40TY4643-00201
40TY4643-00201
B C D E F G H I J
PN
3" 0°
44'5
18° PREVAILING WIND
TN
25 THK.(TYP)
25 THK.(TYP)
25 THK.(TYP)
7 OF PILECAP & PEDESTAL OF PILECAP & PEDESTAL OF PILECAP & PEDESTAL OF PILECAP & PEDESTAL OF PILECAP & PEDESTAL OF PILECAP & PEDESTAL 7
180
(TYP)
(TYP)
P2 IJ(TYP) P2 P1 EL+0.000 P1 IJ(TYP) P1 EL+0.000 P2 IJ(TYP) P2 EL+0.000
75
75
75
(HPP) (HPP) (HPP) SR. DRAWING NO. TITLE
EL.-0.400 EL.-0.400 EL.-0.400
NO.
(TOC) (TOC) (TOC) TAB AND ACRU UNIT STANDARD DRAWING FOR
600
600
600
GB9/GB10 CJ(TYP) GB6/GB7 CJ(TYP) GB2/GB3 CJ(TYP) GB8/GB11 1 00TY4610-00001 & 00002 CONCRETE STRUCTURE GENERAL NOTES , ABBREVATION
PILE CUT OFF PILE CUT OFF PILE CUT OFF
LEVEL LEVEL LEVEL AND SYMBOLS
(TYP)
(TYP)
(TYP)
EL.-1.000 EL.-1.000 EL.-1.000
(TYP)
(TYP)
(TYP)
TAB AND ACRU UNIT STANDARD DRAWING FOR PILE HEAD
75
75
75
50
50
50
(BOF) (BOF) (BOF) 2 00TY4611-00003 & 00004
DETAILS
50 THK. LEVELLING 50 THK. LEVELLING 50 THK. LEVELLING TAB AND ACRU UNIT STANDARD DRAWING FOR CONCRETE
50 3500 4000 50 5000 50 4000 3 00TY4611-00013
CONCRETE CONCRETE CONCRETE PEDESTAL REINFORCEMENT DETAILS
(TYP) (TYP) (TYP)
TAB AND ACRU UNIT STANDARD DRAWING FOR CONCRETE
6 SECTION A-A SECTION B-B SECTION C-C 4 00TY4610-00005
STRUCTURE ANCHOR BOLTS FOR STEEL STRUCTURE
6
(SHOWING GENERAL ARRANGEMENT DETAILS) (SHOWING GENERAL ARRANGEMENT DETAILS) (SHOWING GENERAL ARRANGEMENT DETAILS)
SCALE 1:50 SCALE 1:50 SCALE 1:50 STANDARD DRAWING FOR PILE CAP DETAILS FOR
5 00TY4610-00007 400 SQUARE PILE-TYPE PC1, PC2, PC3
25 THK.(TYP)
25 THK.(TYP)
OF PILECAP & PEDESTAL OF PILECAP & PEDESTAL OF PILECAP & PEDESTAL OF PILECAP & PEDESTAL 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS, CO-ORDINATES ARE IN METERS
UNLESS NOTED OTHERWISE.
2. PLANT DATUM ELEVATION EL. 0.000 CORRESPONDS TO +37.5M ABOVE MEAN SEA LEVEL
(MSL)
EL.+0.275 EL.+0.275 3. HPP ELEVATION EL. +0.000 FOR TAB AREA.
(TOC) (TOC) 4. MATERIAL
CONCRETE (AT 28 DAYS) fc=280 kg/cm2 (CAST IN PLACE)
(TYP)
(TYP)
P1 IJ(TYP) P1 EL+0.000 P1 IJ(TYP) P1 EL+0.000
75
75
(HPP) (HPP) LEVELLING CONCRETE (AT 28 DAYS) fc=175 kg/cm2
EL.-0.400 EL.-0.400 REINFORCING BAR TIS 24-2559 GRADE SD 40 (fy=4000 kg/cm2 )
(TOC) (TOC) GROUT NON SHRINK CEMENT BASED OF MAKE SIKA.
600
600
CJ(TYP) GB1/GB5 CJ(TYP) GB4 SIKA GROUT - 220 OR EQUIVALENT
5 PILE CUT OFF PILE CUT OFF 5. PRE-TENSIONED SQUARE CONCRETE PILE CONFIRMING TO TIS 396-2549 SHALL BE USED. 5
LEVEL LEVEL
E 2179.862
(TYP)
(TYP)
EL.-1.000 EL.-1.000
(TYP)
(TYP)
7. PILE DETAILS SHALL BE REFERED FROM PILE CONTRACTOR'S DRAWING.
75
75
50
50
(BOF) (BOF) 8. CONCRETE ABOVE GROUND SHALL HAVE 25MM CHAMFER ON EDGES.
9. TOP REBAR TO BE ADJUSTED TO CLEAR EMBEDDED ANCHOR BOLT/POCKET.
50 THK. LEVELLING 50 THK. LEVELLING
50 4000 50 4000
CONCRETE CONCRETE
B B
(TYP) (TYP) LEGEND
600 1200 600 600
== (TYP) == (TYP) (TYP)
SECTION D-D SECTION E-E HPP - HIGHEST POINT OF PAVING Li : MINIMUM PILE IMMERSION DEPTH
(SHOWING GENERAL ARRANGEMENT DETAILS) (SHOWING GENERAL ARRANGEMENT DETAILS) TOC - TOP OF CONCRETE : 300 PC PILE
SCALE 1:50 SCALE 1:50
A5 N 2045.280 D GB1 D A5
BOF - BOTTOM OF FOUNDATION : 400 PC PILE
(TYP) = =
EL - ELEVATION
PR221 PR221
P.C.O.EL - PILECUT OFF ELEVATION P 1
PC2 P1 PC2 P1 P352 P354
500
(ANCHOR BAY)
SQ - SQUARE
CJ - CONSTRUCTION JOINT PC 1
GB2
5000
5000
GB3
(HPP) PR-221
PR221 PR221 CONCRETE AND REBAR QUANTITY
900
PC1 P1 PC1 P1 P355 P356 (THIS IS DESIGN MTO CUTTING / WASTAGE NOT CONSIDERED)
(TYP)
1000
3500.0000
3
CONCRETE QUANTITY (M )
B B
(TYP)
DOWEL BAR
75
4-DB20
UP
STRUCTURAL CONCRETE -
2000.0000
3
EL.-1.000 3500.0000
LEVELLING
75
10000
10000
A A
2000 TYPICAL SECTION FOR DB20 -
==
(TYP) (DOWEL BAR) TENSION PILE
D GB5 D
(TYP)
A3 A3
1000
SCHEDULE OF GRADE BEAM A 29/05/2024 IDC FOR IDC RPM R.K/C.S S.T/V.P K.Y
==
PR221 PR221
PC1 P1 PC1 P1 P357 P358 P359 P360 REV. DATE STAGE PURPOSE PREP CHKD APVD AUTHD
PC BEAM MARK SIZE (WxD) NOS. TOP OF BEAM
4000
300x600
GB6
GB7
150 (MIN)
550 == DOWEL BAR
2
== (TYP)
(TYP) SCHEDULE OF PEDESTAL 2
A2 C GB8 C A2
Denka SCGC Advanced Materials CO., LTD
==
150 (MIN)
PC1 P2 P361 P362
(TYP)
PC1 P2
450
P1 500X600 06
==
SECURITY LEVEL: 2
3500
3500
GB9
GB10
P2 450X550 04
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF TOYO ENGINEERING CORPORATION.
THIS DRAWING OR THE MATERIAL DESCRIBED THEREON SHALL NOT BE COPIED OR DISCLOSED
IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR
A1 C GB11 C A1 SCHEDULE OF PILE CAP WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY TOYO ENGINEERING CORPORATION.
PR221 PR221
PC1 P2 PC1 P2 P363 P364 TYP ELEVATION OF PILE TYP PLAN FOR PILECAP MARK SIZE NOS. TOYO WORK NO. CLIENT'S WORK NO.
4000 4000 (SCALE : N.T.S.) (DOWEL BAR) TENSION PILES PC1 1000x1000x600 06
TOYO BA1347
A A
PC2 2000x1500x600 04
TAB UNIT
1 2 1 2
PR221 PR221 PR221 PR221
PIPE RACK PR221 LAYOUT & DETAILS OF
1 1
SCHEDULE OF PC DRIVEN PILE PILE, PILECAP, GRADE BEAM & PEDESTAL
NO. MINIMUM PILE LENGTH OF PILE Equipment No. System No. FWBS AWBS
LAYOUT OF PILECAPS & GRADE BEAMS LAYOUT OF PILES PILE MARK OF
PILE SIZE
IMMERSION PILE BELOW CUTOFF REMARKS - - - -
(MM) LEVEL
PILES DEPTH 'Li' (M) CUTOFF LEVEL (M) PROJECT
SCALE REV.
DWG. No.
40TY4643-00201
__ 1:100
P351 TO P364 14 400X400 8 7.075 EL.-0.925
@A1 FILE NAME A
A B C D E F G H I J