Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

CURICULUM VITAE

Ary Suryadi
Jl. Dwikora No.14 Rt 005/0003
Kelurahan Warudoyong 43133 Kec : Warudoyong
Sukabumi - West Java
Postal Code : 43133
Mobile : +62 81311275110
: +62 89523332139
E-mail : ary.suryadi10@gmail.com
: batara_sastramanggala@yahoo.com
`

PERSONAL INFORMATION
Name : Ary Suryadi
Place/Date of Birth : Sukabumi, Marc 09th 1978
Sex : Male
Marital status : Married
Region : Moslem
Interest : Reading, Traveling, Internet Browsing,playing Music, and Sport.
Strong Point : Hard worker, High responsibility, Motivated, Innovative, Creativity

EDUCATION
Formal Education:
2002 - 2005 : STT Mandala Bandung, Civil Engineering Faculty, Graduate (S1)
1996 - 2001 : Winaya Mukti University Bandung, Civil Engineering Faculty, Graduate (D3)
1993 - 1996 : SMA Negeri I Sukabumi, Graduate
1990 - 1993 : SMP Negeri I Cisaat Sukabumi, Graduate
1984 - 1990 : SD Negeri Gunung Jaya Sukabumi, Graduate

WORK EXPERIENCE :
2001 : Overlay Road Simpang Dago-Rancakendal(1.2 km); Dinas Bina Marga Kota Bandung; Biro
Asri, PT.; (Supervisor)
2006 : Supervision of Elementary School Construction; Dinas Permukiman dan Tata Wilayah
Kabupaten Bandung; Niaga konsultan, CV.;( Team Leader)
2006 : Detailed Engineering Design of Elementary School; Dinas Permukiman dan Tata Wilayah
Kabupaten Bandung; Niaga konsultan, CV.;( Estimator)
2006 : Detailed Engineering Design of Hospital; Dinas Permukiman dan Tata Wilayah Kabupaten
Bandung; Bina Karya, PT.; (Estimator)
2007 : Detailed Engineering Design of Pengadilan Tinggi Garut; Dinas Tata Wilayah Kabupaten
Garut; Empat Petulai, CV.; (Estimator)
2007 : Detailed Engineering Design of Town Park; Dinas Permukiman dan Tata Wilayah Kabupaten
Cianjur; Cipta Karya, PT.; (Estimator)
2007 : Detailed Engineering Design of Office Building ; Dinas Permukiman dan Tata Wilayah Kota
Bajar; Mabua, CV.; (Estimator)
2007 : Detailed Engineering Design of BB POM ; Dinas Tata Wilayah Kota Bandung; Wina Guna
Sarana Teknik, CV.; (Estimator)
2008 : Andhika Mitra Teknik, PT.; (Estimator, Drafter, Asistant Site Manager)
2008 : Dualization Huraymla-Saqrha, Durma-Saqrha (±200 km);Ministri Kingdon of Arab Saudi,Al-
Baier, EST.Wonjin Korea JV; (Site Engineer Equipment & Workshop)
2009 : Toll Road Kanci-Pejagan (35 km);Semesta Marga Raya PT, Bakrie Toll Road ;Adhi Karya
Tbk, PT.; (Supervisior)
2010 : Internal Road and Drainage Gandaria City ;Artistan Wahyu PT, Pakuwon Group ;Trimustika
Perkasa, PT.; (Quantity Surveyor)
2011 : Bangun Indah Graha PT.; (Estimator & Quantity Surveyor)
2011 : Road Construction Usku – Mamberamo – Tengon new thrase (5 km) ; Dinas Pekerjaan
Umum Jayapura Provinsi Papua ; Paesa Pasindo Engineering, PT ; (Engineering Manager)
2011 : Road Construction Usku – Mamberamo (APBN-P) new thrase (1.2 Km) ; Dinas Pekerjaan
Umum Jayapura Provinsi Papua ; Paesa Pasindo Engineering, PT ; (Engineering Manager)
2012 : Road Construction Depapre – Bongkang(MYC) (12 km) ; Dinas Pekerjaan Umum Jayapura
Provinsi Papua ; Paesa Pasindo Engineering, PT ; (Engineering Manager)
2012 : Widening Toll Road Pasteur-Kopo ( 8.85 km) ; Jasa Marga PT (Tbk) ; Nindya Karya, PT ;
(Quantity Surveyor)
2013 : Renovation of Tol Gate ; Jasa Marga PT (Tbk) ; Multi Karya Cemerlang, PT ; (Quantity
Surveyor)
2013 : Bridge Construction of Cikampek-Palimanan Toll Road ; Lintas Marga Sedaya, PT ;
Lancarjaya Mandiri Abadi , PT ; (Engineering Manager)
2013- 2016 : Kwarta Sukses Abadi, PT ; (Engineering Manager)
2016- 2018 : Widening Toll Road Waru-Sidoarjo ( 12.25 km) ; Jasa Marga PT (Tbk) ; Jasa Layanan
Pemeliharaan, PT ; (Site Engineer)
2018- 2019 : Widening Ramp 2 Penjaringan ( 0.75 km) & Widening Tollgate Cenkareng 2 ; Jasa
Marga PT (Tbk) ; Jasa Marga Tollroad Maintenace, PT ; (Site Engineer)
2019- 2021 : Bridge Construction of SUMO, KLBM Toll Road, PT ; Waskita Bumi Wira ; nSB
Inako Prima, PT ; (Site Engineer)
2021 : Relocation Of Bridge Flyover Cibiru DK 141+298 (Jakarta-Bandung High-Speed Railway) ;
Kereta Cepat Indonesia China, PT ; Wasaka Tomo Engineering , PT ; (Deputy Project
Manager)
2022 – at present: Toll Road Serpong - Balaraja (5 km); Trans Balaraja Serpong PT, ;Nusa Raya
Cipta, PT.; (Construction Manager)

SKILLS AND QUALIFICATIONS


Good Knowledge Drawing
Able to operate software application such as
- MS Office
- Power Point
- MS Project
- AUTOCAD
- MS Visio
- Sap 2000
Good Knowledge on internet.

You might also like