NAGPUR METRO RAIL PROJECT Doc No:

REACH 2A, PHASE- Revision No:00

CHECKLIST FOR PIER CONSTRUCTION

Sr.
Item Yes No Remarks
No.
1 Prior to start, whether all existing Overhead services has been
identified & removed / isolated / Drawing available?
2 Ensure that all lifting equipment has third party certificate and
the operator has a valid competency certificate / authorization

3. Area barricaded Working adjacent to major highways or


railways.
4. Are Reinforcement must tie up with hinges & wire rope to
prevent sway or fall of rebar.
5. Are electrical connection are routed through cable hangers
6. Standard work platform with double handrail shall be ensure.
7. Are reinforcement tying, area must be cordoned-off with traffic
marshal.
8. Ensure that worker working with Full body Harness.
9. Swing pendulum movement restriction arrangement for De-
shuttering work.
10 Are employees equipped with adequate PPE's i.e. reflective
jacket, safety helmet, safety shoes etc.?

11. Are adequate illumination level check

12 Are Pier inspected by a competent person after every rainstorm


or other hazard increasing occurrences?
13 Is there emergency control measures available in case of
mishappening?

Inspected and signed by:

Site In-charge:
Safety Representative:

Date: Location: