Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

SHIFT WISE DAILY

SHIFT MONDAY TUESDAY

E.A.F-1 LAUNDER CAR PM(OIL


LEVEL CHECK,LEAKAGE ARRESTING
E.A.F-1 GANTRY WHEEL ,PIVOT PIN
IF ANY,BASE BOLT
GREASING AND GANTRY PIN
TIGHTNESS,WHEEL
CHECKING TO BE DONE.
GREASING,LAUNDER CAR ALL BOLT
CHECKING TO BE DONE)
A-SHIFT

E.A.F-2 GANTRY WHEEL ,PIVOT PIN E.A.F-2 LAUNDER CAR PM(OIL


GREASING AND GANTRY PIN LEVEL CHECK,LEAKAGE ARRESTING
CHECKING TO BE DONE. IF ANY,BASE BOLT
TIGHTNESS,WHEEL
GREASING,LAUNDER CAR ALL BOLT
B- SHIFT CHECKING TO BE DONE)

C - SHIFT
IFT WISE DAILY PM ACTIVITIES
WEDNESDAY THRUSDAY FRIDAY

L.R.F-3 MAST ROLLER


E.A.F-1 GANTRY
CLEANING AND WIRE FEEDER
E.A.F-1 TAPPING CAR PM WHEEL ,PIVOT PIN GREASING
CLEANING(IF L.R.F IS
E.A.F-2 TAPPING CAR PM AND GANTRY PIN CHECKING
AVAILABLE OR WHEN HEAT
TO BE DONE
IS TAKEN OUT FROM L.R.F)

1. L.R.F-1 BOTH LTC CAR PM


1. ALL L.R.F BOOSTER FAN
2.L.R.F-1 MAST ROLLER E.A.F-2 GANTRY
GREASING.
CLEANING AND WIRE FEEDER WHEEL ,PIVOT PIN GREASING
2. VD HOT WELL
CLEANING(IF L.R.F IS AVAILABLE AND GANTRY PIN CHECKING
PUMP GENERAL CHECKING
OR BETWEEN THE TIME WHEN TO BE DONE
AND GREASING TO BE DONE.
HEAT IS TAKEN OUT FROM L.R.F)
SATURDAY SUNDAY

ALL PRE-HEATER GENERAL L.R.F-3 LTC CAR PM


CHECKING TO BE DONE L.R.F-2 LTC CAR PM

L.R.F-2 MAST ROLLER


CLEANING AND WIRE FEEDER
E.A.F-1 AND E.A.F-2 MAST
CLEANING(IF L.R.F IS
GUIDE ROLLERS CLEANING
AVAILABLE OR WHEN HEAT IS
TAKEN OUT FROM L.R.F)

You might also like