TADASHITEC TADASHITEC

100
75
5800

1000
24

GLOBAL BLOCK A
GLOBAL
8275

8275
EXISTING FOR RE-INSTALL
4900 18100 800 17100
2200

22775

5625
CORPORATION 1 13 1
CORPORATION 11 1 13
24362

7600

7600

7600
TADASHITEC TADASHITEC

400
BLOCK B BLOCK C BLOCK D
4900
5625

GLOBAL EXISTING FOR RE-INSTALL


GLOBAL
7112

7112
7512

23600 800 11100 800 28775


1 42

CORPORATION CORPORATION
DETECTOR

DETECTOR

DETECTOR

DETECTOR

DETECTOR

DETECTOR

DETECTOR

DETECTOR

DETECTOR

DETECTOR
STATION

STATION

STATION

STATION

STATION

STATION

STATION

STATION

STATION

STATION
VALVE

VALVE

VALVE

VALVE

VALVE

VALVE

VALVE

VALVE

VALVE

VALVE
LEAK

LEAK

LEAK

LEAK

LEAK

LEAK

LEAK

LEAK

LEAK

LEAK
HT. =1,030

HT. =1340

HT. =1340

HT. =1,030

HT. =1,030

HT. =1,030

HT. =1,020
L = 3,050

L = 3,400

L = 3,400

L = 3,050

L = 3,050

L = 3,050

L = 3,050
(2x)TAN.2-045-12-E-N-D6-07-HG

(2x)TAN.2-045-12-E-N-D6-07-HG

(2x)TAN.2-063-12-E-L-D6-10-HG
TAN.2-063-12-F-L-D6-10-HG

TAN.2-045-12-E-N-D6-07-HG

TAN.2-063-12-F-L-D6-10-HG

TAN.2-063-12-F-L-D6-10-HG
W = 958

W = 1277

W = 1277

W = 958

WT=450kgs

W = 958

WT=450kgs

W = 958

W = 758
wt=505kgs

wt=780kgs each

wt=780kgs each

wt=165kgs

wt.=450kgs each
STORAGE RACKING CAPACITY
RACKS TYPE LANES DEEP - HIGH TOTAL P.P.
BLOCK A 24 LANES 3-7 504
BLOCK B 13 LANES 6-7 546
BLOCK C 11 LANES 6-7 462
BLOCK D 13 LANES 6-7 546
EXISTING DRIVE IN 66 LANES 3-7 1386
TOTAL PALLET POSITION: 3444

NOTE:
DESIGN SUBJECT TO CHANGE
UPON VERIFICATION OF ACTUAL
SITE DIMENSIONS

PROJECT TITLE CLIENT NAME DESIGNED BY: APPROVED BY: SHEET NO.
RA 9266, ARTICLE IV, SECTION 33: EUGENE
IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE TO MAKE SALES EXEC:

Rudanel Bldg. 2, Unit B , 2nd floor,Southpoint Subdivision,Banaybanay,Cabuyao,City


Tel. No. 049-544-6786 / 049-544-6733
DRIVE IN RACK
GLACIER
COPIES OF SAID DOCUMENTS FOR UP REPETITION OF AND OTHER
PROJECTS OF BUILDING, WHETHER EXECUTED PARTLY OR IN WHOLE,
WITHOUT THE WRITTEN C OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS
JOANA
CHECKED BY:
-
NAME:
DATE:
S-01
LOCATION:
Email: sales.tadashitec@gmail.com / tadashitec@yahoo.com DATE: -
1380 1380 1380 1380 1380 1380
HORIZONTAL BRACING

1553 1000KG 1000KG 1000KG

TADASHITEC 1000KG 1000KG 1000KG


BEAM TADASHITEC
BACK STOPPER
DRIVE IN ARM

GLOBAL GLOBAL
1575

UPRIGHT POST

CORPORATION CORPORATION
1000KG 1000KG 1000KG
1575
11280 FLOOR TO CEILING

1000KG 1000KG 1000KG


11175
1575

DIAGONAL BRACING

TADASHITEC TADASHITEC
82
93

1000KG 1000KG 1000KG


1575

GLOBAL 1000KG 1000KG 1000KG


GLOBAL
CORPORATION CORPORATION
1575

560

1000KG 1000KG 1000KG


1650

1242 1242 1242 1242 1242 1242 1050 1050 1050


3150

NOTE:
DESIGN SUBJECT TO CHANGE
UPON VERIFICATION OF ACTUAL
SITE DIMENSIONS

PROJECT TITLE CLIENT NAME DESIGNED BY: APPROVED BY: SHEET NO.
RA 9266, ARTICLE IV, SECTION 33: EUGENE
IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE TO MAKE SALES EXEC:

Rudanel Bldg. 2, Unit B , 2nd floor,Southpoint Subdivision,Banaybanay,Cabuyao,City


Tel. No. 049-544-6786 / 049-544-6733
DRIVE IN RACK
GLACIER
COPIES OF SAID DOCUMENTS FOR UP REPETITION OF AND OTHER
PROJECTS OF BUILDING, WHETHER EXECUTED PARTLY OR IN WHOLE,
WITHOUT THE WRITTEN C OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS
JO-AN
CHECKED BY:
-
NAME:
DATE:
S-01
LOCATION:
Email: sales.tadashitec@gmail.com / tadashitec@yahoo.com DATE: -

You might also like