Professional Documents
Culture Documents
Compliant_Building_Done
Compliant_Building_Done
Forward documents to Technical/Monitoring The staff shall encode all received permit
encoder for Staff/ Section Chief application and schedule for site verification
documentation & schedule by the section chief.
for site verification
The representative of the City Zoning Office
shall verify the land use and classification
base on the latest CLUP. He/She shall
Forward plans &documents City Zoning Office and provide fee and issues the locational
for VERIFICATION of co-
City Assessor’s Office clearance.
located offices (Zoning,
Assessors)
The representative of the City Assessor’s
( ZOning Office shall verify the status of the property
tax record and correct location of the
proposed project based on the current city
map.
OBO ( Line & Grade, The OBO and BFP technical staff
Forward application plans
Architectural, Structural, simultaneously evaluates the submitted
& documents for technical
Plumbing, Electrical, plans and provides assessment fees. The
evaluation and checking of
Mechanical, electronics) , section chief checks the consistency of
compliance
BFP evaluator, Section the technical evaluation. The BFP issues
Chief Fire Safety Evaluation Certificate (FSEC).
A
A
END