Structural Steelwork - On Site Erection CHECKLIST 1102
Project
NO. STANDARD CHECK REMARKS
A DESKTOP STUDY 1 Method of erection and safety precaution approved by OIC Y N NA 2 PE design (including erection stress calculation) & Certificate of Y N NA Supervision for temporary structure, support bracings and tie backs submitted to and approved by OIC 3 Types of crane/lifting equipment approved by OIC Y N NA B SET UP 1 Obtained OIC's permission to start erecting on site Y N NA 2 Structure alignment, level, plumb & correct : Inspected Y N NA foundations for line & level, holding down bolts for position, protruding length , condition & slackness 3 Verified connecting structures' correct position & alignment for Y N NA erection 4 Provided temporary guys/bracings , safe work platform & access Y N NA 5 Informed OIC of any defects of detailing or fabrication errors and Y N NA obtained approval before starting remedial works C STRUCTURE DIMENSION & CONDITION 1 Verified all dimensions and orientation Y N NA 2 Verified bolts & holes quantity, level and position Y N NA 3 Checked joints as per details Y N NA 4 Checked overall steel structure quality is acceptable, clean and Y N NA ready for erection 5 Protection provided to prevent paint damage Y N NA D STRUCTURE LIFTING 1 Steel structure lifting equipment in good condition Y N NA 2 Steel fixers provided with proper safety equipment Y N NA E STRUCTURE ERECTION & FIXING 1 Correct bolts and nuts, material, grade and size Y N NA 2 All bolts properly tightened to correct torque with min 1.5mm Y N NA thread beyond nut 3 Steel structures erected within construction tolerances Y N NA 4 Seal bolt holes in tubes and other hollow sections with OIC Y N NA approved method to prevent access of moisture 5 Grouting installed to the bottom of column plate Y N NA F CORROSION AND FIRE PROTECTION COATING 1 Specification & thickness of material conforms with approved Y N NA plan and specifications 2 Corrosion and/or Fire Protection coatings evenly applied with no Y N NA damage to the coatings