Wales Development

Preliminary Gas Utilisation Study


Press Briefing

26th April 2021


Wales Development Zone

Wales Pipeline route


Development Zone 22 km approx Module Offloading Facility
(MOF)

Monday, 26 April 2021 Press-briefing 2


Wales Industrial Area Layout

G PP

Monday, 26 April 2021 3


Gas processing schematic
Delivery Point
Production (Point of SALE) Transport Domestic Markets Wet gas LPG mix
Crude FOB Crude Export

Stabroek
LPG DOM LPG
Propane Propane
50-120 mmscfd
LPG 66.24% 70%
(C3 + C4)
12 inch pipeline Naptha DOM Naptha Non-Power
Reinjection
Naptha Res/Com
(C5+) Industrial
Transport
Butane Butane
Dry Gas DOM Gas
Wet Dry Gas 33.76% 30%
Gas (C1 + C2)
Liza Ph 1
Onshore P/L Power Power Grid
Offshore P/L NGL Plant n-Propane 6.525 66.24%
Drilling &
Liza Ph 2 ~50 mmscfd ~3,430 bbl/d i-Butane 0.92 33.76%
Operations Initial NGL yield n-Butane 2.405
Payara Throughput 9.85

Other Stabroek

• NGLs include: Plant Condensate, Propane and Butane


• Propane and Butane combine to make LPG 4

• NB: Treatment of naphtha to be considered separately


• Natural gas comprised primarily Methane and Ethane
Gas Processing Plant (GPP)

XOM proposed configuration Simplified configuration

Monday, 26 April 2021 5


Closed-Cycle Gas Turbine Plant

Monday, 26 April 2021 6


Gas Engine Plant

Monday, 26 April 2021 7


Gas Utilisation
Condensate
50 mmscfd Naptha

Gas processing NGLs - LPG 3,400 bbl/d LPGs


plant (GPP) Propane

Dry gas - 250 MW Carbon dioxide


Methane thermal power 800,000 Tpa

Hydrogen Steam
Argon
Steam reforming Waste-heat

Air Separation Fertiliser


Nitrogen Ammonia
ASU Urea

UniBio - Aerobic Animal feed


Oxygen
fermentation 72% protein

Methanol Bio-Polymers
MeOH PHB/PHA

Monday, 26 April 2021 8


Wet gas
Gas processing plant Power Plant – 250 MW
Bio-Protein Solid waste
2 x 1.412 Msm3/d Cement plant
(2 x 50 mmscfd) 6,250 tpa pyrolysis
Wärtsilä 28 x 20V34SG 60 ktpa
150 ktpa

Green corridor Pipe-rack


Shared utilities
CO2

Cryogenic Air Urea Waste-sorting Limestone


Separation Unit Ammonia plant Basalt fibre facility calcination
(ASU) plant 200 tpd 3,500 tpa 250 ktpa 200 ktpa
330 tpd 120 tpd

Glass plant BioGas Aluminia


Agricultural
3,500 tpa 150 ktpa 80 ktpa
Algae farming processing

Fertiliser Waste processing Mineral processing


Monday, 26 April 2021 9
Layout of Industrial Area

Monday, 26 April 2021 10