Reviewed 20220128-TMF-2022-128-Submission of Cross-Sections of Left Bank Permanent Roads P13-P14
Reviewed 20220128-TMF-2022-128-Submission of Cross-Sections of Left Bank Permanent Roads P13-P14
Reviewed 20220128-TMF-2022-128-Submission of Cross-Sections of Left Bank Permanent Roads P13-P14
1202
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1190
1186
1182
1178
1174
6.830
3.589
1166
1158 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+010
Drwg. No. DBD-AR-SD-P13P14-02 Scale AS SHOWN
-32
1202
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1190
1186
1182
1178
1174
4.004
0.60
0.60 1.00 3.64 3.65 1.00
1170
0.750% -2.50%
1166
1158 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+020
Drwg. No. DBD-AR-SD-P13P14-03 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄
0 4 8 12 16 20 24 28 32
(MIN. CBR 30 AT 98% MDD.)
1186
ROAD PAVEMENT DETAIL
1182
1178
1174
2.50
1166
1162
SCHEDULE OF AREA
1158 DATUM
OFFSET PGL
Consultant
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
NSL
P13-P14
X-SECTION AT RD 0+030
Drwg. No. DBD-AR-SD-P13P14-04 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1178
5.50
1166
1154
1146 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+040
Drwg. No. DBD-AR-SD-P13P14-05 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1178
1166
4.48
1154
1146 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+050
Drwg. No. DBD-AR-SD-P13P14-06 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1178
1166
2.35
1154
1146 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+060
Drwg. No. DBD-AR-SD-P13P14-07 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1178
0.60
1.00 1.00 3.65 3.65 1.00
2.64
2.60% -2.63%
1166
1154
1146 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+070
Drwg. No. DBD-AR-SD-P13P14-08 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1178
4.684
0.60 1.00 3.65 3.65 1.00 0.60
1166
-0.52% -2.50%
1154
1146 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+080
Drwg. No. DBD-AR-SD-P13P14-09 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1178
10.354
1166
2.962
0.60 1.00 3.65 3.65 1.00 0.60
-2.48% -2.50%
1154
1146 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+090
Drwg. No. DBD-AR-SD-P13P14-10 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
8.664
1178
3.000
5%
10.000
4.970
1166
0.60 1.00 3.65 3.65 1.00 0.60
-2.50% 1.24%
1154
1146 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+100
Drwg. No. DBD-AR-SD-P13P14-11 Scale AS SHOWN
-32
1190
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
6.974
AGG.BC 150mm
3.000
5%
SUB GRADE LAYERS 300mm
10.000
1178
3.000
5%
10.000
6.916
1166
1154
1146 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+110
Drwg. No. DBD-AR-SD-P13P14-12 Scale AS SHOWN
AWC 50mm
2.773
PRIME COAT
3.000
5% AGG.BC 150mm
1190
SUB GRADE LAYERS 300mm
10.000
ROAD PAVEMENT DETAIL
3.000
5%
1178
10.000
3.000
5%
10.000
8.560
1166
SCHEDULE OF AREA
Revisions
OFFSET SGL
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
X-SECTION AT RD 0+120
Drwg. No. DBD-AR-SD-P13P14-13 Scale AS SHOWN
-32
1198 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1190
ROAD PAVEMENT DETAIL
9.774
1186
3.000
1182 5%
1178
10.000
1174
3.000
5%
1170
10.000
9.544
1166
SCHEDULE OF AREA
DBCG LAND SURVEYOR
Revisions
03 18-Dec-2021
OFFSET SGL
Title
P13-P14
X-SECTION AT RD 0+130
Drwg. No. DBD-AR-SD-P13P14-14 Scale AS SHOWN
-32
1194
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1190
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
12.243
SUB GRADE LAYERS 300mm
1186
1182 3.000
5%
1178
10.000
1174
3.000
5%
1170
10.000
1166
-3.00% 3.00%
1158
1154
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant
1150 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+140
Drwg. No. DBD-AR-SD-P13P14-15 Scale AS SHOWN
-32
1186
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
12.61
SUB GRADE LAYERS 300mm
1178
1174
1170
15.00
1166
7.02
1162
0.60 1.00 3.65 3.65 1.00 0.60
-3.00% 3.00%
1158
1154
1150
1142 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
X-SECTION AT RD 0+150
OFFSET
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1194 TOP OF SUB GRADE LEVEL
8.04
(MIN. CBR 30 AT 98% MDD.)
1186
1182
15.00
1178
4.00
5%
1174
1170
15.00
1166
12.35
1162
-3.00% 3.00%
1158
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant
1154 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+160
Drwg. No. DBD-AR-SD-P13P14-17 Scale AS SHOWN
-32
1194
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1190
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1186
1182
14.75
1178
4.00
1174 5%
1170
1166
15.00
13.60
1162
1154
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant
1150 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+170
Drwg. No. DBD-AR-SD-P13P14-18 Scale AS SHOWN
-32
1186
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1182
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
9.06
ROAD PAVEMENT DETAIL
1174
4.00
5%
1170
1166
15.00
11.76
1162
-2.50% 2.50%
1154
1150
1142 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+180
Drwg. No. DBD-AR-SD-P13P14-19 Scale AS SHOWN
-32
1187
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1179
ROAD PAVEMENT DETAIL
1175
5.82
4.00
1171 5%
1167
1163
15.00
1159
6.77
1151
SCHEDULE OF AREA
DBCG LAND SURVEYOR
Consultant
1147 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
OFFSET SGL
Title
P13-P14
X-SECTION AT RD 0+190
Drwg. No. DBD-AR-SD-P13P14-20 Scale AS SHOWN
AWC 50mm
-32
1179
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1175
1171
ROAD PAVEMENT DETAIL
1167
1163
14.51
1159
3.81
1.00 3.65 3.65 1.00 0.60
1155 0.60
2.79% -2.79%
1151
1147
1143
SCHEDULE OF AREA
DBCG LAND SURVEYOR
Revisions
03 18-Dec-2021
OFFSET SGL
Title
P13-P14
X-SECTION AT RD 0+200
Drwg. No. DBD-AR-SD-P13P14-21 Scale AS SHOWN
-32
1182
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1178
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1170
1166
1162
12.49
1158
1154 0.60
1.00 3.65 3.65 1.00
0.60
3.79% -3.79%
1150
1146
1138 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+210
Drwg. No. DBD-AR-SD-P13P14-22 Scale AS SHOWN
-32
1182
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1178 AGG.BC 150mm
1166
1162
1158
10.84
1154
1.00 3.65 3.65 1.00 0.60
3.79%
-3.79%
1150
1146
1138 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+220
Drwg. No. DBD-AR-SD-P13P14-23 Scale AS SHOWN
-32
1181
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1177 AGG.BC 150mm
5.89
4.00
5%
1165
1161
15.00
1157
1153 2.95
1149
1145
1137 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+230
Drwg. No. DBD-AR-SD-P13P14-24 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
-32
1177
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AGG.BC 150mm
1161
11.68
1153
0.17% -0.17%
1145
SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+240
Drwg. No. DBD-AR-SD-P13P14-25 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1177 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
1161
1153
9.03
1.00 3.65 3.65 1.00
0.60 0.60
-2.36% 2.36%
1145
SCHEDULE OF AREA
Consultant
OFFSET PGL
Revisions
OFFSET SGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+250
Drwg. No. DBD-AR-SD-P13P14-26 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1177 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
PRIME COAT
AGG.BC 150mm
1161
13.11
1153 3.35
-3.90 3.90
1145
SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+260
Drwg. No. DBD-AR-SD-P13P14-27 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1177 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
PRIME COAT
AGG.BC 150mm
1161
14.27
1153
5.91
-4.00% 4.00%
1145
SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
Check NSL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+270
Drwg. No. DBD-AR-SD-P13P14-28 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1177
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
PRIME COAT
AGG.BC 150mm
4.64
1161 4.00
5%
1153
15.00
6.16
SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+280
Drwg. No. DBD-AR-SD-P13P14-29 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1177
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
7.93
1161
4.00
5%
1153
15.00
6.76
1145
0.60 1.00 3.65 3.65 1.00 0.60
-4.00% 4.00% SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+290
Drwg. No. DBD-AR-SD-P13P14-30 Scale AS SHOWN
-32
1177
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1161
7.13
4.00
5%
1153
15.00
1145
5.96
1133 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+300
Drwg. No. DBD-AR-SD-P13P14-31 Scale AS SHOWN
AWC 50mm
TACK COAT
-32
1161
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
ABC 80mm
PRIME COAT
AGG.BC 150mm
15.05
1145
4.95
0.60 1.00 3.65 3.65 1.00 0.60
-3.17% 3.17%
1137
1129
SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+310
Drwg. No. DBD-AR-SD-P13P14-32 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1161
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
1145
15.56
1137
3.24
-2.01% 2.01%
1129
SCHEDULE OF AREA
Consultant
OFFSET PGL
Revisions
OFFSET SGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+320
Drwg. No. DBD-AR-SD-P13P14-33 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1161
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
8.24
5%
1145 4.00
15.00
1137
-0.60% 0.60%
1129
SCHEDULE OF AREA
Consultant
OFFSET PGL
Revisions
OFFSET SGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+330
Drwg. No. DBD-AR-SD-P13P14-34 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1161
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
9.78
4.00
1145 5%
1137
15.00
0.60
1.00 3.65 3.65 1.00
0.89% -0.89%
1129
SCHEDULE OF AREA
Consultant
OFFSET PGL
Revisions
OFFSET SGL
03 18-Dec-2021
Check NSL Rev. Note Date
P13-P14
X-SECTION AT RD 0+340
Drwg. No. DBD-AR-SD-P13P14-35 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1161
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
8.82
1145
4.00
5%
1137
15.00
1.00 3.65 3.65 1.00 0.60
1129 0.60
2.27% -2.27%
SCHEDULE OF AREA
Consultant
OFFSET PGL
Revisions
OFFSET SGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+350
Drwg. No. DBD-AR-SD-P13P14-36 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
-32
1165
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AGG.BC 150mm
10.21
4.00
5%
1149
15.00
1141
1133
SCHEDULE OF AREA
Consultant
OFFSET PGL
Revisions
OFFSET SGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+360
Drwg. No. DBD-AR-SD-P13P14-37 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1165
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
PRIME COAT
AGG.BC 150mm
6.61
4.00
1149 5%
15.00
1141
0.60
0.60 1.00 3.65 3.65 1.00
1.46
3.94% -3.94%
1133
SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+370
Drwg. No. DBD-AR-SD-P13P14-38 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
-32
1157
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
SUB GRADE LAYERS 300mm
4.17
1149
5%
4.00
1141
15.00
1.00 1.00 3.65 3.65 1.00 0.60
SCHEDULE OF AREA
1129 DATUM
OFFSET PGL
Consultant
OFFSET SGL
Revisions
NSL
03 18-Dec-2021
Rev. Note Date
OFFSET
P13-P14
X-SECTION AT RD 0+380
Drwg. No. DBD-AR-SD-P13P14-39 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
-32
1157
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 SUB GRADE LAYERS 300mm
1149
1141
13.26
1133 0.60 1.00 3.65 3.65 1.00 0.60
4.00%
-4.00% SCHEDULE OF AREA
1129 DATUM
OFFSET PGL
Consultant
OFFSET SGL
Revisions
NSL
03 18-Dec-2021
Rev. Note Date
OFFSET
P13-P14
X-SECTION AT RD 0+390
Drwg. No. DBD-AR-SD-P13P14-40 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
-32
1157
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
SUB GRADE LAYERS 300mm
1149
1141
11.03
1133
SCHEDULE OF AREA
0.60 1.00 3.65 3.65 1.00 0.60
-3.27% -3.27%
1129 DATUM
OFFSET PGL
Consultant
OFFSET SGL
Revisions
NSL
03 18-Dec-2021
Rev. Note Date
OFFSET
P13-P14
X-SECTION AT RD 0+400
Drwg. No. DBD-AR-SD-P13P14-41 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
-32
1159
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AGG.BC 150mm
1143
1135
10.81
1.00 1.00 3.65 3.65 1.00 0.60
0.65% -0.65%
1127
SCHEDULE OF AREA
Consultant
OFFSET PGL
Revisions
OFFSET SGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+410
Drwg. No. DBD-AR-SD-P13P14-42 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1159
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
1143
14.58
1135
-2.07% 2.07%
1127
SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+420
Drwg. No. DBD-AR-SD-P13P14-43 Scale AS SHOWN
AWC 50mm
TACK COAT
-32
1157
-28 -24 -20 -16 -12 -8 -4 ℄
0 4 8 12 16 20 24 28 32 ABC 80mm
PRIME COAT
AGG.BC 150mm
1141
14.77
1133
-3.00% 3.00%
1125
SCHEDULE OF AREA
1121 DATUM
DBCG LAND SURVEYOR
OFFSET PGL
Consultant
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+430
Drwg. No. DBD-AR-SD-P13P14-44 Scale AS SHOWN
-32
1155
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1147
ROAD PAVEMENT DETAIL
1139
15.40
1131
3.55
-3.00% 3.00%
1123
SCHEDULE OF AREA
1119 DATUM
OFFSET PGL
Consultant
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
NSL
P13-P14
X-SECTION AT RD 0+440
Drwg. No. DBD-AR-SD-P13P14-45 Scale AS SHOWN
AWC 50mm
TACK COAT
-32
1157
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 ABC 80mm
PRIME COAT
AGG.BC 150mm
1141
1133
13.12
0.60 1.00 3.65 3.65 1.00 0.60
2.26
-3.00% 3.00%
1125
SCHEDULE OF AREA
1121 DATUM
DBCG LAND SURVEYOR
OFFSET PGL
Consultant
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+450
Drwg. No. DBD-AR-SD-P13P14-46 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
1137
10.48
1129
-2.98% 2.98%
1121
SCHEDULE OF AREA
Consultant
OFFSET PGL
Revisions
OFFSET SGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+460
Drwg. No. DBD-AR-SD-P13P14-47 Scale AS SHOWN
AWC 50mm
-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1145
ROAD PAVEMENT DETAIL
1137
14.40
1129
-2.31% 2.31%
1121
SCHEDULE OF AREA
1117 DATUM
Consultant
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
NSL
P13-P14
X-SECTION AT RD 0+470
Drwg. No. DBD-AR-SD-P13P14-48 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
PRIME COAT
AGG.BC 150mm
1137
12.85
1129
-1.01% 1.01%
1121
SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+480
Drwg. No. DBD-AR-SD-P13P14-49 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1153
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
1137
11.05
1129
0.55% -0.55%
1121
SCHEDULE OF AREA
1117 DATUM
DBCG LAND SURVEYOR
OFFSET PGL
Consultant
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+490
Drwg. No. DBD-AR-SD-P13P14-50 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
-32
1150
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AGG.BC 150mm
1146
1142
1138
1134
1130
13.27
1126
1118
SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+500
Drwg. No. DBD-AR-SD-P13P14-51 Scale AS SHOWN
1157-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1153 AGG.BC 150mm
1141
8.55
1137 4.00
1133
1129
15.00
1125
2.87% -2.87%
1121
1117
Consultant
1113
SCHEDULE OF AREA
1109 DATUM
Revisions
OFFSET PGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+510
OFFSET
AGG.BC 150mm
1149 TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1141
11.01
1137
4.00
1133
1129
15.00
1125
1121
1.18
3.00% -3.00%
1117
1109 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+520
OFFSET
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1149
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1145
10.52
1141
1137
1133
1129
15.00
1125
1121
2.56
3.00% -3.00%
1117
1109 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+530
OFFSET
AGG.BC 150mm
1149 TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1145
1141
11.99
1137
1133
1129
15.00
1125
1121
3.00% -3.00%
1117
1109 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+540
Drwg. No. DBD-AR-SD-P13P14-55 Scale AS SHOWN
-32
1144
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
9.14
1136
ROAD PAVEMENT DETAIL
4.00
1132
1128
15.00
1124
1120
5.10
3.00% -3.00%
1116
1112
1108
1100 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+550
Drwg. No. DBD-AR-SD-P13P14-56 Scale AS SHOWN
-32
1156
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1152
AGG.BC 150mm
1148
SUB GRADE LAYERS 300mm
1144
ROAD PAVEMENT DETAIL
1140
1136
9.24
1132 4.00
1128
1124
15.00
1120
7.35
1112
Consultant
1104
SCHEDULE OF AREA
1100 DATUM
Revisions
OFFSET PGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+560
OFFSET
1152
1148
1144
1140
17.88
1136
1132
4.00
1128
1124
15.00
1120
3.63
2.50% -2.50%
1112
Consultant
1104
SCHEDULE OF AREA
1100 DATUM
Revisions
OFFSET PGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+570
OFFSET
AWC 50mm
TACK COAT
ABC 80mm
1160
PRIME COAT
AGG.BC 150mm
1152
1148
1144
1140
1136
15.00
1132
1128
1124
15.00
1120
1116
2.50% -2.50%
1112
DBCG LAND SURVEYOR
Consultant
1108
1104
SCHEDULE OF AREA
Revisions
1100 DATUM
03 18-Dec-2021
Rev. Note Date
OFFSET PGL
P13-P14
NSL
X-SECTION AT RD 0+580
OFFSET
AWC 50mm
TACK COAT
ABC 80mm
1164
PRIME COAT
AGG.BC 150mm
9.83
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1160
1156
15.00
1148
1144
1140
1136
15.00
1132
1128
1124
1120
15.00
11.49
1116
Consultant
1108
1104
SCHEDULE OF AREA
Revisions
1100 DATUM
03 18-Dec-2021
Rev. Note Date
OFFSET PGL
P13-P14
NSL
X-SECTION AT RD 0+590
OFFSET
AWC 50mm
TACK COAT
1172 ABC 80mm
PRIME COAT
AGG.BC 150mm
1164
17.06
ROAD PAVEMENT DETAIL
1160
1156
1152
1148
15.00
1144
1140
1136
15.00
1132
1128
1124
1120
DBCG LAND SURVEYOR
17.48
Consultant
15.00
1116
1112
SCHEDULE OF AREA
-2.42% 2.42%
Revisions
1108 DATUM
03 18-Dec-2021
OFFSET PGL
P13-P14
X-SECTION AT RD 0+600
OFFSET
AWC 50mm
TACK COAT
1172 ABC 80mm
PRIME COAT
AGG.BC 150mm
18.52
ROAD PAVEMENT DETAIL
1160
1156
1152
1148
15.00
1144
1140
1136
1132
15.00
1128
1124
1120
15.00
15.00
1116
DBCG LAND SURVEYOR
Consultant
1112
1108
1104
Revisions
SCHEDULE OF AREA
03 18-Dec-2021
1100 DATUM Rev. Note Date
Checked Approved
Title
P13-P14
NSL
X-SECTION AT RD 0+610
OFFSET
AWC 50mm
TACK COAT
1168 ABC 80mm
PRIME COAT
AGG.BC 150mm
17.76
SUB GRADE LAYERS 300mm
1160
1152
1148
15.00
1144
1140
1136
1132
15.00
1128
1124
2.90
1120
1116
15.00
15.00
1104
SCHEDULE OF AREA
Revisions
1100 DATUM
03 18-Dec-2021
Rev. Note Date
OFFSET PGL
P13-P14
NSL
X-SECTION AT RD 0+620
OFFSET
AWC 50mm
TACK COAT
ABC 80mm
1164 PRIME COAT
AGG.BC 150mm
1156
1152
1148
1144
12.53
1140
1136
1132
15.00
1128
1124
1120
1116
15.00
15.00
Consultant
1108
-0.86% 0.86%
1104
SCHEDULE OF AREA
Revisions
1100 DATUM 03 18-Dec-2021
Rev. Note Date
OFFSET PGL
P13-P14
NSL
X-SECTION AT RD 0+630
OFFSET
1132
1128
1124
1120
1116
1112
1108
3.96%
-3.96%
1100 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+640
Drwg. No. DBD-AR-SD-P13P14-65 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
-32
1132
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
SUB GRADE LAYERS 300mm
1124
1120
1116
1112
1108
-4.00% 4.00%
1104
SCHEDULE OF AREA
1100 DATUM
OFFSET PGL
Consultant
OFFSET SGL
Revisions
03 18-Dec-2021
NSL
P13-P14
X-SECTION AT RD 0+650
Drwg. No. DBD-AR-SD-P13P14-66 Scale AS SHOWN
AWC 50mm
-32
1140
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1136
SUB GRADE LAYERS 300mm
1128
1124
1120
1116
1112
1108
SCHEDULE OF AREA
Revisions
OFFSET SGL
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
X-SECTION AT RD 0+660
Drwg. No. DBD-AR-SD-P13P14-67 Scale AS SHOWN
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1132
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1128
AGG.BC 150mm
1124
SUB GRADE LAYERS 300mm
1116
1112
1108
5H:1V
1096
5H:1V
1092
22.10
5H:1V
1088
5H:1V
Consultant
5H:1V
6.50
1080
SCHEDULE OF AREA
1076 DATUM
Revisions
OFFSET PGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+670
OFFSET
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1128 AGG.BC 150mm
1124
SUB GRADE LAYERS 300mm
1116
1112
1108
1104
The type and stability of wall
0.60 1.00 3.65 3.65 1.00
-3.95%
3.95%
is required to be checked
1100 from the Engineer before
execution on site.
5H:1V
1096
5H:1V
1092
20.00
5H:1V
1088
1084
5H:1V
DBCG LAND SURVEYOR
6.50 Consultant
1080
SCHEDULE OF AREA
1076 DATUM
Revisions
OFFSET PGL
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+680
Drwg. No. DBD-AR-SD-P13P14-69 Scale AS SHOWN
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1132
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1116
1112
1108
1104
-2.42% 2.42%
1100
1096
1092
1088
Consultant
1080
SCHEDULE OF AREA
1076 DATUM
Revisions
OFFSET PGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+690
OFFSET
AGG.BC 150mm
1130
ROAD PAVEMENT DETAIL
1126
1122
1118
1114
1110
1106
11.77
1102
0.60 1.00 3.65 3.65 1.00 0.60
0.17% -0.17%
1094 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+700
OFFSET
AGG.BC 150mm
1122
1118
1114
1110
17.73
1106
1102
2.40%
-2.40%
1098
SCHEDULE OF AREA DBCG LAND SURVEYOR
Consultant
1094 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Checked Approved
Title
OFFSET
P13-P14
X-SECTION AT RD 0+710
Drwg. No. DBD-AR-SD-P13P14-72 Scale AS SHOWN
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1138 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1130
1126
1122
1118
General Comment:
1114 Check need of wall at
such locations
1110
15.00
1106
1102
3.00% -3.00%
1.50
1098
1094
Check the area
DBCG LAND SURVEYOR
Consultant
1090
SCHEDULE OF AREA
1086 DATUM
Revisions
OFFSET PGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+720
OFFSET
AGG.BC 150mm
1130
1126
19.08
1122
1118
4.00
1114
1110
1106
9.30
1102
3.00% -3.00%
1098
1094 5.50
Consultant
1090
SCHEDULE OF AREA
1086 DATUM
Revisions
OFFSET PGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+730
OFFSET
-32
1114
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
9.00
1102
is required to be checked
from the Engineer before
execution on site.
1094
13.06
1090
5.000
1086
1082
1078
SCHEDULE OF AREA
DBCG LAND SURVEYOR
Consultant
1074 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
OFFSET SGL
P13-P14
X-SECTION AT RD 0+740
Drwg. No. DBD-AR-SD-P13P14-75 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1112
ROAD PAVEMENT DETAIL
1110
1106
4.57
0.60 1.00 3.65 3.65 1.00
1098 1.29% -1.29%
1094
13.06
1090
5.000
1086
SCHEDULE OF AREA
Consultant
OFFSET PGL
Revisions
OFFSET SGL
03 18-Dec-2021
Rev. Note Date
Checked Approved
Title
P13-P14
X-SECTION AT RD 0+750
Drwg. No. DBD-AR-SD-P13P14-76 Scale AS SHOWN
-32
1124
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1120 AGG.BC 150mm
10.65
1116 SUB GRADE LAYERS 300mm
1110
1106
15.00
1102
2.28
0.60
1098 0.60 1.00 3.65 3.65
0.85%
1.00
-0.85%
1094
1090
1086
1082
Consultant
1074
SCHEDULE OF AREA
1070 DATUM
Revisions
OFFSET PGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+760
OFFSET
AGG.BC 150mm
1116
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1106
14.38
1102
1094
1090
1086
1082
1078
Consultant
1074
SCHEDULE OF AREA
1070 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+770
Drwg. No. DBD-AR-SD-P13P14-78 Scale AS SHOWN
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1134
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1126
SUB GRADE LAYERS 300mm
1118
1114
1110
1106
13.42
1102
1098
-3.60% 3.60%
3.50
1094
1090
Consultant
1086
SCHEDULE OF AREA
1082 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+780
Drwg. No. DBD-AR-SD-P13P14-79 Scale AS SHOWN
-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
1134
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1130
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1118
1114
1110
1106
16.77
1102
1094
1090
Consultant
1086
SCHEDULE OF AREA
1182 DATUM
Revisions
OFFSET PGL
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 0+790
OFFSET
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1122
AGG.BC 150mm
1110
1106
13.94
1102
1094
1090
1086
1078 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
X-SECTION AT RD 0+800
OFFSET
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1118
1114
1110
1106 12.82
1102
0.77
0.28% -0.28%
1094
1086 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+810
Drwg. No. DBD-AR-SD-P13P14-82 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1118
1114
1110
1106 13.74
1102
2.77
0.60 1.00 3.65 3.65 1.00 0.60
1098
3.03% -3.03%
1094
1086 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+820
Drwg. No. DBD-AR-SD-P13P14-83 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1118
1114
1110
1106 15.21
1102
3.96
0.60 1.00 3.65 3.65 1.00 0.60
1098
3.50% -3.50%
1094
1086 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+830
Drwg. No. DBD-AR-SD-P13P14-84 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1118
1114
1110
1106
11.82
1102
3.11
0.60 1.00 3.65 3.65 1.00 0.60
1098
3.50% -3.50%
1094
1086 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+840
Drwg. No. DBD-AR-SD-P13P14-85 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1118
1114
1110
1106
1102
7.85
1094
1086 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+850
Drwg. No. DBD-AR-SD-P13P14-86 Scale AS SHOWN
-32
1122
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1110
1106
1102
6.42
1098 0.60 1.00 3.65 3.65 1.00
2.57% -2.57%
1.50
1094
1090
1086
1078 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+860
Drwg. No. DBD-AR-SD-P13P14-87 Scale AS SHOWN
-32
1122
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1110
1106
1102
1094
1090
1086
1078 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+870
Drwg. No. DBD-AR-SD-P13P14-88 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1110
1106
1102
7.87
1098 0.60
1.00 3.65 3.65 1.00
0.60
0.16% -0.16%
1094
1090
SCHEDULE OF AREA
1086 DATUM
Consultant
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
NSL
P13-P14
X-SECTION AT RD 0+880
Drwg. No. DBD-AR-SD-P13P14-89 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1126
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1122
1118
1114
1110
1106
1102
7.66
1.11
-1.20% 1.20%
1094
1090
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant
1086 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Checked Approved
Title
P13-P14
OFFSET
X-SECTION AT RD 0+890
Drwg. No. DBD-AR-SD-P13P14-90 Scale AS SHOWN
-32
1130
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1126
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)
1122
1118
1114
1110
1106
1102
7.09
1098
0.60 1.00 3.65 3.65 1.00 0.60
1.56
-2.45% 2.45%
1094
1090
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant
1086 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Checked Approved
Title
P13-P14
OFFSET
X-SECTION AT RD 0+900
Drwg. No. DBD-AR-SD-P13P14-91 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1109
1101
6.99
2.68
0.60 1.00 3.65 3.65 1.00 0.60
-3.42% 3.42%
1093
1081 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+910
Drwg. No. DBD-AR-SD-P13P14-92 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1109
1101
7.42
3.23
0.60 1.00 3.65 3.65 1.00 0.60
3.95%
-3.95%
1093
1081 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+920
Drwg. No. DBD-AR-SD-P13P14-93 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1109
1101
8.30
3.61
0.60 1.00 3.67 3.63 1.00 0.60
-4.00% 4.00%
1093
1081 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+930
Drwg. No. DBD-AR-SD-P13P14-94 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1117
SUB GRADE LAYERS 300mm
1109
1101
10.03
5.73
0.60 1.00 3.65 3.65 1.00 0.60
1093
-4.00% 4.00%
1085
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant
1081 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+940
Drwg. No. DBD-AR-SD-P13P14-95 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1109
1101
14.84
4.38
1093
0.60 1.00 3.65 3.65 1.00 0.60
-4.00% 4.00%
1081 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+950
Drwg. No. DBD-AR-SD-P13P14-96 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1109
7.73
4.00
1101
15.00
1093
3.71
0.60 1.00 3.65 3.65 1.00 0.60
3.96%
-3.96%
1081 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+960
Drwg. No. DBD-AR-SD-P13P14-97 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1109
1101
12.41
1093
1081 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+970
Drwg. No. DBD-AR-SD-P13P14-98 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1109
1101
14.95
1093
0.80
0.60 1.00 3.65 3.65 1.00 0.60
1.13% -1.13%
1081 DATUM
OFFSET PGL
Revisions
Check 03 18-Dec-2021
Rev. Note Date
NSL
POWERCHINA-FWO JOINT VENTURE
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 0+980
Drwg. No. DBD-AR-SD-P13P14-99 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1109
7.00
5%
4.00
1101
15.00
1093
8.04
0.60 1.00 3.65 3.65 1.00 0.60
3.41% -3.41%
1081 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
Title
P13-P14
OFFSET
X-SECTION AT RD 0+990
Drwg. No. DBD-AR-SD-P13P14-100 Scale AS SHOWN
-32
1125
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
AGG.BC 150mm
1109
12.71
5%
1101 4.00
15.00
1093
11.57
0.60 1.00 3.65 3.65 1.00 0.60
4.00% - 4.00%
1085
DBCG LAND SURVEYOR
SCHEDULE OF AREA
Consultant
1081 DATUM
OFFSET PGL
Revisions
03 18-Dec-2021
Rev. Note Date
OFFSET SGL
Title
P13-P14
OFFSET
X-SECTION AT RD 1+000
Drwg. No. DBD-AR-SD-P13P14-101 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1117-32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 AGG.BC 150mm
5.23
5%
1101
4.00
15.00
1093
8.00
0.60 1.00 3.65 3.65 1.00 0.60
4.0% -4.0%
1085
SCHEDULE OF AREA
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 1+010
Drwg. No. DBD-AR-SD-P13P14-102 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1109
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
1105
SUB GRADE LAYERS 300mm
1097
1093
1.18
3.82% -3.82%
1085
4.50
1081
1077
SCHEDULE OF AREA
1073 DATUM
DBCG LAND SURVEYOR
Consultant
OFFSET PGL
Check
OFFSET SGL
NSL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 1+020
Drwg. No. DBD-AR-SD-P13P14-103 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1101
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
1089
The type and
stability of wall is
1.00 1.00 3.65 3.65 1.00
-0.21% 0.21%
required to be
1085 checked from the
Engineer before
execution on site.
1081
16.06
1077
1073
1069
SCHEDULE OF AREA
1065 DATUM
DBCG LAND SURVEYOR
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 1+030
Drwg. No. DBD-AR-SD-P13P14-104 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1101
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
1089
The type and
1.00 1.00 3.65 3.65 1.00
stability of wall is
-2.50% 2.50%
required to be
1085 checked from the
Engineer before
execution on site.
1081
16.06
1077
1073
1069
SCHEDULE OF AREA
1065 DATUM
DBCG LAND SURVEYOR
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 1+040
Drwg. No. DBD-AR-SD-P13P14-105 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
-32
1109
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 32 PRIME COAT
AGG.BC 150mm
1105
SUB GRADE LAYERS 300mm
1097
1093
1089
3.33
0.60 1.00 3.65 3.65 1.00 1.00
-2.50% 2.50%
1085
1081
1077
SCHEDULE OF AREA
1073 DATUM
DBCG LAND SURVEYOR
Consultant
OFFSET PGL
OFFSET SGL
Revisions
03 18-Dec-2021
Rev. Note Date
P13-P14
X-SECTION AT RD 1+050
Drwg. No. DBD-AR-SD-P13P14-106 Scale AS SHOWN