TELCOS PERMIT TO WORK

APPLICATION FORM (GTP Network PTW)

DATE OF THE WORK 5/06/2024 – 18/6/2024

TIME PERIOD OF THE WORK 10.00am – 06.00pm

TELCO COMPANY CELCOM DIGI BERHAD

TELCO PERSON INCHARGE NAME NAIRULLIZANA MESMAN

TELCO PERSON INCHARGE CONTACT NO 019-7733503

CONTRACTOR/VENDOR COMPANY NAME FTK SOLUTION SDN BHD

CONTRACTOR/VENDOR PERSON INCHARGE ANOM ATHIRAH


NAME
CONTRACTOR/VENDOR PERSON INCHARGE 011-19568904
CONTACT NO
TELCO SITE ID/LRD & SITE NAME 6544A_Tmn Flora Height

Structure type (GBT/RTT/Lampole) GBT

GTP Site ID & Site Name (Edgepoint to fill) MY-JHR-00195 SAJ Taman Flora Height

REGION SOUTHERN

Site Survey (Pls. Specified):

New Site Installation:

WORK DESCIPTION (Pls. Tick) Rectification/Trouble Shooting:

/ Upgrading Work on The Existing Equipment: CDB UPGRADING PROJECT


(SWAP ANTENNA, RRU, DCDU and Others)

Others:

Worker Name List:


(Send Via Email with Copy Valid CIDB & WAH)
Rules & Regulation:
1. All application only can submit from Monday to Friday and 3 days in advance for our arrangement.
2. All sites access only allowed from Monday to Friday from 10am to 6pm (subject to the approval from property owner).
3. We only accept the application from the Telco Company by email instead of contractor or vendor.
4. Telco’s contractor is required to display the approved Telco Work Application Form (in hard copy) at site.
5. GTP Network shall not be liable for any incident during this activity if Telco’s or Contractor without any approval PTW.
6. Mandatory PPE Equipment.
a. Safety Shoes at all time.
b. Safety Helmet all the time.
c. Rigger Helmet & Full Body Hardness & Y-Lanyard (MUST BE WORN WHEN WORKING AT HEIGHT >10 FEET).
d. A minimum of two (2) person should be at the work site.
e. No work should be performed at the Tower or Rooftop during adverse weather conditions such as rain, thunderstorm,
lightning or strong wind.
f. Must have at site Fire Extinguisher, First Aid box.
g. Upon arrival at site, check surrounding using test pen/multimeter before start work and any Hazard.
7. It is supervisor or anyone equivalent responsibility to define a hazard before conduct an activity at site. Any unsafe action or
unsafe condition identified; the stop of work is applied.
8. Telco’s or Contractor are required to ensure the site are left in order & clean upon completion of work.
9. For any enquiry please contact Technical Operation Centre (TOC) at 03-9213 0481 or 018-222 0107 (Whatsapp during business
hours)

Page 1
TELCOS PERMIT TO WORK
APPLICATION FORM (GTP Network PTW)

Requested By Approved By

Name : ANOM ATHIRAH Name : Nurain Natasha Mohd Fadli


Date : 4/6/2024 Date : 4th June 2024
Special Notes : TP approved by Warren on 25 May 2024

Notes to applicant; -

1. Please complete the attached PTW form and email to edgepoint TOC 3 days prior to work
commencement.
2. PTW will be processed only during office hours. Daily 0900 to 1800hrs.
3. Completed PTW to be emailed to toc@edgepointinfra.com in PDF format
4. Email subject to follow the below format to ensure it is received by relevant departments for
processing.
Access_edgepoint_<MNO Name>_<Apply Date(DDMMYYYY)>_Region_SiteName/SiteID
Eg as below.
i) Access_edgepoint_Maxis_23052023_Northern_BukitJelutong
ii) Access_edgepoint_CelcomDigi_23052023_Southern_BukitNaga
iii) Access_edgepoint_Webe_23052023_Eastern_BukitNaga
iv) Access_edgepoint_YTL_23052023_Sabah_EcoHill
v) Access_edgepoint_Umobile_23052023_Sarawak_PermatangPauh
Failure to comply with the above may result in delay in processing and approval of PTW.