22038-CCN-43 R3-Enclosed space on 3rd level_240410 (1)
22038-CCN-43 R3-Enclosed space on 3rd level_240410 (1)
43 R3
Subject: Janitorial Room on 3rd floor
Project Name: GOC5033045 – ESDC PDOC Project No.: 22038
Issued To: Finn Madsen, Double V Construction Ltd. Issue Date: April 10, 2024
Issue:
RFI 103 – There is an enclosed space on the southeast side of the freight elevator, accessible only through
the freight elevator door. Schindler's Project Manager expressed concern that the BC Safety Authority
might disapprove of this setup, even if the freight elevator door were secured to prevent opening on that
side. The concern is that a maintenance person could enter the space from the elevator but might be
unable to exit.
Instruction:
Please provide us with detail and pricing for Architectural (infill wall was added), Mechanical and Electrical
scope as per attached drawings.
IREDALE ARCHITECTURE
220 – 12 Water Street, Vancouver, BC V6B 1A5 Vancouver Victoria t 604-736-5581 e architect@iredale.ca iredale.ca
You are hereby authorized, subject to the provisions of your Contract, to proceed with the Work described herein.
Any variance between the attached quotation and this document, this document governs.The amount of the Contract
Sum adjustment is represented below and is the total change to the Contract in Contract Price and Schedule.
Cost of Work: Credits Extras
Authorization:
The Architect, with the recommendation of the relevant design professionals, deems that this Work is reasonably
priced and is not part of the Contractor's responsibility within the approved contract.
Recommended by Architect:
Name and Title: James Emery, Architect of Record – Iredale Date: April 10, 2024
Receipt of this Change is hereby acknowledged and the terms thereof agreed to. Any cumulative effect to the
Contract Price and Schedule as a result of this Change Order have been taken into account within the approved
Cost of Work and Schedule Adjustment.
Agreed by Contractor:
Name and Title: Finn Madsen, Senior Project Manager – Double Date:
V Construction Ltd.
Described Work to not commence until approved by Owner.
Approved by Owner:
Name and Title: Jeff Brown, Executive Vice President – North Date:
Star
Change Order: 43 R3
220 – 12 Water Street, Vancouver, BC V6B 1A5 Vancouver Victoria t 604-736-5581 e architect@iredale.ca iredale.ca
WALL TYPES GENERAL CONSTRUCTION NOTES:
GYPSUM CONSTRUCTION Public Services and Services publics et
W1a 1. THIS DRAWING AND NOTES TO BE READ IN CONJUNCTION WITH THE Procurement Canada Approvisionnement Canada
(FLOOR SLAB TO U/S OF SUSPENDED CEILING) PER WALL SCHEDULE.
OTHER DRAWINGS AND SPECIFICATIONS, INCLUDING THE M&E
DRAWINGS BY ENGINEERING CONSULTANTS. Real Property Direction générale
GYPSUM CONSTRUCTION WITH PLENUM BARRIER
2. OBTAIN APPROVAL FROM ARCHITECT, FOR ALL CHANGES MADE TO THE Branch des biens immobiliers
W2 (FLOOR SLAB TO U/S OF SUSPENDED CEILING & T.O. SUSPENDED
CEILING TO U/S OF SLAB WITH PLENUM BARRIER) PER WALL SCHEDULE. DOCUMENTS PRIOR TO PROCEEDING WITH WORK.
3. VERIFY ALL DRAWINGS, SPECIFICATIONS, DIMENSIONS, MEASUREMENTS
GYPSUM CONSTRUCTION FROM SLAB TO SLAB AND SITE CONDITIONS, NOTIFY ARCHITECT/ PM, OF ANY ERRORS,
W3a
(CONT FROM FLOOR SLAB TO CEILING SLAB) PER WALL SCHEDULE. DISCREPANCIES OR OMISSIONS PRIOR TO PROCEEDING WITH WORK. E F H J
4. CONFIRM THAT ALL DELIVERIES MEET THE CONSTRUCTION SCHEDULE.
GYPSUM CONSTRUCTION FROM SLAB TO SLAB WITH GLAZING SECTION
W3b (CONT FROM FLOOR SLAB TO CEILING SLAB) PER WALL SCHEDULE.
SUBSTITUTIONS DUE TO LATE ORDERING WILL NOT BE ACCEPTED. IF
MATERIALS WILL NOT BE AVAILABLE IN TIME TO MEET SCHEDULE
GYPSUM CONSTRUCTION FROM SLAB TO SLAB WITH WITH MESH COMPLETION DATES, THE CONTRACTOR MUST PROVIDE PROOF OF
W3c D
(CONT FROM FLOOR SLAB TO CEILING SLAB) PER WALL SCHEDULE. DATE OF ORDER OF MATERIALS PRIOR TO REQUESTING SUBSTITUTION.
5. REFER TO DOOR SCHEDULE AND KEYING SCHEDULE FOR DETAILS ON
GYPSUM CONSTRUCTION FROM SLAB TO SLAB WITH WIRE MESH AND FIRE
W4A RATED PLY. (CONTINUOUS FROM FLOOR SLAB TO CEILING SLAB WITH WIRE
LOCKING, KEYING, AND OTHER SECURITY ITEMS. 1'
6. MAKE GOOD THE JUNCTION BETWEEN EXISTING AND NEW WALL AND
MESH, BUILD AS PER RCMP G13-01) PER WALL SCHEDULE.
INFILL WALL TO EXISTING WALL. TAPE, FILL AND SAND SMOOTH
GYPSUM CONSTRUCTION FROM SLAB TO SLAB WITH WIRE MESH. DRYWALL, READY TO RECEIVE SPECIFIED FINISH.
W4B (CONTINUOUS FROM FLOOR SLAB TO CEILING SLAB WITH WIRE MESH,
ALIGN WALLS WITH
7. OUTSIDE EDGES OF DOOR FREAMES ARE LOCATED 100mm FROM
BUILD AS PER RCMP G13-01) PER WALL SCHEDULE. MULLIONS
ADJACENT FINISHED WALLS UNO.
8. PASSAGE OPENINGS THROUGH WALLS TO BE 2135mm HIGH UNO.
EXIST WALLS
NEW WALLS
QUIET
W2 ROOM
OPEN OFFICE
FIRE SEPARATION 1 HOUR
7'-6"
2285
D311
SI-37 1995 3130 WS ROOM Vancouver, BC V6B 1A5
3660 12'-0"
WASHROOMS TO BE BUILT AS PER PWGSC STANDARDS AND MEET W2a 604 - 736 - 5581
2 6'-6 1/2" 10'-3 1/4" W2 W2 311
BARRIER FREE DESIGN (CSA B651-18) AND ALL APPLICABLE CODES.
C W2
Vancouver Victoria
1335
PROVIDE REINF FOR WALL MOUNTED AV UNIT/ OTHER EQUIPMENT. W2 W1 W2
iredale.ca
8'-0"
2440
3 PROVIDE PLY BACKING ON WALLS - 914 (36") AFF TO 2134 (84") AFF. KITCHENETTE 316
319 WOMEN'S WC MEN'S WC W2
IT STORAGE &
14'-3"
W2
4345
PROVIDE PLY BLOCKING FOR SHELVING UNIT ANCHORAGE ALONG 318 317 D316 D300d
4 WORKLAB
1280
ENTIRE WALL AT 2134 AFF. 3280 1520 1100
D315
6'-3 1/2"
315 312 4
1920
CONT OPERABLE PARTITION, UP TO CEILING, MIN STC-52, REFER TO W2 W1
STAIR 3
5 W1 W2 D312
850
SPECS AND ELECTRICAL. COORD DEPTH OF ALCOVE WITH SHOP
DRAWING STACK DEPTH.
5'-6 1/4"
ELEC CLOSET, EXIT
1525
1680
D300a 2690 8'-10" W2a D313 W2
6'-7"
1880
2005
REFER TO ELEC.
VIF
W4a SMALL
W2 MEETING
D320 300
1120
W4a W2 ROOM
760
320
3'-6"
610
1065
8'-8 1/2"
5000 16'-4 3/4" 313
2655
W4a LAN ROOM W2
D300c
321
5'-8"
W2
1725
131
W5a W2
.23
W1 5
°
W4a STAIR 2 EXIT
4'-11"
CLEAR
4'-6"
1370
1500
D321
635
3'-6"
1065
W1
6'-3 1/4"
3660 12'-0"
D314
1915
1855 W2 D300b W2
OPEN OFFICE W1 WS WS LARGE
"
'-0
6'-1"
301D Sim MEETING
30 12 OPEN OFFICE
ROOM
45
A301 301A
91
6'-5"
1840
1955
314
WS
W2
OPEN OFFICE WS
301B 950 W2
14'-10 1/4"
Contractor to verify all dimensions &
70
4525
conditions on site and immediately notify
13
4
5"
discrepancies.
"
MAIL / FILE
'-2
10
ROOM
00
W2 309
31
47
25
3'
D309
0"
QUIET 15
'-1
"
ROOM "
'-9
D308
10
B
00
75
QUIET W2 W2
32
W2 23
'-8
W2
ALIGN WALLS WITH 7'
60
te
ROOM 16 W6 D303 Si no. du detail
QUIET A A
on
D304 25 W2
304 B location drawing no.
C
5' ROOM
TB
TENANT IMPROVEMENT
W1
1 : 100
Designed By Conçu
DG
Date 12 Jan 2024 (yyyy/mm/dd)
Date (yyyy/mm/dd)
Tender Soumission
JSE
Project Manager Administrateur de projets
A107
C:\Users\sahar bahrami\Documents\22038-BGIS PDOC Tenant Improvement_Central_saharL6TYF.rvt
0 10 20mm 40 60 80 100 120 140 160 180 200mm
Public Services and Services publics et
EXISTING FLOOR SLAB EXISTING FLOOR SLAB EXISTING FLOOR SLAB EXISTING FLOOR SLAB EXISTING FLOOR SLAB
IREDALE
FACADE ON INSIDE FACE IN A
SEAMLESS APPLICATION AND BE
FASTENED UNDER METAL BLOCKING
EXISTING FLOOR SLAB EXISTING FLOOR SLAB EXISTING FLOOR SLAB EXISTING FLOOR SLAB
A R CHI T EC T UR E
W1 W1 - GYPSUM CONSTRUCTION W2 W2 - GYPSUM CONSTRUCTION WITH PLENUM BARRIER W2a W2 - GYPSUM CONSTRUCTION WITH PLENUM BARRIER W3a W3a - GYPSUM CONSTRUCTION FROM SLAB TO SLAB
(FLOOR SLAB TO U/S OF SUSPENDED CEILING & T.O. SUSPENDED (FLOOR SLAB TO U/S OF SUSPENDED CEILING & T.O. SUSPENDED
W3b W3b - GYPSUM CONSTRUCTION FROM SLAB TO SLAB 220 - 12 Water Street
(FLOOR SLAB TO U/S OF SUSPENDED CEILING) (CONT FROM FLOOR SLAB TO CEILING SLAB)
CEILING TO U/S OF SLAB WITH PLENUM BARRIER) CEILING TO U/S OF SLAB WITH PLENUM BARRIER) (CONT FROM FLOOR SLAB TO CEILING SLAB)
PLENUM BARRIER NOTES: ACOUSTIC SEALANT BEAD PLENUM BARRIER NOTES: ACOUSTIC SEALANT BEAD
- ALL JOINTS TAPED (BOTH SIDES) CONTINUOUS ON BOTH SIDES - ALL JOINTS TAPED (BOTH SIDES) CONTINUOUS ON BOTH SIDES
ACOUSTIC SEALANT BEAD - ALL PENETRATIONS MUST BE - ALL PENETRATIONS MUST BE
PLENUM BARRIER NOTES:
CONTINUOUS ON BOTH SIDES SEALED WITH ACOUSTIC CAULKING SEALED WITH ACOUSTIC CAULKING
- ALL JOINTS TAPED
600T200-43 STEEL TRACK 600T200-43 STEEL TRACK
- ALL PENETRATIONS MUST BE
EXIST CEILING TILE IN SUSPENDED T- EXIST CEILING TILE IN SUSPENDED T-
600T200-43 STEEL TRACK SEALED WITH ACOUSTIC CAULKING
BAR CEILING. PROVIDE NEW EDGE BAR CEILING. PROVIDE NEW EDGE
TRACK TO MATCH EXIST ON CLIENT SIDE SOUND ATTENUATING BATT INSULATION TRACK TO MATCH EXIST ON CLIENT SIDE SOUND ATTENUATING BATT INSULATION
CONTINUOUS WIRE MESH FROM OF WALL AND CUT BACK CEILING TILE OF WALL AND CUT BACK CEILING TILE
FLOOR TO U/S OF SLAB TO FIT. RESTRAIN PER SEISMIC TO FIT. RESTRAIN PER SEISMIC
REQUIREMENTS SECURE WIRE MESH REQUIREMENTS SECURE WIRE MESH
TO STEEL STUD TO STEEL STUD
PLENUM BARRIER NOTES: ACOUSTIC SEALANT BEAD 6 Issued For Tender 21 Nov 2022
PLENUM BARRIER NOTES:
- ALL JOINTS TAPED (BOTH SIDES) CONTINUOUS ON BOTH SIDES
- ALL JOINTS TAPED (BOTH SIDES) STEEL TRACK
ACOUSTIC SEALANT BEAD
- ALL PENETRATIONS MUST BE
80 - ALL PENETRATIONS MUST BE
5 Issued For Building Permit 07 Nov 2022
PLENUM BARRIER NOTES: ACOUSTIC SEALANT BEAD CONTINUOUS ON BOTH SIDES SEALED WITH ACOUSTIC CAULKING
- ALL JOINTS TAPED (BOTH SIDES) CONTINUOUS ON BOTH SIDES SEALED WITH ACOUSTIC CAULKING
PLENUM BARRIER NOTES: ACOUSTIC SEALANT BEAD EXISTING CEILING TILE
- ALL PENETRATIONS MUST BE - ALL JOINTS TAPED
EXIST CEILING TILE IN SUSPENDED T- IN SUSPENDED T-BAR CEILING 4 Issued For 99% Review 31 Oct 2022
SEALED WITH ACOUSTIC CAULKING - ALL PENETRATIONS MUST BE 18 GA STEEL TRACK
18 GA STEEL TRACK BAR CEILING. PROVIDE NEW EDGE
EXISTING CEILING TILE SEALED WITH ACOUSTIC CAULKING
IN SUSPENDED T-BAR CEILING
TRACK TO MATCH EXIST ON CLIENT SIDE 3 Issued For 90% CP Review 03 Oct 2022
18 GA STEEL TRACK OF WALL AND CUT BACK CEILING TILE
EXISTING WALL
TO FIT. RESTRAIN PER SEISMIC
REQUIREMENTS INSIDE OF SHAFT 2 Issued For 66% Review 31 Aug 2022
Drawing Dessin
Designed By Conçu
DG
Date 12 Jan 2024 (yyyy/mm/dd)
ACOUSTIC SEALANT BEAD
CONTINUOUS ON BOTH SIDES SOUND ATTENUATING BATT INSULATION Drawn By Dessiné par
FL
SECURE BOTTOM TRACK TO STRUCT SLAB 18 GA STEEL TRACK Date (yyyy/mm/dd)
W/ FASTENER @ 400mm OC TYP
12 Jan 2024
NEW RESILIENT WALL BASE Reviewed By Examiné par
ACOUSTIC SEALANT BEAD
JSE
CONTINUOUS ON BOTH SIDES, NEW CARPET OR TILE
Date 12 Jan 2024 (yyyy/mm/dd)
Tender Soumission
JSE
W6 W6 - GYPSUM CONSTRUCTION WITH PLENUM BARRIER (1HR FRR ULC U453)
(FLOOR SLAB TO U/S OF SUSPENDED CEILING & T.O. SUSPENDED Project Manager Administrateur de projets
CEILING TO U/S OF SLAB WITH PLENUM BARRIER)
-
INSULATION (STC-52) IN CAVITY
1 LAYER OF 16mm GYPSUM TYPE X BOARD
22038
- ACOUSTIC CAULKING TOP & BOTTOM
A001
C:\Users\sahar bahrami\Documents\22038-BGIS PDOC Tenant Improvement_Central_saharL6TYF.rvt
0 10 20mm 40 60 80 100 120 140 160 180 200mm
Door Schedule
Frame Material
2. PRIVACY LOCKSETS TO HAVE OCCUPANCY INDICATORS
Door Operator
HM HOLLOW METAL H1 REGULAR CONCEALED HINGE
Door Material
Placeholder 1
Placeholder 2
Placeholder 3
High Security
Frame Finish
3. CLASSROOM LOCKSETS (ANSI F84) TO HAVE DEADLOCKING LATCH-BOLT OPERATED BY LEVER
Locking Bars
SCW SOLID CORE WOOD H2 CONCEALED HINGE WITH NRP
Card Reader
Door Viewer
Door Closer
Door Finish
Storeroom
PS PRESSED STEEL L1 MORTISE LEVER LOCKSET
Kick Plates
Classroom
FROM EITHER SIDE, EXCEPT WHEN OUTSIDE LEVER IS LOCKED FROM OUTSIDE BY KEY. WHEN
Elec Strike
Thickness
Door Seal
Push Bar
PT PAINTED L2 CYLINDRICAL LEVER LOCKSET
OUTSIDE LEVER IS LOCKED, LATCH-BOLT IS OPERATED BY INSIDE LEVER.
Astragal
Passage
Room #
Keypad
Privacy
V VENEER - BIRCH
Hinges
4. STOREROOM LOCKSETS (ANSI F07) TO HAVE DEADLOCKING LATCH-BOLT OPERATED BY KEY IN
Door Fire PF2 PRIVACY FILM
OUTSIDE LEVER, OR BY OPERATING INSIDE LEVER. OUTSIDE LEVER ALWAYS LOCKED, INSIDE
Mark Type Rating Height Width Remarks LEVER ALWAYS UNLOCKED.
5. INSTITUTIONAL LOCKSETS (ANSI F30) TO HAVE LATCH-BOLT RETRACTED BY KEY FROM EITHER
SIDE. LEVER ON BOTH SIDES ALWAYS INOPERATIVE. AUXILIARY LATCH DEADLOCKS LATCH-BOLT
D102a 102 F-1 2134 1524 45 SCW PS PT5 PT4 ● ● ● ● WHEN DOOR IS CLOSED.
6. HIGH SECURITY LOCKSET DOORS REQUIRE CRITICAL ATTACK AREA DOOR BRACING, SEE BELOW.
D102b 102 A 2134 914 45 HM PS PT5 PT4 ● ● ● ● 7. FIRE-RATED DOORS MUST BE FITTED WITH DOOR HARDWARE THAT IS ALSO FIRE-RATED
INCLUDING LOCKSETS, DOOR STRIKES / PLATES, HINGES AND EXITING HARDWARE.
D103 103 A 2134 914 45 HM PS PT5 PT4 ● ● ● ● ●
8. DO NOT PRECUT DOORS FOR ELECTRIC STRIKES.
D104 104 F 2134 1524 45 SCW PS PT5 PT4 ● ● ● ● ● 9. DELAYED EGRESS HARDWARE IS TO COMPLY WITH 3.4.6.16.(4) OF THE BCBC. THE TOTAL TIME
DELAY FOR ALL ELECTROMAGNETIC LOCKS IN ANY PATH OF EGRESS CANNOT BE MORE THAN
D105 105 A 2134 914 45 HM PS PT5 PT4 ● ● ● ● 15 SECONDS.
D106 106 F 2134 1524 45 SCW PS PT5 PT4 ● ● ● ● ● 10. ALL OTHER CARD READER DOORS MUST ALSO BE CONFIGURED TO BE FAIL SECURE.
11. KICKPLATE REQUIREMENTS TO BE ON BOTH INTERIOR AND EXTERIOR FACE OF DOORS, WHERE
D112 112 A 1hr 2134 914 45 HM PS PT5 PT4 ● ● ● ● ● ● REQUIRED, NEW KICKPLATES TO BE 305mm HIGH.
12. ALL DOORS TO HAVE A DOOR STOP.
D113
D114
113
114
A-2
A-2
2134
2134
914
914
45
45
SCW
SCW
PS
PS
PT5 PT4
PT5 PT4
●
●
13. DOOR SEALS - PROVIDE SEAL SET WITH SURFACE MOUNTED DROP SEAL.
14. DOOR OPERATORS TO BE COMPLETE WITH PUSH BUTTONS.
15. HINGES TO BE HEAVY DUTY GRADE 2 SECURITY HINGES WITH NON REMOVABLE PINS.
IREDALE
A R CHI T EC T UR E
D117 101 EXIST 2134 1829 ●
D120 G 2134 1829 45 HM PS ● ELECTRIC DOOR STRIKES TO BE:
220 - 12 Water Street
1. COMPATIBLE WITH DOOR HARDWARE AND DOOR TYPE (I.E. FIRE-RATED DOORS)
D121 121 A-2 2134 914 45 SCW PS PT5 PT4 ● ● ● ● 2. SUITABLE FOR USE WITH BORED LOCKS, MORTISE LOCKS OR MORTISE EXIT DEVICES HAVING A
Vancouver, BC V6B 1A5
(Active Leaf) (Inactive Leaf)
½” OR ⅝” THROW DEAD-LATCH BOLT. 604 - 736 - 5581
D122 122 A-2 2134 914 45 SCW PS PT5 PT4 ● ● ● ● NOTE: 3. MADE OF STAINLESS STEEL FOR HEAVY CONSTRUCTION, CORROSION RESISTANCE, STRENGTH Vancouver Victoria
D124 124 A 2134 914 45 SCW PS PT5 PT4 ● ● ● LOCKING BARS TO BE HEAVY DUTY, INSTALLED AT BOTH TOP AND TAMPER RESISTANCE
AND BOTTOM OF INACTIVE (SMALL) LEAF, AND C/W PADLOCKS. 4. COMMERCIAL / INDUSTRIAL GRADE iredale.ca
D125 125 A 2134 914 45 SCW PS PT5 PT4 ● ● ● ● ● BARS TO HAVE MIN DIAMTER 30mm AND PROJECT MIN 30mm 5. HORIZONTALLY ADJUSTABLE
INTO POCKET OR GUIDE. SECURE WITH RIVETS OR WELDING. 6. NON-HANDED
D126 126 A-2 2134 914 45 SCW PS PT5 PT4 ● ●
7. FAIL-SECURE STANDARD
D127 127 A-2 2134 914 45 SCW PS PT5 PT4 ● ● LOCKING BARS
1
D200a 200 E-1 2134 1016 45 SCW PS PT5 PT4 ● ● ● ● ● 1 : 50
D200b 200 A-1 2134 914 45 HM PS PT5 PT4 ● ● ● ● ●
TYP CRITICAL ATTACK AREA DOOR
D200c 200 A-1 2134 914 45 SCW PS PT5 PT4 ● 610 1220
BRACING (FOR W3c, W4a, W4b WALLS)
D200d 2134 914 45 50 510 50 50 1120 50
D200g 2134 1829 45
50
D201 201 G 2134 1829 45 HM PS PT5 PT4
25
D202 202 A-3 2134 914 45 SCW PS PT5 PT4 ● ● ● ●
D203 203 A-2 2134 914 45 SCW PS PT5 PT4 ●
305
D204 204 A-1 2134 914 45 SCW PS PT5 PT4 ●
PRIVACY FILM;
25
2 2
D205 205 A-3 2134 914 45 SCW PS PT5 PT4 ● ● DENSER ON 2
305
2085
2185
BOTTOM
D206 206 A-3 2134 914 45 SCW PS PT5 PT4 ● ● PANELS &
1
D207 207 A-3 2134 914 45 SCW PS PT5 PT4 ● LIGHTER ON 2
305
1675
2440 8'-0"
TOP PANELS
D208 208 A-3 2134 914 45 SCW PS PT5 PT4 ● TYP.
3
D209a 209 A 2134 914 45 HM PS PT5 PT4 ● ● ● ● ● ●
1220 4'-0"
610
D209b 209 A 2134 914 45 HM PS PT5 PT4 ● ● ● ● 4
25
50
D211 211 F-1 1hr 2134 1524 45 HM PS PT5 PT4 ● ● ● ● ● ● ● ● CARD READER WITH INTEGRATED PIN PAD
Window A Window B Window C
1200 3'-11 1/4" 1200 3'-11 1/4"
D212 212 F 1hr 2134 1524 45 HM PS PT5 PT4 ● ● ● ● ● ● CARD READER WITH INTEGRATED PIN PAD Window Legend Contractor to verify all dimensions &
1 : 25 conditions on site and immediately notify
D214 214 A 2134 914 45 SCW PS PT5 PT4 ● ● KEYNOTES:
the departmental representative of all
1. WELDED DOUBLE STUD DOOR FRAME SUPPORT.
D215 215 A 2134 914 45 SCW PS PT5 PT4 ● ● ● discrepancies.
2. BRACE BETWEEN STUDS AT HORIZONTAL JOINTS
D216 216 A 2134 914 45 SCW PS PT5 PT4 ● ● ● 3. FRAME REINFORCEMENT: 6.4MM X 25MM X 610MM STEEL PLATE TACK
WELDED INSIDE FRAME, CENTER ON LOCK BOLT.
D220 200 G 2134 1829 45 HM PS PT5 PT4 ● 4. ANTI-SPREAD BRACING AT DOOR FRAME BETWEEN WALL STUD AND
D221 221 A 1hr 2134 914 45 HM PS PT5 PT4 ● ● ● ● ● ● DOUBLE STUD - TYP.
5. 16 GA SHEET STEEL ASTM 366, MATTE, INSTALLED ON INSIDE OF SECURE
D225 225 G 2134 1829 45 HM PS PT5 PT4 ● ● ● ● ● ● STORAGE ROOM. EXTEND 1200MM FROM EDGE OF DOOR FRAME.
13 Issued for CCN 43 R1 10 Apr 2024
ATTACH PER RCMP G13-01 RIVET OR WELDING REQUIREMENTS. NO
D226a 226 G 2134 1829 45 HM PS PT5 PT4 ● ● ● ● ● ELECTRICAL OR MECHANICAL PENETRATIONS PERMITTED. 11 Issued for RFI-115 19 Jan 2024
D226b 226 G 2134 1829 45 HM PS PT5 PT4 ● ● ● ●
10 Issued for CCN-08 R1 06 Nov 2023
D228 228 A-3 2134 914 45 SCW PS PT5 PT4 ● ● CRITICAL ATTACK AREA BRACING
2
1 : 50 9 Issued For CCN-09 R2 8 Sept 2023
D229 229 A-3 2134 914 45 SCW PS PT5 PT4 ● ●
125150 150 610 150 150 610 150 8 Issued For CCN-08 06 Jul 2023
D230 230 A-1 2134 914 45 SCW PS PT5 PT4 ●
7 Issued For Construction 17 Mar 2023
150
150
150
D231 231 G 2134 1829 45 SCW PS PT5 PT4 ● ● ● ● ● ●
Revisions Description Date
D232 232 A 1hr 2134 914 45 SCW PS PT5 PT4 ● ● ● ● ●
A detail no.
D300a 300 A-1 2134 914 45 HM PS PT5 PT4 ● ● ● ● no. du detail
A A
760
870
B location drawing no.
D300b 300 G 2134 1829 45 HM PS PT5 PT4 ● ● ● ● sur dessin no.
D300c 300 A-1 2134 914 45 HM PS PT5 PT4 ● ● ● ● C C drawing no. B C
dessin no.
1725
D300d 300 A-1 2134 914 45 SCW PS PT5 PT4 ● ● ● ●
2135
Project Projet
D302 302 A-3 2134 914 45 SCW PS PT5 PT4 ● ●
D303 303 A-2 2134 914 45 SCW PS PT5 PT4 ● ● GOC 5033045 ESDC PDOC
D304 304 A-3 2134 914 45 SCW PS PT5 PT4 ● ● 915 915 915 915
TENANT IMPROVEMENT
D305 305 A-3 2134 914 45 SCW PS PT5 PT4 ● ●
D306 306 E-2 2134 1016 45 SCW PS PT5 PT4 ● ●
255
15330 54a Ave. Surrey, BC
D307 307 E-2 2134 1016 45 SCW PS PT5 PT4 ● ●
D308 308 G 2134 1829 45 SCW PS PT5 PT4 ● ● ● ● TYPE A TYPE A-1 TYPE A-2 TYPE A-3
Drawing Dessin
D309 309 G 2134 1829 45 SCW PS PT5 PT4 ● ● ● ● ● ●
610 915 610 915 915 915
D310 310 E-3 2134 1016 45 SCW PS PT5 PT4 ● ● Door Schedule
D311 311 E-3 2134 1016 45 SCW PS PT5 PT4 ● ●
400
125150
D312 312 A 2134 914 45 SCW PS PT5 PT4 ● ● ● ●
D313 313 A-2 2134 914 45 SCW PS PT5 PT4 ●
As indicated
D314 314 A-2 2134 914 45 SCW PS PT5 PT4 ●
510
D315 315 A 2134 914 45 SCW PS PT5 PT4 ● ● ● Designed By Conçu
DF
D316 316 A 2134 914 45 SCW PS PT5 PT4 ● ● ●
2135
Date 12 Jan 2024 (yyyy/mm/dd)
1225
D322 322 A 1hr 2134 813 45 HM PS PT5 PT4 ● ● ● Reviewed By Examiné par
1015 1525 1525 1830 JSE
D-003 003 G 1hr 2134 1829 45 HM PS ● ● ● ● ● Date (yyyy/mm/dd)
12 Jan 2024
D-004 004 G 1hr 2134 1829 45 HM PS ● ● ● ● ● Approved By Approuvé par
A002
C:\Users\sahar bahrami\Documents\22038-BGIS PDOC Tenant Improvement_Central_saharL6TYF.rvt
0 10 20mm 40 60 80 100 120 140 160 180 200mm
E F H J
Public Services and Services publics et
Procurement Canada Approvisionnement Canada
1'
PT1 RB
1220
1220
AP2 AP2 310
1220
PT1 RB
AP2
1220
AP2
1220
AP2
2440
2440
AP2
2135
12
20 F1
301E
1220
AP2 PT1
2440
2135
RB
24 311
1220
1220
1220
40 F5
AP2 AP2 AP2
915
AP2 TS
12
20
2'
1 TS
SCG
SI-37 SCG 316 SCG SCG
AP1 SCG AP1
SCG PT1 RB SCG 318 317 PT1
RB
F5
C
12
20
AP2
PT1 RB T1
T3
PT1 RB IREDALE
A R C HI T E C T UR E
24 T2
40 F2
TS F2
AP2
319 220 - 12 Water Street
12 TS 312
20 STAIR 3 F2 Vancouver, BC V6B 1A5
T3
AP2 604 - 736 - 5581
ACOUSTIC WALL COVERING PANELS 12 T1
850
20 T2 TS TS
Vancouver Victoria
TS TS TS TS iredale.ca
24 PT1 RB
40 SCG
SCG SCG SCG 315 F1 SCG SCG AP1
AP2
AP2 12
12 20
20 AP2
320
PT1 RB
300 PT1 RB
313
321 AP1
24 12
1220
40 20 AP2
131
RB
F3 F2 F1 SCG
AP2
.23
12
1
F5
PT
12 20
1220
20 STAIR 2 AP2
TS
18 TS
30
AP2 AP2
AP2 301A
12
20 301D AP2
12 SCG
20 SCG
1220
24 SCG AP2
40 AP2 12
1220
12 20 AP2
SCG F1
AP2 20
12 SCG
12 301B 20 AP1
20 12 F5
1220
1220
F1 F1
2440
20 AP2
61 AP2
0 12 AP2
2440
20
AP2
12 314
20
SCG
2440
2440
1220
AP2 AP1 AP2
12 SCG
24
1220
20 40 AP2
RB 1
AP2
PT
24 SCG AP2
1220
12
1220
40 20 AP2 AP2
PT1 RB
AP2 309 3'
RB 1
12 SCG
PT
20 TS
305 AP2
PT 12 Contractor to verify all dimensions &
TS 1 20
24 307 RB conditions on site and immediately notify
B 40
F5 24 the departmental representative of all
SCG AP2 F2 40
RB 1
12 discrepancies.
RB 1
PT
TS 20
AP2 ITEM TAG PRODUCT NAME/ NUMBER/ COLOUR SUPPLIER
308 F1
SCG
303 12
306 20
RB
TS UNO, ALL COLUMN AND GYPSUM ABOVE AND BELOW WINDOW WALLS (BUILDING PERIMETER), BULKHEADS AND CEILING REVEALS TO BE PAINTED TO MATCH:
F5
1
SCG PT1 - BENJAMIN MOORE COLOUR SNOW WHITE 2122-70, 100% ACRYLIC, EGGSHELL
RB
PT
F5
1
• SECTION 06 40 00 - ARCHITECTURAL WOODWORK
PT
302
304 F2
SCG MILLWORK - CABINET PL1 DOWNTOWN URBAN WALNUT W475 ARBORITE
A
RB 1
AP2
PT
F2 TS G' COUNTERTOP PL2 BAROQUE SOAPSTONE P1017 ARBORITE
20
SCG
12
F5
P
PT
TS
W
RB 1
PT
FIBERGLASS REINFORCED PLASTIC WP1 CHROME CANVAS - 011C CRANECOMPOSITE
40
SCG F5
24
F5
• SECTION 08 71 00 - DOOR HARDWARE
AP2
STAIR 1 THRESHOLD TS
INSTALLED IN LOCATIONS WHERE THERE IS A TRANSITION BETWEEN
REFER TO SPECS
20
G PRIVACY FILM [EXTERIOR GLAZING AS INDICATED] PF1 APPLIED ON WINDOWS ON TOP OF SECURITY FILM. REFER TO SPECS
A detail no.
AP2 301C no. du detail
DECO PRIVACY FILM [INTERIOR GLAZING] PF2 DECORATIVE, APPLY TO DOOR LITES. SEE DOOR AND WINDOW LEGENDS REFER TO SPECS
A A
20
20
dessin no.
24
12
SCG
12
20
PORCELAIN TILE WASHROOM FLOORING T1 STONES STOGM24 | 24"X 24" GREY AMES
GOC 5033045 ESDC PDOC
12
TORGS621
24
PORCELAIN TILE WASHROOM WALL TILES T3 TORNARES 6"X21" HIRU WHITE TORHW621 AMES
AP2 TENANT IMPROVEMENT
AP2
20
PORCELAIN TILE KITCHEN BACKSPLASH TILES T4 SLASH | 3"X12" SAGE SLSH73SV CENTURA
12
20
F1
PT
12
1 PORCELAIN TILE ENTRANCE FLOORING T5 DELEGATE - OFF WHITE DL25 24X24 DALTILE
RB 15330 54a Ave. Surrey, BC
40
24
ACOUSTICAL CEILING PANEL ACP CEILING CLOUDS - 6" BAFFLE ASSEMBLY - MARBLE/ MOSS GREEN THE QUIET ROOM
PT
20
12
FLOORING STATIC DISSIPATIVE TILE [LAN ROOM] F3 FORBO EVEREST SD 150201 FORBO
AP2
TRANSITION STRIP TS TRANSITION STRIP TO MATCH WALL BASE REFER TO SPECS
20
12
8. WHERE TILES ARE USED AS FLOORING, RUN 4" UP WALLS AS BASE. TRIM PAINT PT4 TO MATCH WALL BASE COLOUR BM / SW Project No. No. du projet
301E 310
CEILING FIXTURE LEGEND
CEILING LEGEND
ACT-1
GWB ON STEEL STUD CEILING 3048 A.F.F.
313
EXHAUST GRILLE
ACT-1 301B
3029 A.F.F.
305 308
ACT-1
306 3029 A.F.F.
FREIGHT
ELEVATOR 13 Issued For CCN 43 1 Feb 2024
A 303 G'
GWB-1 11 Issued for SI-37 22 Jan 2024
2438 A.F.F.
5 Issued for CCN-13 21 Sep 2023
302
Revisions Description Date
STAIR 1
A detail no.
no. du detail
304 A B location drawing no.
A
1 sur dessin no.
G C C drawing no. B C
dessin no.
Project Projet
Drawing Dessin
Level 3 RCP
1 : 100
Designed By Conçu
DG
Date 12 Jan 2024 (yyyy/mm/dd)
Date (yyyy/mm/dd)
Tender Soumission
3 JSE
Level 3 RCP
1 Project Manager Administrateur de projets
1 : 100
Project No. No. du projet
22038
Drawing No. No. du dessin
A110
C:\Users\sahar bahrami\Documents\22038-BGIS PDOC Tenant Improvement_Central_saharL6TYF.rvt
0 10 20mm 40 60 80 100 120 140 160 180 200mm
C.E.S. Engineering Ltd
402 - 4601 Canada Way
Burnaby, BC, Canada, V5G 4X7
604.239.4424
Proceeding with work in accordance with these instructions indicates the Contractor's acknowledgment that there will
be no change in the Contract Price and Contract Time. If the Contractor believes that this instruction affects the
Contract Price or Contract Time, the Contractor shall promptly notify the Consultant.
_______
Boban Ratkovich, P. Eng
Principal Engineer
CES Engineering
T: 604.239.4424
bratkovich@cesgroupglobal.ca
Page 1 of 1
Canada
Biens Immobiliers, Real Property,
Gestion du Change Management
Changement et and Regional
Services Régionaux Services
(BIGCSR) (RPCMRS)
4 3
D2-16,18,20,22 3 D2-16,18,20,24 3 1 D-1,3,5,9 3 1
4 D-11,13,54,58 7 N
7 PP
7 PP D-1,3,5,7 7 PP 3 D-11,13,54,56 7 PP PP
3 D-18,19,21,60
D2-16 D2-16 D2-16 D2-20 D-1 D-1 3 D-5 D-1 D-5 D-11 D-11 D-11 D-54 2D QUIET ROOM
D2-18 D2-22 D2-18 D2-24 D-3 D-7 D-3 D-9 D-13 D-56 D-13 D-58 D-18 310
2D 2D 2D 2D 2D 2D 2D 2D 2D 2D 2D 2D D-60
D-5 D-54
3 D2-9,21,33,35 D2-35 D2-20 D2-20 D2-16 D2-20 D-5 D-1 D-5 D-54 D-11 D-54
D2-33 MBB-5,7 MBB-9,11
PP 2D
7 2D D2-22 D2-22 MBB-1,3 D2-24 D2-24 D-7 D-7 D-9 D-9 D-56 D-56 D-58 D-58 MB-2,4 8 PP
D-19
D2-33 2D 2D 2D 2D 2D 2D 2D 2D 2D 2D 2D 2D D-6
D2-9 D2-35 D-21 2D
D2-21
2D 2D D2-16 D2-18 D2-18 D2-18 D-1 D-3 D-3 D-3 D-11 D-13 D-13 D-13 2D
OPEN MB-9,11
D2-9 D2-22 D2-22 D2-24 D2-24 2 D-7 D-7 D-9 D-9 D-56 D-56 D-58 D-58 D-18
OFFICE D-6
D2-21 D2-9 2D 2D 2D 2D 2D 2D 2D 2D 2D 2D 2D 2D D-60
2D D2-21 301E 2 2 2
D2-21 2 2
3 D2-15,17,19,21
PP D2-19 MB-38,40 2D 2 MBB-2,4 MBB-6,8
7 2D D2-23 2D
D-2 D-2 D-6 PP 8
D2-21 D-2 D-2
D2-15 D2-19
D2-17 MB-34,36
2D 2D D-35 MB-72,74 2D D-6 FOCUS ROOM
MBB-13,15 D-35 D-17 2D D-15 2D D-15 D-4 311
D2-15 D2-21 D2-6 D-35 GENDER MB-5,7
2D
D2-17 D2-19 D2-14 D2-14 D2-14 NEUTRAL WC
2D 2D BS2
MB-62,64
D2-21 EM-13 316
D2-15 D2-19 KITCHENETTE
D2-17 MEN'S WC D-62,64 EM31-6
2D
BS1
STAIR D-4 PP 8
2D 319 EM-13 317 D-37 2D
7 P D2-44 D-35
P D2-13 D2-15 WOMEN'S WC 3
D2-33 D2-17 D2-12 318 HC WC IT STORAGE &
2D MB-33,35 2D 2 D2-14 D2-14 D2-8 D2-10 D-62,64 MB-18,20
3 D2-9,11,13,33 315 WORKLAB
D2-13 D2-42 EM31-7 D-4
D2-9 EM31-6 312
D2-11 D2-33
2D 2D EM31-4 D2-6 MB-72,74 CORRIDOR D-8 SMALL MEETING
D2-9 D2-13 D2-6 D-2 2D ROOM
3 D2-37,39,41,43 300 MB-13,15
D2-41 D2-11 D2-33 MBB-10,12 PNL PNL PNL
2D 2D EM-10,12 LOCKER (57) 313
7 PP D2-43 D-2 'EM31' MB MBB D-2
2D 320 PNL D D-26 D-30
D2-9 PNL
D2-41 D2-11 D2-7 EM-9,11 D-22 D-26 D-30 D-22
D
2D 2 2 'D2' D D D D D D D D EM31-7
1 D2-37 D2-43 D2-5 4D 8D 8D 2D
D
D2-39 2D 2D 3D SP-23 D-22 D-28 D-28 D-32 D-32
MB-37,39 D2-6 EM31-5 5 FB FB 5
D
D2-41
D2-37 STAIR D-10 D-10
D2-3
D
D2-39 D2-43 7 D-8
4 D1-28 2D 2D D2-1 LAN ROOM 2 MB-17,19
D2-7 3D
PP
D2-41 2 321
D2-37 D2-5 2
D1-32 D2-39 D2-43 D2-1,3,5,7 MB-26,28
3 D1-28,30,32,34 OPEN OFFICE 3D D-39
D1-34 2D 2D E-7.02 EM31-4
D2-3 3
2D 310D D2-7
D2-37 2 D2-5 D2-1 MB-42,44 D2-6 MB-30,32
D1-28 D1-32 D2-39 3D 3D
D1-34 2D 3D 1 D-36 D-36 D-14 C.E.S Engineering Ltd.
D1-30 OPEN OFFICE 2 D2-2 2D D2-4 2D 2 #402 - 4601 Canada Way, Burnaby, BC, V5G 4X7
2D 2D D2-3 D2-34 2
MB-41,43 301B D2-36 T: 604.239.4424
D1-32 D2-1 3D EM31-5 2 D-19 D-19
PP
D1-28 3D D2-1,3,5,7 www.cesgroupglobal.com
D1-30 D1-34 D2-7 2 D-21 D-21 D-14
D2-5 3D D2-38 D-29 D-33 D-23 D-27 OPEN D-21 D-60 7 EGBC Permit To Practice # 1002458
2D 2D 7 3 D2-34
3D D2-40 D-31 D-57 D-25 D-59OFFICE 2D 2D D-12 FB 5
4 D1-28 D1-32 D2-36 2 PP AV
D1-34 3D 3D 3D 2D 2D 2 3
3 D1-20,22,24,26 D1-20 D1-30 D2-7 D2-3 3D 301A D-34 D-34 2D 2D LES ENTREPRENEURS DOIVENT VÉRIFIER TOUTES LES
D1-22 2D 2D D2-5 D2-34 D2-38 D-33 D-18,19,21,60 DIMENSIONS ET CONDITIONS EXISTANTES DE
D2-1 D1-45 D-29 D-23 D-27 MB-14,16
3D D2-40 D-20 D-53 D-61 D-61
2D D1-28 3D D1-42 D2-36 2 D-31 D-57 D-25 D-59
L'EMPLACEMENT ET DE RAPPORTER TOUT ANOMALIES AU
D1-24 D1-30 D2-3 D2-1,3,5,7 3D D2-30 D-24 D-55 MB-21,23 2D 2D 7 PP D-16 GESTIONNAIRES DU PROJECT.
1 D1-20 D1-26 2D 2 MB-25,27 MB-29,31 D-12 FB 5 NE PAS MESURER SUR LES DESSINS.
D1-22 MB-10,12 D2-1 D2-38 D2-32 3D D-18,19,21,60 3
2D 3D 3D 3D
PP
2D 3D 3 D2-34,36,38,40 P 3D 2D D-19 D-34
MB-45,47 P D2-40 2D CONTRACTORS TO VERIFY ALL DIMENSIONS &
D1-24 D1-20 3 D2-30 2D
7 4D 7 D2-26 D-20 D-53 D-29 D-33 D-23 D-27 D-21 D-61 2 CONDITIONS ON SITE AND IMMEDIATELY NOTIFY THE
D1-20 D1-26 D1-22 D2-32 D-23
2D 2D D2-7 D2-28 D-57 D-59 2D 2D D-18 PROJECT MANAGER OF ALL DISCREPANCIES.
3D 3D D-24 D-55 D-31 D-25 D-12 FB 5 DO NOT SCALE DRAWINGS.
D1-24 D2-5 D-19,21,34,61 3 D-19 D-14
D1-20 D1-26 3D D2-3 D1-42 D2-30 3D 3D 3D 3D 2D 2D
3 D1-12,14,16,18 D1-12 D2-1 D2-26
D1-14 D1-22 2D 3 MB-49,51 D2-28 D2-32 D-33 D-27 1
2D 3D D2-1,3,5,7 3D D-20 D-53 D-29 D-23 4
7 PP 3D
2D D-24 D-55 D-31 D-57 D-25 D-59 WP
D1-16 D1-24 D1-45 D2-26 D2-30
PP
1 D1-21 D1-17 D1-17 8 PROVIDE AND INSTALL TWO COMPARTMENTS (POWER AND DATA) PAC-POLE WITH 2 POWER DUPLEX RECEPTACLES
D1-23 3D AND 2 DATA OUTLETS (MODEL: CP2B150-2E BY CANADIAN ELECTRICAL RACEWAYS INC OR EQUAL).
D1-19 3D 3D
D1-15
3D
D1-21 D1-11 D1-17
6 PP
D1-19 D1-13
3D
MB-61,63
THIRD FLOOR
3D 3D
3 D1-19,21,23,25
D1-15 D1-11 POWER LAYOUT
D1-17 D1-13 GENERAL NOTES:
3D
3D
D1-11 D1-15
D1-13 D1-17 1. ELECTRICAL CONTRACTOR IS TO ALLOW FOR INSTALLATION OF THE WHIP FROM THE SYSTEM FURNITURE TO
3D THE BASE BUILDING JUNCTION BOX.
3D Designed By Conçu par
6 PP
D1-11
D1-13 2. THE SIZE OF ALL WIRES FROM PANELS TO WORKSTATION JUNCTION BOXES WILL BE 10AWG.
BR
3D Date (yyyy/mm/dd)
3 D1-11,13,15,17 3. WHERE PAC POLE ARE PROVIDED (AS PER NOTES #6 & 7) THE WHIP FROM SYSTEM FURNITURE IS TO BE RUN Reviewed By Examiné par
UP THROUGHT THE PAC POLE (POWER COMPARTMENT) TO A 150mm x 150mm x 75mm DEEP JUNCTION BOX
(WITH COVER) WITHIN THE CEILING VOID WITHIN 450mm OF THE TOP OF THE PAC POLE. Date
BR (yyyy/mm/dd)
Approved by CFBO Apprové par DGAPF
4. ELECTRICAL CONTRACTOR TO COORDINATE WITH THE SYSTEM FURNITURE MANUFACTURER FOR THE
VOICE/DATA REQUIREMENTS AND TO ALLOW FOR INSTALLATION OF TWO 40mm LIQUID TIGHT FLEXIBLE
CONDUITS BETWEEN THE PACK POLE AND THE SYSTEM FURNITURE, EACH WITH A 90 DEGREE BEND AND Date (yyyy/mm/dd)
MALE TERMINATION AND LOCK OUT (ALLOW FOR EACH FLEXIBLE CONDUIT TO BE 6 FEET IN LENGTH). Approved by ISB Apprové par DGSI
Date (yyyy/mm/dd)
Client Approval Approbation du client
Date (yyyy/mm/dd)
Project no. No. du projet
GOC5033045
THIRD FLOOR POWER LAYOUT Drawing no. No. du dessin
1
E2.03
SCALE 1:100
c
D-47 D-47 D-47 D-47 D-47 D-47 D-47 D-47 D-47 D-47
A3
D2-25
OPEN
A3 WOS A3 A3 WOS A3 A3 WOS OFFICE A3 WOS A3 A3 WOS A3
A3 EM31-1 D-47 D-47 D-47 D-47 301E D-47 D-47 D-47 BRG Z D-47 C-5A BRG
A3 BRG Z BRG Z QUIET
D2-25 D-47 WPS
D2-25 ROOM B2
E
E D-48
A3 A3 A3 A3 A3 A3 A3 A3 A3 310 WOS
E
EM31-1
A3 D-47 D-47 D-47 EM31-1 D-47 D-47 D-47 EM31-1 D-47 B2
A3 D2-25 D-48
D2-25 WOS EXC EXC D-47 D-47 EM31-3 WKA
E D-42 EXC EXC
D-42
EM31-3 D-42 EM31-1 ZONE d D-42 D-42 EM31-3 EM31-1 D-42 WOS D-48
EM12 D-42 D-42 D-42 FOCUS
A3 A3 WOS EM31-3 A3 A3 A3
WOS
A3 A3 A3 WOS A3
E A3 EM31-1 A3 B2
WPS
ROOM
A3 EM12
D-42 311
D2-25 EM31-1 WKC WKB 200W D-42 EM12 WKA WOS
WKC WKB
D2-25 D46
WKB
D2-25 A3
A3 D-42 315 EM12 3 312
A3 WOS
D2-29 D2-25 OS H A4
E E WPS
A1 A1 A1 EM12 D-42 H EM12 D-48 A2 BRG Z A2
D2-25 EM31-1 EM31-1 ECR
D-42 H D-42 D-42 W EM31-1 EM5 EM31-3
E EXC WKB
H D-42 A2
EM31-3
A3 A3 EM31-3 ERC EM12
A3 EM31-1 A3 EM31-3
D2-27 D2-25 EM31-3 ERC WOS E EM31-3 EXC WOS ZONE e WOS WOS D ZONE b D D
A2 A2 EM12D-48
D2-29 ECR BU-5
D-48 EM31-1 CORRIDOR EM31-3 EXC D-48 BRG Z D-48
WKC WKC
WOS
WKB WKB
ZONE g D2-25 WKB BRG Z EM11 BRG Z E
A2 A2 A2 A2 A2
BU-5 D-48
LOCKER (57) 300 D-48 EXWL D-48
A3 EM31-1 D-48 EM31-1 WOS WPS
A3
A3
D2-27 A3 GW D2-25 D-48 D-48
A1 A1
D2-27 320 D-48 D EM31-1 D-48 D
ZONE k A1
D-48
D2-29 D2-25 WKB
D2-27 EM13 D2-25 S EM4 WOS D-48 D-48
A3 A3 A3 A3 A3 A3 D-48 D-48
LAN ROOM S EM4 ECR
D2-27 A3 EM31-3 D-49 D-49 D-49 D-49 D-49 D-49 D D
D2-27 A3 A3 321 STAIR D46 ZONE x A1 A1
A3 A3
D2-25 E EM31-3 D-48 D-48
WKC WKC
WOS E E ECR WOS BRG Z ZONE w WOS SMALL MEETING ROOM
EM31-1 ERC 2 C D-49
D2-29 D2-29 E D-46 ZONE d 313
D2-27 D-49 D-49 D-49 D-49 D-49 EM31-1 D D D
E EM31-1 S
BU-5 D-46 EM4 A1
D-48 D-48
C.E.S Engineering Ltd.
EM31-1 E D-48 #402 - 4604 Canada Way
A3 EM32-1 A3 WKC D-46 A3 A3 A3 A3 A3 A3
A3 D2-27 A3 A3 BU-5 D-48 Burnaby, BC, V5G 4X7
WKB
D2-27 WOS WKC WKC EXC D D D T: 604.221.8715
5 OPEN EXC
WKC
EM32-1 D2-29 EM31-3 D-48 D-48 D-48 www.cesgroup.ca
WPS D2-27 D2-29 OFFICE EM31-3 ERC
D2-27 E-8.03
D-44 EM11 EM12
E EXW 301A EM31-3 D D EGBC Permit To Practice # 1002458
WKB WKB
A3 A3
D2-27 A3
D2-27 A3 A3 WOS ZONE m ZONE n D-44 A2 A2
A3 A3 EM4 EM12 D-48 D-48 LARGE MEETING D-48 D-48
OPEN OFFICE D-44 EM31-1 D-49 D-49 EM31-1 D-49 D-49 D-49
WOS D2-29 D-44 ZONE y ROOM
D2-27 D2-27 D2-27 301B A E
A3 A3 A3 A3 A3 E A3 A3 A3 D-48 LES ENTREPRENEURS DOIVENT VÉRIFIER TOUTES LES
OPEN OFFICE ZONE j 3 314
ZONE h EM31-1 A3 E WOS DIMENSIONS ET CONDITIONS EXISTANTES DE
D-49 D D
D2-27 310D
A3 A3 A3 BRG Z ZONE ax L'EMPLACEMENT ET DE RAPPORTER TOUT ANOMALIES AU
A3 A3 D2-29 WOS ZONE z
A3 D2-27 D-44 D-48 WPS GESTIONNAIRES DU PROJECT.
E
EXC D2-27 D-49 WOS A2 A2 NE PAS MESURER SUR LES DESSINS.
D2-27 WOS D2-27 A3 BRG Z EM11 WOS EM31-1 EM31-1 D-48
E A3
D2-29 A3 E D-44 WOS D-44 D-49 D-49
EM32-3 D-48 BRG Z CONTRACTORS TO VERIFY ALL DIMENSIONS &
EM31-1 EM31-1 E D CONDITIONS ON SITE AND IMMEDIATELY NOTIFY THE
A3 A3 BRG Z D2-29 EM31-3 A3 A3 A3 A3 A3 A3 A3 A3 D
A3 D1-49 EM32-1 A3 A3 D-44 D-44 ZONE a PROJECT MANAGER OF ALL DISCREPANCIES.
D-49 D-49 D-49 D-48 D-48
D2-27 E A3 EM31-3 DO NOT SCALE DRAWINGS.
A1
ZONE i D2-27 D2-27 D2-29 EXC EXC
A3 A2 A2
D-44
A3 D1-49 A3 EM32-1 D2-29 BRG Z
A3
D-44 D-44 D-49 D-49 D-49 D D-48 D-48 D
A3 D1-49 A3 ERC A3 A1 D-44 D-44
D2-27 D-44 D46 D46 D-48 D D D D-48
BU-4 A3 D-44 WOS A3 WPS A3 A3 A3 A3
A1 D-48 WPS D-48 D-48
D1-49 D2-27 AA ZONE c
BU-4 A3 A3 AA
KB
D1-49 W
KA D1-1 A1 MAIL /FILE ROOM BRG Z A3
BU
D1-49 EM13
KC
ERC E
BU
BRG
W
A3 W A1
KA
EM32-1 D-44
W
B2 A3
KC
308 A3
305 D1-49 A3 BU-4 EM32-1 D2-29 A
D-44
W
D1-49 A3
EM32-1 E KA 200W
W
D1-51 C B3 W
QUIET ROOM D1-1 1 C 302 KA
C-5A
D1-49 EM3 D1-51 EM32-3 E
BRG REISSUED FOR BUILDING
A3 BRG WOS WPS 8. 10.02.2023
B1
304 EM32-1 EM32-1 C-5A PERMIT
A3 W C-5A
WPS WOS D1-49 C D-44 KA
KA
B1 D1-51 D1-51 12 A3
A3 D1-51
E D1-49 EM32-1 EM32-1
EXC No. description date
WOS A3 E EM32-3 BRG Z D-44
A3 D1-49 WOS
BRG Z
E
D1-1 WOS A3 D1-51
A3 D1-51 EM3 WPS A A detail no . / no. de détail
KB
D1-51 AA
W
B
KC
A3 ZONE v A3 E
KC
D1-49 D1-51
D1-49
W
D1-51 EXC
ZONE t A3
A3 BRG Z
A3
D1-51
E THIRD FLOOR
D1-51
D1-51
A3
WOS
EM32-1
A3 WPS LIGHTING LAYOUT
A3
D1-51
ZONE s
A3 D1-51
A3 Designed By Conçu par
D1-51
Date
BR (yyyy/mm/dd)
D1-51
A3 Reviewed By Examiné par
Date
BR (yyyy/mm/dd)
Approved by CFBO Apprové par DGAPF
PAPER SIZE: B1 27.8 x 39.4 (707 x 1000) ● PLOT DATE & TIME:
Date (yyyy/mm/dd)
Approved by ISB Apprové par DGSI
Date (yyyy/mm/dd)
Client Approval Approbation du client
Date (yyyy/mm/dd)
Project no. No. du projet
Proceeding with work in accordance with these instructions indicates the Contractor's acknowledgment that there will
be no change in the Contract Price and Contract Time. If the Contractor believes that this instruction affects the
Contract Price or Contract Time, the Contractor shall promptly notify the Consultant.
Instruction/Response:
1. Add a mop sink and all accessories (3/4” ⌀ DCW, 3/4” ⌀ DHW, 1 ½ 2”“⌀
⌀ Vent Pipe, 2” ⌀ Sanitary Pipe)
as shown in the attached drawings.
2. Add a 3”⌀ floor drain.
3. Add a sprinkler head.
4. Refer to the architectural site instructions for the model number and manufacturer information of
the Mop sink.
5. The plumbing contractor to route the sanity pipe on the send floor ceiling space.
Page 1 of 1
Canada
Biens Immobiliers, Real Property,
Gestion du Change Management
Changement et and Regional
Services Régionaux Services
(BIGCSR) (RPCMRS)
CD
CD
CD
3/4" CD @1%
GENDER
CD
3/4" CD @1%
HP-3-17 3/4" CD @1% NEUTRAL FOCUS ROOM
CD 3/4" CD @1%
WC 311
4" STM @1% 1" CD @1% 3"FD-1 1" CD @1%
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
4" STM T/B
CD
4" STM T/B
CD
CD
316
CD
CD
CD
CD
CD
4" STM @1%
CD
CD CD
CD
CD
CD
CD
CD CD
CD
CD
CD
CD CD
CD
CD
CD
CD
CD
CD CD
HP-3-2
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
KS
CD
CD
CD
ST
CD
CD
CD
CD
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
ST
ST
ST ST
SAN
CO
ST
ST
ST
SAN
ST
CD
SAN
ST
SAN
CD
ST
CD
CD
CD
SAN
ST
ST ST ST
ST ST
CD
CD
SAN
ST
ST
CD CD CD
SAN
ST
ST ST CD
SAN
ST
SAN
SAN
ST
ST
CD
ST
SAN
SAN ST
CD
SAN
SAN SAN CD
SAN
ST
SAN SAN
SAN
CD
SAN
CD
SAN
ST
AN
SANS
SAN
SAN CD
SAN
V
SAN
SAN
SAN ST CD
SAN
SAN
SAN
ST
ST
CD
SAN
SAN
SAN
ST ST
SAN
ST SAN SAN SAN CD
SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN
SAN
SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
3/4" CD @1%
CD
SAN
SAN
SAN
SAN SAN
SAN
SAN
V
SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
SAN
SAN SAN
CD
SAN SAN
SAN
SAN SAN SAN
SAN
SAN SAN
SAN
SAN
CD
ALL WASHROOM FIXTURES AND SERVICES
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
SAN
SAN SAN
SAN
SAN
SAN
CD
3" DCW F/B
SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
CD SAN
SAN
SAN
CD
CD
CD
SAN
CD
CD
SAN
CD
SAN
CD
HP-3-36
CD CD
SAN
SAN
CD
SAN SAN
3"FD-1
CD
CD
CD
CD
CD
CD
SAN
CD
SAN SAN
LV
SAN
SAN
CD
SAN
CD
KS
SAN
SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
3/4" CD @1%
SAN
SAN
SAN
SAN
CD
CD CD
SAN
SAN
CD
HP-3-8
CD
SAN
SAN
SAN
CD
CD
CD CD
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANS
SAN
SAN
AN
SAN
SAN
LINE SUPPLIED AND INSTALLED BY BASE
SAN
SAN
SAN
SAN
ST
KITCHENETTE 3/4" CD @1% HP-3-9
4" STM @1% STAIR
ST
LV
SAN
SAN
SAN
SAN
4" SAN T/B 4" STM
SAN
V
SAN
SAN
SAN
SAN
SAN
SAN
SAN
3/4" CD @1%
SAN SAN
SAN
SAN
SAN
319 2"Ø SAN VENT LINE
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
V
SAN
SAN
SAN
SAN SAN
3
SAN SAN SAN
SAN
SAN
SAN
SAN
F/A T/B
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
CO
SAN
SAN SAN
HC WC
CD
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
3"FD-1
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
312
SAN
SAN
SAN
SAN
CD
SAN SAN SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
CD
SAN
CD
SAN
SAN SAN
SAN
CD
SAN
CD
SAN
SAN
SAN
SAN
CD
SAN
CD
SAN SAN SAN
SAN
CD
SAN
SAN
SAN
CD
SAN
SAN
SAN
CD
SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
SAN
SAN
SAN
CD SAN
SAN
SAN
SAN SAN
315
SAN
SAN
CD
SAN
SAN
SAN
SAN
SAN
V V V V SAN SAN
G
G
G
WC
SAN
SAN
ST G
ST ST G
ST
SAN
SAN
ST
G
G
ST
ST
SAN
SAN
G
G
ST
ST
SAN
G
SAN
G
ST
ST
SAN
G
SAN
G
ST
ST
G
G
SAN
SAN
ST
ST
G
G
G G
ST
ST
G
FD
ST ST
RD
ST
ST
ST
ST
ST
ST
ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST ST
ST
ST
ST
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CD
CD
LOCKER (57)
CD
CD
600x350
CD
3/4" CD T/B
CD
767 l/s
CD
CD
CD
CD
CD
CD
CD CD
CD
CD
CD
CD
CD
CD
1132 l/s
CD
CD
CD CD
CD
CD
CD
CD
V
CD
CD
CD
CD
1" CD @1% CD
1" CD @1%
CD
CD
CD
CD
CD
CD
CD
CD
CD CD CD
CD
CD
CD CD
CD
CD
CD
CD
CD
CD CD CD
FC-1B FC-1A HP-3-39
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CO 1" CD @1% 1" CD @ 1%
HP-3-21 ST
LAN ROOM STAIR
V
CD HP-3-10
3/4" CD @1% 321 2
4" STM @1%
CD
ST
ST
ST
3/4" CD @1%
ST
ST
450x200 400x250
ST
ST
RD
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
CD
HP-3-13 C.E.S Engineering Ltd.
HP-3-22 450x200 450x250 CD CD LARGE MEETING ROOM #402 - 4601 Canada Way, Burnaby, BC, V5G 4X7
V
350 l/s 700 l/s 314 T: 604.239.4424
2"Ø SAN VENT LINE HP-3-12 www.cesgroupglobal.com
HP-3-19 3/4" CD @1%
3/4" CD @1% 3/4" CD @1% EGBC Permit To Practice # 1002458
OPEN OFFICE 350x200 OPEN OFFICE
CD
CO OPEN OFFICE 3/4" CD @1%
301B 218 l/s 301A
CD
CD
CD
CD
CD
310D
CD
CD CD CD CD
CD
CD
CD
CD
V
CD
CD
CD
CD CD
HP-3-6 L'EMPLACEMENT ET DE RAPPORTER TOUT ANOMALIES AU
CD GESTIONNAIRES DU PROJECT.
400x200 HP-3-7 NE PAS MESURER SUR LES DESSINS.
3/4" CD @1%
245 l/s
3/4" CD @1%
CONTRACTORS TO VERIFY ALL DIMENSIONS &
HP-3-16 CONDITIONS ON SITE AND IMMEDIATELY NOTIFY THE
V
1" CD @1% CD CD PROJECT MANAGER OF ALL DISCREPANCIES.
CD CD CD CD CD CD
HP-3-23
CD CD CD CD CD CD
CD CD CD CD CD CD
CD CD CD CD CD CD
V
ST ST ST ST ST ST ST ST ST
ST
ST
ST
CD
CD ST
ST
ST
CD
CD
ST
ST
ST
ST
CD
CD
ST
ST
CD
ST
CD
ST
ST
CD
ST
ST
ST
ST
ST
HP-3-24
ST
ST
CD
ST
ST
ST
ST
CD
ST
ST
ST
CD
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
CD
ST
ST
ST
ST
ST ST
CD
ST
ST
ST
ST
ST
ST
ST
ST
ST
CD
ST
ST
ST
ST
ST
ST ST
ST
ST
ST
ST
ST
CD
ST
ST
ST
ST ST ST ST ST ST ST ST ST
CD
CD
CD
3"DD-1
309 350x200
CO (300 L)
3/4" CD @1% 186 l/s
QUIET ROOM RD 3/4" CD @1%
V
ST
ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
307
ST
CD
ST
ST
ST ST
ST
ST
CD
306
CD
CD
CD
CD CD
CD
CD
CD
CD
CD CD
CD
305
CD
CD
CD PERMIT
4" STM @1% HP-3-11
CD
ST
ST
CD
ST
ST
ST
ST
ST
ST
T/B.
ST
ST
ST
ST
ST
ST
ST
STAIR ELEVATOR
QUIET ROOM
V
CD CD
NEW 3"FD-1
CD
CD
CD
CD CD
CD
CD
CD
CD
CD
303
CD
CD
CD
HP-3-27
CD
CD
CD
HP-3-25 SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CD
SAN
CO
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
3/4"CD @1%
SAN SAN
QUIET
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
ROOM CD
CD
CD
CD
CD
CD
CD CD
CD
CD
CD
CD
CD CD
CD
CD
CD
CD
CD
302
304 3/4" CD @1%
11 NEW MOP SINK 3/4" CD @1% No. description date
CD
CD
ST
ST
B B location drawing no. / sur dessin no.
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
RD
CD 3/4" CD300x200
@1% Project Projet
112 l/s
GOC5033045 ESDC PDOC
ST ST ST ST ST ST ST ST ST
ST
ST
ST
HP-3-29
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST ST
ST
ST
ST
ST
ST ST ST ST ST ST ST ST ST
3/4" CD @1%
CD
Drawing Dessin
3/4" CD @1%
HP-3-32
PAPER SIZE: B1 27.8 x 39.4 (707 x 1000) ● PLOT DATE & TIME: 2024-3-08 10:31:41 ● READ DRAWING ACCORDINGLY.
CD
THIRD FLOOR
PLUMBING LAYOUT
HP-3-31
Date (yyyy/mm/dd)
Approved by ISB Apprové par DGSI
Date (yyyy/mm/dd)
Client Approval Approbation du client
Date (yyyy/mm/dd)
Project no. No. du projet
GOC5033045
3RD FLOOR PLAN - PLUMBING
1 SCALE 1:100 Drawing no. No. du dessin
c M1.04
0 10 20mm 40 60 80 100 120 140 160 180 200mm
Canada
Biens Immobiliers, Real Property,
Gestion du Change Management
Changement et and Regional
Services Régionaux Services
(BIGCSR) (RPCMRS)
CD
DIRECTOR OFFICE
201 CO
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
CD
3/4" CD @1% DIRECTOR OFFICE
CD
NEUTRAL
CD
CD
CD
4" STM WC 3/4" CD @1% 3/4" CD @1% 208
4" STM 2" SAN F/A T/B
1" CD @1% 1" CD @1% 1" CD @1% F/A T/B (3FU) 216
F/A, T/B 1" CD @1%
CO CD
KS LV 3/4" CD @1%
CD
CD CD
SAN
SAN SAN
CD CD SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
CD
CD
SAN
SAN
SAN
SAN
CD
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CD
SAN
SAN
CD
SAN SAN SAN SAN
SAN SAN
SAN
SAN
SAN
SAN
CD CD
CD
CD
SAN
LOCKER (86)
ST
CD CD
CD ST ST
CD
CD
CD CD ST
SAN
ST
SAN
CD
CD
CD
ST
ST
CD
SAN
SAN
CD
ST
ST
CD CD CD
CD
SAN
CD
CD
SAN
CD
CD
CD
CO
ST
CD CD CD CD
CD
SAN
CD
ST
CD
1" CD @1%
ST CD
CD
CD ST ST
CD
CD CD
SAN
CD CD CD
SAN
CD
CD
ST
ST
SAN
CD
CD
ST
ST
CD
ST
SAN
ST
CD
CD
SAN
SAN
CD
CD
SAN
CD
ST
SAN
ST
CD
CD
CD ST
SAN
SAN
ST
SAN
ST
CD
CD
CD
ST CD
CD
SAN
SAN
SAN
ST ST
ST
CD
CD
ST
ST SAN SAN
SAN
SAN SAN
CD
CD
SAN
CD
CD
ST
ST
CD
CD
CD
CD
CD
CD
ST
ST
CD
CD
CD
CD
ST
ST
CD CD
Ø200
SAN SAN
HP-2-8
ST ST SAN
SAN
ST
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
V
SAN
SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
ALL WASHROOM FIXTURES AND SERVICES
SAN
SAN
SAN SAN SAN SAN
SAN
SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
233
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN
SAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
WC
SAN