REPORT_MEETING_NO_4
REPORT_MEETING_NO_4
REPORT_MEETING_NO_4
NO KONTRAK: MADA(T)/BPPP/P/3/2024
NO KONTRAK: MADA(T)/BPPP/P/3/2024
ISI KANDUNGAN
1
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN DI HILIR
TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
1.0MAKLUMAT PROJEK
2
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN DI
HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
NOKONTRAK:
NO KONTRAK:MADA(T)/BPPP/P/3/2024
MADA(T)/BPPP/P/3/2024
4
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN DI
HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
5
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN DI
HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
CONTRACT NO : JKR/CKUB/22758/2023
SEPERTI DI LAMPIRAN
6
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN DI
HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
4.1
CONTRACT NO : JKR/CKUB/22758/2023
S - CURVE FIZIKAL
7
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN DI
HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
8
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN DI
HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
9
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN DI
HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
Jun-24
JENTERA/ PERALATAN
NO 20 21 22 23 24 25 26 27 28 29 30
1 EXCAVATOR
2 MINI EXCAVATOR
3 VIBRATOR CONCRETE
4 LORRY 1
5 CRANE
6 BACKHOE 1
7 LOADER 1
8 BAR BENDER & BAR CUTTER
9 WELDING MACHINE
10 EXC. VIBRO 1 1 1 1 1 1
11 GAS CUTTING TORCH SET
12 SURVEY MACHINE
13 WATER PUMP
14 LORRY MIXER CONC.
JUMLAH 0 3 0 0 1 1 1 1 0
10
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN DI
HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
Jun-24
JENTERA/ PERALATAN
NO 20 21 22 23 24 25 26 27 28 29 30
1 SITE AGENT 4 4 4 8 4 4 4 4
2 GENERAL WORKER 5 2
3 LORRY DRIVER 4 2 1
4 LORRY MIXER CONC
5 MACHINE OPERATOR (TRACKTOR)
6 MACHINE OPERATOR
7 (BACKHOE) 1
8 MACHINE OPERATOR EXCAVATOR
9 MACHINE
10 OPERATOR CRANE 2
11 SHEETPILE WORKERS 3 4 4 4 4 4 4
12 CARPENTER & CONCRETER
13 BAR BENDER &
14 BAR CUTTER
JUMLAH 18 4 13 8 8 8 8 9
11
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
TARIKH TARIKH
BIL PERKARA CATATAN
KEMUKAKAN LULUS
1. PENYERAHAN INSURANS DAN NOMBOR 04/03/2024 SELESAI
PENDAFTARAN KWSP
2. MAKLUMAN LANTIKAN WAKIL TAPAK 04/03/2024 14/03/2024 TIADA KETEGAHAN
3. PENYERAHAN JENIS BAHAN DAN PEMBEKAL 04/03/2024 14/03/2024 TIADA KETEGAHAN
(INTERLOCKING STEEL SHEET PILES)
4. PENYERAHAN PROFIL SYARIKAT JURUUKUR 04/03/2024 14/03/2024 TIADA KETEGAHAN
TANAH
5. PENYERAHAN SURAT SETUJU TERIMA DAN 04/03/2024 04/03/2024 SELESAI
BORANG PENDAFTARAN KONTRAKTOR
6. PENYERAHAN KATALOG PERALATAN 10/03/2024 18/03/2024 TIADA KETEGAHAN
PERLINDUNGAN PERIBADI (PPE)
10. PENYERAHAN KATALOG KEPERLUAN PERALATAN 10/03/2024 18/03/2024 TIADA KETEGAHAN
PEGAWAI PENGUASA
11. PENYERAHAN CADANGAN PAPAN TANDA PROJEK 11/03/2024 18/03/2024
TIADA KETEGAHAN
DAN LOKASI PEMASANGAN
12. PENYERAHAN CADANGAN KELULUSAN BAHAN 11/03/2024 18/03/2024 TIADA KETEGAHAN
13. SERAHAN BON PELAKSANAAN (INSURANCE 20/03/2024 20/03/2024 SELESAI
GUARANTEE)
14. PERMOHONAN DEED OF ASSIGNMENT (DOA) 20/03/2024 TIADA
15. SERAHAN PERALATAN DAN KEMUDAHAN 20/03/2024 20/03/2024 SELESAI
PEJABAT
16. SERAHAN PERSONEL PROTECTIVE EQUIPMENT 20/03/2024 20/03/2024 SELESAI
(PPE)
17. SERAGAN LEVI DAN PENGESAHAN PENDAFTARAN 20/03/2024 20/03/2024 SELESAI
MAJIKAN PERKESO
18. SERAHAN DERAF WORK PROGRAM 20/03/2024 SELESAI
12
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
13
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
Baseline Baseline %
WBS Task Name Duration Baseline Start
Duration Finish Complete
KERJA PENGUKUHAAN CERUN SERTA KERJA-KERJA
1 BERKAITAN DI HILIR TANDOP 'D' TERUSAN ARAU, 180 d 180 d 7/3/2024 6/12/2024 47%
WILAYAH I, MADA
1.4.2.7 Reinforced Conrete Capping Beam 44 d 44 d 2/9/2024 5/11/2024 0%
1.4.2.7.1 Area 1: 0m to 20m 11 d 11 d 2/9/2024 18/9/2024 0%
1.4.2.7.1.1 Formwork 5d 5d 2/9/2024 8/9/2024 0%
1.4.2.7.1.2 Steel Reinf. 5d 5d 9/9/2024 15/9/2024 0%
1.4.2.7.1.3 Conc. G40 1d 1d 18/9/2024 18/9/2024 0%
1.4.2.7.2 Area 2: 21m to 40m 11 d 11 d 19/9/2024 3/10/2024 0%
1.4.2.7.2.1 Formwork 5d 5d 19/9/2024 25/9/2024 0%
1.4.2.7.2.2 Steel Reinf. 5d 5d 26/9/2024 2/10/2024 0%
1.4.2.7.2.3 Conc. G40 1d 1d 3/10/2024 3/10/2024 0%
1.4.2.7.3 Area 3: 41m to 60m 11 d 11 d 6/10/2024 20/10/2024 0%
1.4.2.7.3.1 Formwork 5d 5d 6/10/2024 10/10/2024 0%
1.4.2.7.3.2 Steel Reinf. 5d 5d 13/10/2024 17/10/2024 0%
1.4.2.7.3.3 Conc. G40 1d 1d 20/10/2024 20/10/2024 0%
1.4.2.7.4 Area 4: 61m to 80m 11 d 11 d 21/10/2024 5/11/2024 0%
1.4.2.7.4.1 Formwork 5d 5d 21/10/2024 27/10/2024 0%
1.4.2.7.4.2 Steel Reinf. 5d 5d 28/10/2024 4/11/2024 0%
1.4.2.7.4.3 Conc. G40 1d 1d 5/11/2024 5/11/2024 0%
14
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
VIEW 2 VIEW 4
VIEW 1 VIEW 3
15
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
PANDANGAN 1
30.06.2024
16
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
PANDANGAN 2
30.06.2024
17
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
PANDANGAN 3
30.06.2024
18
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
PANDANGAN 4
30.06.2024
19
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
20
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
21
KERJA PENGUKUHAN CERUN SERTA KERJA – KERJA BERKAITAN
DI HILIR TANDOP ‘D’ TERUSAN ARAU, WILAYAH I, MADA
NO KONTRAK: MADA(T)/BPPP/P/3/2024
22