Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Building No 96 (Option 3)

JYD INFRA PRIVATE LIMITED


Shaft Dimension Unit Name Designation Validity Travel Stops Pass. Speed Final Price(Net) Total Price (Gross)
Width X Depth
1840mm x 2620mm E1 G, 1, 2, 3 ~ 22 30.03.2025 64.8 23 10 1.75 25,42,372.88 30,00,000.00
1840mm x 2970mm E2 G, 1, 2, 3 ~ 23 30.03.2025 67.7 24 13 1.75 26,69,491.53 31,50,000.01
2770mm x 1920mm E3 G, 1, 2, 3 ~ 22 30.03.2025 64.8 23 15 1.75 27,75,423.74 32,75,000.01

Final Price(Gross) 94,25,000.02

Free Maintenance- 12 Months

Other Features:
Cabin Size- Civil activities - Clients Scope
E1 - 1200 mm x 1400 mm PWD payment and clearance- Clients Scope (Co-ordination by
Door Size - 800 mm x 2000 mm - CO Schindler)

Finishes- Other Safety Feature-


Ceiling- Stainless Steel AISI441 Hairline
Ceiling Light- Round Spot Intercom TAI 1; 3 ways
Cabin finish- Stainless steel AISI441 hairline Provision for CCTV Interface
Car Door- Stainless steel cladd. 441 hairline Remote Monitoring Device
Landing Door(G floor)- Stainless steel AISI441 hairline Alarm by horn in hoistway
Landing Door(rest floors)-Stainless steel AISI441 hairline Automatic return to main floor
Flooring- Artificial Black Granite Door pre-opening
Skirting- Protruding SS Anti-nuisance operation 3
Car call cancellation
Operation- Simplex Auto.door closing final time
Mirror- Full height par. width; center Position indicator car 1
Handrail- Straight, Stainless Steel Hairline Finish, Back wall Travel direction indicator car
Auto. Rescue Device (ARD)
Min. Overhead- 4500 mm Fire emergency switch
Pit Depth - 1800 mm
COP - Mechanical Push Buttons Half Height
LOP - Mechanical Push Buttons

Other Features:
Cabin Size- Civil activities - Clients Scope
E2 - 1050 mm x 2100 mm x 2100 mm PWD payment and clearance- Clients Scope (Co-ordination by
Door Size - 800 mm x 2000 mm - CO Schindler)
Fireman Lift
Other Safety Feature-
Finishes-
Ceiling- Stainless Steel AISI441 Hairline Intercom TAI 1; 3 ways
Ceiling Light- Round Spot Provision for CCTV Interface
Cabin finish- Stainless steel AISI441 hairline Remote Monitoring Device
Car Door- Stainless steel cladd. 441 hairline Alarm by horn in hoistway
Landing Door(G floor)- Stainless steel AISI441 hairline Automatic return to main floor
Landing Door(rest floors)-Stainless steel AISI441 hairline Door pre-opening
Flooring- Artificial Black Granite Anti-nuisance operation 3
Skirting- Protruding SS Car call cancellation
Auto.door closing final time
Operation- Simplex Position indicator car 1
Mirror- Full height par. width; center Travel direction indicator car
Handrail- Straight, Stainless Steel Hairline Finish, Back wall Auto. Rescue Device (ARD)
Fire emergency switch
Min. Overhead- 4500 mm
Pit Depth - 1800 mm COP - Mechanical Push Buttons Half Height
LOP - Mechanical Push Buttons

Other Features:
Cabin Size- Civil activities - Clients Scope
E3 - 1600 mm x 1500 mm x 2100 mm PWD payment and clearance- Clients Scope (Co-ordination by
Door Size - 800 mm x 2000 mm - CO Schindler)

Finishes- Other Safety Feature-


Ceiling- Stainless Steel AISI441 Hairline
Ceiling Light- Round Spot Intercom TAI 1; 3 ways
Cabin finish- Stainless steel AISI441 hairline Provision for CCTV Interface
Car Door- Stainless steel cladd. 441 hairline Remote Monitoring Device
Landing Door(G floor)- Stainless steel AISI441 hairline Alarm by horn in hoistway
Landing Door(rest floors)-Stainless steel AISI441 hairline Automatic return to main floor
Flooring- Artificial Black Granite Door pre-opening
Skirting- Protruding SS Anti-nuisance operation 3
Car call cancellation
Operation- Simplex Auto.door closing final time
Mirror- Full height par. width; center Position indicator car 1
Handrail- Straight, Stainless Steel Hairline Finish, Back wall Travel direction indicator car
Auto. Rescue Device (ARD)
Min. Overhead- 4500 mm Fire emergency switch
Pit Depth - 1800 mm
COP - Mechanical Push Buttons Half Height
LOP - Mechanical Push Buttons

Delivery Timelines-
60 days post drawing approval/receipt of manufacturing payment (Whichever is later)

Installation Timelines-
70 days post Material delivery at site/Payment clearance/site readiness by client (Whichever is later)

You might also like