Malong HUC ( ENA Painter doing painting activity without QC - Quality of painting posibility out off
4 Habitat ) Painting Actiity 12-Jan-23 checked before continue sequence layer. limited transfer personel specification requiremment
10 Jan-23 Burner equipment untuk pekerjaan di QC personnel and welder supervisor Bad quality in weldment
site tidak memadai/tidak cukup. were not monitor
Problem connection to server at Batam Batam team couldn't access any Emails,
12 Server Connection 1-Jan-23 Office Delayed payment by timas to provider Meeting, Documents and server folder
Burner shuld be
available minimal 1
Heriedy
(one) burner for 2
welders
QC personnel shuld be
communication with Heriedy
welder supervisor
Timas/ Contractor
document controller
Mepn document controller do deep should check transmittal
checked for all redline drawings along with actual drawings Anna C
once receipt from timas document properly from
controller subcontractor to reduce
any problem of future
documents