRUBS SQ.M.
DISPOSAL OF SOIL CU.M.
MAULING OF SOIL CU.M.
GRAVEL FILL CU.M.
EXCAVATION CRANE AND CLAMPSHELL -
. WITH 8-MEN AND 2 CARPENTERS CU.M.
-
K. TRADE: UNDERGROUND PIPING AND PLUMBING WORKS -
1.00 LAYING ASBESTOS PIPES: -
1//2Ø L.M.
3/4" Ø L.M.
1 1/4" L.M.
1 1/2 TO 2" Ø L.M.
2 1/2" Ø L.M.
3" Ø L.M.
3 1/2" Ø L.M.
4" Ø L.M.
2.00 CAST IRON PIPE -
2" Ø L.M.
4" Ø L.M.
6" Ø L.M.
8" Ø L.M.
10" Ø L.M.
12" Ø L.M.
14" Ø L.M.
16" Ø L.M.
18" Ø L.M.
20" Ø L.M.
24" Ø L.M.
30" Ø L.M.
3.00 LAYING PVC PIPE -
1/2 TO 3/4" Ø L.M.
1 TO 1 1/4" Ø L.M.
1 1/2 TO 2" Ø L.M.
2 1/2" Ø L.M.
3" Ø L.M.
4" Ø L.M.
5" Ø L.M.
6" Ø L.M.
4.00 LAYING RCP 8 MEN (1 TEAM) -
24"Ø L.M.
36"Ø L.M.
48"Ø L.M.
6-18"Ø L.M.
-
LAVATORY EACH
WATER CLOSET EACH
URINAL UTILITY STALL EACH
URINAL PEDESTRAL TYPE EACH
SHOWER AND INSTALL EACH
5 MAN GROUP SHOWER EACH
BAH TUBS EACH
SLOPE SINK EACH
HOT WATER HEATER EACH
16 PERSON WASH SINK EACH
DRINKING FOUNTAIN EACH
EYE WASH EACH
MISC. FIXTURES EACH
PARTITIONS EACH
LAYING OF 24"Ø RCP PIPE
LAYING OF 36"Ø RCP PIPE
LAYING OF 48"Ø RCP PIPE
-
L. TRADE INSULATION -
EQUIPMENT INSTALLATION -
VESSEL, EXCHANGE & TANKS -
FIELD FABRICATION INSULATION S.M.
FIELD FABRICATION SHEET METAL COVER S.M.
APPLY INSULATION S.M.
APPLY SHEET METAL COVER S.M.
PUMPS, COMPRESSORS & TURBINES -
FABRICATE S.M.
APPLY S.M.
PIPINGS AND COMPONENT INSULATION -
FIELD FABRICATE FLG.
FIELD FABRICATESHEET METAL COVER S.M.
APPLY INSULATION L.M.
APPLY SHEET METAL COVER OR METAL COVER EACH
FABRICATE INSTRUMENT COVER EACH
INSTALL INSTRUMENT COVER EACH
INSULATE PIPE HANGERS EACH
FOR STREAM TRACED LINES L.M.
REMOVAL OF OLD OR EXISTING INSTALLATION L.M.
-
M. TRADE:FIRE PROOFING -
INSTALL STUDS EACH
INSTALL MESH S.M.
POURED -
FORMING S.M.
STRIP FORMS S.M.
POUR CONCRETE S.M.
CURING/PATCHING S.M.
FINISHING S.M.
TROWEL, PLASTERED S.M.
PNEUMATIC APPLICATION -
GUNITE S.M.
APPLY FINEBRICK OR BLOCK PC.
REMOVAL OF EXISTING OR OLD FIREPROOFING S.M.
APPLY FIREPROOFING PAINT S.M.
FIRE PROTERCTION: -
FIRE PROTECTION EQUIPMENT INSTALLATION: -
MONITOR EACH
HOSE REELS AND CARTS EACH
FIRE EXTINGUISHERS EACH
PERSONAL EQUIPMENT: -
EYE WASH EACH
SAFETY SHOWERS EACH
BREATHING APPARATUS EACH
SPRINKLER SYSTEM -
SPRAY NOZZLES EACH
WATER CANNONS EACH
-
N. TRADE:PERMANENT FENCING -
INSTALL FENCE L.M.
INSTALL GATES L.M.
TO RAIL L.M.
BARBE WIRE, 3 STRANDS L.M.
-
O. TRADE:PAINTING WORKS -
NEW STRUCTURAL STEEL TON
OLD STRUCTURAL STEEL S.M.
NEW FLAT FLAT PLATES S.M.
SURFACE PREPARATION: -
IN TERMS OF WEIGHT TON
IN TERMS OF AREA S.M.
SAND PREPARATION TON
-
P. TRADE:HEATING VENTILATING AND CONDITIONING -
HEAVY PIPING L.M.
DUCT WORK INSTALL S.M.
DUCT WORK FAB. S.M.
PACKAGE UNIT AIR CONDITIONER EACH
UNIT HEATER EACH
FINNED CONVERTER EACH
EXHAUST FAN PROPELLER EACH
GRAVITY ROOF PAINT L.M.
POWER ROOF VENT EACH
ROUND ROOF VENT EACH
PLUMBING PIPING L.M.
-
Q. MISCELLANEOUS -
WATER STOP INSTALLATION L.M.
CAULKING SLAB JOINT L.M.
ASPHALTING S.M.
GROUTNG AND TOOL PLASTERING S.M.
WATER PROOFING RUBBERIZED S.M.
COPPER CLADDING ROOF DECK L.M.
WATER PROOFING FLINKOTE S.M.
DEMOLITION OF ADOBE WALL CU.M.
PAINTING S.M.
COPPER WATER STOP CUT AND SHAPE L.M.
COPPER WATER STOP CUT AND INSTALLATION L.M.
SETTING ANCHOR BOLT KG
SETTING ANCHOR BOXES CU.M.
TOTAL LABOR COST
choose labor productivity
rate BELOW

LABOR PRODUCTIVITY
HIGH
RATE PER UNIT TOTAL COST
HIGH

₱ 93.89 ₱ -
₱ 110.32 ₱ -
₱ 144.35 ₱ -
₱ 110.32 ₱ -
₱ - ₱ -
₱ 78.63 ₱ -
₱ 156.09 ₱ -
₱ - ₱ -
₱ 403.72 ₱ -
₱ 516.39 ₱ -
₱ 23.47 ₱ -
₱ - ₱ -
₱ 50.47 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 11.74 ₱ -
₱ 60.44 ₱ -
₱ 48.12 ₱ -
₱ 39.90 ₱ -
₱ - ₱ -
₱ 39.32 ₱ -
₱ 50.47 ₱ -
₱ - ₱ -
₱ 164.31 ₱ -
₱ 131.44 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 46.94 ₱ -
₱ 6.45 ₱ -
₱ 17.02 ₱ -
₱ 12.32 ₱ -
₱ 45.18 ₱ -
₱ 19.95 ₱ -
₱ 16.43 ₱ -
₱ 37.56 ₱ -
₱ 9.98 ₱ -
₱ 6.45 ₱ -
₱ 5.87 ₱ -
₱ 21.13 ₱ -
₱ - ₱ -
₱ 46.94 ₱ -
₱ 19.36 ₱ -
₱ - ₱ -
₱ 62.20 ₱ -
₱ 52.81 ₱ -
₱ 5.87 ₱ -
₱ 8.22 ₱ -
₱ 23.47 ₱ -
₱ 328.61 ₱ -
₱ 211.25 ₱ -
₱ 164.31 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 18.78 ₱ -
₱ 93.89 ₱ -
₱ - ₱ -
₱ 217.12 ₱ -
₱ 146.70 ₱ -
₱ 217.12 ₱ -
₱ 146.70 ₱ -
₱ 158.44 ₱ -
₱ 469.44 ₱ -
₱ 563.33 ₱ -
₱ 469.44 ₱ -
₱ 1,173.61 ₱ -
₱ 14.67 ₱ -
₱ 75.11 ₱ -
₱ 10.56 ₱ -
₱ 15.26 ₱ -
₱ 146.70 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 78.63 ₱ -
₱ 78.63 ₱ -
₱ 93.89 ₱ -
₱ 234.72 ₱ -
₱ 494.09 ₱ -
₱ 204.21 ₱ -
₱ 140.83 ₱ -
₱ 211.25 ₱ -
₱ 187.78 ₱ -
₱ 23.47 ₱ -
₱ 199.51 ₱ -
₱ 93.89 ₱ -
₱ 56.33 ₱ -
₱ 84.50 ₱ -
₱ 399.03 ₱ -
₱ 53.40 ₱ -
₱ 33.45 ₱ -
₱ - ₱ -
₱ 75.11 ₱ -
₱ 62.20 ₱ -
₱ 93.89 ₱ -
₱ 249.98 ₱ -
₱ 280.49 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 50.47 ₱ -
₱ 143.77 ₱ -
₱ 46.94 ₱ -
₱ 37.56 ₱ -
₱ 23.47 ₱ -
₱ 163.13 ₱ -
₱ 38.73 ₱ -
₱ 24.65 ₱ -
₱ 104.45 ₱ -
₱ 7.63 ₱ -
₱ 41.66 ₱ -
₱ 14.08 ₱ -
₱ 6.45 ₱ -
₱ 84.50 ₱ -
₱ 84.50 ₱ -
₱ 399.03 ₱ -
₱ 93.89 ₱ -
₱ 79.81 ₱ -
₱ 28.17 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 234.72 ₱ -
₱ 1,173.61 ₱ -
₱ 46.94 ₱ -
₱ 66.90 ₱ -
₱ - ₱ -
₱ 3.52 ₱ -
₱ 3.52 ₱ -
₱ 4.69 ₱ -
₱ 751.11 ₱ -
₱ 84.50 ₱ -
₱ - ₱ -
₱ 328.61 ₱ -
₱ 657.22 ₱ -
₱ 1,267.50 ₱ -
₱ 131.44 ₱ -
₱ - ₱ -
₱ 985.83 ₱ -
₱ 24.65 ₱ -
₱ 15.26 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 28.17 ₱ -
₱ 37.56 ₱ -
₱ 51.64 ₱ -
₱ 56.33 ₱ -
₱ 70.42 ₱ -
₱ - ₱ -
₱ 187.78 ₱ -
₱ 305.14 ₱ -
₱ 492.92 ₱ -
₱ 258.19 ₱ -
₱ 375.56 ₱ -
₱ 563.33 ₱ -
₱ - ₱ -
₱ 61.03 ₱ -
₱ 845.00 ₱ -
₱ - ₱ -
₱ 21.13 ₱ -
₱ 25.82 ₱ -
₱ 56.33 ₱ -
₱ - ₱ -
₱ 5.87 ₱ -
₱ 84.50 ₱ -
₱ 61.03 ₱ -
₱ 65.72 ₱ -
₱ 70.42 ₱ -
₱ 15.26 ₱ -
₱ 56.33 ₱ -
₱ 15.26 ₱ -
₱ 19.95 ₱ -
₱ 24.65 ₱ -
₱ 28.17 ₱ -
₱ - ₱ -
₱ 19.95 ₱ -
₱ 9.39 ₱ -
₱ 9.39 ₱ -
₱ - ₱ -
₱ 19.95 ₱ -
₱ 197.17 ₱ -
₱ - ₱ -
₱ 15.26 ₱ -
₱ 19.95 ₱ -
₱ 24.65 ₱ -
₱ - ₱ -
₱ 32.86 ₱ -
₱ 9.39 ₱ -
₱ 93.89 ₱ -
₱ - ₱ -
₱ 375.56 ₱ -
₱ 61.61 ₱ -
₱ 76.87 ₱ -
₱ 123.23 ₱ -
₱ - ₱ -
₱ 313.35 ₱ -
₱ 782.80 ₱ -
₱ - ₱ -
₱ 38.73 ₱ -
₱ 234.72 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 58.68 ₱ -
₱ 137.31 ₱ -
₱ 117.36 ₱ -
₱ 156.09 ₱ -
₱ 4.69 ₱ -
₱ 9.98 ₱ -
₱ 22.30 ₱ -
₱ 2.35 ₱ -
₱ - ₱ -
₱ 2.35 ₱ -
₱ 1.17 ₱ -
₱ 79.22 ₱ -
₱ 46.94 ₱ -
₱ 97.41 ₱ -
₱ - ₱ -
₱ 50.47 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 31.10 ₱ -
₱ 31.10 ₱ -
₱ 34.62 ₱ -
₱ 38.73 ₱ -
₱ 41.08 ₱ -
₱ 50.47 ₱ -
₱ 53.99 ₱ -
₱ 62.20 ₱ -
₱ - ₱ -
₱ 102.69 ₱ -
₱ 154.33 ₱ -
₱ 231.20 ₱ -
₱ 308.66 ₱ -
₱ 468.27 ₱ -
₱ 484.11 ₱ -
₱ 565.68 ₱ -
₱ 642.55 ₱ -
₱ 720.01 ₱ -
₱ 771.06 ₱ -
₱ 848.52 ₱ -
₱ 964.12 ₱ -
₱ - ₱ -
₱ 8.80 ₱ -
₱ 34.62 ₱ -
₱ 38.73 ₱ -
₱ 45.77 ₱ -
₱ 50.47 ₱ -
₱ 61.61 ₱ -
₱ 76.87 ₱ -
₱ 115.60 ₱ -
₱ - ₱ -
₱ 187.78 ₱ -
₱ 300.44 ₱ -
₱ 501.13 ₱ -
₱ 62.20 ₱ -
₱ - ₱ -
₱ 375.56 ₱ -
₱ 563.33 ₱ -
₱ 1,126.67 ₱ -
₱ 751.11 ₱ -
₱ 469.44 ₱ -
₱ 1,690.00 ₱ -
₱ 1,126.67 ₱ -
₱ 657.22 ₱ -
₱ 657.22 ₱ -
₱ 1,220.56 ₱ -
₱ 610.28 ₱ -
₱ 375.56 ₱ -
₱ 93.89 ₱ -
₱ 375.56 ₱ -
₱ 187.78 ₱ -
₱ 300.44 ₱ -
₱ 500.55 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 117.36 ₱ -
₱ 563.33 ₱ -
₱ 234.72 ₱ -
₱ 234.72 ₱ -
₱ - ₱ -
₱ 798.06 ₱ -
₱ 1,408.33 ₱ -
₱ - ₱ -
₱ 187.78 ₱ -
₱ 37.56 ₱ -
₱ 126.75 ₱ -
₱ 70.42 ₱ -
₱ 375.56 ₱ -
₱ 281.67 ₱ -
₱ 187.78 ₱ -
₱ 173.69 ₱ -
₱ 70.42 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 23.47 ₱ -
₱ 56.33 ₱ -
₱ - ₱ -
₱ 657.22 ₱ -
₱ 281.67 ₱ -
₱ 3,286.11 ₱ -
₱ 28.17 ₱ -
₱ 32.86 ₱ -
₱ 126.75 ₱ -
₱ - ₱ -
₱ 56.33 ₱ -
₱ 37.56 ₱ -
₱ 117.36 ₱ -
₱ 140.83 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 234.72 ₱ -
₱ 704.17 ₱ -
₱ 234.72 ₱ -
₱ - ₱ -
₱ 469.44 ₱ -
₱ 469.44 ₱ -
₱ 234.72 ₱ -
₱ - ₱ -
₱ 4,694.44 ₱ -
₱ 234.72 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 56.33 ₱ -
₱ 140.83 ₱ -
₱ 14.08 ₱ -
₱ 14.08 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 528.13 ₱ -
₱ 2,581.94 ₱ -
₱ 1,525.69 ₱ -
₱ - ₱ -
₱ 375.56 ₱ -
₱ 19.95 ₱ -
₱ 1,408.33 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 164.31 ₱ -
₱ 281.67 ₱ -
₱ 845.00 ₱ -
₱ 1,126.67 ₱ -
₱ 563.33 ₱ -
₱ 234.72 ₱ -
₱ 375.56 ₱ -
₱ 342.69 ₱ -
₱ 1,126.67 ₱ -
₱ 375.56 ₱ -
₱ 164.31 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 31.69 ₱ -
₱ 9.39 ₱ -
₱ 37.56 ₱ -
₱ 49.29 ₱ -
₱ 16.43 ₱ -
₱ 14.67 ₱ -
₱ 8.22 ₱ -
₱ 46.94 ₱ -
₱ 9.98 ₱ -
₱ 1.76 ₱ -
₱ 3.52 ₱ -
₱ 14.08 ₱ -
₱ 53.40 ₱ -
TOTAL LABOR COST =
₱ -
PROBABLE OUTPUT OF HEAVY EQUIPMENT

EQUIPMENT PROBABLE OUTPUT

A.1 DOZER 165 HP


Cutting & Stockpiling 30.00 cu.m./hr. 0.033 hr/m³
Clearing & Grubbing 300.00 sq.m./hr 0.003 hr/m²
A.2 DOZER D65P-7
Stripping 200.00 sq.m./hr 0.005 hr/m²
Excavation 25.00 cu.m./hr. 0.040 hr/m³
Quarrying 50.00 cu.m./hr. 0.020 hr/m³
Pushing 3.00 sq.m./hr 0.333 hr/m²

B.1 LOADER -1.91 CU.M.


Loading 70.00 cu.m./hr. 0.014 hr/m³
B.2 LOADER 950

C. DUMP TRUCK - 10 CU.M.


Hauling (dist. = 600M) 90.00 cu.m./hr. 0.011 hr/m³

D. GRADER- 130G
10 Passes 700.00 sq.m./hr 0.001 hr/m²
Subgrading 300.00 sq.m./hr 0.003 hr/m²
Spreading 40.00 cu.m./hr. 0.025 hr/m³

E.1 ROLLER VIBRATORY


10 Passes 600.00 sq.m./hr 0.002 hr/m²
SHEETS FOOT ROLLER
Static Rolling 12 passes-15m3 lift
Vibratory Rolling-4 pases-15m3 lift 135.00 cu.m./hr. 0.007 hr/m³
No.3W Road Roller-static rolling
4 passes-15 m3 lift 24.00 cu.m./hr. 0.042 hr/m³
Tractor Drawn Roller (1-d)
Static Rolling 6 passes-20m3 lift 240.00 cu.m./hr. 0.004 hr/m³
Tandem Roller-static rolling
6 passes-20 m3 lift 24.00 cu.m./hr. 0.042 hr/m³

E.2 VIBRATORY COMPACTOR CA25D

G. WATER TRUCK - 10 CU.M.


Watering 1,600.00 sq.m./hr 0.001 hr/m²

ASPHALT PAVER
ASPHALT DISTRIBUTOR SPRAYING PHALT
PLATE COMPACTOR
Grave Bedding 8.00 cu.m./hr. 0.125 hr/m³
Concrete Vibrator:
Vibrating Concrete 40.00 cu.m./hr. 0.025 hr/m³
Clearing & Grubbing Lot Grading (Cut & Fill) m3 Trench Excavation

300 30 m3/hr

232.55 m3/hr

232.55 m3/hr

384.62 m3/hr

303.03 m3/hr

769.23 m3/hr
Disposal of Unsuitable Materials m3-km Road way Excavation (m3)

29.41 m3/hr

125.00 m3/hr

125.00 m3/hr
Embankment/Imported Backfill (m3) Subgrade Preparation (m2)

142.86 m3/hr 769.23 sq.m./hr

125.00 m3/hr 588.23 sq.m./hr

333.33 m3/hr 1,666.67 sq.m./hr


Aggregate Sub-base Course (m3) Aggregate Base Course (m3)

76.92 m3/hr 115.38 m3/hr

58.82 m3/hr 88.23 m3/hr

166.67 m3/hr 250.00 m3/hr


Bituminous Asphalt Pavement (MT) Concrete Pavement (m3)

65.00 MT/hr

32.50 MT/hr
300 SQ.M.
A. STRIPPING OF METAL FORMS

MANHOURS PER SQ. METER OF CONTACT AREA


WOOD SHORES 215 TO 316 FLOORS
FORM HEIGHT LOW AVERAGE HIGH
(METER)
3 TO 4 0.58 0.22 0.16
4 TO 5 0.59 0.23 0.16
5 TO 6 0.60 0.23 0.17
6 TO 7 0.61 0.24 0.17
7 TO 8 0.64 0.25 0.18

WOOD SHORES 368 TO 419 FLOORS


3 TO 4 0.60 0.23 0.17
4 TO 5 0.61 0.24 0.17
5 TO 6 0.64 0.25 0.18
6 TO 7 0.66 0.25 0.18
7 TO 8 0.68 0.26 0.19

CREW: TOOLS:
1 CARPENTER LEAD MAN 8 ONE LOT CARPENTRY TOOLS
3 CARPENTERS 24 8 TOOLS HOUR
6 HELPERS 48
10 MANDAYS 80 MANHOURS

B. STEEL ERECTION FOR MULTI STOREY BUILDING FRAME


PREFAB SECTIONS, HIGHLY MECHANIZED OPERATION

MANHOURS & EQUIPMENTHOUR PER TON ERECTED:

MAN-HOURS EQUIPMENT-HOURS
LOW AVERAGE HIGH LOW
MEDIUM FRAME 36.00 13.85 10.00 7.00
HEAVY FRAME 32.73 12.63 9.11 6.36
STEEL JOIST 40.00 15.37 11.08 7.78

CREW: TOOLS:
1 LEAD MAN 8 0.50 TOWER CRANE
4 RIGGERS 32 2.00 WELDING TRANSFORME
4 FITTERS 32 1.00 LOT TOOLS
2 WELDERS 16 3.50
1 CRANE OPERATOR 8
6 HELPERS 48
18 MANDAYS 144 MANHOURS

MATERIALS : A36 WELDED CONNECTION


C. STEEL ERECTION FOR COMMERCIAL AND MILL BUILDING FRAME
PREFAB SECTIONS, HIGHLY MECHANIZED OPERATION

MANHOURS & EQUIPMENTHOUR PER TON ERECTED:

MAN-HOURS EQUIPMENT-HOURS
LOW AVERAGE HIGH LOW

COMMERCIAL TYPE BUILDING:


LIGHT FRAME 46.67 18.06 13.02 18.33
MEDIUM FRAME 40.00 15.56 11.20 15.71
HEAVY FRAME 35.00 13.33 9.66 13.75
STEEL JOIST 43.08 16.47 11.91 16.92

MILL TYPE BUILDING:


LIGHT FRAME 35.00 13.33 9.66 13.75
MEDIUM FRAME 31.11 11.91 8.62 12.22
HEAVY FRAME 35.00 10.77 7.78 13.75
STEEL JOIST 32.94 12.27 9.18 12.94

CREW: TOOLS:
1 LEAD MAN 8 0.50 20 TON TOWER CRANE
2 RIGGERS 16 2.00 WELDING TRANSFORME
4 FITTERS 32 2.00 CUTTING OUTFIT
2 WELDERS 16 1.00 LOT TOOLS
1 CRANE OPERATOR 8 5.50 EQPT. DAYS
4 HELPERS 32
14 MANDAYS 112 MANHOURS

MATERIALS : A36 WELDED CONNECTION


CARPENTRY TOOLS
TOOLS HOUR

EQUIPMENT-HOURS
AVERAGE HIGH
2.69 1.94
2.46 1.77
2.98 2.15

TOWER CRANE 4.00


WELDING TRANSFORMER 16.00
LOT TOOLS 8.00
28.00 TOOL HOURS
EQUIPMENT-HOURS
AVERAGE HIGH

7.10 5.12
6.11 4.40
5.24 3.79
6.47 4.68

5.24 3.79
4.68 3.38
4.23 3.06
5.00 3.61

20 TON TOWER CRANE 4.00


WELDING TRANSFORMER 16.00
CUTTING OUTFIT 16.00
LOT TOOLS 8.00
EQPT. DAYS 44.00 EQPT. HOURS