STEEL SUMMARY
Sr # Description #3 #4 #5 #6 Total
Page 2 of 32
MT SPECIAL VEHICAL SHED (8 X BAYS) (14'-10" X 39'-6" X 16'-0") AT TARIQ GARRISION DIA OF BARS
FOOTINGS 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in SHAPE OF BAR
Nos (Rft) #3 #4 #6 #8 Laps
# Mbrs Each
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.681 1.211
1.170
Checked by : Weight Kg - 1,170 - -
Page 3 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON DIA OF BARS
COLUMNS UPTO GROUND FLOOR 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #6 #8 #11 Laps
# Mbrs Each
Column C-1 (1'-0" X 1'-0")
0.67
0.75
Ring-1 Upto Plinth Beam 3 4'' c/c 4.17 8 x 14 112 3.50 392.00 - - - 0.50
0.75 0.75
- 0.75
0.54
Ring-2 Upto Plinth Beam 3 4'' c/c 4.17 8 x 14 112 2.66 297.92 - - - 0.50
0.54 0.54
- 0.54
0.75
Ring-1 Upto Bot of Beam at L/3 0.50
3 4'' c/c 3.25 16 x 11 176 3.50 616.00 - - - 0.75 0.75
at Top & Bottom
- 0.75
0.54
Ring-2 Upto Bot of Beam at L/3 0.50
3 4'' c/c 3.25 16 x 11 176 2.66 468.16 - - - 0.54 0.54
at Top & Bottom
- 0.54
0.75
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.681 1.211 2.410
0.760 M.Ton
Checked by : Weight Kg 379 381 - - -
Rings at grid 1~4 & 5~8 3 8'' c/c 13.75 6 x 22 132 2.00 264.00 - - - - 0.50
0.25 0.25
0.50
Page 5 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON DIA OF BARS
PLINTH BEAMS 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
0.50
Rings at grid B~B' 3 8'' c/c 15.58 8 x 22 176 2.00 352.00 - - - - 0.50
0.25 0.25
0.50
PB AT GRID B'~D / 1~4 & 5~8 (L=9'-10")
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
0.959 M.Ton
Checked by : Weight Kg 257 702 - - -
Page 6 of 32
MT SPECIAL VEHICAL SHED (8 X BAYS) (14'-10" X 39'-6" X 16'-0") AT TARIQ GARRISION DIA OF BARS
PLINTH BEAMS 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
LB AT GRID 1~4 & 5~8 / B (L=45'-0")
Rings at grid 1~4 & 5~8 3 8'' c/c 13.75 6 x 22 132 2.00 264.00 - - - - 0.50
0.25 0.25
0.50
0.50
Page 7 of 32
MT SPECIAL VEHICAL SHED (8 X BAYS) (14'-10" X 39'-6" X 16'-0") AT TARIQ GARRISION DIA OF BARS
PLINTH BEAMS 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
0.50
Rings at grid B~B' 3 8'' c/c 15.58 8 x 22 176 2.00 352.00 - - - - 0.50
0.25 0.25
0.50
D2 (L=2'-6" )
0.25 0.00
Binding Bars 3 1 6 x 2 12 0.25 3.00 - - - -
V1 SHADE (L = 2'-6") (9" Bearing)
3.88 0.00
Dist Bars 3 6'' c/c 1.5 6 x 3 18 3.88 69.84 - - - -
W1 SHADE (L = 7'-0") (9" Bearing)
8.38 0.00
Dist Bars 3 6'' c/c 1.5 1 x 3 3 8.38 25.14 - - - -
Page 8 of 32
MT SPECIAL VEHICAL SHED (8 X BAYS) (14'-10" X 39'-6" X 16'-0") AT TARIQ GARRISION DIA OF BARS
PLINTH BEAMS 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
W2 SHADE (L = 4'-0") (9" Bearing)
5.38 0.00
Dist Bars 3 6'' c/c 1.5 6 x 3 18 5.38 96.84 - - - -
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
0.928 M.Ton
Checked by : Weight Kg 285 551 92 - -
Page 9 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON DIA OF BARS
ROOF BEAMS 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
SECTION X-X (L=45'-0")
Rings at grid 1~4 & 5~8 3 6'' c/c 13.75 6 x 29 174 3.34 581.16 - - - - 0.50
0.92 0.92
0.50
B-1 AT GRID 1~8 / A (L=102'-0")
Rings at grid 1~2 & 7~8 3 6'' c/c 13.37 2 x 28 56 3.50 196.00 - - - - 0.50
1.00 1.00
0.50
0.50
Rings at grid 2~3 & 3~4, 5~6, 0.50
3 6'' c/c 13.50 4 x 26 104 3.50 364.00 - - - - 1.00 1.00
6~7
0.50
0.50
Page 10 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON DIA OF BARS
ROOF BEAMS 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
1.017 M.Ton
Checked by : Weight Kg 242 91 684 - -
Page 11 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
GROUND FLOOR SLAB Steel 3,072 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 2.26 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
MAIN BARS
13.50
Main Bars at grid B~B'/4~5 3 6'' c/c 6.54 1 x 14 14 13.50 189.00 - - - -
30.19
Main Bars at grid 1~3 & 6~8/B'~D 3 7'' c/c 8.00 2 x 8 16 30.19 483.04 - - - -
27.69
Main Bars at grid 1~3 & 6~8/B'~D 3 7'' c/c 8.00 2 x 7 14 27.69 387.66 - - - -
25.07
Dist Bars at grid 1~2 & 7~8 /A'~B' 3 8'' c/c 13.88 2 x 22 44 25.07 1,103.08 - - - -
25.07
Dist Bars at grid 2~3 & 6~7/A'~B' 3 8'' c/c 13.88 2 x 22 44 25.07 1,103.08 - - - -
25.07
Dist Bars at grid 3~4 & 5~6/A'~B' 3 8'' c/c 13.88 2 x 22 44 25.07 1,103.08 - - - -
15.17
Dist Bars at grid 4~5/A~B' 3 8'' c/c 12.00 1 x 19 19 15.17 288.23 - - - -
9.44
Dist Bars at grid B~D/1~2 & 7~8 3 7'' c/c 13.88 2 x 25 50 9.44 472.00 - - - -
Page 12 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
GROUND FLOOR SLAB Steel 3,072 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 2.26 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
9.44
Dist Bars at grid B~D/2~3 & 7~8 3 7'' c/c 13.88 2 x 25 50 9.44 472.00 - - - -
9.44
Dist Bars at grid B~D/3~4 & 5~6 3 7'' c/c 13.88 2 x 25 50 9.44 472.00 - - - -
TOP EXTRA STEEL (Horizontal)
2.94
At grid A /1~2 & 7~8 3 6'' c/c 13.62 2 x 28 56 2.94 164.64 - - - -
2.94
At grid A /2~3 & 6~7 3 6'' c/c 13.75 2 x 29 58 2.94 170.52 - - - -
2.94
At grid A /3~4 & 5~6 3 6'' c/c 13.75 2 x 29 58 2.94 170.52 - - - -
2.94
At grid A /4~5 3 6'' c/c 11.75 1 x 25 25 2.94 73.50 - - - -
8.75
At grid B /1~2 & 7~8 3 6'' c/c 13.94 2 x 29 58 8.75 507.50 - - - -
8.75
At grid B /2~3 & 6~7 3 6'' c/c 14.00 2 x 29 58 8.75 507.50 - - - -
8.75
At grid B /3~4 & 5~6 3 6'' c/c 14.00 2 x 29 58 8.75 507.50 - - - -
10.00
At grid B /4~5 3 6'' c/c 12.00 1 x 25 25 10.00 250.00 - - - -
2.75
At grid B' /1~2 & 7~8 3 6'' c/c 13.94 2 x 29 58 2.75 159.50 - - - -
2.75
At grid B' /2~3 & 6~7 3 6'' c/c 14.00 2 x 29 58 2.75 159.50 - - - -
2.75
At grid B' /3~4 & 5~6 3 6'' c/c 14.00 2 x 29 58 2.75 159.50 - - - -
2.75
At grid D /1~2 & 7~8 3 6'' c/c 13.94 2 x 29 58 2.75 159.50 - - - -
2.75
At grid D /2~3 & 6~7 3 6'' c/c 14.00 2 x 29 58 2.75 159.50 - - - -
Page 13 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
GROUND FLOOR SLAB Steel 3,072 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 2.26 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
2.75
At grid D /3~4 & 5~6 3 6'' c/c 14.00 2 x 29 58 2.75 159.50 - - - -
TOP EXTRA STEEL (VERTICAL)
4.19
At grid A~B /1 & 8 3 9'' c/c 7.25 2 x 11 22 4.19 92.18 - - - -
4.19
At grid B~B' /1 & 8 3 9'' c/c 15.62 2 x 22 44 4.19 184.36 - - - -
10.25
At grid B~B' /2,3,6 & 8 3 9'' c/c 15.62 4 x 22 88 10.25 902.00 - - - -
4.19
At grid B~B' /4 & 5 3 9'' c/c 15.62 2 x 22 44 4.19 184.36 - - - -
4.19
At grid B'~D /1 & 8 3 9'' c/c 8.00 2 x 12 24 4.19 100.56 - - - -
10.25
At grid B'~D/2,3,6 & 8 3 9'' c/c 8.00 4 x 12 48 10.25 492.00 - - - -
4.19
At grid B'~D /4 & 5 3 9'' c/c 8.00 2 x 12 24 4.19 100.56 - - - -
BINDING BARS (Vertical)
Page 14 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
GROUND FLOOR SLAB Steel 3,072 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 2.26 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
3.072 M.Ton
Checked by : Weight Kg 3,072 - - - -
Page 15 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON DIA OF BARS
COLUMNS UPTO ROOF 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #6 #8 #11 Laps
# Mbrs Each
Column C-1 (1'-0" X 1'-0")
0.75
Ring-1 Upto Bot of Beam at L/3 0.50
3 4'' c/c 3.25 16 x 11 176 3.50 616.00 - - - 0.75 0.75
at Top & Bottom
- 0.75
0.54
Ring-2 Upto Bot of Beam at L/3 0.50
3 4'' c/c 3.25 16 x 11 176 2.66 468.16 - - - 0.54 0.54
at Top & Bottom
- 0.54
0.75
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.681 1.211 2.410
0.465 M.Ton
Checked by : Weight Kg 244 221 - - -
Rings at grid 1~4 & 5~8 3 8'' c/c 13.75 6 x 22 132 2.00 264.00 - - - - 0.50
0.25 0.25
0.50
Page 17 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON DIA OF BARS
LINTEL BEAMS FIRST FLOOR 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
0.50
Rings at grid B~B' 3 8'' c/c 15.58 8 x 22 176 2.00 352.00 - - - - 0.50
0.25 0.25
0.50
D2 (L=2'-6" )
0.25 0.00
Binding Bars 3 1 6 x 2 12 0.25 3.00 - - - -
V1 SHADE (L = 2'-6") (9" Bearing)
3.88 0.00
Dist Bars 3 6'' c/c 1.5 6 x 3 18 3.88 69.84 - - - -
W1 SHADE (L = 7'-0") (9" Bearing)
8.38 0.00
Dist Bars 3 6'' c/c 1.5 1 x 3 3 8.38 25.14 - - - -
Page 18 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON DIA OF BARS
LINTEL BEAMS FIRST FLOOR 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
W2 SHADE (L = 4'-0") (9" Bearing)
5.38 0.00
Dist Bars 3 6'' c/c 1.5 1 x 3 3 5.38 16.14 - - - -
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
0.762 M.Ton
Checked by : Weight Kg 209 553 - - -
Page 19 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON DIA OF BARS
ROOF BEAMS 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
B-1 AT GRID 1~8 / A (L=102'-0")
Rings at grid 1~2 & 7~8 3 6'' c/c 13.37 2 x 28 56 3.50 196.00 - - - - 0.50
1.00 1.00
0.50
0.50
Rings at grid 2~3 & 3~4, 5~6, 0.50
3 6'' c/c 13.50 4 x 26 104 3.50 364.00 - - - - 1.00 1.00
6~7
0.50
0.50
Page 20 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON DIA OF BARS
ROOF BEAMS 3 4 5 6 8
BAR BENDING SCHEDULE 1.25 1.6667 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
0.551 M.Ton
Checked by : Weight Kg 143 91 317 - -
Page 21 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1589.415 DIA OF BARS
GROUND FLOOR SLAB Steel 3,874 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 2.44 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
MAIN BARS
38.00 1.00
Main Bars at grid B~D/3~6 (Alt) 3 6'' c/c 24.26 1 x 25 25 38.00 950.00 - - - -
33.76
Dist Bars at grid 1~2 & 7~8 /A~D 3 8'' c/c 13.88 2 x 22 44 33.76 1,485.44 - - - -
33.76
Dist Bars at grid 2~3 & 6~7/A~D 3 8'' c/c 13.88 2 x 22 44 33.76 1,485.44 - - - -
33.76
Dist Bars at grid 3~4 & 5~6/A~D 3 8'' c/c 13.88 2 x 22 44 33.76 1,485.44 - - - -
33.76
Dist Bars at grid 4~5/A~D 3 8'' c/c 12.00 1 x 19 19 33.76 641.44 - - - -
TOP EXTRA STEEL (Horizontal)
2.94
At grid A /1~2 & 7~8 3 6'' c/c 13.62 2 x 28 56 2.94 164.64 - - - -
2.94
At grid A /2~3 & 6~7 3 6'' c/c 13.75 2 x 29 58 2.94 170.52 - - - -
2.94
At grid A /3~4 & 5~6 3 6'' c/c 13.75 2 x 29 58 2.94 170.52 - - - -
2.94
At grid A /4~5 3 6'' c/c 11.75 1 x 25 25 2.94 73.50 - - - -
11.50
At grid B /1~2 & 7~8 3 6'' c/c 13.88 2 x 29 58 11.50 667.00 - - - -
11.50
At grid B /2~3 & 6~7 3 6'' c/c 13.88 2 x 29 58 11.50 667.00 - - - -
Page 22 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1589.415 DIA OF BARS
GROUND FLOOR SLAB Steel 3,874 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 2.44 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
11.50
At grid B /3~4 & 5~6 3 6'' c/c 13.88 2 x 29 58 11.50 667.00 - - - -
8.50
At grid B /4~5 3 6'' c/c 12.00 1 x 25 25 8.50 212.50 - - - -
8.75
At grid D /1~2 & 7~8 3 9'' c/c 13.94 2 x 20 40 8.75 350.00 - - - -
8.75
At grid D /2~3 & 6~7 3 9'' c/c 13.88 2 x 20 40 8.75 350.00 - - - -
8.75
At grid D /3~4 & 5~6 3 9'' c/c 13.88 2 x 20 40 8.75 350.00 - - - -
8.75
At grid D /4~5 3 9'' c/c 12.00 1 x 17 17 8.75 148.75 - - - -
TOP EXTRA STEEL (VERTICAL)
4.19
At grid A~B /1 & 8 3 9'' c/c 7.25 2 x 11 22 4.19 92.18 - - - -
10.25
At grid B~D /1 & 8 4 7'' c/c 24.38 2 x 43 86 10.25 - 881.50 - - -
10.25
At grid B~D /3 & 6 4 8'' c/c 24.38 2 x 38 76 10.25 - 779.00 - - -
9.50
At grid B~C /4 & 5 4 8'' c/c 24.38 2 x 38 76 9.50 - 722.00 - - -
BINDING BARS (Vertical)
Page 23 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1589.415 DIA OF BARS
GROUND FLOOR SLAB Steel 3,874 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 2.44 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
BINDING BARS (Horizontal)
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
3.874 M.Ton
Checked by : Weight Kg 2,503 1,371 - - -
Page 24 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
MUMTY FLOOR SLAB Steel 344 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 0.25 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
BOTTOM SLAB
2.44 2.44
6.38
3.19 3.19
8.38
6.38
3.19 3.19
8.38
2.67
Extra Bars Along Manhole Cover 3 2'' c/c 2 x 4 8 2.67 21.36 - - - -
Page 25 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
MUMTY FLOOR SLAB Steel 344 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 0.25 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
DEDUCTION OF MANHOLE BARS
1.75 2.00
Main Bars 3 8'' c/c 1.75 -2 x 3 -6 1.75 - 10.50 - - - -
1.75 2.00
Dist Bars 3 8'' c/c 1.75 -2 x 3 -6 1.75 - 10.50 - - - -
1.75 2.00
Top Dist Bars 3 8'' c/c 1.75 -2 x 3 -6 1.75 - 10.50 - - - -
1.75 2.00
Top Dist Bars 3 8'' c/c 1.75 -2 x 3 -6 1.75 - 10.50 - - - -
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
0.344 M.Ton
Checked by : Weight Kg 136 208 - - -
Page 26 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
MUMTY FLOOR SLAB Steel 273 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 0.20 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
VERTICAL BARS
0.50
Short Wall (Outer Side) 3 6'' c/c 4.84 4 x 11 44 5.69 250.36 - - - - 4.69
0.50
0.50
Short Wall (Inner Side) 3 6'' c/c 3.84 4 x 9 36 5.69 204.84 - - - - 4.69
0.50
0.50
Long Wall (Outer Side) 3 6'' c/c 6.88 4 x 14 56 5.69 318.64 - - - - 4.69
0.50
0.50
Long Wall (Inner Side) 3 6'' c/c 5.84 4 x 13 52 5.69 295.88 - - - - 4.69
0.50
1.00
Short Wall 4 9'' c/c 3.00 2 x 5 10 3.50 - 35.00 - - - 1.50
1.00
1.00
Long Wall 4 9'' c/c 5.00 2 x 8 16 3.50 - 56.00 - - - 1.50
1.00
DISTRIBUTION BARS
Page 27 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
MUMTY FLOOR SLAB Steel 273 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 0.20 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
0.273 M.Ton
Checked by : Weight Kg 245 28 - - -
Page 28 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
MUMTY FLOOR SLAB Steel 307 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 0.23 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
SLAB STEEL
13.38
Main Bars 3 6'' c/c 24.26 1 x 25 25 13.38 334.50 - - - -
25.76
Dist Bars 3 8'' c/c 11.88 1 x 10 9.5 25.76 244.72 - - - -
TOP EXTRA STEEL
8.69
At top side of span 3 9'' c/c 11.88 1 x 17 17 8.69 147.73 - - - -
8.69
At Bototm Side of span 3 6'' c/c 11.88 1 x 25 25 8.69 217.25 - - - -
4.69
At Right Side of Span 4 8'' c/c 24.26 1 x 37 37 4.69 - 173.53 - - -
4.69
At Left Side of Span 4 8'' c/c 24.26 1 x 37 37 4.69 - 173.53 - - -
BINDING BARS
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
0.307 M.Ton
Checked by : Weight Kg 202 105 - - -
Page 29 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
MUMTY FLOOR SLAB Steel 347 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 0.25 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
STAIR FOOTINGS (5' x 2'-6")
0.50
Outer Side 3 6'' c/c 4.84 1 x 11 11 6.77 74.47 - - - - 5.77
0.50
0.50
Inner Side 3 6'' c/c 4.84 1 x 11 11 6.77 74.47 - - - - 5.77
0.50
DISTRIBUTION BARS OF RCC WALL
5.67 0.33
Main Bars (Bottom) 4 6'' c/c 4.84 1 x 11 11 19.33 - 212.63 - - - 12.83
0.50
4.84
Dist Bars at main Bars (Bottom) 3 8'' c/c 12.83 1 x 10 10 4.84 48.40 - - - -
Top Main Bar at 1st Step (Top) 4 6'' c/c 4.84 1 x 11 11 4.75 - 52.25 - - - 4.25
0.50
4.84
Dist Bars at 1st Step (Top) 3 8'' c/c 4.25 1 x 4 3.5 4.84 16.94 - - - -
Page 30 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
MUMTY FLOOR SLAB Steel 347 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 0.25 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
4.54 0.5
Top Main Bar at Landing Portion 4 6'' c/c 4.84 1 x 11 11 9.29 - 102.19 - - - 4.25
4.84
Dist Bars 3 8'' c/c 4.25 1 x 4 3.5 4.84 16.94 - - - -
5.75
4.84
Dist Bars at main Bars (Bottom) 3 8'' c/c 6.42 1 x 6 5.5 4.84 26.62 - - - -
6.25
4.84
Dist Bars (Top) 3 8'' c/c 2.25 1 x 2 2 4.84 9.68 - - - -
4.84
Dist Bars (Top) 3 8'' c/c 2.25 1 x 2 2 4.84 9.68 - - - -
1.50
At the point of connecting With Slab 4 6'' c/c 4.84 2 x 11 22 3.00 - 66.00 - - - 1.50
Page 31 of 32
CONSTRUCTION OF BOQ (SET OF 6) AT ALLAMA IQBAL GARRISON Conc 1361.325 DIA OF BARS
MUMTY FLOOR SLAB Steel 347 3 4 5 6 8
BAR BENDING SCHEDULE kg/Cft 0.25 1.25 1.67 2.08 2.50 3.33
Dia of Nos of Bars Dia of Bars
Total Cut Length No of
Description Bar Spacing SPAN No of No. in Shape of Bar
Nos (Rft) #3 #4 #5 #6 #8 Laps
# Mbrs Each
Junaid Khan (Q.S) Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211
0.347 M.Ton
Checked by : Weight Kg 56 291 - - -
Page 32 of 32