1.

0 PURPOSE
The purpose of this document is to check and verify that CellBRx® Bioreactor system
is fully functional and not having any issues with any operations in the system after
any maintenance or repair work done on the system.
2.0 System details :
System Name : _______________________________________________________
Art. No : _______________________________________________________
Sr. No : _______________________________________________________

3.0 Test protocol :


Sr.
Check Points Pass / Fail Remark
No.
Check the power supply and power cord cable
1.
connection for docking station.
Check the power supply and power cord cable
2.
connection for controller unit.
Check and ensure that all the mounting screws are
3.
tighten properly and not having any loose ends.
Check the communication cable between docking
4.
station and controller unit.
Check the connector of pump unit connected to
5.
docking station.
Check the connector of trypsinization unit connected
6.
to docking station.
Check the temperature sensor, pH sensor cable and
7.
level sensor cable.
Check the disk motor cable and fitment of disk
8.
motor.
Power on the system and check for the system on
9.
status.
Check and verify communication between docking
10.
station and controller unit.
Verify functioning of Vans motor by turning on and
11.
off the motor from controller unit.
Verify functioning of Disc/Vibration motor by turning
12.
on and off the motor from controller unit.
Verify functioning of Base pump by turning on and
13.
off the pump from controller unit.

P a g e | 1 of 2
Sr.
Check Points Pass / Fail Remark
No.
Verify functioning of Perfusion pump by turning on
14.
and off the pump from controller unit.
Verify functioning of Harvest pump by turning on
15.
and off the pump from controller unit.
Verify functioning of Recirculation pump by turning
16.
on and off the pump from controller unit.
Connect any pH probe to the cable and verify
17.
response on the controller screen.
Check and verify the green pulsing light on the
18.
docking for DO transmitter.
Verify temperature sensor working by placing it in
19.
any room temperature water.

Remark:_________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________

3.0 Signatures

Name Date Signature

Performed by

Witnessed/reviewed by

P a g e | 2 of 2