ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

HSEIA SCREEENING REPORT

PLANT: COMMON

0 14-03-2021 Final Issue (FI) US AA PTS


B 24-02-2021 Issued for Approval (IFA) SS AA PTS

A 04-02-2021 Issued for Client Review (ICR) SS AA PTS

PREPARED CHECKED APPROVED


REV. DATE PURPOSE OF ISSUE
CONSULTANT

CONSULTANT Doc. No. Document No. Doc. Class No. of Pages


3415076 RPT-7006-GG-01-61-00-004 2 63
NOTICE: THIS DOCUMENT AND THE INFORMATION IT CONTAINS IS THE SOLE PROPERTY OF
ADNOC GAS PROCESSING. IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
HOLD LIST

S. No. Hold Points

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 2 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
REVISION HISTORY

Rev
Section or Page
. Date Description of Change
Revised
No.

A 04-02-2021 - Issued For Client Review

B 24-02-2021 - Issued For Client Approval

0 14-03-2021 - Final issue

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 3 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

TABLE OF CONTENTS

1. PROJECT DESCRIPTION.......................................................................................................
1.1 Introduction....................................................................................................................
1.2 Project Objective and Scope.........................................................................................
1.3 Purpose of this Document.............................................................................................
2. DEFINITIONS & ABBREVIATIONS.....................................................................................
2.1 Definitions......................................................................................................................
2.2 Abbreviations.................................................................................................................
3. REFERENCE DOCUMENTS...................................................................................................
3.1 Order of Precedence.....................................................................................................
3.2 References....................................................................................................................
4. SCOPE AND OBJECTIVES.....................................................................................................
4.1 Objective and Scope of HAZID/ENVID/OHID Study.....................................................
4.2 Objective of HSEIA Screening Study............................................................................
5. WORKSHOP SUMMARY AND RECOMMENDATIONS..................................................
5.1 HAZID Summary and Findings......................................................................................
5.2 ENVID Summary and Findings...................................................................................
5.3 OHID Findings.............................................................................................................
6. HSEIA SCREENING LIST.....................................................................................................
6.1 Control Of Major Accident Hazard (COMAH) Screening............................................
6.2 Environmental Screening............................................................................................
6.3 Occupational Health Screening...................................................................................
7. LIST OF HSE STUDIES..........................................................................................................
8. CONCLUSION.........................................................................................................................
ATTACHMENT 1 – HAZID WORKSHEET....................................................................................
ATTACHMENT 2 – ENVID WORKSHEET....................................................................................
ATTACHMENT 3 – OHID WORKSHEET......................................................................................

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 4 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
1. PROJECT DESCRIPTION

1.1 Introduction

The Habshan & Bab Gas Complex is a set of gas processing facilities operated by ADNOC
Gas Processing (AGP) and located approximately 140km southwest of the city of Abu Dhabi.
The first plant in the complex was commissioned almost four decades ago. Since then, several
other plants were added to the complex making it one of the largest gas processing facilities in
the world.

In order to ensure the continued viability of Habshan and Bab Gas Complex, ADNOC Gas
Processing regularly reviews the installed equipment and systems, and carries out necessary
refurbishments, upgrades, replacements and additions to ensure that the facilities can be
operated in a safe, sustainable and efficient manner. This project is a continuation of these
efforts.

ADNOC Gas Processing (hereinafter referred to as COMPANY) has assigned M/s Bilfinger
Tebodin Middle East Ltd. (hereafter referred to as CONSULTANT) to carry out Front End
Engineering & Design (FEED) and Detail Engineering for the Project to enable COMPANY to
engage a Procurement & Construction (PC) CONTRACTOR to execute the Project.

CONSULTANT shall perform Engineering for the PROJECT as per Scope of Services under
the framework Agreement No. TE.18.048 (J) / 2018-21 /SRC/021. CONSULTANT shall carry
out Engineering for the project to enable COMPANY to engage a Procurement & Construction
(PC) CONTRACTOR to execute the PROJECT without further detailed engineering.

1.2 Project Objective and Scope

The objective of the project is to ensure safety and security of personnel and buildings by
providing adequate public address system annunciation, safety monitoring and incident review
capability, and controlled access to critical buildings by implementing/enhancing the Public
Address, CCTV and Access Control Systems in accordance with international codes,
standards, HSE and Electronic Security requirements.

The scope includes the following main items, in addition to all associated multi-disciplinary
works:

 New CCTV and Access Control Systems in Habshan & Bab Process Buildings

 Existing CCTV System Enhancement in Habshan & Bab Plant Areas

 New Public Address System in Bab Plant Area & Residential Complex

 Existing Public Address System Enhancement in process area of Habshan-3

 Integration of the above system including Security LAN and Video Analytics

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 5 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 6 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
1.3 Purpose of this Document

The purpose of this document is to present the findings of the HSEIA screening report for the
Habshan and Bab Telecom Systems Upgrade Project.

2. DEFINITIONS & ABBREVIATIONS

2.1 Definitions

AGREEMENT Contract (Agreement No. TE.18.048 (J) / 2018-21/SRC/021)


between COMPANY and CONSULTANT for the implementation
of PROJECT as per the Contract Terms & Conditions

COMPANY ADNOC Gas Processing

CONSULTANT Bilfinger Tebodin Middle East Ltd.

HSE CONSULTANT Velimor UK Limited Representing GHRDC

SUBCONTRACTOR The party(s) to whom any part of PROJECT has been


subcontracted by CONSULTANT

PROJECT Habshan and Bab Telecom Systems Upgrade Project No. 7006

VENDOR The party which manufactures or supplies the material /


MANUFACTURER equipment, and / or provides technical documents / drawings and
services to perform the duties specified by CONTRACTOR

CONTRACTOR The party which carries out all or part of the procurement,
construction, commissioning or management of the PROJECT.

SHALL Indicates a mandatory requirement

SHOULD Indicates a strong recommendation to comply with the


requirements of this document

2.2 Abbreviations

Abbreviation Full Name

ADNOC Abu Dhabi National Oil Company

CCTV Closed Circuit Television

COMAH Control Of Major Accident Hazard

DGS Design General Specification

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 7 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Abbreviation Full Name

ENVID Environmental Impact Identification

EPC Engineering, Procurement and Construction

ERP Emergency Response Plan

FEED Front End Engineering Design

FRP Facility Response Plan

F&G Fire & Gas

HAZID Hazard Identification

HSE Health Safety Environment

HSEIA Health, Safety and Environmental Impact Assessment

LH Likelihood of Harm

LOC Loss Of Containment

MAH Major Accident Hazard

MH Material Handling

OHID Occupational Health Identification

PPE Personnel Protective Equipment

SIMOPS Simultaneous Operations

3. REFERENCE DOCUMENTS

3.1 Order of Precedence

The following “Order of Precedence” shall generally govern in case of conflict, unless otherwise
directed by COMPANY in writing. In case a conflict exists between these documents,
CONSULTANT shall highlight it to COMPANY for resolution.

 UAE statutory rules and regulations

 PROJECT documents

 COMPANY DGS

 International codes & standards

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 8 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
3.2 References

ADNOC Procedures/ Specifications

HSE-GA-ST06 PROJECT HSE PLANS

HSE-RM-ST03, Rev 1 HAZID, ENVID, OHID STANDARD

HSE-RM-ST02 Health Safety Impact Assessment (HSEIA) Standard

COMPANY Procedures/ Specifications

HSE-ST-008, Rev 2 HAZID/ ENVID/ OHID STANDARD

Project Documents

IE-7006-GG-000-15-11-001 PROJECT DESIGN BASIS

RPT-7006-GG-01-61-00-002 HAZID/ENVID/OHID REPORT

RPT-7006-GG-01-61-00-001 HAZID/ENVID/OHID TOR

4. SCOPE AND OBJECTIVES

4.1 Objective and Scope of HAZID/ENVID/OHID Study

The Scope of the HAZID/ENVID/OHID was limited to the project, Habshan & Bab Telecom
Systems Upgrade Project.

The scope entails reviewing all relevant information pertaining to the project, the anticipated
HSE risks and the sensitivity of the surrounding environment with an objective to ascertain the
need for detailed HSEIA for the Detailed Engineering phase.

Accordingly, workshops entailing the following were conducted:

- Hazards Identification (HAZID) workshop;

- Environmental Impact Identification (ENVID) workshop; and

- Occupational Health (Risks) Identification (OHID) workshop.

The current report presents the findings from the HSEIA screening study carried out based on
the results of the HAZID, ENVID and OHID workshops and other relevant project related
documents.

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 9 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

4.2 Objective of HSEIA Screening Study

The objective of this document is to provide a summary of the HSEIA screening for the Detailed
Engineering phase of the project considering HSE hazards and impacts associated with the
project, based on the outcome of the HAZID, ENVID & OHID workshops as well as COMPANY
Health Safety and Environmental Management System (HSEMS).

The Hazard Identification (HAZID), Environmental Impact Identification (ENVID) and


Occupational Health Hazard Identification (OHID) workshops carried out for “HABSHAN & BAB
TELECOM SYSTEMS UPGRADE” on 27th January 2021. The workshops were held via video
conferencing utilizing Microsoft Team Meetings due to current COVID-19 restrictions limiting
group meetings.

The workshops were conducted in accordance with the approved Terms of Reference (TOR)
for the Project incorporating guidance provided in Abu Dhabi National Oil Company (ADNOC)
HSE Standard (HSE-RM-ST03), Reference Doc No. RPT-7006-GG-01-61-00-001-0.

The workshops were attended by a multi-discipline team of personnel from both COMPANY
and CONSULTANT facilitated by independent HSE CONSULTANT Chairmen Mr Subramanian
(for HAZID), Mr. Shaun Pearce (for ENVID) and Mr. Gopakumar Nayar (for OHID).

5. WORKSHOP SUMMARY AND RECOMMENDATIONS

5.1 HAZID Summary and Findings

Table 5-1 includes the risk ranking summary of the unmitigated risks for the Node considered.

Table 5-1: Overall HAZID Summary (Unmitigated Risks)

High-Medium/
Node Description High / Cat. 1 Medium/ Cat. 3 Low/ Cat. 4
Cat. 2
Node 1. Habshan &
Bab Telecom
0 8 14 1
Systems Upgrade -
Detailed Engineering
The risk assessment was repeated for all identified hazards to assess the mitigated risk by
considering the preventive and mitigation measures.

Table 5-2 includes the risk ranking summary of the mitigated risks for all nodes by considering
the preventive and mitigation measures.

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 10 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

Table 5-2: Overall HAZID Summary (Mitigated Risks)

High-Medium/
Node Description High / Cat. 1 Medium/ Cat. 3 Low/ Cat. 4
Cat. 2
Node 1. Habshan & Bab
Telecom Systems Upgrade 0 0 17 6
- Detailed Engineering

As can be seen from Tables 5-1 and 5-2, the majority of unmitigated risks fall under high-
medium or medium categories have been reduced subsequently to either medium or mainly
low categories by incorporating the preventive and mitigation Safeguard measures.

The HAZID Worksheets generated during the workshop are provided in the Attachment – 1.

The 9 Recommendations / Actions captured during the HAZID workshop are presented in
Table 5-3.

Table 5-3: HAZID Recommendations

Sl.
Recommendations Responsibility
No.
Requirement for Lifting Plan to be specified in the PC Design & Engineering
1
Contractor Scope of Work. Contractor (TME)
COMPANY MOPO Matrix for extreme weather Design & Engineering
2 conditions should be specified to the PC Contractor Contractor (TME)
Scope of Work
Requirement for preparation and obtaining Approval of Design & Engineering
3 Heat Stress Management Plan is to be specified in the Contractor (TME)
PC Contractor Scope.
Requirement of Transportation Plan to be specified in Design & Engineering
4
PC Contractor Scope of Work Contractor (TME)
Building integrity to be ensured for the effectiveness of
Clean Agent Suppression System in the context of new Design & Engineering
5
cable entries - Requirement to be specified in the PC Contractor (TME)
Contractor Scope of work.
Adequacy of existing clean agent suppression system to Design & Engineering
6
be verified with the Supplier. Contractor (TME)
Adequacy of existing VESDA System coverage for new Design & Engineering
7
project facilities to be verified with OEM. Contractor (TME)
Project specific FRP has to be developed by PC Design & Engineering
8 Contractor - Requirement to be specified in PC Contractor (TME)
Contractor Scope of Work
Design & Engineering
9 Adequacy of existing UPS facilities to be verified. Contractor (TME)

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 11 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

5.2 ENVID Summary and Findings

Summary of environmental risks identified during the ENVID workshop are presented in Table
5 -4 respectively.

Table 5-4: Overall ENVID Summary

High-Medium/
Node Description High/ Cat. 1 Medium/ Cat. 3 Low/ Cat. 4
Cat. 2
Node: 1. Habshan & Bab
Telecom System Upgrade - 0 0 0 9
Construction

As can be seen from Table 5-4, all of the environmental risks assessed as part of the workshop
fall in Low category.

The ENVID Worksheets generated during the ENVID Workshop are provided in Attachment-2.

The 2 Recommendations / Actions captured during the ENVID workshop are presented in
Table 5-5.
Table 5-5: ENVID Recommendations

Sl.
Recommendations Responsibility
No.

1 Develop CEMP (Construction Environmental EPC Contractor


Management Plan)
2 Develop CWMP (Construction Waste Management Plan) EPC Contractor

5.3 OHID Findings

A summary of occupational risks identified during the OHID workshop are presented in Table 5-
6.
Table 5-6: Overall OHID Summary

High-Medium/
Node Description High/ Cat. 1 Medium/ Cat. 3 Low/ Cat. 4
Cat. 2

System 1:. Habshan & Bab


Telecom System Upgrade - 0 4 17 1
Construction / Demolition

System 2: Habshan & Bab


Telecom System Upgrade - 0 0 1 0
Operation

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 12 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

As can be seen from Table 5-6, the majority of occupational risks identified fall in low, medium
or high-medium categories.

No recommendations were raised during OHID session. The OHID Worksheets provided in
Attachment-3.

6. HSEIA SCREENING LIST

This section provides the HSEIA screening checklist applicable for the project scope and also
provides the list of HSE studies to be conducted as minimum during project lifecycle.

The HSEIA screening checklists as shown in Tables 6-1 to 6-3 were prepared based on the
inputs from HAZID/ENVID/OHID report for the project and other project documents.

Any additional HSE studies required shall be identified in line with HSE-RM-ST02 with prior
consensus with COMPANY corporate HSE.

6.1 Control Of Major Accident Hazard (COMAH) Screening

The COMAH screening checklist for the proposed project is presented through Table 6-1.

Table 6- 1: COMAH Screening Checklist

SN Description Y N N/A Remarks

Is the project in the Concept Stage? The project is in the Detailed


If yes, conduct Inherent Safe Design Engineering stage.
01 Review workshops/reviews (Please N
check and confirm - if not carried out,
justification for the same).

02 Have any new/additional Major N The objective of the project is to


Accident Hazards been identified in ensure safety and security of
the HAZID? personnel and buildings which
is basically a
If yes and related to process safety, telecommunications project.
then develop/update COMAH Report,
No Hydrocarbons or process
QRA, Bowties, HSECES Register,
units are involved in the project.
Performance Standards as applicable.
No MAHs have been identified
If yes, but not related to process in the HAZID study conducted.
safety, demonstrate control of hazards
Additionally, Other HSE studies
through HSEMS.
including SIMOPS and
Constructability Review for the
If not, demonstrate control of hazards
project will be conducted which
thorough HSEMS.
will cover the other High-
Medium risks mentioned in
CONSULTANT Doc. No. Document No. Doc. Class Page
3415076 RPT-7006-GG-01-61-00-004 2 13 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
SN Description Y N N/A Remarks

HAZID detail and safeguards/


recommendations will be
captured to reduce the risk to
ALARP

Are there any existing location specific Refer SN.02.


Major Accident Hazards that may have
an impact on the new facilities?

If yes and related to process safety,


then develop/update COMAH Report,
QRA, Bowties, HSECES Register,
03 Performance Standards as applicable. N

If yes, but not related to process


safety, demonstrate control of hazards
through HSEMS.

If not, demonstrate control of hazards


thorough HSEMS.

Are any hydrocarbons involved in the Refer SN.02


process?
04 If yes, conduct / review / update: N
HAZOP & SIL studies Fire Risk
Assessment QRA Study ESSA Study.

Is any H2S present in the project (i.e. Refer SN.02


greater than 1000ppm?
05 If yes conduct / review / update: QRA N
H2S zoning studies EPZ / AEZ studies
EERA studies.

Are there any changes in the Refer SN.02


composition, more importantly, the
concentration of H2S which could
potentially result in changes in toxic
zones?
06 If yes conduct / review / update: QRA N

H2S zoning studies.


H2S / SO2 Dispersion Studies.
EERA studies.

Are there any changes in manning No change in manning is


07 levels/distribution in the facility? N envisaged as part of the project.
If yes, update QRA.

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 14 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
SN Description Y N N/A Remarks

Is there a potential for lifting over live Refer SN.02.


08 equipment / panels? If yes, conduct N
dropped objects study.

Is there a potential for vehicle/


vessel/helicopter collision in the
project?
09 N/A
If yes, conduct specific study
associated with identified hazard.

Are there any buildings/structures


(where people may congregate) in the
10 vicinity of equipment carrying N/A
hydrocarbons streams? If yes, conduct
building risk assessment.

Are there any temporary refuges /


shelter-in-place in the vicinity of
11 equipment carrying toxic streams? N/A
If yes, conduct TR Impairment study
and Shelter-in-Place study.

Has a site-specific emergency plan Existing FRP is available and


been prepared for the existing will be applicable for the new
location? facility.
12 Y
If yes, update site-specific emergency
plan for new MAH (if any). If no,
prepare site specific emergency plan.

Has there been any change in the HSECES Register and


controls identified for MAHs (down to Performance Standards are
13 tag level)? N required to be updated as part
If yes update tag-level Bowties. of the Operations Phase
HSEIA.

Has there been any modification to HSECES Register and


HSECES performance standards or Performance Standards are
HSE critical activities? required to be updated as part
14 N of the Operations Phase
If yes, updated HSECES Performance
HSEIA.
Standards or HSE Critical Activity
Register.

Is a Manual of Permitted Operations in Existing MOPO will be


Place? applicable after implementation
15 Y
If yes, review/update MOPO. If no, of the project.
develop MOPO for identified MAH.

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 15 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
SN Description Y N N/A Remarks

Are there any neighbouring Group


Company operating facilities/wells/
pipelines are available in the vicinity
that may be impacted due to the
16 project? N/A

If yes, then initiate joint review of


COMAH and ensure hazards from
neighbouring facilities are captured.

6.2 Environmental Screening

The Environmental screening checklist for the proposed project is presented through Table 6-2.

Table 6- 2: Environmental Screening Checklist

SN Description Y N N/ Remarks
A

01 Is Environmental Baseline study Y Existing baseline available and valid.


available?
If not, then jump to Question 4.

02 If available, when was the baseline Y Existing baseline available and valid.
study carried out?
N
03 Is there any change in the The objective of the project is to ensure
environmental conditions from the safety and security of personnel and
above baseline study? buildings which is basically a
If yes, then baseline study needs telecommunications project.
to be updated. No Hydrocarbons or process units are
involved in the project.
No significant environmental impact
identified due to implementation of
project facilities during the ENVID
workshop.
N
04 Are there any environmentally No significant environmental impact
sensitive areas or zones in and identified due to implementation of
around the area? project facilities during the ENVID
workshop.
If yes, then baseline study needs
to be developed / updated

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 16 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
SN Description Y N N/ Remarks
A

If answers to any of the questions from 5 to 36 is yes, then following to be performed in


addition to specific requirements given against each question:
 Baseline study & EIA to be developed / updated for the FEED / Detailed Engineering Phase
 CEMP to be developed for the Construction Phase
 OEMP to be developed for the Operations Phase

05 Will the project construction, N No significant environmental impact


operation or decommissioning of identified due to implementation of
the project involve action that will project facilities during the ENVID
cause physical changes in the workshop.
locality (topography, Land use,
changes in water bodies etc.)

06 Does the activity involve: N No significant environmental impact


identified due to implementation of
a. clearance of vegetation or
project facilities during the ENVID
structures?
workshop.
b. facilities for disposal of
hazardous wastes?
If yes, then Waste Management
Plan is required.
N
07 Does the activity cause loss of No significant environmental impact
native species? identified due to implementation of
project facilities during the ENVID
If yes, then baseline study to
workshop.
include ecological survey.
N
08 Will the project use natural No significant environmental impact
resources such as land, water, identified due to implementation of
materials or energy, especially any project facilities during the ENVID
resources which are non-renewable workshop.
or in short supply?

09 Will the project involve use, No significant environmental impact


N
storage, transport & handling of identified due to implementation of
hazardous material or chemicals project facilities during the ENVID
that could harm humans or workshop.
environment or raise concerns
about actual or perceived risks to
human health?

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 17 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
SN Description Y N N/ Remarks
A

10 Will the Project produce solid, liquid Y Construction Environment Management


or gaseous wastes during Plan and Construction Waste
construction or operation or Management Plan will be in place prior
decommissioning? to the construction.
ENVID identified the produce solid, liquid
or gaseous wastes generation during
construction and operation as low risk.

11 If so, did the project have Y Construction Environment Management


(Hazardous & Non-hazardous) Plan and Construction Waste
Waste Management Plan? Management Plan will be in place prior
to the construction.
If yes, then existing Waste
Management Plan to be reviewed ENVID identified the produce solid, liquid
and updated if necessary. or gaseous wastes generation during
construction and operation as low risk.
If not, then Waste Management
Plan to be developed.

12 Does the operation involve flaring? N/A


If yes, then:
 Baseline study to include air
monitoring.
 Air dispersion (including cold
venting) modelling and flare
radiation studies to be
conducted.
N
13 Will the Project release pollutants No significant environmental impact
or any hazardous, toxic or noxious identified due to implementation of
substances to air? project facilities during the ENVID
workshop.
If yes, then:
 Baseline study to include air
monitoring.
 Air dispersion modelling to
be conducted.

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 18 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
SN Description Y N N/ Remarks
A
N
14 Will the Project cause noise and No significant environmental impact
vibration or release of light, heat identified due to implementation of
energy or electromagnetic project facilities during the ENVID
radiation? workshop.
If yes, then:
 Baseline study to include
ambient noise monitoring
 Noise modelling to be
conducted.
N
15 Will the Project lead to risks of No significant environmental impact
contamination of land or water from identified due to implementation of
releases of pollutants onto the project facilities during the ENVID
ground or into surface waters, workshop.
groundwater, coastal wasters or the
sea?
If yes, then:
 Baseline study to include soil
& groundwater survey
(onshore).
 Baseline study to include
marine survey (offshore).

16 Will there be any risk of accidents Y The risks of accidents during


during construction or operation of construction or operation have been
the Project which could affect captured in HAZID with adequate
human health or the environment? safeguards and residual risks reduced to
ALARP.
No significant environmental impact
identified due to implementation of
project facilities during the ENVID
workshop.
N
17 Will the project result in social No significant environmental impact
changes (demography, lifestyles, identified due to implementation of
employment)? project facilities during the ENVID
workshop.
N
18 Are there any other factors which No significant environmental impact
should be considered such as identified due to implementation of
consequential development which project facilities during the ENVID
could lead to environmental effects workshop.
or the potential for cumulative
impacts with other existing or
planned activities in the locality?

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 19 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
SN Description Y N N/ Remarks
A
N
19 Are there any areas on or around No significant environmental impact
the location which are protected identified due to implementation of
under international or national or project facilities during the ENVID
local legislation for their ecological, workshop.
landscape, cultural or other value,
which could be affected by the
project?
N
20 Are there any other areas on or No significant environmental impact
around the location which are identified due to implementation of
important or sensitive for reasons of project facilities during the ENVID
their ecology e.g. wetlands, workshop.
watercourses or other water bodies,
the coastal zone, mountains,
forests or woodlands, which could
be affected by the project?
If yes, then baseline study to
include ecological survey.
N
21 Are there any areas on or around No significant environmental impact
the location which are used by identified due to implementation of
protected, important or sensitive project facilities during the ENVID
species of fauna or flora e.g. for workshop.
breeding, nesting, foraging, resting,
overwintering, migration, which
could be affected by the project?
If yes, then baseline study to
include ecological survey.
N
22 Are there any inland, coastal, No significant environmental impact
marine or underground waters on identified due to implementation of
or around the location which could project facilities during the ENVID
be affected by the project? workshop.
If yes, then:
 Baseline study to include
groundwater survey
(onshore).
 Baseline study to include
marine survey (offshore).
N
23 Are there any areas or features of No significant environmental impact
high landscape or scenic value on identified due to implementation of
or around the location which could project facilities during the ENVID
be affected by the project? workshop.
If yes, then EIA to include Visual
Impact Assessment.

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 20 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
SN Description Y N N/ Remarks
A

24 Are there any routes or facilities on N/A


or around the location which are
used by the public for access to
recreation or other facilities, which
could be affected by the project?

25 Are there any transport routes on or N/A


around the location which are
susceptible to congestion or which
cause environmental problems,
which could be affected by the
project?

26 Is the project in a location where it N/A


is likely to be highly visible to many
people?
If yes, then EIA to include Visual
Impact Assessment.

27 Are there any areas or features of N/A


historic or cultural importance on or
around the location which could be
affected by the project?
If yes, then baseline study to
include archaeological survey.

28 Is the project located in a previously N/A


undeveloped area where there will
be loss of greenfield land?

29 Are there existing land uses on or N/A


around the location e.g. homes,
gardens, other private property,
industry, commerce, recreation,
public open space, community
facilities, agriculture, forestry,
tourism, mining or quarrying which
could be affected by the project?

30 Are there any plans for future land N/A


uses on or around the location
which could be affected by the
project?

31 Are there any areas on or around N/A


the location which are densely
populated or built-up, which could
be affected by the project?

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 21 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
SN Description Y N N/ Remarks
A

32 Are there any areas on or around N/A


the location which is occupied by
sensitive land uses e.g. hospitals,
schools, places of worship,
community facilities, which could be
affected by the project?

33 Are there any areas on or around N/A


the location which contain
important, high quality or scarce
resources e.g. groundwater,
surface waters, forestry, agriculture,
fisheries, tourism, minerals, which
could be affected by the project?
If yes, then:
 Baseline study to include
groundwater survey
(onshore)
 Baseline study to include
marine survey (offshore)
N
34 Are there any areas on or around No significant environmental impact
the location which are already identified due to implementation of
subject to pollution or project facilities during the ENVID
environmental damage e.g. where workshop.
existing legal environmental
standards are exceeded, which
could be affected by the project?
N
35 Is the project location susceptible to No significant environmental impact
earthquakes, subsidence, identified due to implementation of
landslides, erosion, flooding or project facilities during the ENVID
extreme or adverse climatic workshop.
conditions e.g. temperature
inversions, fogs, severe winds,
which could cause the project to
present environmental problems?
N
36 Is the project site outside the No significant environmental impact
ADNOC concession and EIA shall identified due to implementation of
be developed in EAD format? project facilities during the ENVID
workshop.
If yes, then EIA to be developed
in EAD format.

6.3 Occupational Health Screening

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 22 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
The Occupational Health screening checklist for the proposed project is presented through
Table 6-3.

Table 6- 3: Occupational Health Screening Checklist

SN Description Y N N/A Remarks

Are Engineering Studies (e.g. Human No adverse occupational


Factors Engineering Study, Noise Study, Air health impact identified
Dispersion Study, Control Room from the project
Ergonomics Study etc.) required to control facilities during the
01 the OH hazards identified in the OHID? N OHID workshop.
If Yes, Review the engineering studies and
incorporate in the subsequent phase
OHID / Operations OHRA.

Are there any Extreme / High Risk OH No adverse


Hazards identified? occupational health
impact ide identified
02 If Yes, develop OHRA for operations. If No, N
from the project
demonstrate control of hazards through
facilities during the
HSEMS.
OHID workshop.

Has the OHID identified any new physical, No adverse occupational


chemical, ergonomic, biological or health impact identified
psychosocial hazards which are different from the project
03 from or at a higher risk than those N facilities during the
identified in the existing operations OHRA? OHID workshop.
If Yes, develop OHRA for operations.

Is the existing facility OHRA applicable to No adverse occupational


the Brownfield/modification project? Can it health impact identified
be utilized as a typical study and updated from the project
for the new operations? facilities during the
04 N OHID workshop.
If Yes, Update existing operations OHRA for
project scope. Hence there is no
requirement to update
the existing OHRA.

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 23 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
SN Description Y N N/A Remarks

Are there any new extreme, high and/or No adverse occupational


medium risk hazards identified, that will health impact identified
require Industrial Hygiene Monitoring and from the project
05 Health Surveillance? N facilities during the
OHID workshop.
If Yes, Develop Industrial Hygiene & Health
Surveillance Plan for Operations.

Has the existing Industrial Hygiene, Health No adverse occupational


Surveillance Program, and Illness Reports health impact identified
identified any exceedances in exposure from the project
06 limits or uncontrolled hazards? N facilities during the
OHID workshop.
If Yes, Update OHID / Operations OHRA /
Industrial Hygiene and Health Surveillance
Plan.

Are there any new accommodation No new accommodation


facilities in the scope of this project? as part of the project
07 N facilities.
If Yes, Conduct Food Hygiene and Camp
Welfare Inspections.

7. LIST OF HSE STUDIES

The various HSE studies to be conducted as a minimum during the Detailed Engineering phase
of the project were screened based on Tables 6-1 to 6-3 and identified from the list of HSE
Studies presented in HSE-RM-ST02 and included in Table 7-1.

Table 7-1: List of HSE Studies

# HSE Studies # HSE Studies √ # HSE Studies √


1 HAZID/ENVID/OHID 16 Dropped Objects 31 Environment
Register Study Baseline Study
2 Internet Safe Design 32 Environment
Review 17 Shelter in Place Impact
Assessment (SIP) Assessment (EIA)
(ADNOC format)
3 HAZOP Study 18 Scenario Based 33 Noise Study
Risk Assessment (Environment)
4 SIL Study 19 Manual / Matrix 34 Waste
of Permitted Management Plan
Operation
(MOPO)
5 Coarse QRA / 20 Toxic Gas Refuge 35 Air Emission
Preliminary QRA Design / Dispersion
CONSULTANT Doc. No. Document No. Doc. Class Page
3415076 RPT-7006-GG-01-61-00-004 2 24 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Impairment Assessment
Assessment
(TRIA)
6 Quantitative Risk 21 Performance 36 Effluent Discharge
Assessment (QRA) Standards Modelling
(Design Specific)
7 Building Risk Performance 37 Operation
Assessment (BRA) 22 Standards Environmental
(Operation Management Plan
Specific) (OEMP)
8 Fire and Explosion HSE Critical 38 Construction
Risk Assessment 23 Activities Environmental
(FERA / FSA) Register Management Plan
(CEMP)
9 Escape Evacuation Emergency 39 Decommissioning
and Rescue 24 Response Plan Environmental
Assessment (EERA) Management Plan
(DEMP)
10 Emergency Systems 25 F&G Detector 40 Energy Reviews
Survivability Mapping Study
Analysis (ESSA)
11 H2S Zoning 26 3D modelling 41 OHRA
reviews
12 Dispersion Analysis 27 Shelter in Place 42 Ergonomic Study
Assessment (SIP)
13 Bowtie 28 Passive Fire 43 Industrial Hygiene
Development & Protection Monitoring Study
HSECES design & layouts & Plan
Identification
(System Level)
14 Bowtie 29 Active Fire 44 Human Factor
Development & Protection Engineering /
HSECES design & Assessment
Identification (Tag drawings
Level)
15 Vent & Flare 30 Demolition HSE 45 Noise Study &
Dispersion Study Plan Contours (OH)
46 ALARP Workshop 47 HSEIA Screening  48 H&E Management
49 COMAH 50 Constructability  51 SIMOPS 
Review

8. CONCLUSION

As per HSE-RM-ST06 on Control of Major Accident Hazards (COMAH), hazards with the
potential for level 4 or 5 consequences (Severe or Catastrophic) or risk ranking of 3F are
considered as Major Accident Hazards (MAH).

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 25 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
The Workshops did not identify any showstoppers or key areas of weakness of the current
Design as presented. Any gaps in the design Safeguards were strengthened by recommending
further Safeguards in agreement with Workshop Team.

Environment

Since no significant environmental hazards have been identified as part of the project scope, a
detailed Environmental Impact Assessment is not required to be carried out.

Further, the existing baseline survey has been conducted by Company and changes to the
baseline conditions are not envisaged, hence baseline survey will not be required as part of the
project scope.

COMAH

The proposed project is limited to Habshan & Bab Telecom Systems Upgrade only.

As can be seen from Tables 5-1 and 5-2, the majority of unmitigated risks fall under high or
high-medium categories have been reduced subsequently to either medium or mainly low
categories by incorporating the preventive and mitigation Safeguard measures.

Additionally, Other HSE studies including SIMOPS and Constructability Review for the project
will be conducted which will cover the High and High-Medium risks mentioned above in detail
and safeguards/ recommendations will be captured to reduce the risk to ALARP.

Hence, there is no requirement to carry out a separate COMAH study for the project.

However, as mentioned earlier, the following are required to be carried out as part of project
scope:

• SIMOPS study

• Constructability Review.

Occupational Health

Since no significant occupational hazards have been identified as part of the project scope, a
detailed OHRA study is not required to be carried out. The existing OHRA study will be
applicable for the project scope.

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 26 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

ATTACHMENT 1 – HAZID WORKSHEET

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 27 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
1 Hydrocarbons 1.1 Oil under Not Applicable
(Unrefined) pressure
1.2 Hydrocarbons in Not Applicable
formation
1.3 LPGs (e.g. Not Applicable
propane)
1.4 LNGs Not Applicable
1.5 Condensate, Not Applicable
NGL
1.6 Hydrocarbon Not Applicable
gas
1.7 Oil at Low Not Applicable
Pressures
1.8 Wax Not Applicable
1.9 Coal Not Applicable
2 Hydrocarbons 2.1 Hydraulic oil Not Applicable
(Refined)
2.2 Lube and seal Not Applicable
oil
2.3 Diesel fuel Not Applicable
2.4 Petroleum Not Applicable
spirit/gasoline
3 Other flammable 3.1 Cellulosic Not Applicable
materials materials
3.2 Pyrophoric Not Applicable
materials
3.3 Hydrogen Not Applicable
3.4 Polypropylene Not Applicable
Polymer
4 Explosives 4.1 Detonators Not Applicable
4.2 Conventional Not Applicable
explosive
material
4.3 Perforating gun Not Applicable
charges.
4.4 Dust Explosions Not Applicable

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 28 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
(Sulphur,
Cement, etc.)
5 Pressure 5.1 Bottled Gas Not Applicable
under Pressure
5.2 Water under Not Applicable
pressure
5.3 Air under high Not Applicable
pressure
5.4 Hyperbaric Not Applicable
operations
(diving)
5.5 Decompression Not Applicable
(diving)
5.6 Oil and Not Applicable
hydrocarbon
gas under
pressure.
6 Differences in 6.1 Personnel at Construction Fall from 6.1.1.1. Potential for 4 4 C H- Personnel First Aid 4 B M
Height Height >2m activities height injury / Fatality M Training (Work
requiring building at height)
of scaffolds, Certified Medivac
erection of poles, scaffolding
cable equipment and
terminations, etc. supervisors (by
EPC Contractor)
PTW / TRA Facility
Safety harness Response
(PPE) Plan (ERP)
6.2 Personnel at Construction Trips and 6.2.1.1. Potential for 3 3 C M House keeping First Aid 3 B M
Height <2m activities falls injury PTW / TRA Medivac
requiring building
Facility
of scaffolds,
Response
cable
Plan (ERP)
terminations, etc.
6.3 Overhead Lifting the Poles Dropped 6.3.1.1. Potential for 4 3 4 C H- Certified lifting Medivac 4 B M 1. Requirement for Design &
Engineering
Equipment MH object injury / Fatality M equipment Lifting Plan to be Contractor (TME
and Asset Personnel Facility specified in the PC
damage training Response Contractor Scope
Visual check of Plan (ERP) of Work.
lifting gears

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 29 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
Exclusion zone
PTW / TRA
Certified Lifting
and Rigging
Personnel
6.4 People under Not Applicable
water
6.5 People below Potential Contact with 6.5.1.1. Damage to 3 3 3 C M Topography Medivac 3 B M
grade excavation for U/G services U/G services, Survey
Foundation and difficulty in Manual Facility
Cable Tranches accessing Excavation Response
(around 1 m) PTW / TRA Plan (ERP)
COMPANY
HSEMS
Procedures
7 Objects under 7.1 Objects under No concerns
induced stress tension
7.2 Objects under No concerns
compression.
8 Dynamic 8.1 On-land Traffic congestion Potential 8.1.1.1. Potential 3 2 3 C M Banksman First Aid 3 B M 4. Requirement of Design &
Engineering
situation hazards transport collision of personnel Restricted Facility Transportation Plan Contractor (TME
(driving, vehicles injury, asset movement for Response to be specified in
transportation of damage vehicles in the Plan (ERP) PC Contractor
materials). Plant area Scope of Work.
8.2 On-water Not Applicable
transport
(boating)
8.3 In-air transport Not Applicable
(flying)
8.4 Boat collision Not Applicable
hazard to other
vessels and
offshore
structures
8.5 Equipment with Not Applicable
moving or
rotating parts
8.6 Use of No concerns
hazardous hand
tools (grinding,
CONSULTANT Doc. No. Document No. Doc. Class Page
3415076 RPT-7006-GG-01-61-00-004 2 30 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
sawing)
8.7 Use of knives, No concerns
machetes and
other sharp
objects
8.8 Transfer from Not Applicable
boat, Flotel to
offshore
platform
9 Environmental 9.1 Weather Winds, rain, Adverse 9.1.1.1. Potential 4 2 4 C H- Environmental Facility 3 B M 2. COMPANY MOPO Design &
Engineering
Hazards storms, fog environmenta personnel M data established Response Matrix for extreme Contractor (TME
l conditions injury/ in Project Plan weather conditions
fatalities, asset Design Basis should be specified
damage Works stopped to the PC
at high wind Contractor Scope
conditions (more of Work
than 17 knots)
Journey
Management
Plan
PTW
Thermal work
limit- wind speed
limits for working
at height and
excavation
Speed limit
Vehicle
maintenance
Driver training
Induction for
construction
crew
Fitness test for
Drivers
COMPANY
HSEMS
Procedures
COMPANY
MOPO Matrix for
extreme weather
conditions
CONSULTANT Doc. No. Document No. Doc. Class Page
3415076 RPT-7006-GG-01-61-00-004 2 31 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
9.2 Weather Extreme Adverse 9.2.1.1. Potential 4 4 C H- PTW First Aid 3 B M 3. Requirement for Design &
Engineering
Temperatures environmenta personnel M Different work Facility preparation and Contractor (TME
l conditions injury/ fatality timings for Response obtaining Approval
summer Plan of Heat Stress
Training for Management Plan
construction is to be specified in
crew the PC Contractor
Heat Stress Scope.
Campaign
COMPANY
HSEMS
Procedures
9.3 Sea state / river No concerns
currents
9.4 Tectonic No concerns
10 Hot Surfaces 10.1 Process piping Not Applicable
and equipment
between 60°C
and 150°C
10.2 Process piping Not Applicable
and equipment
over 150°C
10.3 Engine and Not Applicable
turbine exhaust
systems
10.4 Steam piping Not Applicable
11 Hot Fluids 11.1 Temperatures Not Applicable
between 100°C
and 150°C
11.2 Temperatures Not Applicable
greater than
150°C
12 Cold Surfaces 12.1 Process piping Not Applicable
between -25°C
and -80°C
12.2 Process piping Not Applicable
less than -80°C
13 Cold Fluids 13.1 Oceans, seas Not Applicable
and lakes less
CONSULTANT Doc. No. Document No. Doc. Class Page
3415076 RPT-7006-GG-01-61-00-004 2 32 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
than 10°C
14 Open Flame 14.1 Flares Not Applicable
14.2 Heaters with Not Applicable
fire tube
14.3 Direct-fired Not Applicable
furnaces
15 Electricity 15.1 Voltage > 50V Electricity Short Circuit 15.1.1.1. Electrocution 4 2 4 C H- Earthing and Facility 3 C M
to 440 V in and damage M Grounding Response
cables to Equipment Plan
Inspection of First Aid
Equipment
PTW Medivac
TRA
Proper PPE
15.2 Voltage > 50V Electricity Short Circuit 15.2.1.1. Electrocution 4 2 4 C H- Earthing and Facility 3 C M
to 440 V in and damage M Grounding Response
Equipment to Equipment Plan
Inspection of First Aid
Equipment
PTW Medivac
TRA
Proper PPE
15.3 Voltage > 440 Not Applicable
V
15.4 Lightning No additional
discharge Concern as
Project facility is
part of the
existing Plant
Operation
15.5 Electrostatic Not Applicable
Energy
16 Electromagnetic 16.1 Ultraviolet No concerns
Radiation radiation
16.2 Infrared No concerns
radiation
16.3 Microwaves No concerns

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 33 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
16.4 Lasers No concerns
16.5 E/M radiation: No concerns
high voltage
AC cables
17 Ionizing 17.1 Alpha, Beta, No concerns
Radiation, open open source
source 17.2 Gamma rays, No concerns
open source
17.3 Neutron, open No concerns
source
17.4 Naturally No concerns
occurring
ionizing
radiation
18 Ionizing 18.1 Alpha, Beta, No concerns
Radiation, closed source
closed source 18.2 Gamma rays, No concerns
closed source
18.3 Neutron, No concerns
closed source
19 Asphyxiates 19.1 Low oxygen No concerns
atmospheres
19.2 Excessive CO2 No concerns
19.3 Drowning No concerns
19.4 Excessive N2 Not Applicable
19.5 Halon Not Applicable
19.6 Smoke Not Applicable
19.7 Clean Agent Clean agent Release of 19.7.1.1. Potential 4 4 B M Audio-visual 3 B M 5. Building integrity to Design &
Engineering
(FM200, etc.) suppression Clean agent physical Alarm be ensured for the Contractor (TME
system suppression asphyxiation effectiveness of
system Clean Agent
Suppression
System in the
context of new
cable entries -
Requirement to be
specified in the PC
CONSULTANT Doc. No. Document No. Doc. Class Page
3415076 RPT-7006-GG-01-61-00-004 2 34 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
Contractor Scope
of work.
Training 6. Adequacy of Design &
Engineering
PTW existing clean agent Contractor (TME
suppression system
to be verified with
the Supplier.
20 Toxic Gas 20.1 H2S, Sour Gas Working in H2S Emergencies 20.1.1.1. Potential for 4 4 B M Training Facility 3 B M
Zone (Existing - Release of injury / Response
Hazard) H2S Fatality Plan
PTW First Aid
TRA
COMPANY
HSEMS
Procedures
20.2 Exhaust Not Applicable
Fumes
20.3 SO2 Refer to 20.1
20.4 Benzene Not Applicable
20.5 Chlorine Not Applicable
20.6 Welding No additional
Fumes concerns, as it
will be covered in
Construction HSE
Plan, TRA and
PTW
20.7 Tobacco Not Applicable
Smoke
20.8 CFCs Not Applicable
20.9 Ammonia Not Applicable
21 Toxic Liquids 21.1 Mercury Not Applicable
21.2 PCBs Not Applicable
21.3 Biocide Not Applicable
21.4 Methanol Not Applicable
21.5 Brines Not Applicable

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 35 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
21.6 Glycols Not Applicable
21.7 Degreasers Not Applicable
21.8 Isocyanates Not Applicable
21.9 Sulfanol Not Applicable
21.10 Amines Not Applicable
21.11 Corrosion Not Applicable
inhibitors
21.12 Scale Not Applicable
inhibitors
21.13 Liquid mud Not Applicable
additives
21.14 Odorant Not Applicable
additives
21.15 Alcohol Not Applicable
containing
beverages
21.16 Non Not Applicable
prescribed
drugs
21.17 Used engine Not Applicable
oils
21.18 Carbon tetra Not Applicable
chloride
21.19 Grey and/or Not Applicable
black water
22 Toxic Solids 22.1 Asbestos Not Applicable
22.2 Man-made Not Applicable
mineral fiber
22.3 Cement dust Not Applicable
22.4 Sodium Not Applicable
hypochlorite
22.5 Powdered mud Not Applicable
additives
22.6 Sulphur dust Not Applicable
22.7 Pig trash Not Applicable

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 36 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
22.8 Oil based Not Applicable
muds
22.9 Pseudo oil- Not Applicable
based muds
22.10 Water based Not Applicable
muds
22.11 Cement Handling of
slurries cement slurries -
No additional
concerns, as it
will be covered in
Construction HSE
Plan, TRA and
PTW
22.12 Dusts During
construction
activities / vehicle
movement - No
additional
concerns, as it
will be covered in
Construction HSE
Plan, TRA and
PTW
22.13 Cadmium Not Applicable
compounds
22.14 Oil based Not Applicable
sludges
23 Corrosive 23.1 Hydrofluoric Not Applicable
substances acid
23.2 Hydrochloric Not Applicable
acid
23.3 Sulphuric acid Not Applicable
23.4 Caustic soda Not Applicable
24 Biological 24.1 Poisonous Not Applicable
hazards plants (e.g.
poison ivy and
oak)

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 37 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
24.2 Large animals Not Applicable
24.3 Small animals Not Applicable
24.4 Food borne Not Applicable
bacteria
24.5 Water borne Not Applicable
bacteria
24.6 Parasitic Not Applicable
Insects
24.7 Disease Not Applicable
transmitting
insects
24.8 Cold and flu Personnel from Working with 24.8.1.1. Potential 4 2 1 4 C H- COMPANY Facility 4 B M
viruses different countries FLU infected spread of M HSEMS Response
personnel in FLU leading Procedures Plan
field to health Project Planning
impacts and
potential
project delay
24.9 Human Not Applicable
immune
deficiency
viruses
24.10 Other Not Applicable
communicabl
e diseases
25 Ergonomic 25.1 Manual Manual handling 25.1.1.1. 25.1.1.1. Potential for 3 3 C M Manual handling First Aid 3 B M
materials during Body strain injury procedure
handling maintenance or Trolleys for
construction manual handling
Lifting
equipment is
provided to
reduce manual
handling
25.2 Instrument / Improper access Difficulty in 25.2.1.1. Potential 2 2 C M Design 2 B L
equipment for instrument / accessing delay, quality Specifications
accessibility equipment issues and Quality
safety inspection
concerns Program

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 38 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
25.3 Damaging Refer to ENVID
noise
25.4 Loud steady Refer to ENVID
noise > 85dBA
25.5 Heat stress Refer to OHID
(high
ambient
temperatures)
25.6 Cold stress No concerns
(low
ambient
temperatures)
25.7 High humidity No additional
concerns,
existing Site
Procedures will
apply
25.8 Vibration Refer to OHID
25.9 Workstations Improper access Difficulty in 25.9.1.1. Potential 2 2 C M Design 2 B L
for panels accessing delay, quality Specifications
issues and Quality
safety inspection
concerns Program
25.10 Lighting Inadequate Difficulty in 25.10.1.1. Potential for 2 2 B L Existing Plant Temporary 2 A L
Lighting carrying injury, Asset area with lighting
(Construction construction damage adequate Equipment
Phase) works lighting provided as
PTW / TRA and when
required.
25.11 Incompatible No concerns
hand
controls
25.12 Awkward No concerns
location of
workplaces
and
machinery
25.13 Mismatch of No concerns
work to

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 39 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
physical
abilities
25.14 Mismatch of No concerns
work to
cognitive
abilities
25.15 Long and No additional
irregular Concerns
working
hours/shifts
25.16 Poor No concerns
organization
and job
design
25.17 Work No concerns
planning
issues
25.18 Indoor climate No concerns
(too hot/cold/
dry/ humid,
draughty)
26 Psychological 26.1 Living on the Refer to OHID
hazards job / away from
family
26.2 Working and Refer to OHID
living on a live
plant
26.3 Post-traumatic Refer to OHID
stress
26.4 Fatigue Refer to OHID
26.5 Shift work Refer to OHID
27 Security related 27.1 Piracy No additional
hazards Concern as
Project facility is
part of the
existing Plant
Operation
27.2 Assault No additional
Concern as
CONSULTANT Doc. No. Document No. Doc. Class Page
3415076 RPT-7006-GG-01-61-00-004 2 40 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
Project facility is
part of the
existing Plant
Operation
27.3 Sabotage No additional
Concern as
Project facility is
part of the
existing Plant
Operation
27.4 Crisis No additional
(terrorism, civil Concern as
disturbances) Project facility is
part of the
existing Plant
Operation
27.5 Theft No additional
Concern as
Project facility is
part of the
existing Plant
Operation
28 Use of natural 28.1 Land No additional
resources Concerns
28.2 Water No additional
Concerns
28.3 Air No additional
Concerns
28.4 Trees, No additional
Vegetation Concerns
28.5 Gravel No additional
Concerns
29 Medical 29.1 Medical No additional
unfitness Concerns
29.2 Motion No additional
sickness Concerns
30 Noise 30.1 High level Refer to ENVID /
noise OHID
30.2 . Intrusive No additional

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 41 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
Noise Concerns
31 Drilling 31.1 Rig Operations Not Applicable
Operations
31.2 Rig Integrity Not Applicable
31.3 Well control Not Applicable
31.4 Lithology Not Applicable
31.5 Data Not Applicable
uncertainty
31.6 Formation Not Applicable
32 Rig Moving 32.1 Adverse Not Applicable
Activities Environmental
Changes
32.2 Co- Not Applicable
Ordination/
Communicatio
n Failure
32.3 Tug boat Not Applicable
mooring failure
32.4 Structural / Not Applicable
mechanical
failure
32.5 Loss of Not Applicable
Stability
32.6 Dropped Not Applicable
Objects
32.7 Loss of Not Applicable
services
32.8 Impact / Not Applicable
Collision
32.9 Seismic Not Applicable
Activity
32.10 Platform Not Applicable
Operations/
Emergency
32.11 Drilling Rig Not Applicable
Operations /
Emergency

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 42 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
32.12 Seabed / Not Applicable
Subsea
32.13 Other Not Applicable
32.14 Interfaces Not Applicable
33 Concurrent 33.1 Concurrent Simultaneous Simultaneous 33.1.1.1. Potential for 3 3 3 C M PTW / TRA Facility 3 B M
Activities / Activities / activities in the activities injury and COMPANY Response
Proximity Proximity same location leading to asset HSEMS Plan
Hazards Hazards increased damage Procedures
Risk
34 Working inside 34.1 Personnel at Construction Fall from 34.1.1.1. Potential for 4 4 C H- Personnel First Aid 4 B M
the Buildings Height >2m activities height injury / M Training (Work
requiring laying of Fatality at height)
cables, PTW / TRA Medivac
installation of Safety harness Facility
Equipment. (PPE) Response
Plan (ERP)
34.2 Live panels Working near/ Fall of objects 34.2.1.1. Potential 2 2 C M Personnel Facility 2 B L 8. Project specific Design &
Engineering
inside live panels damage to training Response FRP has to be Contractor (TME
(at present, only existing PTW / TRA Plan (ERP) developed by PC
wall mounted panels, Supervision Contractor -
junction boxes, Switch gears, Requirement to be
installation of etc., potential specified in PC
CCTV, wall disturbance Contractor Scope
penetration for to existing of Work
cable routing are Plant
expected, cable operations
routing below and
above the false
floor)
Installation of Fall of objects 34.2.2.1.
Potential 2 2 C M Personnel Facility 2 B L
new panels damage to training Response
(NMCR, MCR existing PTW / TRA Plan (ERP)
telecom room) panels, Supervision
potential
disturbance
to existing
Plant
operations
34.3 Clean Agent Clean agent Release of 34.3.1.1. Potential 4 4 B M Audio-visual 3 B M 5. Building integrity to Design &
Engineering
(FM200, etc.) suppression Clean agent physical Alarm be ensured for the Contractor (TME
CONSULTANT Doc. No. Document No. Doc. Class Page
3415076 RPT-7006-GG-01-61-00-004 2 43 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node 1. Habshan & Bab Telecom Systems Upgrade - Detailed Engineering
Mitigated
Unmitigated Risk
Risk
Hazard Mitigations /
Hazard Healt Envi Over Preventive Responsib
Refere Hazard Threats Top Event Consequences Recovery Recommendation
Category h & ron Finan Reput all Likelih Ris Controls ty
nce Measures S L RR
Safet men cial ation Seve ood k
y t rity
system suppression asphyxiation effectiveness of
system Clean Agent
Suppression
System in the
context of new
cable entries -
Requirement to be
specified in the PC
Contractor Scope
of work.
Training 6. Adequacy of Design &
Engineering
PTW existing clean agent Contractor (TME
suppression system
to be verified with
the Supplier.
34.4 Fire detection Inadequate Delay in Fire 34.4.1.1. Potential 3 3 B M 3 B M 7. Adequacy of Design &
Engineering
(VESDA coverage of detection damage and existing VESDA Contractor (TME
System) VESDA System disruption of System coverage
for the new services for new project
panels which are facilities to be
as part of the verified with OEM.
project facilities.
34.5 Modification of Modification of Working in 34.5.1.1. Potential 2 2 C M Training 2 B L 9. Adequacy of Design &
Engineering
existing UPS existing UPS DBs live UPS DBs Trips of PTW existing UPS Contractor (TME
DBs existing UPS Supervision facilities to be
system verified.

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 44 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

ATTACHMENT 2 – ENVID WORKSHEET

CONSULTANT Doc. Document No. Doc. Page


No. Class
3415076 RPT-7006-GG-01-61-00-004 2 45 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

Node: 1. Habshan & Bab Telecom System Upgrade - Construction

Is a Legal Significance of Impact & Risk after mitigation


Requirement measures
Preventative and Control
Activity Aspect Impact/Consequences (Community Monitoring Measures Recommendations Responsibility
Measures
Concerns and Impact
Reputational Risks) Severity Duration RR
Severity

1. General Construction 1. Air Emissions - Process Emissions Not considered applicable

2. General Construction 1. Air Emissions - Engine exhaust Deterioration of local ambient air quality and Federal Ambient Air ADNOC-HSE-EN-ST02 Daily Visual Inspection 1 B 1B Low 1. Develop CEMP EPC Contractor
emissions increase in GHG emissions Quality Standards HSE approval of equipment of Equipment
ADNOC-HSE-EN- ADNOC Inspection
ST02 Requirements
Routine CEMP Audit

3. General Construction 1. Air Emissions - Stack Emissions Not considered applicable

4. General Construction 1. Air Emissions - Flare Emissions Not considered applicable

5. General Construction 1. Air Emissions - Vent Emissions Not considered applicable

6. General Construction 1. Air Emissions - Fugitive Emissions Not considered applicable

7. General Construction 1. Air Emissions - Gas / Condensate Not considered applicable


leaks

8. General Construction 1. Air Emissions -Dust Deterioration of local ambient air quality from Federal Ambient Air ADNOC- Visual Inspection 1 B 1B Low 1. Develop CEMP EPC Contractor
Excavation activities Quality Standards HSE-EN-ST02 Routine CEMP Audit
ADNOC-HSE-EN-
ST02

9. General Construction 1. Air Emissions - Odor Not considered applicable

10. General Construction 1. Liquid Discharges - Chemical Spills Localized deterioration of soil quality ADNOC-HSE-EN- ADNOC- Visual Inspection 1 B 1B Low 1. Develop CEMP EPC Contractor
(Accidental) ST02 HSE-EN-ST02 Routine CEMP Audit

11. General Construction 1. Liquid Discharges - Liquid Sulphur Not considered applicable
leaks

12. General Construction 1. Liquid Discharges - Oil Spills Localized deterioration of soil quality ADNOC-HSE-EN- ADNOC- Visual Inspection 1 B 1B Low
(Accidental) ST02 HSE-EN-ST02 Routine CEMP Audit

13. General Construction 1. Liquid Discharges - Process Not considered applicable


Effluents

14. General Construction 1. Liquid Discharges - Sewage Sewage generation from workers ADNOC-HSE-EN- ADNOC HSE-EN-ST04 Visual Inspection 1 B 1B Low 2. Develop CWMP EPC Contractor
ST02,
ADNOC-HSE-EN-
ST04 Company WMP Routine CEMP Audit

Tadweer requirements
15. General Construction 1. Liquid Discharges - Surface runoffs Not considered applicable

16. General Construction 1. Waste Disposal - Domestic / Controlled generation of waste ADNOC-HSE-EN- ADNOC HSE-EN-ST04 ADNOC-HSE-EN-ST04 1 B 1B Low 2. Develop CWMP EPC Contractor
ST04

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 46 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 1. Habshan & Bab Telecom System Upgrade - Construction

Is a Legal Significance of Impact & Risk after mitigation


Requirement measures
Preventative and Control
Activity Aspect Impact/Consequences (Community Monitoring Measures Recommendations Responsibility
Measures
Concerns and Impact
Reputational Risks) Severity Duration RR
Severity

municipal wastes Tadweer ADNOC-HSE-EN-ST05


Requirements Company WMP

17. General Construction 1. Waste Disposal - Non-hazardous Controlled generation of waste ADNOC-HSE-EN- ADNOC HSE-EN-ST04 ADNOC-HSE-EN-ST04 1 B 1B Low 2. Develop CWMP EPC Contractor
industrial wastes ST04 ADNOC-HSE-EN-ST05
Tadweer
Requirements Company WMP

18. General Construction 1. Waste Disposal - Surface runoff Not considered applicable
(Drainage)

19. General Construction 1. Waste Disposal - Hazardous Controlled generation of waste ADNOC-HSE-EN- ADNOC-HSE-EN-ST04 ADNOC-HSE-EN-ST04 1 B 1B Low 2. Develop CWMP EPC Contractor
wastes ST04 Company WMP ADNOC-HSE-EN-ST05
Tadweer
Requirements

20. General Construction 1. Waste Disposal - NORM Not considered applicable

21. General Construction 1. Resource Composition - Land use Not considered applicable

22. General Construction 1. Resource Composition - Not considered applicable


Groundwater Consumption

23. General Construction 1. Resource Composition - Electric Not considered applicable


power Consumption

24. General Construction 1. Resource Composition - Fuel Limited usage for Vehicles. Usage considered
Consumption (Diesel, Natural Gas, negligible
Petrol)

25. General Construction 1. Resource Composition - Water General use for drinking and general site
Consumption activities. Usage considered negligible.

26. General Construction 1. Resource Composition - Material Material for construction not considered in limited
Consumption supply.

27. General Construction 1. Physical Interactions - Noise Localized noise generation ADNOC-HSE-EN- Regular Maintenance Routine CEMP Audit of 1 B 1B Low 1. Develop CEMP EPC Contractor
ST02 ADNOC HSE Approval of maintenance /inspection
Equipment records

28. General Construction 1. Physical Interactions - Artificial Not considered applicable


Lighting

29. General Construction 1. Physical Interactions - Ground Localized excavation, no new land take,
Disturbance considered negligible impacts on ecological
sensitivities.

30. General Construction 1. Use of Restricted Substances - Considered unlikely to occur


Loss of radioactive sources

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 47 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 1. Habshan & Bab Telecom System Upgrade - Construction

Is a Legal Significance of Impact & Risk after mitigation


Requirement measures
Preventative and Control
Activity Aspect Impact/Consequences (Community Monitoring Measures Recommendations Responsibility
Measures
Concerns and Impact
Reputational Risks) Severity Duration RR
Severity

31. General Construction 1. Use of Restricted Substances - Not considered applicable - use not permitted
Release of Ozone Depleting
Substances (ODS)

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 48 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE


PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

ATTACHMENT 3 – OHID WORKSHEET

CONSULTANT Doc. Document No. Doc. Page


No. Class
3415076 RPT-7006-GG-01-61-00-004 2 49 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0

Node: 1. Habshan & Bab Telecom System Upgrade - Construction / Demolition

Category of Initial Risk


Type of
Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

1. Physical 1. Noise Construction / Demolition Hearing Acute: Temporary Construction / Daily 8-10 Hrs. 60 to 80 at peak A/C Compliance with Company 5 B 5B
Hazards activities (Machinery tools, Threshold Shift (TTS) demolition crew activity level Hearing Conservation (Unli
pneumatic hammer, Diesel Chronic: Noise Induced Programme kely)
generator) Hearing Loss (NIHL).
Permanent Threshold shift.
Compliance with ADNOC
Standard HSE-OH-ST08 on
Physical Agents

Compliance with Contractor


PPE Procedure

Equipment maintained
(Planned Preventative
Maintenance)

Company Approved Procedure

COMPANY approved
Construction Equipment

2. Vibration (Hand arm Use of vibrating tools and Whole Body Acute: Fatigue, Muscular Construction / 4-6 Hrs 5 to 10 A/C COMPANY approved 4 C 4C
Vibration) equipment, operating hand pain , tingling in the demolition crew Construction Equipment (Pos
tools impact e.g. Pneumatic hand or arm sible)
Jack Hammer, Impact Chronic : Hand Arm
wrenches, grinders Vibration Syndrome Equipment maintained
(HAVS) (Planned Preventative
Maintenance)

Job duration and rotation


(personnel will take breaks by
doing different tasks)

Company Approved Procedure

Compliance with ADNOC


Standard HSE-OH-ST08 on
Physical Agents

Compliance with Contractor


PPE & RPE Procedure

Anti Vibration gloves provided

HSE Management Plan

3. Thermal Environment (Heat Construction / Demolition Whole Body Acute: Heat related illness, Construction / Daily 6-8 Hrs. 60 to 80 at peak A Company Heat Stress 4 C 4C
and Humidity) activities in Summer months Heat exhaustion, cramps, demolition crew activity level Management Programme (Pos
rash sible)
Heat Stress Management

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 50 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 1. Habshan & Bab Telecom System Upgrade - Construction / Demolition

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

Prickly heat, fatigue, salt Procedure submitted to


loss Company
Heat Stress, Potential heat
stroke leading to fatality
Federal regulation on mid-day
break during summer

Compliance with ADNOC


Standard HSE-OH-ST08 on
Physical Agents

PTW for restricted hours

Buddy system

Compliance with TWL

4. Non-Ionizing Radiation - UV, Working under direct sun Whole Body Acute: Redness of Skin, Construction / Occasionally 6- 6-8 A/C Company Heat Stress 3 C 3C
Visible, IR from sunlight during Summer months/ Arc Sun burn demolition crew 8 Hrs. Management Programme (Pos
Welding Chronic: Potential Skin sible)
Cancer
Heat Stress Management
Procedure submitted to
Company

Federal regulation on mid-day


break during summer

Compliance with ADNOC


Standard HSE-OH-ST08 on
Physical Agents

PTW for restricted hours

5. Ionizing Radiations - NORM Not Applicable

6. Ionizing Radiations Not Applicable

7. Electromagnetic Radiation- Not Applicable


Laser, Infra-red

8. Lighting / Illumination Work at night/ working in Eye Acute: Eye strain, fatigue Construction / Occasional 3-4 A Illumination as per design 2 B 2B
dark location demolition crew specification ADNOC HSE-OH- (Unli
ST-11 recommended kely)
illumination levels

Compliance with ADNOC HSE-


OH-ST11

PTW

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 51 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 1. Habshan & Bab Telecom System Upgrade - Construction / Demolition

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

Company Approved Procedure

2. Chemical 1. Toxic Solids -Dust - Construction / Demolition Inhalation, Dermal, Acute: Eye Respiratory Construction / Daily 8-10 Hrs. 40-50 A Compliance with Contractor 2 C 2C
Hazard Inhalable dust activities Eye. irritation demolition crew PPE & RPE Procedure (Pos
sible)
Dust Suppression

Approved Method Statement


and TRA

2. Toxic Liquid -Diesel Fuel Refueling activities Inhalation, Dermal, Acute: Skin irritant, eyes Refueling Twice a week, 1-2 A/C Company Safe operating 4 B 4B
Eye. and Respiratory irritation Operator 1-2 hrs. procedure (Unli
construction activities on inhalation of vapor kely)
Hazardous Materials Storage
and Handling Procedure
Chronic: Dermatitis,
Defatting
Compliance with Contractor
PPE & RPE Procedure

Approved TRA for refueling

3. Toxic Liquid -Paint, Solvent, Painting Activities during Inhalation, Dermal, Acute: Drowsiness, Painters and Occasional 6-8 A/C Company Approved Painting 3 C 3C
Thinner Construction. Demolition Eye. defatting of skin and eye helpers Procedure (Pos
activities of painted surfaces irritation. Chronic: sible)
Long term harmful effect
[depending on types of Compliance with ADNOC
chemicals and solvents Standard HSE-OH-ST09 on
present in paints and Chemical Agents
coatings]
PTW

RPE/PPE

4. Toxic Gas -Welding Fumes Fumes from Welding Inhalation Acute: Eye and Respiratory Welding crew 4-6 hours 2-4 A/C Company Welding Procedure 3 C 3C
activities during construction irritation (Pos
Chronic: Respiratory sible)
ailment related to Welding; LEV in Confined Space
Effect depend on the
material welded on. Confined Space procedure

Welding and Hot Works


Procedure to be submitted to
ADNOC

Welding Booth

PTW

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 52 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 1. Habshan & Bab Telecom System Upgrade - Construction / Demolition

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

Compliance with Contractor


PPE & RPE Procedure

5. Asbestos Not applicable

6. Manmade Mineral Fiber No additional concern

7. Cement Mix Concreting / Cementing Dermal / Skin Acute skin irritation Cementing Occasional, 6-8 8-10 A/C PTW 3 B 3B
crew hrs. (Unli
Chronic: dermatitis kely)
Approved Procedure

PPE

8. Corrosive Substances Not Applicable

9. Nitrogen Not Applicable

3. Biological 1. Communicable Diseases Construction and demolition Ingestion and Depending on the Construction / Whole day 60 to 80 at peak A/C ADNOC Medical Services 4 B 4B
Agents crew Inhalation pathogen exposed to Demolition activity level Management guidelines (Unli
crew kely)
Compliance with ADNOC
Standard HSE-OH-ST07 on
Contractor Welfare
Management Standard

Compliance with ADNOC


Standard HSE-OH-ST06 on
Food and Water

Compliance with ADNOC


Standard HSE-OH-ST10 on
Biological Hazard

UAE Federal Law

Medical Insurance

2. Communicable Diseases Construction and demolition Ingestion and Infection due to Corona Construction / Whole day 60 to 80 at peak A/C ADNOC Medical Services 5 B 5B
(COVID-19) crew Inhalation Virus COVID 19 Demolition activity level Management guidelines (Unli
crew kely)
Compliance with ADNOC
Standard HSE-OH-ST07 on
Contractor Welfare
Management Standard

Compliance with ADNOC


Standard HSE-OH-ST06 on
Food and Water

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 53 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 1. Habshan & Bab Telecom System Upgrade - Construction / Demolition

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

Compliance with ADNOC


Standard HSE-OH-ST10 on
Biological Hazard

UAE Federal Law

Medical Insurance

COVID-19 ADNOC Guidelines

COVID-19 advisories

MOHAP Guidelines on COVID-


19

COVID-19 screening before


mobilization

Site specific controls COVID-19


prevention

Accommodation camp
Management guidelines on
COVID-19

3. Food and Water borne Consuming contaminated Ingestion Food Poisoning, Symptoms All Living in the 80 A HACCP certified catering 3 C 3C
organisms (Pathogens) food and water during can vary, depending on Construction/ contractor contractor (Pos
working hours and in what has caused the Demolition Camps sible)
accommodation camp poisoning. Food Poisoning Crew
and all related illness Compliance with ADNOC
depend on the Micro- Standard HSE-OH-ST06 on
organism exposed to. Food and Water

Compliance with ADNOC


Standard HSE-OH-ST07 on
Contractor Welfare
Management Standard

4. Water borne pathogen - Sewage handling and Ingestion E-coli induced ill health, Sewage Daily 2-3 A Compliance with COMPANY 3 B 3B
viruses and bacteria transportation dermatitis, hepatitis handlers Waste Management Procedure (Unli
contained in sewage kely)
Compliance with ADNOC HSE
Standard (HSE-EN-ST04) -
Waste Management Standard

Compliance with ADNOC HSE


Standard (HSE-OH-ST10)
Biological hazard

5. Water borne pathogens - No additional concern

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 54 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 1. Habshan & Bab Telecom System Upgrade - Construction / Demolition

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

Legionella bacteria

6. Snake, scorpions, insects Stings / bite from these Dermal / Skin Allergic reactions, some All During outdoor 60 to 80 at peak A PTW 4 B 4B
creatures during are potentially life Construction/ construction activity level (Unli
construction and demolition threatening allergic. Some Demolition activities kely)
activities are poisonous. Crew Compliance with Contractor
PPE & RPE Procedure

Well illuminated work place if


there is Company Approved
night time work taking place.

7. Poisonous plants (e.g. No additional concern


poison ivy and oak, stinging because it is within the
nettles etc.) existing plant boundaries

8. Large animals (e.g. dogs, No additional concern


cats, rats, African wild because it is within the
animals) existing plant boundaries

9. Disease-transmitting insects No additional concern


(mosquitoes: malaria and because it is within the
yellow fever; ticks: lime existing plant boundaries
disease; fleas: plague)

10. Human immune deficiency No additional concern as it


virus (HIV) is addressed by Federal
UAE Law for residency

4. Ergonomics 1. Poor workplace design, Construction and demolition Whole Body Musculoskeletal disorders, Construction / Daily 8-10 Hrs. 60 to 80 at peak Design specifications 3 B 3B
leading to awkward activities RSI, Work related upper Demolition activity level (Unli
postures, repetitive limb disorder (WRULD). crew kely)
movements, excessive Compliance with ADNOC HSE
stretching, bending, pushing Standard (HSE-OH-ST11) -
and pulling) Ergonomics Hazard Standard

Company Approved
Construction HSE Plan

2. Incompatible hand controls Manual Material Handling Whole Body Acute: fatigue, muscular Construction / Daily 8-10 Hrs A/C Company Approved Procedure 3 C 3C
(Manual materials Handling during Construction/ pain and Sprain, Demolition (Pos
Pushing, pulling or handling demolition activities Chronic : MSD of Back and crew sible)
heavy objects) Work Related Upper Limb Compliance with ADNOC
Disorder (WRULD Standard HSE-OH-ST11

HSE Management Plan

Approved Method Statement


and TRA

Mechanical aid

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 55 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 1. Habshan & Bab Telecom System Upgrade - Construction / Demolition

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

Compliance with Contractor


PPE & RPE Procedure

3. Awkward location of Installation of CCTV Whole Body Acute: fatigue, muscular Construction / Occasional 4-5 A/C Compliance with ADNOC 3 B 3B
workplaces and machinery Cameras and speakers pain and Sprain, Demolition Standard HSE-OH-ST11 (Unli
Chronic : MSD of Back and crew kely)
Work Related Upper Limb
Disorder (WRULD Company Approved Procedure

HSE Management Plan

Approved Method Statement


and TRA

Compliance with Contractor


PPE & RPE Procedure

4. Work planning issue (High No additional concern as


workload, lack of clear project planning and
planning) manpower distribution plan
are in place

5. Mismatch of work No additional concerns as


environment to cognitive specific workforce has been
skills, capabilities and identified for relevant task
limitations of workforce as part of resource
deployment schedule

6. Mismatch of task No additional concerns as


requirements to physical specific workforce has been
skills, capabilities and identified for relevant task
limitation of workforce as part of resource
deployment schedule

5. Psychological 1. Living away from family for Construction/ demolition Stress related ill health All Throughout the 60 to 80 at peak Company Contractor welfare 2 C 2C
Factors job activities Construction / work period activity level initiatives (Pos
demolition crew sible)
Compliance with ADNOC
Standard HSE-OH-ST07 on
Contractor Welfare
Management Standard

2. Long and irregular working No additional concern. Stress related ill health All Throughout the 60 to 80 at peak Company Contractor welfare 2 C 2C
hours; working cycles; shift Construction / work period activity level initiatives (Pos
work, Organizational stress demolition crew sible)
e.g. poor communications,
inappropriate targets Compliance with ADNOC
Standard HSE-OH-ST07 on
Contractor Welfare
Management Standard

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 56 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 1. Habshan & Bab Telecom System Upgrade - Construction / Demolition

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

3. Lack of social activities due Construction/ demolition Stress related ill health All Throughout the 60 to 80 at peak Company Contractor welfare 2 C 2C
to COVID 19 protocol activities Construction / work period activity level initiatives (Pos
demolition crew sible)
Compliance with ADNOC
Standard HSE-OH-ST07 on
Contractor Welfare
Management Standard

4. Post-traumatic stress No additional concern as


this will be addressed as
per HSE Plan approved by
the COMPANY

5. Fatigue No additional concern as


this will be addressed as
per HSE Plan approved by
the COMPANY

6. Shift work No additional concern as


this will be addressed as
per HSE Plan approved by
the COMPANY

6. Lifestyle 1. Smoking No additional concern. As


Factors per compliance to company
no smoking policy

2. Lack of physical exercise No additional concern

3. Alcohol and drugs abuses Not applicable as per


COMPANY Standards and
UAE regulations

4. Unbalanced diet Eating and drinking in the Ingestion Poor health condition due All Residents in while eating 60 to 80 at peak A Compliance with ADNOC HSE 2 C 2C
accommodation to unbalance diet the camp activity level Standard (HSE-OH-ST07) - (Pos
Contractor Welfare sible)
Management Standard

Compliance with ADNOC HSE


Standard (HSE-OH-ST06)
Food and water

5. Interrupted sleep patterns No additional concern as it


will be compliance with
ADNOC HSE Standard
(HSE-OH-ST07) - Welfare
Standard and ADNOC
Medical Services Guidelines

7. Living 1. Infectious diseases No additional concern as it


environment will be compliance with
(Public ADNOC HSE Standard
Health) (HSE-OH-ST07) - Welfare

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 57 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 1. Habshan & Bab Telecom System Upgrade - Construction / Demolition

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

Factors Standard

2. Contaminated drinking water No additional concern as it


supply is compliance with ADNOC
HSE Standard (HSE-OH-
ST06) - Food and water
safety standard and
ADNOC HSE Standard
(HSE-OH-ST07) - Welfare
Management Standard

3. Poor medical infra-structure No additional concern as all


the activities are in
compliance with ADNOC
Medical Services Division
Guidelines

4. Environmental health No additional concern as it


hazards e.g. Air pollution, will be compliance with
radiation hazards ADNOC HSE Standard
(HSE-OH-ST07) - Welfare
Management Standard

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 58 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 2. Habshan & Bab Telecom System Upgrade - Operation

Category of Initial Risk


Type of
Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

1. Physical 1. Noise No additional concerns as


Hazards no new noise generating
Equipment introduced as
part of the Project. Similar
hazard already exist at site
and relevant applicable
controls are in place

2. Noise (Design) Use of public address Hearing Speech interference Operators / During public 10-20 A Design specifications
system affecting communication Maintenance address
crew
In the design of PAGA System,
these aspects have been
addressed

3. Vibration (Hand arm No additional concern


Vibration)

4. Thermal Environment (Heat No additional concerns.


and Humidity) Similar hazard already exist
at site and relevant
applicable controls are in
place

5. Non-Ionizing Radiation - UV, No additional concerns.


Visible, IR from sunlight Similar hazard already exist
at site and relevant
applicable controls are in
place

6. 4. Non-Ionizing Radiation - Not Applicable


Laser

7. Ionizing Radiations - NORM Not Applicable

8. Ionizing Radiations Not Applicable

2. Chemical 1. Dust - Inhalable dust No additional concerns.


Hazard (nuisance dust - not Similar hazard already exist
otherwise regulated) at site and relevant
applicable controls are in
place

2. Diesel Fuel No additional concerns.


Similar hazard already exist
at site and relevant
applicable controls are in
place

3. Toxic liquid No additional concerns

Paint Solvents, touch paint


& Thinners (VOCs)

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 59 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 2. Habshan & Bab Telecom System Upgrade - Operation

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

4. Toxic solids No additional concerns.


Similar hazard already exist
at site and relevant
applicable controls are in
place

5. Corrosive Not applicable

6. Irritant Not applicable

7. Nitrogen Not applicable

3. Biological 1. Communicable Diseases No additional concerns.


Agents Similar hazard already exist
at site and relevant
applicable controls are in
place

2. Food and Water borne No additional concerns.


organisms (Pathogens) Similar hazard already exist
at site and relevant
applicable controls are in
place

3. Snake, scorpions, insects No additional concerns.


Similar hazard already exist
at site and relevant
applicable controls are in
place

4. Water borne pathogen - No additional concerns.


Legionella bacteria Similar hazard already exist
at site and relevant
applicable controls are in
place

5. Pathogens / Sewage No additional concerns.


Similar hazard already exist
at site and relevant
applicable controls are in
place

6. Poisonous plants (e.g. No additional concerns.


poison ivy and oak, stinging Similar hazard already exist
nettles etc.) at site and relevant
applicable controls are in
place

7. Large animals (e.g. dogs, No additional concerns.


cats, rats, African wild Similar hazard already exist
animals) at site and relevant
applicable controls are in

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 60 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 2. Habshan & Bab Telecom System Upgrade - Operation

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

place

8. Small animals (snakes, No additional concerns.


scorpions, lizards) Similar hazard already exist
at site and relevant
applicable controls are in
place

9. Disease-transmitting insects No additional concerns.


(mosquitoes: malaria and Similar hazard already exist
yellow fever; ticks: lime at site and relevant
disease; fleas: plague) applicable controls are in
place

10. Human immune deficiency Not Applicable as UAE


virus (HIV) Government and ADNOC
Health Services Standards
will not allow infected
personnel to work.

4. Ergonomics 1. Poor workplace design, Working at workstations for Whole Body Work related Upper Limb Telecom Daily 2 hrs. 2-4 A/C Design specifications 3 B 3B
leading to awkward controls and collecting data Disorder (WRULD), Operators (Unlik
postures, repetitive Muscular Skeletal Disorder ely)
movements, excessive (MSD) Compliance with ADNOC HSE
stretching, bending, pushing Standard (HSE-OH-ST11) -
and pulling) Ergonomics Hazard Standard

2. Incompatible hand controls No additional concern as


(Manual Handling Pushing, the new design is in line
pulling or handling heavy with COMPANY ergonomics
objects) requirement

3. Awkward location of work No additional concern as


places, machinery and the new design is in line
equipment with COMPANY ergonomics
requirement

4. Work planning issue (High No additional concern as


workload, lack of clear the new design is in line
planning) with COMPANY ergonomics
requirement

5. Mismatch of work No additional concern as


environment to cognitive the new design is in line
skills, capabilities and with COMPANY ergonomics
limitations of workforce requirement

6. Mismatch of task No additional concern as


requirements to physical the new design is in line
skills, capabilities and with COMPANY ergonomics
limitation of workforce requirement

7. Manual Handling Pushing, Not applicable

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 61 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 2. Habshan & Bab Telecom System Upgrade - Operation

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

pulling or handling heavy


objects.

5. Psychological 1. Living away from family for Covered as per existing


Factors job procedures, no additional
concern

2. Long and irregular working Covered as per existing


hours; working cycles; shift procedures, no additional
work, Organizational stress concern
e.g. poor communications,
inappropriate targets

3. Post-traumatic stress Covered as per existing


procedures, no additional
concern

4. Shift work Covered as per existing


procedures, no additional
concern

6. Lifestyle 1. Smoking Not applicable


Factors
2. Lack of physical exercise No additional concerns as it
is managed by the existing
System

3. Alcohol and drugs abuse No additional concerns as it


is managed by the existing
System

4. Unbalanced diet No additional concerns as it


is managed by the existing
System

5. Interrupted sleep patterns No additional concerns as it


is managed by the existing
System

7. Living 1. Infectious diseases No additional concerns.


environment Similar hazard already exist
(Public at site and relevant
Health) applicable controls are in
Factors place

2. Contaminated drinking water No additional concerns.


supply Similar hazard already exist
at site and relevant
applicable controls are in
place

3. Poor medical infra-structure No additional concerns.

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 62 of 63
ADNOC GAS PROCESSING

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT No. 7006

Rev.
HSEIA SCREENING REPORT
0
Node: 2. Habshan & Bab Telecom System Upgrade - Operation

Category of Type of Initial Risk


Hazard Consequence / Health People Frequency / No. Of Emp. Recommended Action By /
Hazard Activity / Task / Source Exposure route exposure Existing Controls
Category Effects exposed Duration Exposed Action (When)
Acute / Chronic SH LH RR
(SEG)

Similar hazard already exist


at site and relevant
applicable controls are in
place

4. Environmental health No additional concerns.


hazards e.g. Air pollution, Similar hazard already exist
radiation hazards at site and relevant
applicable controls are in
place

CONSULTANT Doc. No. Document No. Doc. Class Page


3415076 RPT-7006-GG-01-61-00-004 2 63 of 63