1154

-28 -24 -20 -16 -12 -8 -4 ℄0 4 8 12 16 20 24 28


AWC 50mm
TACK COAT
ABC 80mm
PRIME COAT

AGG.BC 150mm

TOP OF SUB GRADE LEVEL


1150 (MIN. CBR 30 AT 98% MDD.)

SUB GRADE LAYERS 300mm

1146
ROAD PAVEMENT DETAIL

1142

1138

1134

1.00 3.65 3.65 1.00 0.60

2.73
2.50%
-2.50%
2
1130 1

1126

1122
SCHEDULE OF AREA
10.491 m²
DBCG LAND SURVEYOR
2.857 m²
1118 DATUM Consultant
-6.314 1129.593

-4.650 1130.145 -4.650 1130.425


-3.670 1129.680 -3.650 1130.120 -3.650 1130.400

1130.309

1130.218
1130.193
1130.178
OFFSET PGL

1130.029 0.000

1129.938 3.650
4.650
1129.892 5.250

Revisions
1129.460
1132.860

00 04-May-2021
OFFSET SGL

Rev. Note Date

POWERCHINA-FWO JOINT VENTURE


1130.230 0.000

1131.480 3.650

5.486
6.350
7.200

DIAMER BASHA DAM PROJECT


CONTRACT NO. MW-1
-22.860 1133.110

-21.270 1131.190

-17.830 1130.680

-10.080 1129.470

1133.010

10.600 1134.040

13.160 1134.770

15.400 1136.980

18.750 1136.980
Drawn M.Safdar Verified
NSL

Checked Approved
Title
OFFSET

P29-P30
0.000

3.620

7.590

X-SECTION AT RD 0+000
Drwg. No. DBD-AR-SD-P29P30-01 Scale AS SHOWN