Work Order Type: Preventive Maintenance Work Order Sub-Type: Regular Preventive Maintenance
1.) Upon Arriving UPS is Online and Operational, No Active Alarms Present 2.) Conduct Visual Inspection of
UPS Parts and Components: Fans = Working, Display = Working 3.) Check UPS Status, Parameters and
Work Performed:
Measurements - Normal 4.) Download UPS Status and Parameters via Onsite 5.) Perform Non-Intrusive PM
via OnSite checklist 6.) Record AC and DC measurement 7.) Clean External Parts of UPS 8.) Final Inspection
Special
Instructions:
Recommendation: UPS battery replacement due to end of service life for UPS A2,A1,B1,B2, A3,B3,B4 & A4.
CUSTOMER FEEDBACK
Customer Feedback:
1 of 5
SERVICED PRODUCTS
Installed
Commercial Device Description/Work Commissioning
Product Product Name Serial Number Brand Range
Reference Type Performed Date
Number
1.) Perform
runtime
calibration/battery
UPS - discharge test 2.)
UPS B2 Data Allow UPS to
APC Center charge the
Schneider Symmetra
Symmetra SY125K250DR-PD SY125K250DR-PD QD1948120047 and battery up to 02/27/2020
Electric PX
PX Facility 100% Load -
250kvA 3 22% Runtime -
Phase 1H23min @ 72%
battery charge,
ongoing battery
charging
UPS -
UPS 1A Data
APC Center Load - 4%%
Schneider Symmetra
Symmetra SY100K250D SY100K250D QD1946120276 and Runtime - 08/28/2023
Electric PX
PX Facility 22h11m
100kVA 3
Phase
2 of 5
1.) Measure
individual battery
float voltage and
UPS -
internal
UPS B4 Data
resistance 2.)
APC Center
Schneider Symmetra Draw out power
Symmetra SY200K500D SY200K500D QD1948120051 and 06/25/2020
Electric PX module L4 and
PX Facility
adjust/align
250kVA 3
backplane
Phase
connector Load -
44% Runtime -
42m
UPS -
UPS 1B Data
APC Center Load - 4%
Schneider Symmetra
Symmetra SY100K250D SY100K250D QD1946120275 and Runtime - 09/02/2023
Electric PX
PX Facility 31h57m
100kW 3
Phase
1.) Perform
runtime
calibration/battery
UPS - discharge test 2.)
UPS A1 Data Allow UPS to
APC Center charge the
Schneider Symmetra
Symmetra SY500K500DR-PD SY500K500DR-PD QD1939120336 and battery up to 01/31/2020
Electric PX
PX Facility 100% Load -
500kVA 3 32% Runtime -
Phase 47 min @ 72%
battery charge,
ongoing battery
charging
1.) Perform
runtime
calibration/battery
UPS - discharge test 2.)
UPS B1 Data Allow UPS to
APC Center charge the
Schneider Symmetra
Symmetra SYIOF500KD SYIOF500KD QD1939120337 and battery up to 02/06/2020
Electric PX
PX Facility 100% Load -
500kVA 3 35% Runtime -
Phase 41 min @ 72%
battery charge,
ongoing battery
charging
3 of 5
SPARE PARTS
Part Number Installed Quantity Part Description Stock Origin For Part Used Billable ?
TIME
Total Is
FSR Start Date End Date Activity Type Hour Type Description
Time Billable
Emmanuel Normal
03/20/2024 7:12 am 03/20/2024 9:23 am Travel 2.18 No
YAP hours
Emmanuel Normal
03/20/2024 6:08 pm 03/20/2024 8:26 pm Travel 2.3 No
YAP hours
Emmanuel Normal
03/21/2024 7:31 am 03/21/2024 9:55 am Travel 2.4 No
YAP hours
Normal
Ryman Diwa 03/20/2024 7:00 am 03/20/2024 9:00 am Travel 2 No
hours
Normal
Ryman Diwa 03/20/2024 9:00 am 03/20/2024 5:00 pm Service 8 No
hours
Normal
Ryman Diwa 03/20/2024 6:00 pm 03/20/2024 8:00 pm Travel 2 No
hours
EXPENSE
FSR Expense Date Expense Type Hour Type Description Expense Quantity Total Expense Is Billable
4 of 5
FSR Sign Off:
Technician Sign
,
Technician Sign 2