Download as pdf or txt
Download as pdf or txt
You are on page 1of 22

-28

1200
-24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

1196 TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1192

ROAD PAVEMENT DETAIL

1188

1184

12.97
1180

3.57
0.60 1.00 3.65 3.65 1.00
1176
-2.50% 1.67%

1172

1168

1164
SCHEDULE OF AREA
DBCG LAND SURVEYOR

Consultant
1160 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M LONE Verified
Checked Approved
NSL

Title

P15-P16
OFFSET

X-SECTION AT RD 0+000
Drwg. No. DBD-AR-SD-P15P16-00 Scale AS SHOWN
AWC 50mm
TACK COAT
-28
1200
-24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1196 SUB GRADE LAYERS 300mm

7.77
ROAD PAVEMENT DETAIL

1192
4.00

1188

1184

15.00

1180

4.83
0.60
1176 1.00 3.65 3.65 1.00
-3.00% 3.00%

1172
SCHEDULE OF AREA

1168 DATUM
DBCG LAND SURVEYOR
OFFSET PGL

Consultant
OFFSET SGL

Revisions
00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
NSL

CONTRACT NO. MW-1


Drawn M LONE Verified
Checked Approved
OFFSET

Title

P15-P16
X-SECTION AT RD 0+010
Drwg. No. DBD-AR-SD-P15P16-01 Scale AS SHOWN
AWC 50mm

-28
1200
-24 -20 -16 -12 -8 -4 ℄
0 4 8 12 16 20 24 28
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1196 SUB GRADE LAYERS 300mm

9.37
ROAD PAVEMENT DETAIL
1192
4.00

1188

1184

15.00

12.66
1180

0.60 1.00 3.65 3.65 1.00


1176 3.00%
-3.00%

1172
SCHEDULE OF AREA

1168 DATUM
DBCG LAND SURVEYOR

Consultant
OFFSET PGL

Revisions
OFFSET SGL

00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
NSL

CONTRACT NO. MW-1


Drawn M LONE Verified
Checked Approved
OFFSET

Title

P15-P16
X-SECTION AT RD 0+020
Drwg. No. DBD-AR-SD-P15P16-02 Scale AS SHOWN
-28
1208
-24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

1204 TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1200

ROAD PAVEMENT DETAIL

12.33
1196

1192 4.00

1188

1184
15.00

12.56
1180

0.60 1.00 3.65 3.65 1.00


1176 -3.00% 3.00%

1172
SCHEDULE OF AREA
DBCG LAND SURVEYOR

Consultant
1168 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M LONE Verified
Checked Approved
NSL

Title

P15-P16
OFFSET

X-SECTION AT RD 0+030
Drwg. No. DBD-AR-SD-P15P16-03 Scale AS SHOWN
-28
1208
-24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

1204 TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1200

ROAD PAVEMENT DETAIL

13.92
1196

1192 4.00

1188

1184
15.00

10.56
1180

0.60
1.00 3.65 3.65 1.00
1176 -3.00% 3.00%

1172
SCHEDULE OF AREA
DBCG LAND SURVEYOR

Consultant
1168 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M LONE Verified
Checked Approved
NSL

Title

P15-P16
OFFSET

X-SECTION AT RD 0+040
Drwg. No. DBD-AR-SD-P15P16-04 Scale AS SHOWN
-28
1208
-24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

1204 TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1200

15.95
ROAD PAVEMENT DETAIL

1196

1192 4.00

1188

1184
15.00

1180

5.64
0.60 1.00 3.65 3.65 1.00

3.22%
1176 -3.22%

1172
SCHEDULE OF AREA
DBCG LAND SURVEYOR

Consultant
1168 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M LONE Verified
Checked Approved
NSL

Title

P15-P16
OFFSET

X-SECTION AT RD 0+050
Drwg. No. DBD-AR-SD-P15P16-05 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
-32
1188
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1184

ROAD PAVEMENT DETAIL


1180

1176

1172

12.220
1168

0.60 1.00 3.65 3.65 1.00

2.891
1164 3.85% -3.85%

1160
SCHEDULE OF AREA

1156 DATUM

DBCG LAND SURVEYOR


OFFSET PGL

Consultant
OFFSET SGL

Revisions
00 26-10-2021

Check NSL Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M.LONE Verified


Checked Approved
Title

P15-P16
X-SECTION AT RD 0+310
Drwg. No. DBD-AR-SD-P15P16-31 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


-32
1184
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 (MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1180
ROAD PAVEMENT DETAIL

1176

1172

11.20
1168

1164 0.60 1.00 3.65 3.65 1.00


3.55% -3.55%

1160
SCHEDULE OF AREA

1156 DATUM
OFFSET PGL

DBCG LAND SURVEYOR

Consultant
OFFSET SGL

Revisions
00 26-10-2021
Rev. Note Date
NSL

POWERCHINA-FWO JOINT VENTURE


OFFSET

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.LONE Verified
Checked Approved
Title

P15-P16
X-SECTION AT RD 0+320
Drwg. No. DBD-AR-SD-P15P16-32 Scale AS SHOWN
-32
1204
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1200 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

9.68
1196
SUB GRADE LAYERS 300mm

4.00

1192 ROAD PAVEMENT DETAIL

1188

15.00
1184

1180
4.00

1176

1172
15.00

1168

1164
0.60 1.00 3.65 3.65 1.00
3.24% -3.24%

DBCG LAND SURVEYOR


1160
Consultant
SCHEDULE OF AREA

1156 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.LONE Verified
Check NSL Checked Approved
NSL

Title

P15-P16
OFFSET

X-SECTION AT RD 0+330
Drwg. No. DBD-AR-SD-P15P16-33 Scale AS SHOWN
1208
-36 -32 -28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1204
AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

14.85
1200
SUB GRADE LAYERS 300mm

1196
ROAD PAVEMENT DETAIL
4.00

1192

1188

15.00
1184

1180

4.00

1176

1172
15.00

1168

1164

3.18
0.60 1.00 3.65 3.65 1.00
3.00% -3.00% DBCG LAND SURVEYOR

Consultant
1160
SCHEDULE OF AREA

1156 DATUM

Revisions
OFFSET PGL

00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.LONE Verified
Checked Approved
Title
NSL

P15-P16
X-SECTION AT RD 0+340
OFFSET

Drwg. No. DBD-AR-SD-P15P16-34 Scale AS SHOWN


-32
1204
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
1200
AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

10.24
1196
SUB GRADE LAYERS 300mm

4.00

1192 ROAD PAVEMENT DETAIL

1188

15.00
1184

1180

4.00

1176

1172
15.00

1168

1164
0.60 1.00 3.65 3.65 1.00

1.52
3.00% -3.00%

DBCG LAND SURVEYOR


1160 Consultant
SCHEDULE OF AREA

1156 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked Approved
Title
NSL

P15-P16
X-SECTION AT RD 0+350
OFFSET

Drwg. No. DBD-AR-SD-P15P16-35 Scale AS SHOWN


-32
1196
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28

AWC 50mm

4.06
TACK COAT
ABC 80mm
4.00 PRIME COAT

AGG.BC 150mm
1192
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1188

ROAD PAVEMENT DETAIL

15.00
1184

1180

4.00

1176

1172 15.00

1168

1164
0.60 1.00 1.00
3.65 3.65
1.60% -1.60%

1160
SCHEDULE OF AREA
DBCG LAND SURVEYOR

Consultant
1156 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKAR Verified
Checked Approved
NSL

Title

P15-P16
OFFSET

X-SECTION AT RD 0+360
Drwg. No. DBD-AR-SD-P15P16-36 Scale AS SHOWN
-32
1192
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1188
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1184

ROAD PAVEMENT DETAIL

9.18
1180

4.00

1176

1172

1168 15.00

1164
0.60 1.00 3.65 3.65 1.00

-1.20% 1.20%

1160

7.00
1156
SCHEDULE OF AREA
DBCG LAND SURVEYOR

Consultant
1152 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKAR Verified
Checked Approved
NSL

Title

P15-P16
OFFSET

X-SECTION AT RD 0+370
Drwg. No. DBD-AR-SD-P15P16-37 Scale AS SHOWN
-32
1188
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1184
SUB GRADE LAYERS 300mm

1180

6.85
ROAD PAVEMENT DETAIL

4.00

1176

1172
General Note for RD 0+370
& 0+380:
Such a high wall is not

15.00
1168 feasible to build.
Need/provision of retaining
wall at this location shall be
1164
decided by the Engineer at
Site in consultation with the
0.60 1.00 3.65 3.65 1.00
4.00%
design office.
-4.00%

1160

10.00
1156
SCHEDULE OF AREA

DBCG LAND SURVEYOR


1152 DATUM
Consultant
OFFSET PGL

Revisions
OFFSET SGL

00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
NSL

Drawn M.ABUBAKAR Verified


Checked Approved
OFFSET

Title

P15-P16
X-SECTION AT RD 0+380
Drwg. No. DBD-AR-SD-P15P16-38 Scale AS SHOWN
-32
1188
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1184

SUB GRADE LAYERS 300mm

1180
ROAD PAVEMENT DETAIL

4.38
4.00

1176

1172

15.00
1168

5.32
1164
0.60 1.00 3.65 3.65 1.00

-4.00% 4.00%

1160

1156
SCHEDULE OF AREA

DBCG LAND SURVEYOR


1152 DATUM
Consultant
OFFSET PGL

Revisions
OFFSET SGL

00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
NSL

Drawn M.ABUBAKAR Verified


Checked Approved
OFFSET

Title

P15-P16
X-SECTION AT RD 0+390
Drwg. No. DBD-AR-SD-P15P16-39 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm

-32
1184
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

1180 SUB GRADE LAYERS 300mm

ROAD PAVEMENT DETAIL


1176

1172

13.92
1168

1164

3.75
0.60 1.00 3.65 3.65 1.00

-4.00% 4.00%

1160

1156
SCHEDULE OF AREA

1152 DATUM

DBCG LAND SURVEYOR


OFFSET PGL

Consultant
OFFSET SGL

Revisions
00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M.ABUBAKAR Verified


Checked Approved
Title

P15-P16
X-SECTION AT RD 0+400
Drwg. No. DBD-AR-SD-P15P16-40 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
-32
1188
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1184

ROAD PAVEMENT DETAIL


1180

8.602
1176

4.000

1172

1168
15.000

1164

1160
0.60 1.00 3.65 3.65 1.00
1.33% -2.50% SCHEDULE OF AREA

1156 DATUM

DBCG LAND SURVEYOR


OFFSET PGL

Consultant
OFFSET SGL

Revisions
00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M.LONE Verified


Checked Approved
Title

P15-P16
X-SECTION AT RD 0+510
Drwg. No. DBD-AR-SD-P15P16-51 Scale AS SHOWN
-32
1188
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28

AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

1184 TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1180

12.446
ROAD PAVEMENT DETAIL

1176

4.000

1172

1168

15.000
General Note:
1164
Such a high wall is not feasible to
build.
Need/provision of retaining wall at this
1160 location shall be decided by the
0.60 1.00 3.65 3.65 1.00
2.50% 0.500
Engineer at Site in consultation with
-2.50%
the design office.
1156

1152

18.00
1148 DBCG LAND SURVEYOR
SCHEDULE OF AREA Consultant

1144 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


OFFSET SGL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
Drawn M.LONE Verified
Check NSL,
Checked Approved
1162.99?
NSL

Title

P15-P16
X-SECTION AT RD 0+520
OFFSET

Drwg. No. DBD-AR-SD-P15P16-52 Scale AS SHOWN


-32
1188
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm
1184
TOP OF SUB GRADE LEVEL
(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1180

10.892
ROAD PAVEMENT DETAIL

1176

4.000

1172

1168

15.000
1164

1160
0.60 1.00 3.65 3.65 1.00

2.50% -2.50%

1156

1152
SCHEDULE OF AREA
DBCG LAND SURVEYOR

Consultant
1148 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUBAKR Verified
Checked Approved
NSL

Title

P15-P16
OFFSET

X-SECTION AT RD 0+530
Drwg. No. DBD-AR-SD-P15P16-53 Scale AS SHOWN
-32
1184
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


1180 (MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1176

7.318
ROAD PAVEMENT DETAIL

4.000
1172

1168

15.000
1164

1160

2.92
0.60 1.00 3.65 3.65 1.00
-0.50% 0.50%
1156

1152

1148
SCHEDULE OF AREA DBCG LAND SURVEYOR

Consultant

1144 DATUM
OFFSET PGL

Revisions
00 26-10-2021
Rev. Note Date
OFFSET SGL

POWERCHINA-FWO JOINT VENTURE


DIAMER BASHA DAM PROJECT
CONTRACT NO. MW-1
Drawn M.ABUAKAR Verified
Checked Approved
NSL

Title

P15-P16
OFFSET

X-SECTION AT RD 0+540
Drwg. No. DBD-AR-SD-P15P16-54 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT
-32
1136
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28 AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1132

ROAD PAVEMENT DETAIL


1128

1124

1.00 1.00 3.65 3.65 1.00 0.60

-2.50% 2.50%
1120

1116

1112

1108
SCHEDULE OF AREA

1104 DATUM

DBCG LAND SURVEYOR


OFFSET PGL

Consultant
OFFSET SGL

Revisions
00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M.ABUBAKR Verified


Checked Approved
Title

P15-P16
X-SECTION AT RD 1+000
Drwg. No. DBD-AR-SD-P15P16-100 Scale AS SHOWN
AWC 50mm
TACK COAT
ABC 80mm

-32
1136
-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


(MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm


1132

ROAD PAVEMENT DETAIL


1128

1124

0.60 1.00 1.00


3.65 3.65

2.57
1120 -2.50% 2.50%

1116

1112

1108
SCHEDULE OF AREA

1104 DATUM

DBCG LAND SURVEYOR


OFFSET PGL

Consultant
OFFSET SGL

Revisions
00 26-10-2021
Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


NSL

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
OFFSET

Drawn M.ABUBAKR Verified


Checked Approved
Title

P15-P16
X-SECTION AT RD 1+010
Drwg. No. DBD-AR-SD-P15P16-110 Scale AS SHOWN