Visatron Measuring Head Replacement Procedure

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Operation Manual VISATRON® series VN87plus 04/2021

Page 44

5.5 Exchange measuring head

Scavenging air
fitting

Figure 47: Step 1 is to open the scavenging air fitting

Additionally on
VN116 and VN215
Measuring head units:
main connector Valve box connector

Figure 48: Step 2 is to unplug the connectors

SCHALLER AUTOMATION D-66440 Blieskastel / Saarland / Germany / Industriering 14 / P.O Box 1280
Industrielle Automationstechnik GmbH & Co. KG Tel. +49(0)6842-508-0 / Fax -260 / eMail: info@schaller.de / www.schaller.de
Operation Manual VISATRON® series VN87plus 04/2021
Page 45

Fixing
screws

Figure 49: Step 3 is to unscrew the measuring head

To mount the new measuring head execute the 3 steps in reverse order.

WARNING! Check the values of the wire break resistors or


in case of doubt use the old ones.

SCHALLER AUTOMATION D-66440 Blieskastel / Saarland / Germany / Industriering 14 / P.O Box 1280
Industrielle Automationstechnik GmbH & Co. KG Tel. +49(0)6842-508-0 / Fax -260 / eMail: info@schaller.de / www.schaller.de

You might also like