Reviewed 20220128-TMF-2022-128-Submission of Cross-Sections of Left Bank Permanent Roads P13-P14

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 105

-32

1202
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1198 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1194

ROAD PAVEMENT DETAIL

1190

1186

1182

1178

1174

6.830
3.589

0.60 1.00 3.65 3.65 1.00 0.60

1170 -2.50% -2.50%

1166

1162 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1158 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+010
Drwg. No. DBD-AR-SD-P13P14-02 Scale AS SHOWN
-32
1202
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1198 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1194

ROAD PAVEMENT DETAIL

1190

1186

1182

1178

1174

4.004
0.60
0.60 1.00 3.64 3.65 1.00
1170
0.750% -2.50%

1166

1162 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1158 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+020
Drwg. No. DBD-AR-SD-P13P14-03 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL

-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄
0 4 8 12 16 20 24 28 32
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1186
ROAD PAVEMENT DETAIL

1182

1178

1174

1170 1.00 3.65 3.65 1.00 0.60


4.00% -4.00%

2.50
1166

1162
SCHEDULE OF AREA

1158 DATUM
OFFSET PGL

DBCG LAND SURVEYOR

Consultant
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date
NSL

POWERCHINA-FWO JOINT VENTURE


OFFSET

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+030
Drwg. No. DBD-AR-SD-P13P14-04 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1178

1.00 3.65 3.65 1.00 1.00


4.00% -4.00%

5.50
1166

1154

DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1146 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+040
Drwg. No. DBD-AR-SD-P13P14-05 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1178

1.00 3.65 3.65 1.00 1.00


4.00% -4.00%

1166

4.48

1154

DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1146 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+050
Drwg. No. DBD-AR-SD-P13P14-06 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1178

1.00 3.65 3.65 1.00 0.60


4.00% -4.00%

1166

2.35

1154

DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1146 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+060
Drwg. No. DBD-AR-SD-P13P14-07 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1178

0.60
1.00 1.00 3.65 3.65 1.00

2.64
2.60% -2.63%
1166

1154

DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1146 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+070
Drwg. No. DBD-AR-SD-P13P14-08 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1178

4.684
0.60 1.00 3.65 3.65 1.00 0.60

1166
-0.52% -2.50%

1154

DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1146 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+080
Drwg. No. DBD-AR-SD-P13P14-09 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1178

10.354
1166

2.962
0.60 1.00 3.65 3.65 1.00 0.60

-2.48% -2.50%

1154

DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1146 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+090
Drwg. No. DBD-AR-SD-P13P14-10 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

8.664
1178

3.000
5%

10.000
4.970
1166
0.60 1.00 3.65 3.65 1.00 0.60
-2.50% 1.24%

1154

DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1146 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+100
Drwg. No. DBD-AR-SD-P13P14-11 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

6.974
AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

3.000
5%
SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

10.000
1178

3.000
5%

10.000
6.916
1166

0.60 1.00 3.65 3.65 1.00 0.60


-2.54% 1.49%

1154

DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1146 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+110
Drwg. No. DBD-AR-SD-P13P14-12 Scale AS SHOWN
AWC 50mm

-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 TACK COAT


ABC 80mm

2.773
PRIME COAT
3.000
5% AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1190
SUB GRADE LAYERS 300mm

10.000
ROAD PAVEMENT DETAIL

3.000
5%

1178

10.000
3.000
5%

10.000
8.560

1166

0.60 1.00 3.65 3.65 1.00 0.60


-3.00% 3.00%

SCHEDULE OF AREA

DBCG LAND SURVEYOR

1154 DATUM Consultant


OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
NSL

Drawn M.ABUBAKR Verified


Checked ENGR. M. BILAL Approved
OFFSET

Title

P13-P14
X-SECTION AT RD 0+120
Drwg. No. DBD-AR-SD-P13P14-13 Scale AS SHOWN
-32
1198 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)
1194

SUB GRADE LAYERS 300mm

1190
ROAD PAVEMENT DETAIL

9.774
1186

3.000
1182 5%

1178

10.000
1174
3.000
5%

1170

10.000
9.544

1166

0.60 1.00 3.65 3.65 1.00 0.60

1162 -3.00% 3.00%

SCHEDULE OF AREA
DBCG LAND SURVEYOR

1158 DATUM Consultant


OFFSET PGL

Revisions
03 18-Dec-2021
OFFSET SGL

Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
NSL

Drawn M.ABUBAKR Verified


Checked ENGR. M. BILAL Approved
OFFSET

Title

P13-P14
X-SECTION AT RD 0+130
Drwg. No. DBD-AR-SD-P13P14-14 Scale AS SHOWN
-32
1194
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1190
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

12.243
SUB GRADE LAYERS 300mm
1186

ROAD PAVEMENT DETAIL

1182 3.000
5%

1178

10.000
1174

3.000
5%

1170

10.000
1166

1162 0.60 1.00 3.65 3.65 1.00 0.60

-3.00% 3.00%

1158

1154
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant

1150 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+140
Drwg. No. DBD-AR-SD-P13P14-15 Scale AS SHOWN
-32
1186
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


1182 (MIN. CBR 30 AT 98% MDD.)

12.61
SUB GRADE LAYERS 300mm

1178

4.00 ROAD PAVEMENT DETAIL


5%

1174

1170

15.00
1166

7.02
1162
0.60 1.00 3.65 3.65 1.00 0.60

-3.00% 3.00%

1158

1154

1150

1146 DBCG LAND SURVEYOR

SCHEDULE OF AREA Consultant

1142 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
X-SECTION AT RD 0+150
OFFSET

Drwg. No. DBD-AR-SD-P13P14-16 Scale AS SHOWN


-32
1198
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1194 TOP OF SUB GRADE LEVEL

8.04
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


4.00
1190 5%

ROAD PAVEMENT DETAIL

1186

1182

15.00
1178

4.00
5%
1174

1170

15.00
1166
12.35

1162

0.601.00 3.65 3.65 1.000.60

-3.00% 3.00%

1158
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant

1154 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+160
Drwg. No. DBD-AR-SD-P13P14-17 Scale AS SHOWN
-32
1194
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1190
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1186

ROAD PAVEMENT DETAIL

1182

14.75
1178

4.00
1174 5%

1170

1166

15.00
13.60

1162

0.60 1.00 3.65 3.65 1.00 0.60

1158 -3.00% 3.00%

1154
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant

1150 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+170
Drwg. No. DBD-AR-SD-P13P14-18 Scale AS SHOWN
-32
1186
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1182
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1178

9.06
ROAD PAVEMENT DETAIL

1174
4.00
5%

1170

1166

15.00
11.76
1162

1158 0.60 1.00 3.65 3.65 1.00 0.60

-2.50% 2.50%

1154

1150

1146 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1142 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+180
Drwg. No. DBD-AR-SD-P13P14-19 Scale AS SHOWN
-32
1187
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)
1183

SUB GRADE LAYERS 300mm

1179
ROAD PAVEMENT DETAIL

1175

5.82
4.00
1171 5%

1167

1163

15.00
1159
6.77

0.60 1.00 3.65 3.65 1.00 0.60


-0.06% 0.06%
1155

1151
SCHEDULE OF AREA
DBCG LAND SURVEYOR

Consultant
1147 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
OFFSET SGL

Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
NSL

Drawn M.ABUBAKR Verified


Checked ENGR. M. BILAL Approved
OFFSET

Title

P13-P14
X-SECTION AT RD 0+190
Drwg. No. DBD-AR-SD-P13P14-20 Scale AS SHOWN
AWC 50mm
-32
1179
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1175

SUB GRADE LAYERS 300mm

1171
ROAD PAVEMENT DETAIL

1167

1163

14.51
1159

3.81
1.00 3.65 3.65 1.00 0.60
1155 0.60
2.79% -2.79%

1151

1147

1143
SCHEDULE OF AREA
DBCG LAND SURVEYOR

1139 DATUM Consultant


OFFSET PGL

Revisions
03 18-Dec-2021
OFFSET SGL

Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
NSL

Drawn M.ABUBAKR Verified


Checked ENGR. M. BILAL Approved
OFFSET

Title

P13-P14
X-SECTION AT RD 0+200
Drwg. No. DBD-AR-SD-P13P14-21 Scale AS SHOWN
-32
1182
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1178
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1174

ROAD PAVEMENT DETAIL

1170

1166

1162

12.49
1158

1154 0.60
1.00 3.65 3.65 1.00
0.60
3.79% -3.79%

1150

1146

1142 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1138 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+210
Drwg. No. DBD-AR-SD-P13P14-22 Scale AS SHOWN
-32
1182
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1178 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1174 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1170

1166

1162

1158

10.84
1154
1.00 3.65 3.65 1.00 0.60

3.79%
-3.79%

1150

1146

1142 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1138 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+220
Drwg. No. DBD-AR-SD-P13P14-23 Scale AS SHOWN
-32
1181
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1177 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1173 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1169

5.89
4.00
5%
1165

1161

15.00
1157

1153 2.95

1.00 3.65 3.65 1.00 0.60


0.60
2.58% -2.58%

1149

1145

1141 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1137 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

Check NSL POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+230
Drwg. No. DBD-AR-SD-P13P14-24 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
-32
1177
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1159

1161

11.68
1153

0.60 1.00 3.65 3.65 1.00 0.60

0.17% -0.17%

1145
SCHEDULE OF AREA

1141 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+240
Drwg. No. DBD-AR-SD-P13P14-25 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1177 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1159

1161

1153

9.03
1.00 3.65 3.65 1.00
0.60 0.60
-2.36% 2.36%

1145
SCHEDULE OF AREA

1141 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
NSL

CONTRACT NO. MW-1


Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+250
Drwg. No. DBD-AR-SD-P13P14-26 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm

-32
1177 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1159

1161

13.11
1153 3.35

0.60 1.00 3.65 3.65 1.00 0.60

-3.90 3.90

1145
SCHEDULE OF AREA

1141 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+260
Drwg. No. DBD-AR-SD-P13P14-27 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm

-32
1177 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1159

1161

14.27
1153
5.91

0.60 1.00 3.65 3.65 1.00 0.60

-4.00% 4.00%

1145
SCHEDULE OF AREA

1141 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
Check NSL
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+270
Drwg. No. DBD-AR-SD-P13P14-28 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm

-32
1177
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1159

4.64
1161 4.00
5%

1153

15.00
6.16

0.60 1.00 3.65 3.65 1.00 0.60


1145 -4.00% 4.00%

SCHEDULE OF AREA

1141 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+280
Drwg. No. DBD-AR-SD-P13P14-29 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm

-32
1177
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1159

7.93
1161
4.00
5%

1153

15.00
6.76

1145
0.60 1.00 3.65 3.65 1.00 0.60
-4.00% 4.00% SCHEDULE OF AREA

1141 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+290
Drwg. No. DBD-AR-SD-P13P14-30 Scale AS SHOWN
-32
1177
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1169 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1161

7.13
4.00
5%

1153

15.00
1145
5.96

0.60 1.00 3.65 3.65 1.000.60


3.87%
-3.87%

1137 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1133 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
Checked ENGR. M. BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+300
Drwg. No. DBD-AR-SD-P13P14-31 Scale AS SHOWN
AWC 50mm
TACK COAT

-32
1161
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1153 ROAD PAVEMENT DETAIL

15.05
1145

4.95
0.60 1.00 3.65 3.65 1.00 0.60

-3.17% 3.17%

1137

1129
SCHEDULE OF AREA

1125 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+310
Drwg. No. DBD-AR-SD-P13P14-32 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1161
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1153

1145

15.56
1137
3.24

0.60 1.00 3.65 3.65 1.00 0.60

-2.01% 2.01%

1129
SCHEDULE OF AREA

1125 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+320
Drwg. No. DBD-AR-SD-P13P14-33 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1161
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1153

8.24
5%
1145 4.00

15.00
1137

0.60 1.00 3.65 3.65 1.00 0.60

-0.60% 0.60%

1129
SCHEDULE OF AREA

1125 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+330
Drwg. No. DBD-AR-SD-P13P14-34 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1161
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1153

9.78
4.00
1145 5%

1137

15.00
0.60
1.00 3.65 3.65 1.00
0.89% -0.89%
1129
SCHEDULE OF AREA

1125 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Check NSL Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+340
Drwg. No. DBD-AR-SD-P13P14-35 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1161
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1153

8.82
1145
4.00
5%

1137

15.00
1.00 3.65 3.65 1.00 0.60
1129 0.60
2.27% -2.27%
SCHEDULE OF AREA

1125 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+350
Drwg. No. DBD-AR-SD-P13P14-36 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
-32
1165
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1157

10.21
4.00
5%

1149

15.00
1141

1.00 1.00 3.65 3.65 1.00 0.60


3.35% -3.35%

1133
SCHEDULE OF AREA

1129 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
NSL

CONTRACT NO. MW-1


Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+360
Drwg. No. DBD-AR-SD-P13P14-37 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm

-32
1165
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1157

6.61
4.00

1149 5%

15.00
1141

0.60
0.60 1.00 3.65 3.65 1.00
1.46

3.94% -3.94%

1133
SCHEDULE OF AREA

1129 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+370
Drwg. No. DBD-AR-SD-P13P14-38 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

-32
1157
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

4.17
1149
5%

4.00

1141

15.00
1.00 1.00 3.65 3.65 1.00 0.60

1133 4.00% -4.00%

SCHEDULE OF AREA

1129 DATUM
OFFSET PGL

DBCG LAND SURVEYOR

Consultant
OFFSET SGL

Revisions
NSL

03 18-Dec-2021
Rev. Note Date
OFFSET

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+380
Drwg. No. DBD-AR-SD-P13P14-39 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

-32
1157
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1149

1141

13.26
1133 0.60 1.00 3.65 3.65 1.00 0.60
4.00%
-4.00% SCHEDULE OF AREA

1129 DATUM
OFFSET PGL

DBCG LAND SURVEYOR

Consultant
OFFSET SGL

Revisions
NSL

03 18-Dec-2021
Rev. Note Date
OFFSET

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+390
Drwg. No. DBD-AR-SD-P13P14-40 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

-32
1157
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1149

1141

11.03
1133
SCHEDULE OF AREA
0.60 1.00 3.65 3.65 1.00 0.60
-3.27% -3.27%

1129 DATUM
OFFSET PGL

DBCG LAND SURVEYOR

Consultant
OFFSET SGL

Revisions
NSL

03 18-Dec-2021
Rev. Note Date
OFFSET

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+400
Drwg. No. DBD-AR-SD-P13P14-41 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

-32
1159
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1151

1143

1135

10.81
1.00 1.00 3.65 3.65 1.00 0.60
0.65% -0.65%

1127
SCHEDULE OF AREA

1123 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+410
Drwg. No. DBD-AR-SD-P13P14-42 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1159
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1151

1143

14.58
1135

1.00 1.00 3.65 3.65 1.00 0.60

-2.07% 2.07%

1127
SCHEDULE OF AREA

1123 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+420
Drwg. No. DBD-AR-SD-P13P14-43 Scale AS SHOWN
AWC 50mm
TACK COAT
-32
1157
-28 -24 -20 -16 -12 -8 -4 ℄
0 4 8 12 16 20 24 28 32 ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1149 ROAD PAVEMENT DETAIL

1141

14.77
1133

0.60 1.00 3.65 3.65 1.00 0.60


2.13

-3.00% 3.00%

1125
SCHEDULE OF AREA

1121 DATUM
DBCG LAND SURVEYOR
OFFSET PGL

Consultant
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+430
Drwg. No. DBD-AR-SD-P13P14-44 Scale AS SHOWN
-32
1155
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1147
ROAD PAVEMENT DETAIL

1139

15.40
1131
3.55

0.60 1.00 3.65 3.65 1.00 0.60

-3.00% 3.00%

1123
SCHEDULE OF AREA

1119 DATUM
OFFSET PGL

DBCG LAND SURVEYOR

Consultant
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date
NSL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
OFFSET

CONTRACT NO. MW-1


Drawn M. ABUBAKR Verified
Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+440
Drwg. No. DBD-AR-SD-P13P14-45 Scale AS SHOWN
AWC 50mm
TACK COAT
-32
1157
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1149 ROAD PAVEMENT DETAIL

1141

1133

13.12
0.60 1.00 3.65 3.65 1.00 0.60
2.26

-3.00% 3.00%

1125
SCHEDULE OF AREA

1121 DATUM
DBCG LAND SURVEYOR
OFFSET PGL

Consultant
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+450
Drwg. No. DBD-AR-SD-P13P14-46 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1145

1137

10.48
1129

0.60 1.00 3.65 3.65 1.00 0.60

-2.98% 2.98%

1121
SCHEDULE OF AREA

1117 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+460
Drwg. No. DBD-AR-SD-P13P14-47 Scale AS SHOWN
AWC 50mm
-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1145
ROAD PAVEMENT DETAIL

1137

14.40
1129

1.00 3.65 3.65 1.00 0.60

-2.31% 2.31%

1121
SCHEDULE OF AREA

1117 DATUM

DBCG LAND SURVEYOR


OFFSET PGL

Consultant
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date
NSL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
OFFSET

CONTRACT NO. MW-1


Drawn M. ABUBAKR Verified
Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+470
Drwg. No. DBD-AR-SD-P13P14-48 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm

-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1145

1137

12.85
1129

1.00 3.65 3.65 1.00 0.60

-1.01% 1.01%

1121
SCHEDULE OF AREA

1117 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+480
Drwg. No. DBD-AR-SD-P13P14-49 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1145 ROAD PAVEMENT DETAIL

1137

11.05
1129

0.60 1.00 3.65 3.65 1.00 0.60

0.55% -0.55%

1121
SCHEDULE OF AREA

1117 DATUM
DBCG LAND SURVEYOR
OFFSET PGL

Consultant
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M. BILAL Approved
Title

P13-P14
X-SECTION AT RD 0+490
Drwg. No. DBD-AR-SD-P13P14-50 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

-32
1150
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1146

ROAD PAVEMENT DETAIL

1142

1138

1134

1130

13.27
1126

0.60 1.00 3.65 3.65 1.00 0.60

1122 1.97% -1.97%

1118
SCHEDULE OF AREA

1114 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
OFFSET

Checked ENGR. M. BILAL Approved


Title

P13-P14
X-SECTION AT RD 0+500
Drwg. No. DBD-AR-SD-P13P14-51 Scale AS SHOWN
1157-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1153 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1149 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1145

1141

8.55
1137 4.00

1133

1129

15.00
1125

0.60 1.00 3.65 3.65 1.00 0.60


0.98

2.87% -2.87%

1121

1117

DBCG LAND SURVEYOR

Consultant
1113
SCHEDULE OF AREA

1109 DATUM

Revisions
OFFSET PGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+510
OFFSET

Drwg. No. DBD-AR-SD-P13P14-52 Scale AS SHOWN


-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1149 TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1145

ROAD PAVEMENT DETAIL

1141

11.01
1137
4.00

1133

1129

15.00
1125

0.60 1.00 3.65 3.65 1.00 0.60

1121
1.18

3.00% -3.00%

1117

DBCG LAND SURVEYOR


1113
SCHEDULE OF AREA Consultant

1109 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+520
OFFSET

Drwg. No. DBD-AR-SD-P13P14-53 Scale AS SHOWN


-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1149
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1145

ROAD PAVEMENT DETAIL

10.52
1141

1137

1133

1129

15.00
1125

1121
2.56

0.60 1.00 3.65 3.65 1.00 0.60

3.00% -3.00%

1117

1113 DBCG LAND SURVEYOR


SCHEDULE OF AREA Consultant

1109 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+530
OFFSET

Drwg. No. DBD-AR-SD-P13P14-54 Scale AS SHOWN


-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1149 TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1145

ROAD PAVEMENT DETAIL

1141

11.99
1137

1133

1129

15.00
1125

1121

0.60 1.00 3.65 3.65 1.00 0.60


1.88

3.00% -3.00%

1117

1113 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1109 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+540
Drwg. No. DBD-AR-SD-P13P14-55 Scale AS SHOWN
-32
1144
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)
1140

SUB GRADE LAYERS 300mm

9.14
1136
ROAD PAVEMENT DETAIL

4.00

1132

1128

15.00
1124

1120
5.10

0.60 1.00 3.65 3.65 1.00 0.60

3.00% -3.00%

1116

1112

1108

1104 DBCG LAND SURVEYOR

SCHEDULE OF AREA Consultant

1100 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+550
Drwg. No. DBD-AR-SD-P13P14-56 Scale AS SHOWN
-32
1156
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1152
AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1148
SUB GRADE LAYERS 300mm

1144
ROAD PAVEMENT DETAIL

1140

1136

9.24
1132 4.00

1128

1124

15.00
1120
7.35

0.60 1.00 3.65 3.65 1.00 0.60

1116 2.75% -2.75%

1112

Check the area


1108 DBCG LAND SURVEYOR

Consultant

1104
SCHEDULE OF AREA

1100 DATUM

Revisions
OFFSET PGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+560
OFFSET

Drwg. No. DBD-AR-SD-P13P14-57 Scale AS SHOWN


-32
1156
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

1152

1148

1144

1140

17.88
1136

1132
4.00

1128

1124

15.00
1120
3.63

1116 0.60 1.00 3.65 3.65 1.00 0.60

2.50% -2.50%

1112

1108 DBCG LAND SURVEYOR

Consultant

1104
SCHEDULE OF AREA

1100 DATUM

Revisions
OFFSET PGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+570
OFFSET

Drwg. No. DBD-AR-SD-P13P14-58 Scale AS SHOWN


-32
1164
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
1160
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)
1156

SUB GRADE LAYERS 300mm

1152

ROAD PAVEMENT DETAIL

1148

1144

1140

1136

15.00
1132

1128

1124

15.00
1120

1116

0.60 1.00 3.65 3.65 1.00 0.60

2.50% -2.50%

1112
DBCG LAND SURVEYOR

Consultant
1108

1104
SCHEDULE OF AREA

Revisions
1100 DATUM
03 18-Dec-2021
Rev. Note Date
OFFSET PGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
OFFSET SGL

Drawn Hafiz Ahmad Verified


Checked Approved
Title

P13-P14
NSL

X-SECTION AT RD 0+580
OFFSET

Drwg. No. DBD-AR-SD-P13P14-59 Scale AS SHOWN


-32
1168
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
1164
PRIME COAT

AGG.BC 150mm

9.83
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1160

SUB GRADE LAYERS 300mm

1156

ROAD PAVEMENT DETAIL


1152

15.00
1148

1144

1140

1136

15.00
1132

1128

1124

1120

15.00
11.49

1116

0.60 1.00 3.65 3.65 1.00 0.60


2.50% -2.50%
1112 DBCG LAND SURVEYOR

Consultant

1108

1104
SCHEDULE OF AREA

Revisions
1100 DATUM
03 18-Dec-2021
Rev. Note Date
OFFSET PGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
OFFSET SGL

Drawn Hafiz Ahmad Verified


Checked Approved
Title

P13-P14
NSL

X-SECTION AT RD 0+590
OFFSET

Drwg. No. DBD-AR-SD-P13P14-60 Scale AS SHOWN


-32
1176
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
1172 ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)
1168

SUB GRADE LAYERS 300mm

1164

17.06
ROAD PAVEMENT DETAIL

1160

1156

1152

1148

15.00
1144

1140

1136

15.00
1132

1128

1124

1120
DBCG LAND SURVEYOR
17.48

Consultant

15.00
1116

1112
SCHEDULE OF AREA
-2.42% 2.42%

Revisions
1108 DATUM
03 18-Dec-2021
OFFSET PGL

Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
OFFSET SGL

Drawn Hafiz Ahmad Verified


Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+600
OFFSET

Drwg. No. DBD-AR-SD-P13P14-61 Scale AS SHOWN


-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 36 40
1176

AWC 50mm
TACK COAT
1172 ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


1168 (MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1164

18.52
ROAD PAVEMENT DETAIL
1160

1156

1152

1148

15.00
1144

1140

1136

1132

15.00
1128

1124

1120
15.00

15.00
1116
DBCG LAND SURVEYOR

Consultant
1112

0.60 1.00 3.65 3.65 1.00 0.60


1.19% -1.19%

1108

1104

Revisions
SCHEDULE OF AREA

03 18-Dec-2021
1100 DATUM Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET PGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
OFFSET SGL

Checked Approved
Title

P13-P14
NSL

X-SECTION AT RD 0+610
OFFSET

Drwg. No. DBD-AR-SD-P13P14-62 Scale AS SHOWN


-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
1168 ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)
1164

17.76
SUB GRADE LAYERS 300mm

1160

ROAD PAVEMENT DETAIL


1156

1152

1148

15.00
1144

1140

1136

1132

15.00
1128

1124
2.90

1120

1116

15.00
15.00

DBCG LAND SURVEYOR


1112
Consultant

1108 -0.86% 0.86%

1104
SCHEDULE OF AREA

Revisions
1100 DATUM
03 18-Dec-2021
Rev. Note Date
OFFSET PGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
OFFSET SGL

Drawn Hafiz Ahmad Verified


Checked Approved
Title

P13-P14
NSL

X-SECTION AT RD 0+620
OFFSET

Drwg. No. DBD-AR-SD-P13P14-63 Scale AS SHOWN


-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1168

AWC 50mm
TACK COAT
ABC 80mm
1164 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)
1160

SUB GRADE LAYERS 300mm

1156

ROAD PAVEMENT DETAIL

1152

1148

1144

12.53
1140

1136

1132

15.00
1128

1124

1120

1116

15.00
15.00

1112 DBCG LAND SURVEYOR

Consultant

1108

-0.86% 0.86%

1104
SCHEDULE OF AREA

Revisions
1100 DATUM 03 18-Dec-2021
Rev. Note Date
OFFSET PGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
OFFSET SGL

Drawn Hafiz Ahmad Verified


Checked Approved
Title

P13-P14
NSL

X-SECTION AT RD 0+630
OFFSET

Drwg. No. DBD-AR-SD-P13P14-64 Scale AS SHOWN


-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1144
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1140 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1136

ROAD PAVEMENT DETAIL

1132

1128

1124

1120

1116

1112

1108

0.60 1.00 3.65 3.65 1.00 0.60

3.96%
-3.96%

1104 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1100 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+640
Drwg. No. DBD-AR-SD-P13P14-65 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

-32
1132
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
SUB GRADE LAYERS 300mm

1128 ROAD PAVEMENT DETAIL

1124

1120

1116

1112

1108

0.60 1.00 3.65 3.65 1.00 0.60

-4.00% 4.00%

1104
SCHEDULE OF AREA

1100 DATUM
OFFSET PGL

DBCG LAND SURVEYOR

Consultant
OFFSET SGL

Revisions
03 18-Dec-2021
NSL

Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title

P13-P14
X-SECTION AT RD 0+650
Drwg. No. DBD-AR-SD-P13P14-66 Scale AS SHOWN
AWC 50mm
-32
1140
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1136
SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1132

1128

1124

1120

1116

1112

1108

0.60 1.00 3.65 3.65 1.00

1104 -4.00% 4.00%

SCHEDULE OF AREA

DBCG LAND SURVEYOR

1100 DATUM Consultant


OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
NSL

Drawn Hafiz Ahmad Verified


Checked Approved
OFFSET

Title

P13-P14
X-SECTION AT RD 0+660
Drwg. No. DBD-AR-SD-P13P14-67 Scale AS SHOWN
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1132

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1128
AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1124
SUB GRADE LAYERS 300mm

1120 ROAD PAVEMENT DETAIL

1116

1112

1108

The type and stability of wall


1104 0.60 1.00 3.65 3.65 1.00
is required to be checked
-4.00% 4.00%
from the Engineer before
1100
execution on site.

5H:1V

1096
5H:1V

1092

22.10
5H:1V

1088
5H:1V

1084 DBCG LAND SURVEYOR

Consultant
5H:1V

6.50
1080
SCHEDULE OF AREA

1076 DATUM

Revisions
OFFSET PGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
OFFSET SGL

CONTRACT NO. MW-1


Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+670
OFFSET

Drwg. No. DBD-AR-SD-P13P14-68 Scale AS SHOWN


-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1132

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1128 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1124
SUB GRADE LAYERS 300mm

1120 ROAD PAVEMENT DETAIL

1116

1112

1108

1104
The type and stability of wall
0.60 1.00 3.65 3.65 1.00

-3.95%
3.95%
is required to be checked
1100 from the Engineer before
execution on site.
5H:1V
1096

5H:1V

1092

20.00
5H:1V

1088

1084
5H:1V
DBCG LAND SURVEYOR

6.50 Consultant
1080
SCHEDULE OF AREA

1076 DATUM

Revisions
OFFSET PGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+680
Drwg. No. DBD-AR-SD-P13P14-69 Scale AS SHOWN
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1132
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

1128 TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1124

ROAD PAVEMENT DETAIL


1120

1116

1112

1108

1104

-2.42% 2.42%

1100

1096

1092

1088

1084 DBCG LAND SURVEYOR

Consultant

1080
SCHEDULE OF AREA

1076 DATUM

Revisions
OFFSET PGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+690
OFFSET

Drwg. No. DBD-AR-SD-P13P14-70 Scale AS SHOWN


-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1138
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


1134 (MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1130
ROAD PAVEMENT DETAIL

1126

1122

1118

1114

1110

1106
11.77

1102
0.60 1.00 3.65 3.65 1.00 0.60
0.17% -0.17%

DBCG LAND SURVEYOR


1098
SCHEDULE OF AREA Consultant

1094 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+700
OFFSET

Drwg. No. DBD-AR-SD-P13P14-71 Scale AS SHOWN


AWC 50mm
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 TACK COAT
ABC 80mm
1134 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1130 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1126

1122

1118

1114

1110
17.73

1106

1102

2.40%
-2.40%

1098
SCHEDULE OF AREA DBCG LAND SURVEYOR

Consultant
1094 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
NSL

Checked Approved
Title
OFFSET

P13-P14
X-SECTION AT RD 0+710
Drwg. No. DBD-AR-SD-P13P14-72 Scale AS SHOWN
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1138 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


1134 (MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1130

ROAD PAVEMENT DETAIL

1126

1122

1118

General Comment:
1114 Check need of wall at
such locations
1110

15.00

1106

1102

3.00% -3.00%

1.50
1098

1094
Check the area
DBCG LAND SURVEYOR

Consultant
1090
SCHEDULE OF AREA

1086 DATUM

Revisions
OFFSET PGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+720
OFFSET

Drwg. No. DBD-AR-SD-P13P14-73 Scale AS SHOWN


-32
1138
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

1134 TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1130

ROAD PAVEMENT DETAIL

1126

19.08
1122

1118

4.00

1114

1110

1106
9.30

1102

0.60 1.00 3.65 3.65 1.00

3.00% -3.00%
1098

1094 5.50

DBCG LAND SURVEYOR

Consultant
1090
SCHEDULE OF AREA

1086 DATUM

Revisions
OFFSET PGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+730
OFFSET

Drwg. No. DBD-AR-SD-P13P14-74 Scale AS SHOWN


AWC 50mm

-32
1114
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1110 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1106

9.00
1102

0.60 1.00 3.65 3.65 1.00


The type and stability of wall
1098 2.77% -2.77%

is required to be checked
from the Engineer before
execution on site.
1094

13.06
1090

5.000

1086

1082

1078
SCHEDULE OF AREA
DBCG LAND SURVEYOR

Consultant
1074 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
OFFSET SGL

Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
NSL

Drawn Hafiz Ahmad Verified


Checked Approved
Title
OFFSET

P13-P14
X-SECTION AT RD 0+740
Drwg. No. DBD-AR-SD-P13P14-75 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32


AGG.BC 150mm

TOP OF SUB GRADE LEVEL


1116 (MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1112
ROAD PAVEMENT DETAIL

1110

1106

The type and stability of wall


1102
is required to be checked
from the Engineer before
execution on site.

4.57
0.60 1.00 3.65 3.65 1.00
1098 1.29% -1.29%

1094

13.06
1090

5.000

1086
SCHEDULE OF AREA

1082 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Revisions
OFFSET SGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
OFFSET

Checked Approved
Title

P13-P14
X-SECTION AT RD 0+750
Drwg. No. DBD-AR-SD-P13P14-76 Scale AS SHOWN
-32
1124
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1120 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

10.65
1116 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1112 4.00

1110

1106

15.00
1102

2.28
0.60
1098 0.60 1.00 3.65 3.65
0.85%
1.00
-0.85%

1094

1090

1086

1082

1078 DBCG LAND SURVEYOR

Consultant

1074
SCHEDULE OF AREA

1070 DATUM

Revisions
OFFSET PGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
OFFSET SGL

CONTRACT NO. MW-1


Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+760
OFFSET

Drwg. No. DBD-AR-SD-P13P14-77 Scale AS SHOWN


-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1120
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1116
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1112

ROAD PAVEMENT DETAIL


1110

1106

14.38
1102

0.60 1.00 3.65 3.65 1.00


1098 2.77% -2.77%

1094

1090

1086

1082

1078

DBCG LAND SURVEYOR

Consultant
1074
SCHEDULE OF AREA

1070 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+770
Drwg. No. DBD-AR-SD-P13P14-78 Scale AS SHOWN
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1134

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1130 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1126
SUB GRADE LAYERS 300mm

1122 ROAD PAVEMENT DETAIL

1118

1114

1110

1106

13.42

1102

0.60 1.00 3.50 3.65 1.00

1098
-3.60% 3.60%

3.50
1094

1090

DBCG LAND SURVEYOR

Consultant
1086
SCHEDULE OF AREA

1082 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+780
Drwg. No. DBD-AR-SD-P13P14-79 Scale AS SHOWN
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1134
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1130
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

1126 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1122

1118

1114

1110

1106
16.77

1102

0.60 1.00 3.50 3.65 1.00 0.60

1098 -3.60% 3.60%

1094

1090

DBCG LAND SURVEYOR

Consultant
1086
SCHEDULE OF AREA

1182 DATUM

Revisions
OFFSET PGL

03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
Title
NSL

P13-P14
X-SECTION AT RD 0+790
OFFSET

Drwg. No. DBD-AR-SD-P13P14-80 Scale AS SHOWN


-32
1126
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1122
AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1118 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1114

1110

1106

13.94
1102

0.60 1.00 3.65 3.65 1.00 0.60


1098 2.73%
-2.73%

1094

1090

1086

DBCG LAND SURVEYOR


1182
Consultant
SCHEDULE OF AREA

1078 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
X-SECTION AT RD 0+800
OFFSET

Drwg. No. DBD-AR-SD-P13P14-81 Scale AS SHOWN


-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1126 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1122

ROAD PAVEMENT DETAIL

1118

1114

1110

1106 12.82

1102

0.60 1.00 3.65 3.65 1.00 0.60


1098

0.77
0.28% -0.28%

1094

1090 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1086 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+810
Drwg. No. DBD-AR-SD-P13P14-82 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1126 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1122

ROAD PAVEMENT DETAIL

1118

1114

1110

1106 13.74

1102

2.77
0.60 1.00 3.65 3.65 1.00 0.60
1098
3.03% -3.03%

1094

1090 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1086 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+820
Drwg. No. DBD-AR-SD-P13P14-83 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1126 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1122

ROAD PAVEMENT DETAIL

1118

1114

1110

1106 15.21

1102

3.96
0.60 1.00 3.65 3.65 1.00 0.60
1098
3.50% -3.50%

1094

1090 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1086 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+830
Drwg. No. DBD-AR-SD-P13P14-84 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1126 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1122

ROAD PAVEMENT DETAIL

1118

1114

1110

1106

11.82

1102

3.11
0.60 1.00 3.65 3.65 1.00 0.60
1098
3.50% -3.50%

1094

1090 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1086 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+840
Drwg. No. DBD-AR-SD-P13P14-85 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1126 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1122

ROAD PAVEMENT DETAIL

1118

1114

1110

1106

1102
7.85

1.00 3.65 3.65 1.00


0.60 0.60
1098 3.03% -3.03%

1094

1090 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1086 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+850
Drwg. No. DBD-AR-SD-P13P14-86 Scale AS SHOWN
-32
1122
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1118 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1114

ROAD PAVEMENT DETAIL

1110

1106

1102

6.42
1098 0.60 1.00 3.65 3.65 1.00
2.57% -2.57%

1.50
1094

1090

1086

1182 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1078 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+860
Drwg. No. DBD-AR-SD-P13P14-87 Scale AS SHOWN
-32
1122
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

1118 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1114

ROAD PAVEMENT DETAIL

1110

1106

1102

1098 0.60 1.00 3.65 3.65 1.00 0.60


1.47% -1.47%

1094

1090

1086

1182 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1078 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+870
Drwg. No. DBD-AR-SD-P13P14-88 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


-32
1118
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 (MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1114 ROAD PAVEMENT DETAIL

1110

1106

1102

7.87
1098 0.60
1.00 3.65 3.65 1.00
0.60

0.16% -0.16%

1094

1090
SCHEDULE OF AREA

1086 DATUM

DBCG LAND SURVEYOR


OFFSET PGL

Consultant
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date
NSL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
OFFSET

CONTRACT NO. MW-1


Drawn M. ABUBAKAR Verified
Checked Approved
Title

P13-P14
X-SECTION AT RD 0+880
Drwg. No. DBD-AR-SD-P13P14-89 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1126
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1122

ROAD PAVEMENT DETAIL

1118

1114

1110

1106

1102
7.66

1098 0.60 1.00 3.65 3.65 1.00 0.60

1.11
-1.20% 1.20%

1094

1090
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant

1086 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
NSL

Checked Approved
Title

P13-P14
OFFSET

X-SECTION AT RD 0+890
Drwg. No. DBD-AR-SD-P13P14-90 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1126
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1122

ROAD PAVEMENT DETAIL

1118

1114

1110

1106

1102
7.09

1098
0.60 1.00 3.65 3.65 1.00 0.60

1.56
-2.45% 2.45%

1094

1090
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant

1086 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
NSL

Checked Approved
Title

P13-P14
OFFSET

X-SECTION AT RD 0+900
Drwg. No. DBD-AR-SD-P13P14-91 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1117 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1109

1101
6.99

2.68
0.60 1.00 3.65 3.65 1.00 0.60

-3.42% 3.42%

1093

1085 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1081 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+910
Drwg. No. DBD-AR-SD-P13P14-92 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1117 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1109

1101
7.42

3.23
0.60 1.00 3.65 3.65 1.00 0.60
3.95%
-3.95%

1093

1085 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1081 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+920
Drwg. No. DBD-AR-SD-P13P14-93 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1117 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1109

1101
8.30

3.61
0.60 1.00 3.67 3.63 1.00 0.60

-4.00% 4.00%
1093

1085 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1081 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+930
Drwg. No. DBD-AR-SD-P13P14-94 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1117
SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1109

1101
10.03

5.73
0.60 1.00 3.65 3.65 1.00 0.60
1093
-4.00% 4.00%

1085
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant

1081 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+940
Drwg. No. DBD-AR-SD-P13P14-95 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1117 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1109

1101
14.84

4.38
1093
0.60 1.00 3.65 3.65 1.00 0.60

-4.00% 4.00%

1085 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1081 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+950
Drwg. No. DBD-AR-SD-P13P14-96 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1117 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1109

7.73
4.00

1101
15.00

1093

3.71
0.60 1.00 3.65 3.65 1.00 0.60
3.96%
-3.96%

1085 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1081 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+960
Drwg. No. DBD-AR-SD-P13P14-97 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1117 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1109

1101
12.41

1093

1.00 3.65 3.65 1.00


0.60
-1.67% 1.67%

1085 1.50 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1081 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+970
Drwg. No. DBD-AR-SD-P13P14-98 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1117 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1109

1101

14.95

1093

0.80
0.60 1.00 3.65 3.65 1.00 0.60
1.13% -1.13%

1085 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1081 DATUM
OFFSET PGL

Revisions
Check 03 18-Dec-2021
Rev. Note Date
NSL
POWERCHINA-FWO JOINT VENTURE
OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+980
Drwg. No. DBD-AR-SD-P13P14-99 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1117 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1109

7.00

5%

4.00

1101

15.00

1093

8.04
0.60 1.00 3.65 3.65 1.00 0.60
3.41% -3.41%

1085 DBCG LAND SURVEYOR


SCHEDULE OF AREA
Consultant

1081 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn Hafiz Ahmad Verified
Checked Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 0+990
Drwg. No. DBD-AR-SD-P13P14-100 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1117 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL

1109

12.71

5%

1101 4.00

15.00

1093

11.57
0.60 1.00 3.65 3.65 1.00 0.60
4.00% - 4.00%

1085
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant

1081 DATUM
OFFSET PGL

Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M. ABUBAKR Verified
Checked ENGR. M .BILAL Approved
NSL

Title

P13-P14
OFFSET

X-SECTION AT RD 1+000
Drwg. No. DBD-AR-SD-P13P14-101 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1117-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1109

5.23
5%
1101
4.00

15.00

1093

8.00
0.60 1.00 3.65 3.65 1.00 0.60
4.0% -4.0%

1085
SCHEDULE OF AREA

1081 DATUM DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M .BILAL Approved
Title

P13-P14
X-SECTION AT RD 1+010
Drwg. No. DBD-AR-SD-P13P14-102 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1109
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1105
SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1101

1097

1093

The need of wall may


jointly be checked on
1089
site.

0.60 1.00 3.65 3.65 1.00

1.18
3.82% -3.82%
1085

4.50
1081

1077
SCHEDULE OF AREA

1073 DATUM
DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Check
OFFSET SGL

NSL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M .BILAL Approved
Title

P13-P14
X-SECTION AT RD 1+020
Drwg. No. DBD-AR-SD-P13P14-103 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm

-32
1101
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1097 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1093

1089
The type and
stability of wall is
1.00 1.00 3.65 3.65 1.00

-0.21% 0.21%
required to be
1085 checked from the
Engineer before
execution on site.
1081

16.06
1077

1073

1069
SCHEDULE OF AREA

1065 DATUM
DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M .BILAL Approved
Title

P13-P14
X-SECTION AT RD 1+030
Drwg. No. DBD-AR-SD-P13P14-104 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm

-32
1101
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1097 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1093

1089
The type and
1.00 1.00 3.65 3.65 1.00
stability of wall is
-2.50% 2.50%
required to be
1085 checked from the
Engineer before
execution on site.
1081

16.06
1077

1073

1069
SCHEDULE OF AREA

1065 DATUM
DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M .BILAL Approved
Title

P13-P14
X-SECTION AT RD 1+040
Drwg. No. DBD-AR-SD-P13P14-105 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1109
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1105
SUB GRADE LAYERS 300mm

1101 ROAD PAVEMENT DETAIL

1097

1093

1089

3.33
0.60 1.00 3.65 3.65 1.00 1.00

-2.50% 2.50%
1085

1081

1077
SCHEDULE OF AREA

1073 DATUM
DBCG LAND SURVEYOR

Consultant
OFFSET PGL
OFFSET SGL

Revisions
03 18-Dec-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M. ABUBAKR Verified


Checked ENGR. M .BILAL Approved
Title

P13-P14
X-SECTION AT RD 1+050
Drwg. No. DBD-AR-SD-P13P14-106 Scale AS SHOWN