1. Provide manpower(20) to assist, replacement of the following
(17 days approx) *422-AS1/AS2/AS3 Airslide Canvass
*Replacement of Coal Plant Area Bag Filters
(422-BF1)
3. Replacement of Coal Conveyor Rollers (Selective)
4. Declogging and Cleaning of coal conveyor from materials
at coal transports.
5. Replacement of conveyor side skirts at Coal conveyors
6. Cleaning of Raw Coal Bins, Fine Coal Bins & Pre-hoppers
7. Clearing & disposal of materials inside the Coal Mill
during 2023 SPS.
8. Conduct minor repairs of equipment as needed at Coal Mill
Area
9. Provide/Assigned personnel to properly segregate and
dispose waste materials such as cellophane, pallets, metal, etc. to designated areas.
10. Provide 2- Foreman / leadman for the supervision of
activity, 2- Safety officer
11. Other necessary works needed to complete the at Coal Plant
Area SPS Activities.
12. Provide necessary tools and equipment's to do the jobs.
Terms and Conditions :
1. Work permit shall be process & completed before start of work. Tool box meeting should be regularly (twice a shift or as needed) conducted to discuss the Job planning tool. 2. All Holcim required PPE's should be provided to all manpower by the Contractor(dust mask, gloves, safety goggles). 2. Contractor shall provide enough manpower for the completion of the project including cutting outfit and Oxy/Acy if necessary. 3. The contractor should provide their own Safety inspector to call & correct any deviation.
Note : No personnel shall render work in excess of 12 hours.
4.Consumables such as power, water, housekeeping tools will be provided / shouldered by Holcim. 5. All personnel shall be covered with accident insurance, SSS, and other usual benefits should be provided by contractor. 6.The contractor shall be held responsible for all damages to person, materials and equipment that might occur during