Glacier Pulilan Revised - Tadashitec

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

QUOTATION

Date: March 25, 2023


Quotation No: GLACIER-2024-0001
GLACIER PULILAN Quotation Valid Until: 15 DAYS
Sales Person: Joana Buban

ATTENTION : Engr. Ronel B. Canaria


rbcanaria.gpulilan@glacier.com.ph

SUBJECT : PROPOSAL FOR DRIVE IN RACKING SYSTEM – REVISED 1

Dear Ma’am / Sir:


Thank you very much for inviting us to quote on your requirement, Please see here under our formal
proposal for your evaluation and approval.

QUOTATION
To Supply, Deliver and Install
ITEM PRODUCT DESCRIPTION QTY U.O.M UNIT PRICE TOTAL AMOUNT
A.) DRIVE IN RACKING SYSTEM
1 FRAME 1 A.)Upright Frame – 11175mmH x 214 Sets Php 20,360.00 Php 4,357,040.00
1050mmD x Z120 x 135 (Q355B)
2 SPACER 1 A.)Row Spacer – 1050mmL x J50 x 30 749 Pcs 265.00 198,485.00
3 ARM A.)Double Arm 1284 Pcs 390.00 500,760.00
4 BEAM 1 A.)Top Beam -1380mmL x J80 392 Pcs 590.00 231,280.00
5 BEAM 2 A.)Back Beam -1380mmL x J80 1176 Pcs 490.00 576,240.00
6 BRACING 1 A.)Top Cross Bracing for Top Beam – 392 Pcs 215.00 84,280.00
1734mmL x C40 x 24
7 BRACING 2 A.)Back Cross Bracing – 2094mmL 61 Pcs 7,150.00 436,150.00
8 RAIL 1 A.)Pallet Rail – 3150mmL 1176 Pcs 1,065.00 1,252,440.00
9 PROTECTOR A.)Guard Post – 900mmH x Z90 x 70 107 Pcs 830.00 88,810.00
10 FLOOR RAIL A.)Floor Guide Rail – 3150mmL 107 Set 2,195.00 234,865.00
11 SPACER 2 A.)Row Spacer for Back Bracing - 61 Pcs 1,985.00 121,085.00
12 STRUCTURAL A.)Structural Beam - 1 Lot 78,500.00 78,500.00
BEAM
SUB-TOTAL AMOUNT Php 8,159,935.00
B.) RACKING SERVICES -
1 INSTALLATION A.)Installation of Existing Drive In 38 Sets Php 220,000.00 Php 220,000.00
WORKS Racking System – 1386 Pallet Position
2 Supply – A.)Supply of Anchor Bolts/ Floor Fixing 1 Lot 30,000.00 30,000.00
Anchor Bolts Bolts
SUB-TOTAL AMOUNT Php 250,000.00
C.) SPARE PARTS -
1 FRAME 1 A.)Upright Frame – 11175mmH x 10 Sets Php 20,360.00 Php 203,600.00
1050mmD x Z120 x 135 (Q355B)
2 Anchor Bolts A.)Anchor Bolts - 1500 Pcs 20.00 30,000.00
3 Bolts & Nuts A.Bolts & Nuts for Bracing 2000 Pcs 15.00 30,000.00
4 ARM 1 A.)Single Arm 10 Pcs 340.00 3,400.00
5 ARM 2 A.)Double Arm 10 Pcs 390.00 3,900.00
6 RAIL 1 (LEFT) A.)Pallet Rail – 3150mmL 10 Pcs 1,065.00 10,650.00
7 RAIL 1 (RIGHT) A.)Pallet Rail – 3150mmL 10 Pcs 1,065.00 10,650.00
8 BEAM 1 A.)Back Beam -1380mmL x J80 10 Pcs 490.00 4,900.00
9 BEAM 2 A.)Back Beam -1380mmL x J80 10 Pcs 490.00 4,900.00
10 BEAM 3 A.)Back Beam -1380mmL x J80 10 Pcs 490.00 4,900.00
SUB-TOTAL AMOUNT Php 306,900.00
D.) SUMMARY :
TOTAL AMOUNT Php 8,716,835.00
MOBILIZATION/DEMOBILIZATION/INSTALLATION COST 800,000.00
DELIVERY CHARGE (3 Containers) 120,000.00
TOTAL AMOUNT (VAT EXCLUSIVE) Php 9,636,835.00
DISCOUNT - 486,835.00
BEST PRICE (VAT EXCLUSIVE) Php 9,150,000.00

NOTE: 10 YEARS WARRANTY WITH 12 MONTHS FREE PREVENTIVE


MAINTENANCE AND FREE RACKING SAFETY SEMINAR

SPECIFICATION TABLE
Material construction Q235 B(Commodity: Hot Rolled) & Minimum Yield 235Mpa
Q355B Strength

GB 50009-2012 Building structure Minimum Tensile 235Mpa


Strength
load code; GB 50017-2003 Design Factor:
205
Steel structure design code;
GB 50018-2002 Technical code for
Design Standard
cold-formed thin-walled steel
structure; CECS 23:1990 Design
specification for steel shelf
structure

Coating Standard -Thickness:60-80u Brand Tadashitec


-Adhesion:ASTM D3359-02
-Heat Resistance: 10 min at 180 Bolt Spec and High Tensile grade
Degree Strength 8.8/4.8 bolts and
nuts
Racking As stated Upright Safety Factor 1:1.98
Beam Safety Factor 1:1.2
Specification
Max Beam Deflection L/200
Load Capacity As stated

COMMERCIAL TERMS & CONDITIONS


PAYMENT TERMS 50 % Downpayment LANDED
50% FULL PAYMENT UPON COST/DELIVERED
COMPLETION ALREADY TO SITE
Delivery 6-7 weks Type of Packing Loose Loading
Leadtime (ETD)
Quotation Validity 15 Days Note VAT- EXCLUSIVE
Container Volume: Subject to Final Confirmation WITH PACKING LIST FOR DETAILS OF ITEMSDELIVERED

CONDITION:
• The site/area must be free and cleared by customer before installation. Tadashitec reserves the right to refuse installation if the area has
not been cleared.
• The Customer must provide lighting & power needed for the installation of the storage racking system
• The Customer is responsible for the security of all equipment & materials delivered on site.
• Customer must see to it that the area where the racking to be installed upon is specifically designed to carry the load of the storage racks
& the items to be stored
• A company representative is required during the installation process for mobilization & proper coordination.
• Any unauthorized disassembly, re-installation or relocation of the storage racks that have been properly installed shall be charged
accordingly & may void the Product Warranty & Liability.

REMARK:
Please check the quotation & the layout (if any). Upon receipt of your Purchase Order Confirmation, we will treat
the above quotation no. _______ as final and correct and any claims, modifications, changes, or alteration on the
projects that deviate on the final quotation which is the basis of Purchase Order shall be quoted separately.
The prices are subject to current steel prices and shall reserve the right to revise the quoted price should there be a
change in steel prices.

We assure you of the best service at all times. Please do not hesitate to contact us, should you need
further information or clarification. We look forward to a long-term business relationship with your
company.

Thank you very much, we remain.


CONFORME:
Very truly yours,
Name: _____________________________
Signature: __________________________
Date: ______________________________
Joana Rose Buban
Company: __________________________
SALES EXECUTIVE This quotation once approved will serve as contract

PREPARED BY :

SALES DEPT.
CHECKED BY :

Mr. BENJO PAPAGAYO


APPROVED BY :

You might also like