Scheduling Training Slide Basic_Rev.jun11 for MSP2010
Scheduling Training Slide Basic_Rev.jun11 for MSP2010
JULAI 2011
Ringkasan Kandungan Kursus
Perancangan Kos Projek
Perancangan Skop Projek Menentukan Penggunaan
Memahami Skop Projek Sumber Kerja
Menyediakan WBS Menentukan Kos Perbelanjaan
Mengenalpasti Milestones Sumber
Menganggar Kos Kerja
Perancangan Jadual Masa Kerja Menghasilkan S- Curve
(Kewangan)
Menentukan Susunan Cara Kerja
Merancang Kegunaan Sumber
Pemantauan Kerja Projek
Menentukan Tempoh Kerja
Pengesanan Kemajuan
Merancang Kalender Projek
Menentukan Baseline
Penggunaan CPM Mengesan Kemajuan Jadual
Mengenalpasti kerja- kerja kritikal Dan Sebenar Projek
Menentukan Masa Apungan ‘Float Mengenalpasti Perbezaan
Time’
Penggunaan Kaedah
Memendekkan Jadual Kerja
Fast Tracking
Crashing
Objektif Kursus
4
Kenapa Pentingnya Penjadualan
Kontraktor
5
Kenapa Pentingnya Penjadualan
Pelanggan
6
Kenapa Pentingnya Penjadualan
Apa akan berlaku jika jadual projek tidak dipantau??
• Over quantity
• Over payment
• Bad quality
Microsoft Project
KES PROJEK
KES PROJEK
= RM 180,000
PENGENALAN
(Hands-On)
KEY PLANNING PROCESSES FOR SCHEDULING &
ESTIMATING
Time Management
Activity
Scope
Sequencing
Definition
Schedule
Create WBS Development
Activity Activity
Resource Duration
Planning Estimating
Scope
Cost Cost
Management
Estimating Budgeting
Cost Management
SOFTWARE MSPROJECT
MS PROJECT
JKR requirement
US – follow PMBOK
LICENSE RM 2-3k (easy copy of pirated)
User friendly
PRIMAVERA
JKR Requirement
License RM 15K
US – follow PMBOK
MICROSOFT PROJECT
Aktiviti Level 2 A B C
Fasa
Aktiviti Level 3 A1
Aktiviti
A1.1.1
PECAHAN KERJA (SENARAI WBS KEPADA CARTA WBS)
(Hands-on 1)
Blok A
Projek JKR Kerja Tanah
Kerja Struktur
Projek Mula Kerja Arkitek
Kerja M&E
Preliminaries Blok B
Performance Bond / Insurance Kerja Tanah
Kerja Struktur
(Initial Cost)
Kerja Arkitek
Establish & Removal of Site Kerja M&E
Completion of Cable Laying By TNB
Office (Initial & On Completion)
Testing & Commissioning
Maintenance of Site Office Projek Siap
(Maintenance)
Progress Report (Recurring)
Highlight &
indent
SISTEM KOD WBS
Highlight &
insert coloumn
SISTEM KOD WBS
Sistem Kod
WBS
SUMMARY TASK & SUB - TASK
Summary Task
Sub- Task
1 summary task
9 Sub- tasks
TASK OUTDENT
Outdent
Menggunakan ‘SHOW’
Menggunakan ‘+’& ‘-’
MEMBINA WBS BAGI TAHAP 3 & SETERUSNYA
1. H/light
2. Right Click & Insert
new task
3. Isikan aktiviti di
bawah preliminaries
MEMBINA WBS BAGI TAHAP 3 & SETERUSNYA
4. H/light
5. Indent
Step 1 : Insert
new task
Step 2 : Enter
The Task
Step 3 : Indent
the task
MEMBINA WBS BAGI TAHAP 3 & SETERUSNYA
SENARAI WBS
MICROSOFT PROJECT
TASK
1/8 15/8
II) MILESTONES
1/8
45
MANUAL SCHEDULE & AUTO SCHEDULE
SELEPAS CLICK AUTO SCHEDULE
MENGENALPASTI SIMBOL
Summary task
Sub-task
Milestone
Recurring task
Hammock
• Tugas yang mempunyai kerja tetapi dibuat oleh pihak luar. 1/8
• Kontraktor tidak tahu skop kerja ini dan bila tarikh siap.
• Perlu ditunjukkan dalam jadual bagi kontraktor memohon EOT
(sebab kerja ini diluar bidang kuasa Kontraktor Utama)
• Ambil tarikh siap sahaja sebagai milestone.
• Tempoh kerja = 0 hari
Contoh : Land Acquisition (oleh Pejabat Tanah) = 0d
Services allocation (oleh TNB/TMB/etc.) = 0d
Cable lying (oleh TNB) = 0d
49
MILESTONES & ‘EXTERNAL DEPENDENCY’
51
MEMBINA ‘RECURRING TASKS’
5 Lap. Kemajuan
Point
Simbol
54
RINGKASAN KERJA DALAM PROJEK
Projek =
Task =
Summary Task =
Sub-Task =
Work =
Milestone =
Recurring Task =
WBS Level =
MICROSOFT PROJECT
1. Method statements
2. Predecessor
3. Successor
4. Link type
5. Lead time
6. Lag time
7. Task constraint
8. Network diagram
PREDECESSOR & SUCCESSOR
Predecessor
Kerja mesti mula @ siap sebelum kerja seterusnya bermula @ siap
Successor
Link (Hubungan)
Akt. A
Akt. B
FS – FINISH TO START – AKT. B TIDAK
BOLEH MULA
SEHINGGA AKT. A SIAP.
- CTH: SIAP BINA TIANG,
BARU BOLEH BINA
DINDING Akt. A
Link (Hubungan)
FF – Finish to Finish – akt. B perlu siap bila akt. Akt. A
A siap.
- cth: pembinaan dinding
2 mesti siap bersama Akt. B
dinding 1
Kerja Struktur
Kerja Struktur
Aktiviti B
Aktiviti A
Aktiviti A Aktiviti B
4 Jenis Hubungan
1. Finish to Start (FS)
2. Start to Start (SS)
3. Finish to Finish (FF)
4. Start to Finish (SF)
TASK CONSTRAINT
i. ASAP : A Soon As Possible
Schedule method base on PSD
Forward Pass
69
ACTIVITY SEQUENCING : HOW TO CHECK
CONTRACTOR’S SUBMISSION?
Method Statement
Method of Construction
Shop Drawing
Work Procedures
Predecessors
Successors
Link Type – FS, SS, FF, SF
Lead Time
Lag Time
Task Constraints
Why imposed the constraints to the certain work?
What type of task constraints has been chosen and why?
Network Diagram
Continuity from the Project Start to the Project End is needed in order to perform
CPM (Critical Path Method) unless there are constraints in the project.
Linking Pattern – sub-task to sub-task, sub-task to summary task, sub-task to
milestones and etc.
MICROSOFT PROJECT
PERANCANGAN SUMBER
(Activity Resource Planning)
MERANCANG SUMBER (RESOURCE ESTIMATE)
Ada 5 langkah :
1. Resource planning
2. Resource allocation
3. Resource usage – create resource histogram to monitor usage of resources
4. Resource over/under allocation
5. Resource levelling
Overallocated
MERANCANG SUMBER (RESOURCE ESTIMATE)
Tujuan :
Fixed Duration –
Tiada Effort Driven
(kerja sudah
ditetapkan
tempohnya).
Fixed Units –
Kuantiti sudah fixed
Fixed Work –
Effort dah
ditetapkan
Norman Md. Rabani
[2] -
{2} - x
(2) - x
MICROSOFT PROJECT
D = Q/PR
Q = 100, 000 m3
PR = 2 GANG X
1,000 M3/hari
Anggaran Parametrik D = Q/PR
Blok A
Bil Aktiviti Bil Gang Qty = Q= Productn rate, Risk Tempoh,
m3/d/g Quantiti PR = gang x qty consideration D=Q/PR
1 Kerja tanah 2 1000 100,000.00 2,000.00 10%+ 55
2 Kerja Struktur 3 100 9,000.00 300.00 Testing - 7 days 37
Blok B
Bil Aktiviti Bil Gang Qty = Q= Productn rate, Risk consideration Tempoh,
m3/d/g Quantiti PR = gang x qty D=Q/PR
1 Kerja tanah 3 800 120,000.00 2,400.00 10%+ 55
2 Kerja Struktur 3 100 12,000.00 300.00 Testing - 7 days, 49
Access - 5%
3 Kerja Arkitek 2 150 15,000.00 300.00 Delivery - 10 d 60
88
UNTUK LIHAT KESELURUHAN JADUAL
MICROSOFT PROJECT
92
MENGUBAHSUAI MINGGU KERJA
3 4
1 2
6
Norman Md. Rabani
Negeri Kedah…
Ahad dari tidak bekerja
Jumaat – Cuti
kepada bekerja
Ahad - Kerja
94
Norman Md. Rabani
95
MENGUBAHSUAI MINGGU KERJA
MENGUBAHSUAI HARI CUTI
3
4
97
MICROSOFT PROJECT
Activity Duration
Tempoh masa yang diperlukan untuk menyiapkan setiap kerja.
Biasanya bergantung kepada sumber dan kadar produktiviti
sesuatu kerja di antara aktiviti. Ianya ditentukan dengan :
Pengiraan kuantiti kerja yang perlu disiapkan berdasarkan kepada
sumber (pekerja atau peralatan (mesin)).
Project Duration
Ditentukan melalui rangkaian laluan kritikal.
CRITICAL PATH METHOD
MENGENALPASTI KERJA- KERJA KRITIKAL
(GANTT TABLE)
MENGENALPASTI KERJA- KERJA KRITIKAL
(GANTT BAR)
Mengenalpasti Kerja- Kerja Kritikal
(Total Float)
CPM
Jumlah Apungan (-ve ???)
107
MICROSOFT PROJECT
Schedule
Compression
Fast-
Crashing
Tracking
SCHEDULE COMPRESSION
Fast Tracking
Kaedah mengubahsuai berkaitan dengan kerja supaya kerja-kerja itu
dapat dilakukan serentak pada masa tertentu sahaja.
Biasanya digunakan bagi kerja-kerja yang belum bermula.
Melibatkan hubungan (link type dan predecessor).
Crashing
Biasanya digunakan bagi kerja-kerja yang belum bermula atau sedang
dalam pelaksanaan.
Kaedah dimana masa dan kos yang digunakan adalah yang paling
minima atau tanpa sebarang kos dengan :
memendekkan tempoh kerja
Meningkatkan usaha sumber (4M)
Total Float ( Tentukan Deadline)
2
1
Fast- Tracking (i)
112
Fast- Tracking (ii)
CRASHING (I)
Duration Resources
SCHEDULE COMPRESSION
WORK PROGRAM
MICROSOFT PROJECT
Cost Budgeting
Bottom-up cost (kos lebih detail )
Kos baseline / financial s-curve
MENGANGGAR KOS KERJA
119
VALUE OF WORKS
Preliminaries
Performance Bond 10,000
Establish & Removal of Site Office 20,000
Maintenance of Site Lab 15,000
Progress Report 5,000
Blok A
Kerja Tanah 200,000
Kerja Struktur 400,000
Kerja Arkitek 250,000
Kerja M&E 200,000
Blok B
Kerja Tanah 180,000
Kerja Struktur 290,000
Kerja Arkitek 200,000
Kerja M&E 230,000
FIXED COST & TOTAL COST
FIXED COST ACCRUAL (PAYMENT METHOD)
TOTAL COST
MICROSOFT PROJECT
Pelaksanaan
Kawalan
MENGENALPASTI BASELINE
132
MENGENALPASTI BASELINE
MENGENALPASTI BASELINE
MICROSOFT PROJECT
6 langkah
MENGEMASKINI KEMAJUAN MENGIKUT JADUAL
(PERANCANGAN ASAL)
MENGEMASKINI KEMAJUAN MENGIKUT JADUAL
(PERANCANGAN ASAL)
MENUNJUKKAN DATA KEMAJUAN JADUAL
(PERANCANGAN ASAL)
MICROSOFT PROJECT
Perancangan= Sebenar =
48% 41%
Variance = ?
IDENTIFY VARIANCES
Financial
Progress
Physical
Progress
Project
Finish Date