[ABC Company] PROCEDURE OF INSPECTION AND TESTING
Table of contents
TABLE OF CONTENTS..................................................................................................................................... 2
1.0 PURPOSE...................................................................................................................................................3
2.0 SCOPE....................................................................................................................................................... 3
3.0 USERS/ RESPONSIBILITY............................................................................................................................3
4.0 DEFINITION / ABBREVIATION....................................................................................................................3
5.0 PROCEDURE OF RECORD RETENTION.......................................................................................................3
6.0 REFERENCE DOCUMENTS..............................................................................................................................5
7.0 RECORDS.......................................................................................................................................................5
8.0 CHANGE HISTORY..........................................................................................................................................6
1.0 PURPOSE
To establish and maintain a system for Inspection and Testing at all stages of processes in
manufacturing operations.
2.0 SCOPE
Quality Head is overall responsible for inspection and testing of incoming Raw Materials, in-process
and final products.
SQA are responsible for calibration of measuring instruments related to product and process
inspection and testing.
Production supervisors are responsible for in-process material checking and release for further
processing. Quality inspector will cross check the material released by the production team.
Nil
Receiving Inspection
Receive material GRN from Stores inform arrival of material in organization. By the time material is
handed over and kept in an under inspection area.
If material received along with test reports by the supplier then after reviewing all reports supplier
quality perform incoming inspection and testing accordingly.
Check/test the samples for the required specifications and maintain records in dimensional
inspection report/Lab report.
Compare the results with the values given in respective Inspection Standards.
If material is found as per the specifications then accept the batch/lot and send reports to Stores.
If material is ok then material is transferred to the RM store with ok/acceptance tag along with a
report.
In case the material is found rejected, mention the reason for rejection on red tag and incoming
inspection report and transfer the material in red bin rejection area.
Also intimate to supplier using proper mail communication through purchase department for the
non-conformance and ask for corrective action and 8D report.
Production persons do checking and released the parts further. Do sample inspection of those
released in-process parts as per sampling plan and control plan.
Prepare the line parts inspection report. Maintain records of those inspection and testing of in-
process parts.
Accepted parts release to next user section with confirming tag on material.
Check the components at each stage of operation as per the control plan /operational standards.
Maintain records till record retention period defined as per QMS standard.
Carryout patrol inspection and testing at each stage of process operation as per control plan.
In case the material is not meeting the specified requirements,inform the same to production
supervisor, try to stop the production and record the same in inspection report with time.
This inspection covers Visual and Dimensional inspection and other testing specified in control plan
to validate final product.
Segregate the non-conforming material in red bins and conforming material to other normal bins.
Record the inspection and testing result report as final inspection report.
Tag “OK” green tag with signature as approved material and release for dispatch to customer.
Provide “Reject” red tag on non-confirming material indicating reasons of rejection and quantity
with signatures. Those material found rejected and handle the non-conforming product as per
control of non-conforming products procedure.
Provide “HOLD” yellow tag with the status of material requiring a pending decision for acceptance.
After final inspection but prior to shipment carry out PDI (Pre-dispatch inspection) or dock audit`
to verify conformance of product, packaging and labeling as per specified requirements.
As per layout inspection plan (Once in a year or as required), all printed dimension mentioned in
drawing shall be verified and inspected. Keep record of layout inspection and maintained to
retention period of time.
The results may be sent for customer approval if there are any customer specific requirement.
7.0 RECORDS
QUALITY ALERT
F-SYS-XX 01-02-2018
DEVIATION RECORDS
F-SYS-XX 01-02-2018