Professional Documents
Culture Documents
1_2_3_merged (7)
1_2_3_merged (7)
NOTES
B B
06-Z-301
C C
06-3"-RW-001-A3A-NI
D D
SPARE 24"
MH
2" NOZZLE
2" N6
N1
3" N5
OVER FLOW
H : AUTO STOP 06 2" HHLL = 1414 3" LINE
LS
L : AUTO RUN XXX N2 N6
HLL = 914
E E
06-T-301
LLL = 855
3"-A3A M
LLLL = 355
F F
3"-A3A
3" 06-3"-RW-002-A3A-NI
N3 FILTERED WATER
2" 3"-A3A
SHT2 2024LNG-I-PR-PID-06-009
N4
EL. (HOLD) TO RESERVE OSMOSIS PACKAGE
MULTI MEDIA FILTER MULTI MEDIA FILTER
G G
REFERENCE DRAWINGS
2"-A3A
M
H H
M
06-2"-RW-003-A3A-NI
06-3"-RW-004-A3A-NI
06-P-301A/B FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS
EXPRESSLY PERMITTED BY PT. ENVIROMATE TECHNOLOGY INTERNATIONAL.
XXXX PROJECT :
RW
DEVELOPMENT AND OPERATION OF
LNG INFRASTRUCTURE SERVICE FOR
GAS POWER PLANT IN NUSA TENGGARA CLUSTER
OWNER :
J J
TITLE :
KUPANG
NTS - 2024LNG-I-PR-PID-06-009 1OF3 1
SCALE JOB NO. DRAWING NO. SHT NO. REV.
A1 (841x594)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES
06-Z-301
WATER TREATMENT PACKAGE 1. TYPICAL DRAWING, EQUIPMENT INSIDE VENDOR BATTERY
LIMIT AREA TO BE DETAILED BY VENDOR
A A
SERVICE : SERVICE WATER
3
CAPACITY : 8.5 m /h
PUMP COMMON
RUNNING ALARM
HH H H H H H H H
06 06 06 06 06 06 06 06 06 06
LI AI AI XL AI PDI UA FI AI PI
001 006 006 006 006 001 006 001 007 001
LL COND PH SILICA L TURBIDITY
B B
06-Z-301
NOTE 1
C C
LCP
BIOCIDE DOSING PUMP
D D
BIOCIDE TANK
06
M PI
XXX
06 OXYDATOR PUMP
PI
E XXX E
HIGH PRESSURE
PUMP A 06 06 COND 06 PH 06 SiO2
FM AI AI AI
XXX XXX XXX XXX
OXYDATOR TANK
F PRODUCT WATER F
SHT3 2024LNG-I-PR-PID-06-009
TO PRODUCT WATER TANK
06 06
PI PS
06 XXX XXX 06
PT M PI
XXX XXX
G FILTERED WATER G
SHT1 2024LNG-I-PR-PID-06-009 REFERENCE DRAWINGS
FROM MULTI MEDIA FILTER
06
PI
HIGH PRESSURE XXX
PUMP B
ACID TANK
1 10 JUNE 2024 ISSUED FOR REVIEW AGG HST ISA
REY
DRAWN CHECKED APPROVED
REV DATE DESCRIPTION PREPARED
I THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT. ENVIROMATE TECHNOLOGY INTERNATIONAL, THIS I
DRAWING OR THE MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO
THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED
FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS
EXPRESSLY PERMITTED BY PT. ENVIROMATE TECHNOLOGY INTERNATIONAL.
M PROJECT :
DEVELOPMENT AND OPERATION OF
LNG INFRASTRUCTURE SERVICE FOR
GAS POWER PLANT IN NUSA TENGGARA CLUSTER
OWNER :
J J
CIP TANK
CATRIDGE FILTER CIP PUMP PT. ENVIROMATE TECHNOLOGY INTERNATIONAL
TITLE :
SW KUPANG
NTS - 2024LNG-I-PR-PID-06-009 2OF3 1
SCALE JOB NO. DRAWING NO. SHT NO. REV.
A1 (841x594)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES
B B
06
PG
068
06-Z-301 06 M 3/4"-A33Y
STR FIRE WATER
NOTE 1 001 06-3"-FW-001-A33Y-NI
SHT1 2024LNG-I-PR-PID-06-010
06-4"-SW-001-A3A-NI
3"-A33Y 3"-A33Y TO FIRE WATER TANK
4"-A3A
3/4"-A3A 06-P-302A
C C
06-3"-FW-006-A33Y-NI
D D
06
PG
069
06 M 3/4"-A33Y
STR
PRODUCT WATER 006
SHT2 2024LNG-I-PR-PID-06-009 06-4"-SW-004-A3A-NI 3"-A33Y 3"-A33Y
TO PRODUCT WATER TANK
4"-A3A
3/4"-A3A 06-P-302B
E E
PRODUCT TANK
F 06-4"-SW-001-A3A-NI F
EL. (HOLD)
06
PG
060
G
06 M 3/4"-A3A
G
STR
006 06-2"-SW-006-A3A-NI REFERENCE DRAWINGS
06-2"-SW-006-A3A-NI 2"-A3A 2"-A3A
2"-A3A 06-1 1/2"-SW-007-A3A-NI
3/4"-A3A
SERVICE WATER
06-P-303A - -
1 1/2"-A3A TO JETTY
SERVICE WATER
H 06-1 1/2"-SW-008-A3A-NI H
- -
1 1/2"-A3A TO DIESEL TANK AREA
06-2"-SW-006-A3A-NI
SERVICE WATER
06-1 1/2"-SW-009-A3A-NI
- -
1 1/2"-A3A TO OFFICE
SERVICE WATER
06-P-303B 06-1 1/2"-SW-063-A3A-NI PT. ENVIROMATE TECHNOLOGY INTERNATIONAL
- -
1 1/2"-A3A TO VENT STACK
SERVICE WATER
06-1 1/2"-SW-064-A3A-NI TITLE :
- -
1 1/2"-A3A TO SEA WATER PUMP
PIPING & INSTRUMENT DIAGRAM
K K
SERVICE WATER
FILE NAME :
KUPANG
NTS - 2024LNG-I-PR-PID-06-009 3OF3 1
SCALE JOB NO. DRAWING NO. SHT NO. REV.
A1 (841x594)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16