NON CONFORMITY REPORT
Project ‘202760004 -1408-Suphurie Aca Plant (2000 WIPO) LST Enquiry EPO
Dato 27-Dec-2023 |
Title Nozzle A welding aviangemant
[NC Originator Me Dilip Manohae
NC Issue Date 2r-DeC 2023
Equipment Manufacturer | Ms. KRR Heavy Enginesring id
Equipment Name
Intemass Absorstion Tower
Doscription of the Non-
Nazale A welding arrangement
Too many TEE joints and eross Wels at Gas inlet nzale Knction with Shel
aaa + Peaking and banding out of tolerance at Nozze to Shell Junction
Rateed By Steen
Dilipmanohar 0 ses
Krishnasamy icy
Contractor Comments / Racommendatior
‘CORRECTIVE ACTION
o
Rerun. | Sippr request perfo he flowing carecive actos.
@ REPAR {00% RT shal bake o ener ho wel ons near around the Nozze as per AP 620 Section 7.17.
G REWORK ——_| 2 Peaking and banding to be recited to mainan winin MEGS alowable ae
0 other
Carnmenis rowed by —
BSN Murty BSN saan ee
Ste QC Lead
Murthy Eien
Equipment Manufacturer Response:
‘Cause Deseription
a imitation of aw materia plate width receivable far manufacturing the Nozle A Rehiforcenent pad
Pate
2. shal Long seam welds were located mistakeny close to Nozze A Reinforcement pa Joints
3: Supports /Stifeners provided ding Shel plus Nozae A welding were inadequate to contol the
deformation within tolerance
Corrective Action,
{L Nozale A shell weld joints where the peaking and banding where Out of olevance are grounded outside
the weld surface masamum of 5~ men
2. Grounded portions wil be welded outside the nozzle for which 320 M welding consumable willbe used,
3. Nozze A nse weleing wth Shall i be grounded off tothe depth ofS “Gm
Grounded Portions wil be welded inside the nozale for which 310 M welding cansumable willbe used
5. alltherepatrweles wil be visually checked and PT Teste
6. Peaking and banding wll be measured and recorded,
7 PM for weld and hase material & Chemical test as ner ASTM A957 Practice Dshallbe dot and reported,
sin audition to Tee Joints, all bute welds around Noztle A 100% RT wil taken to ensure weld ines.
9. Pleding and Passtion wl be erred cut fo the welds and bose materia surrounded by Nozzle A,
‘Response provided by
Head Qualty RR,
ME,
MAMIKA kD AL €
GArlec )RR
Format No. IFFCO/TECHNIP/KRR/F-3 Rev. 0
INSPECTION RECORD FOR A NOZZLE AFTER RECTFICATION PEAKING & BANDING CHECK
Name of work GENERAL ARRANGEMENT FOR INTERPASS TOWER ‘Job No. = KA2018
contractor KRR ENGINEERING PVT LTD. Report No —_:KAZOLA/IT/AN/PR/8R/001
‘onsultant__ SHIV SULPHURIC SOLUTIONS (0PC) PVT LTD. bate 202.2004
cent ‘TEGHNIP ENERGIES NDIA LIMITED.
location _\FFCO PARADEEP UNIT,ODISHANDIA
P.0. Mo. 202178C-101-P0-0119-0001-00-011 REV.0
rankNo. 1057-3440
rank Size 10.67,7 6Mtrx Height 16 Mtr
|Ret. Drawing No. KAR-GH-065-00 REVS
Inspection Details : Peaking & Banding Inspection arround Nozzle-A After Rectfication.
Results ‘Banding Results
(413mm) Values: (13mm)
From A Nozzle centre towards nozzle Top
side
(Measurements taken at every 200mm)
[betwoen Nome A woudng &
From A Nozzle centre towards nozzle
Bottom side
(Measurements taken at every 200mm)
Note :
* Permissible Tolerance In AP 650: Honzontal & Vertical Wold Joint shall nt exco0d #13 mm.
Mi.KRR ENGINEERING PVT LD ‘Mis. TECHNIP ENERGIES INDI OMTR ES
2. S
aa ”
MANIKANDAN.C
‘SENIOR ENGINEER QA/QC
wenaSons
ies >>
Forma i FO/TECRMP/RRATTT Re 0
TRSPECTION RECORD FOR INTERPASS TOWER
lemon SERENE FORTRPAS TOWER ane ae
eos rom evoneeane PVT tap Ho ALR AAREIENALYOL
Jeon Sev LP HURESOLUTENS (oP PTD, be. 0222004
srcontacor reo RS ND UTES rere :010re2
ie rcoPAAOEP OOD NIA
.o.no oxime 0:-400s8-nt-o130rang7am2
mer rorauo
frome poate scion Ares Mase
trig 2011710 8 cA 02
JELEVATION| A1(mm) | Az (mm) | A3 (mm) | Aa (mm)| AS (mm) | AG (mm) | A7 (mm) REMARKS:
osm | ems | ez | coon | coo | coos | oma | coms
om | ose | cw | cae | oom | com | om | om
asm | oe | om | | - =| wm | ose
zom | coo | cos = =| we | ooo
zsm | we | om | - | - | - | «mo | om
aom | wo | «= | - | — = [we | os
asm | a | om | — : = [es | oro
aom | om | eo | oor | cm | om | oo | om7
Remarks “sense Diameter eed S700 en Observed in E663 to 6107,
+ shal tundness ound whim 38 rm, Which Under MEE oleae
RR ENGINEERING YTETO TEGAIP ENERGIES NDIA YR,
stvatre “x SY 2A)
= MANIKANDANC t eae
esa ewan eR OVO eet at
" aah ;
|= ee ondpefvy 3.224PRR
Tormat No: HFCO/TEGHNI/RVAITA Rew 0
INSPECTION RECORD FOR INTERPASS TOWER
ome otek GENERAL ane FOR TERPS TOWER TR aE
eomador cat GEER Pv TO, opr No: AZO ARTE NAO
omen ——_stevsuirnu soUTONS (or PTD se: o2saam4
fsrecontacor -TeOWPENERGES NOMA LUMTED aga 02 02
ent FCO PARADEEPUNICOSHAINOK
one 202178 301-9054-00L 0094107007 20
jowerrogna, so 360
jowertpe —_-Nose A Sacton ater Reteaton 1 Mesuemens
versie TEREX ZL
[et oravingno. 0117-01 S13 0c At107-00m
Cpe a
om
soul
asm NOZZLE A OPENING
zou
seu
10m|
o.sw| sao a soon
Roean a7
TREN RGRTATO
= MANKANDAN.C
Joweraon SENIOR ENGINNER (QA/QC)
[oste: 02.02.2024E> qaexeic.
Format No, IFFCO/TECHNIP/KRR/VIS-1 Rev. 0
VISUAL INSPECTION RECORD FOR INTERPASS TOWER
ame of work __[:-SENERALARRANGEMENTFORINTERPASSTOWER | KRRJ0b No} #A2018
[contractor 1H ENGINEERING PVE LTD. Report No|#AZ018/I/A NOZAE/RECT/VS/O2
[Consultant Shy SULPHURIC SOLUTIONS (OPC) PVT TD. Date]: 10.02 2020
LSTK Contractor _ | Tec eNERGIes NDIA LMATED Page No|01 of ot
[client IFFCO PARADEEP UNIT ODISHAINDIA
|P.0. No. 202178C-201-P0-0513-0001-00-011 DT: 08.07.2022
rower Tag No, | 10730
Hower Type [A nore afer Reciieation Vial
[Tower size 1 7.6RE TMAH 29 Me
Ref. Drawing No. {202178 101-wn0si3-0001-a11070002 Reva
ANoxsle ster Rectification Visual checked & found satisfactory.
. Welding size checked Visually 8 found satisfactory.
«Welding surface smoothly grinded and free from visual defects observed and found satisfactory.
4. Are Strike,rake,Pin hole Blow Hole & etc. Weld defects not found and Satisfactory.
KRR ENGINEERING PVT LTD TECHNIP ENERGIES INDIA LIMITED
signature : CML @ SI
Namé MANIKANDAN.C a
Tapas seshentye
if tion :| SENIOR ENGINE!
Designation :| IGINEER (QA/QC) “tov bod, ate C
Dat 10.02.2024»
) 2
NDE INTERPRETATION REPORT (RADIOGRAPHY TESTING}
Customer TECHNIP ENERGIES INDIA LIMITED __ MSN: a
INTERPASS TOWER
Job Description eS Report No. TT/RT/62
Drawing No. - Date of Report 12.02.2024.
ZECOR-Z & SA 240
Material ZR aes Date of Test 11.02.2024. |
Thickness & Weld
THe oN 8mm & 1mm | Fechnique ‘SWSI
procedure Ref. & Rev. | reypRo/RT/01 Rev.0 | Selection of QI | ASTM 18
Surface condition __| Smooth grinding Placement of 1Qi | Source side
Source to object 3 Film manufacture &
distance ag designation AGES
Density 2t04 No. of Exposures _| 13
No, of films per
Source: Ir -192 eae 4
Gamma Ray Source Size: 2.7x1.1 Type of viewing _| Single wall
Source strenathe2 Cu". || acceptance: ASME Sec VIII Div 1.
Sensitivity
ere Fim sie | Type of
ISINo| Joint Nos Welder No Segment /FE/HO| poetry Disposition
[visible a
1 NAW 34 Kw-s7a | a"xisas | 6 NSD ACCEPTED
2 NAW 34 Kw-s7a | 4"xisec | 6 NSD ACCEPTED
3 NAW J4 Kws7a | a’xisyco | 6 NSD ‘ACCEPTED
4 NAWJ7 KW-574 | 4"xI5"/AB | 6 NSD ‘ACCEPTED
5 NARa7 KW-574 | 4 xIS/BC | 6 NSD ACCEPTED
[e NA-37 KWw-574_ | 4”x157CD | 6 | NSD (PORE) ACCEPTED
7 NA- 18 Kw-574 | 3" x 9708 6 NSD ‘ACCEPTED
8 NA- 12 Kw574_ | a7xI5'7AB | 6. NSD ‘ACCEPTED
9 NA 14 Kw-574_ | 4"x157AB | 6 NSO ACCEPTED
10 | _Na-yia Kwes74_ | a”xi57ec | 6 NSD ‘ACCEPTED
i [NAS Kw-574 | 4" x 15°/A-B 6 NSD ‘ACCEPTED
12 | _NA5 xws7a | a"xi5yec | 6 NSD ACCEPTED
13 | __NA-u5 kws7a__| a”xisyco | 6 NSD “ACCEPTED
INTERPRETED & EVALUATED REVIEWED BY
CfA Fines
MANIKANDAN.C Ee abe
KRR - NDE LEVEL II (RT) ‘TECHNIP ENERGIES INDIA LIMITEDNDE INTERPRETATION REPORT (RADIOGRAPHY TESTING)
Customer TECHNIP ENERGIES INDIA LIMITED MSN:
T
5 INTERPASS TOWER ]
Job Description ae Report No. TT/RT/63
| Drawing No. : Date of Report 12.02.2024,
Material ZECOR-Z & ZECOR 310M | Date of Test 11.02.2024.
Thickness & Weld 3
rentoemen | 8mm & mm Technique _|swst
procedure Ref. & Rev. | xarpRo/RT/01 Rev.0 | Selection of IQl_ | ASTM 1B
Surface condition | Smooth grinding Placement of 1Q1 | Source side
Source to object 2 Film manufacture &
distance _ a designation SCrADe
Density 2t4 No. of Exposures | 7 z
ae No. offilms per)
Source: Ir -192 hero 8 1
Gamma Ray Source Size: 2.7x1.4 Type of viewing _| Single wall
Source strength: 12 Cu acceptance ASME Sec VIII Div 1.
[Sensitivity
= Film size/ [S@NSItWItY| type of :
SINo | Joint Nos | Welder No Segment [WieMOl| yr cty Disposition
1 NA- 316 xws7¢ | arxasas | 6 nso ACCEPTED
B NA-318 xwes7a | arxisyae | 6 NSD ACCEPTED
3 | nang Kw-s7a | a"xoune | 6 NSD ACCEPTED
a) xws74 | arxisyae | 6 NSD ACCEPTED
5 NA- 3120 xws7a | avxisyec | 6 NSD ACCEPTED
6 | _NA320 Kws7a | axisyco | 6 NSD ACCEPTED
7 NAW 321 xws7 | arxisyco | 6 NSD ‘ACCEPTED
ef
INTERPRETED & EVALUATED REVIEWED BY
ChE fey
MANIKANDAN.C sopfasy
KRR - NDE LEVEL II (RT) TECHNIP ENERGIES INDIA LIMITEDED cczxz.
Format No, IFFCO/TECHNIP/KRR/THK-1 Rev. 0
‘THICKNESS MEASUREMENT INSPECTION RECORD FOR INTERPASS TOWER
Name of work |:GENTAAL ARRANGEMENT FOR INTERPASSTOWER | KRR Job No] XA2018
[Contractor RR ENGINEERING PVT LT. Report No| xA2018/17/a NazZLE/THK/NS/02
[Consultant HIV SULPHURIC SOLUTIONS (OPC) PVT ET. Date|; 10.02.2024
LSTK Contractor |: TEcHNIP ENERGIES NDIA LMITED. Page No|:01 of.
client IFFCO PARADEEP UNIT,ODISHAINDIA
P.0. No. 202178C-101-P0-0513-0001-00-011 DT: 08.07.2022
ower TagNo. _|:1073#40
[Tower Type ' Nozzle Thickness inspection area
[Tower size 107.6 8 6.7Mtrx Height 23 Mr
Ref. Drawing No.
202178C-101-M4R-0513-0001-A1107-0002 REV-1
‘Allon after Rectification Area Thickness & found satisfactory. -
Note: Please Refer Annexure: in Measurement Reading.
KRR ENGINEERING PVT LTD TECHNIP ENERGIES INDIA LIMITED
Signature:| GLE ne
Name :| MANIKANDAN.c ae eu
Designation :| SENIOR ENGINEER fac) ,
|_Designati (aaac) Tey sad Bee GEN
Date 10.02.2024 Yo 92> ay i) aE> TRAE.
Format No. FFCO/TECHNIP/KRR/THK-1 Rev. 0
(NESS MEASUREMENT INSPECTION RECORD FOR INTERPASS TOWER
Name of work | GENERAL ARRANGEMENT FORINTERPASS TOWER | KRRJOb No] KA2018,
[Contractor RR ENGINEERING PVT LTD. ‘Report No] KA2018/I7/ NOZ2LE/THK/INS/O1
[Consultant SHV SULPHURIC SOLUTIONS (OPC) PVT LTD. Date| 10.02.2028
lisTK Contractor | Teche ENERGIES NDIA UNITED. Page No| otro
(Client IFFCO PARADES? UNTT,ODISHA NDIA
P.O. No. | 202178C-103-r0-0513 0001-00011 OF: 08.07.2022
Tower Tag No. [20-730
ower Type "A Nozze Thickness inspection area
Tower size 10 7.6 & 6:7 x Height 23 Mtr
[Ref. Drawing No.
302378C-103-04R-0513-0001-A1107-0002 REV-L
"ANNEXURE-1
KRR ENGINEERING PVT LTD TECHNIP ENERGIES INDIA LIMITED
signature]? Ke NES) Cong
_Name: MANIKANDAN.C aw rear wad ay |
Designation :| sewiorencineer(aa/ac) |!” pa rey rw od
Date :| 10.02.2024 Lolo yoo 24)>
PENETRANT EXAMINATION REPORT _ [Report No jxzoraerevanozzos
Date |raonzoze
IeRR ENGINEERING PVT 2021700-101-PO.0519-000 00017
[contractor ee PO No 08.07 2002
[shiv Suphune 2ARITOO-1O1-R0519-D00-ANTOT-
Consular) |solutions(OPC PVT LTD) ease! (0002 REV-1
stk contactor TECINPENERSESINOR [int ug Races erences
IFFCO PARADE
cent IFFCO PARADE" |Roterence Code ASME SECV
Reference Procedure |KRRIPOILPEMOT
[Acceptance Standard ASME SEC Vil OW 1, Appendix-6
inspection Stage “MerWeldeg [Area Inspected 70% on Final aiding Area
Product form Tnerpass Tover [Surface Condition 7a Welded
Materiat Zecor 310M [Thickness ‘mm
Penetrant Materials
Material Type Make: Brand Name
lGeaner ‘Vi, Seve removable _| ——WAY-2022- JUNE 2004 FRAG FLAWCHECK (PCT)
Penerart | Vise Sovent removable | MAY-2022 -JUNE 7024 HIG FLAVICHECK (PP-15B)
Developer | Vise Sovent removable | DE-2002- JAN 2005 PRG FLAWICHECK (PO31B)
|Penetrant system: [Visible TTechnique: Solvent Removable
Surtace Temperature 25
Dwell Time 70 wins
Development Time 0 Mins
Lighting Equipment [T2W Bulb distance of 250 mm (White Nght Light intensiy 7710 Lae
[Observation Relevent indications as per Table (J _[No Relevant indication Cal
TABLE 1
ISLNo- [Location ‘Size [Length Interpretation Type Disposition
Resut- Acceptes
KRR ENGINE! iy TECHNIP ENERGIES INDIA LIMITED
[Signature Gi
Name MANIKANDAN.C ar.
INDE Lever ti| ASNT LeveL Seared 4)
ate 10.02.2024 ene 4
[Format no. FFCO/TECHRP/KRR/ EAXR
Report No |kazoranreveriaNozzi01
[Date __[ro0aa0e4
TECHNIP ENERGIES INDIA L{MITED
KRR ENGINEERING PYF LTD
Gq
MANTKANDAN.«
[Signature
Name
INDE Level-1
Date
ASNT LEVEL tT
oma
[Format no. TFFCO/TECHNIP/RRR/P-E
vend fate
“Taga teeny Seto)
Jo-02:24 poly |[Repor No _|kecotemawozannicwe
PICKLING AND PASSIVATION REPORT ss
Date TOE ZOE
‘202176C-T01.P0-0515-0001-00-011
|contractor IkRreNcnceRNGevriT [PO No peo
env sure suners(OPC 2O217EC-101-NR0513.0007-41107.004
|consuitant nn ea lorg. No rot
lrectwe eneRGies NOM
lLstk Contractor ee |Joint No ANOZZLE AFTER RECTIFICATION
lrecoparaveer
Jctiene rico anAES lReterence Code ASTI Ase0
[TEN document Reference [200176 -1oT-MACOSTS.0007-B 1106-0000
inspection Stage ‘tor Peking [Area inspected 100% On Reeteaton wang ea
Product form merpassToner [surface Condition) ‘As Passhised
Material 7ZECOR-STON
[STEPS ‘CHEMICAL USED TEMP. C TIME
lsteP \WELDBRIRTE CALLINGTON CODE 1105 2 0 minutes
[step 2 ‘DM WATER WET CLOTH CLEANING 28 ‘mecistly
steps DM WATER RINSE AND CLEANING 6 immediately
JREMARKS:
1. After pickling and passivation deaning found satisfactory.
.\viual inspection and sutace Inspection cai out fund No hea marks, cll grease black spots on surface area.
|. nandom Spots Copper Suphate Test was conducted as per ASTM AGGT Practic=-D and found no races of copper deposi
aa NS TTS TECuNGP ENOTES oan MTD
as pe
ee aanaareras
cr 1")
Joate 10.02.2024 10h:
Format Wo FFCO/TECHIIPTRRAU Fe 0AX
PICKLING AND PASSIVATION REPORT —[RsvotNo_[esouninsciennen
HrooaIza
RR ENGINEERING PYF LTD TECHNIP ENERGIES INDIA LIMITED
signature: as fh ia) yD
ame: MANIKANDAN.E
Dectgnation | ___ SENIOR ENGINEER (QA/@6) ie anwe|
pate: 10.02.2008 Yo-o2 24 ad
Formate FRCOECRP TERRA ROPRR
[Report No] kA 2018mT/A NozzPuD:
PMI REPORT e
Date losozzoze
2021786-101-PO-0519-0001-00.011 OT:
Contractor Iker ENGINEERING PvT LTO |PO No pe
eee Sriv Sulphuric soustons(orc 2021786-101-MF-0513-0001-A2001-0602
one purity REVS
HrECHNIP ENERGIES INDIA INTERPASS TOWER
LST Contractor eat [TOWER NAME Mean
l-Fco paRADEEP [ASME SEC PART A
cent Junrr-coistanNDIA Reference Code ASTM E522, ASTM E572
HEN Document Reference ‘2O2T7EC-TOT-MR051-0007-61 108-0001
[st.no ‘REF. Pll REPORT NO LOCATION REMARKS,
‘Material Confirmed ZECOR-S10M
REF. PMI PHOTOS IN &
1 ANNEXTURE ATTACHED | SNOZZLE(PLATE & WELDING) | weising Confirmed ZECOR - 310M from]
‘Shollto Nozzle
Result - Accepted
KRR ENGINEERING PVT LID
mr Ne 2a
Name MANIKANDAN.C
Designation ‘SENIOR ENGINEER (QA/QC)
bate 03.02.2024
Tonmat No, FCO TECHNIP/RRR/FS Rov.PMI ANNEXURE
REPORT NO: KA 2018/IT/A NOZZLE/PMI/O1
DATE: 03.02.2024
INTERPASS TOWER A NOZZLE PMI READINGS
[SAMPLE VALUESOL
ISAMPLE VALUE:02
KRR ENGINEERING PVT LTD
Name MANIKANDAN.C Bay Wa
Designation SENIOR ENGINEER (QA/QC) Bt ven