Date: 11.03.2024
Department: Production
Unit: MTBE
Scenario: Instrument Air failure
Introduction:
Methodology:
1. INCIDENT FACTS:
Date: 11.03.2024
Time: 10.30 hrs
Shift in charge (SIC): Vamsi Krishna
Mock Drill Observer (External): Ravi Bhushan
Panel Operator (PO): PR Mehta
Field operators: LR Patel
Pump Operator: Saddam Hussain
2. INCIDENT DESCRIPTION:
3 Stop feed to surge drum. Divert FCC LPG to Field 10:32 10:40 Done
OM&S directly from B/L. Operator/Panel HRS HRS
Operator
4 Stop C-1 reflux pump, Isolate steam to E-1, Pump/Field 10:40 10:50 Done
E-6, E-9, E-15 and E-20. Operator HRS HRS
5 Stop C-3 reflux pump, C-5 reflux pump & C-5 Pump Operator 10:50 10:55 Done
bottom pump. HRS HRS
6 Close all B/L b/vs. i.e. feed to unit, DM water Field Operator 11:00 11:05 Done
to unit,C-1 bottom. To B/L,C-1 top to HRS HRS
B/L.,MTBE to R/D at B/Land C-6 bottom to
r/d at B/L.
7 Keep watch on columns pressure. Open PSV Panel operator 11:05 11:10 Done
by pass if Pressure increases beyond limit. HRS HRS
8 Keep unit under bottled up condition. Panel/Pump/Field 11:10 11:30 Done
Operator HRS HRS
3. SHORTCOMINGS:-
PATH FROM CHECK N CHANGE ROOM TO PUMP HOUSE WAS FOUND CROWDED DUE
TO NBA PROJECT
POOR FUNCTIONING OF WALKIE- TALKIE OBSERVED.
4. OBSERVATIONS / COMMENTS
PERFORMANCE OF OPERATORS FOUND SATISFACTORY.
ALL EMERGENCY STEPS WERE TAKEN BY OPERATOR CORRECTLY.