PCO:Indicate within __ days of the above date the changes to the Contract Price and Contract Time for the following proposed change in the Work. Do not proceed with the change
without a Change Order or Change Directive authorizing a change in the Work..
See attached drawings A103 and and A411: Add localized furring wall behind sinks, to height of toilet partition, for sink plumbing rough-in.
Reason:
Prepared by:
Prime Consultant, Jayleen Chivers
Recommended by the Prime Consultant Accepted by the Owner Accepted by the Contractor Recommended by the Project Manager
Name & Title (print) Name & Title (print) Name & Title (print) Name & Title (print)
https://publicdesign.rform.ca/documents/changeOrders/216636 1/2
4/2/24, 3:34 PM Change Order
https://publicdesign.rform.ca/documents/changeOrders/216636 2/2
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.
ISSUES + REVISIONS
NO DATE DESCRIPTION
A Nov 03, 2020 Issued for SD Report
B Mar 24, 2021 Issued for Class B Costing
D Mar 31, 2021 Issued for DD
F June 15, 2021 Issued for 50% CD
G Sep 03, 2021 Issued for 75% CD
H Sep 30, 2021 Issued for Class A Costing
I June 01, 2022 Issued for BP Application (not issued)
J Oct 31, 2022 Issued for 95%CD
K Jan 26, 2023 Issued for BP Application
L Feb 02, 2023 Issued for Tender
M Feb 13, 2023 Issued for Tender Addendum TP-02
N April 19, 2023 IFT to IFC
O April 20, 2023 Issued for Construction
P Aug 08, 2023 CO-001 : Revised for BP
U Sep 29, 2023 CO-010 : Revised Elevator Pit
Z Dec 07, 2023 PCO-014 : Revised Millwork
AA Nov 6, 2023 RFI - 067 LVL 2 Washrooms
MM Feb 23, 2024 PCO-043 : Acoustic Walls + Floor
PP Mar 4, 2024 SI-013 Acoustic insulation reduction
A A' B C D E F G H J K K' L AAA Apr 2, 2024 PCO-052 Add Furring Wall Men's WC 223
Keynote Description
54900
3050 6100 6100 6100 6100 6100 6100 6100 6100 3050
ACOUSTIC NOTES
A2.01
FRR NOTES
1 HR FRR
1'
1
framing
4 A4.20 2 centered on GL
222b 221b
3 E4a
P4b
framing W4a
1 centered on GL framing
centered on GL
Studio
4 A4.21 2
222 Classroom
56.7 m2/ 63.0 m² 6 218
3 A4.22 1
8112
3800
A4.20 220
3 A4.23 4 2
P4a 210.8 m2/ 74.0 m²
AAA
2 P6a
A3.04
243
6100 7625
ECCE lab storage
221
1900
50.8 m2/ 30.0 m²
470
995
993
P3a
1931 4169
2 778 739 3096 W/D
570
570
Men's w/c Women's w/c
223 222a 221a 218a 1
ø 1800 217
19.0 m² / 15.4 m² A4.10
P3a 19.0 m² / 24.2 m²
1 ø 1500 P4a P5a
4949
FD
1200
FD
A4.11 1
300 P4a A4.32
1 1018
3957
1783
1
1500
1696
319
3 224b X01c
DW
27.0 m² / 16.8 m²
26.0 m² / 20.7 m² 10.0 m² / 7.7 m² 6 A4.23
7 A4.26 5 4
8 1222 2685
2 10
P4a P5a PS4 fur out wall P4a
A3.03 6 A5.30
1
4 224a
1
X01b 6 ø 1800
Corridor
2
4 A4.25 11 A4.25
1220
1220
ø 1200 A4.25 2 ø 1200 10
1200
165
600
A4.26 2
1500
1 1517
Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office L2 ?Comms
A3.03 Copy rm 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216
?
1495 FRANCES STREET
VANCOUVER BC V5L 1Z1
226 11.1 m² / 9.9 m² 11.1 m² / 9.7 m² 11.1 m² / 9.9 m² 11.1 m² / 9.3 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.7 m² 11.1 m² / 9.9 m² ? / ? m2
4.67 TEL 604 738 4323
WWW.PUBLICDESIGN.CA
4.74 m2
6 Capilano University
ECCE
C:\Users\jayleen\Documents\2015 CapU Childcare Post IFT_jayleenD4QHC.rvt
1 8 9
7 A4.09 A6.14
7
A6.14
A6.14
PROJECT CODE
1 2 1 2
2015
A3.01 A3.01 A3.02 A3.02 SCALE
As indicated
1
A2.01
Reference plan - L2
4/2/2024 3:21:43 PM
SHEET
A1.03
Level 3 98320 Level 3 98320
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.
ISSUES + REVISIONS
NO DATE DESCRIPTION
B Mar 24, 2021 Issued for Class B Costing
D Mar 31, 2021 Issued for DD
F June 15, 2021 Issued for 50% CD
Align G Sep 03, 2021 Issued for 75% CD
H Sep 30, 2021 Issued for Class A Costing
I June 01, 2022 Issued for BP Application (not issued)
J Oct 31, 2022 Issued for 95%CD
K Jan 26, 2023 Issued for BP Application
L Feb 02, 2023 Issued for Tender
PTwh M Feb 13, 2023 Issued for Tender Addendum TP-02
PRT2
N April 19, 2023 IFT to IFC
O April 20, 2023 Issued for Construction
PTwh PRT2 PTwh PRT2 PTwh
Y Oct 06, 2023 CO-013 : Revised Washrooms
AA Nov 6, 2023 RFI - 067 LVL 2 Washrooms
AAA Apr 2, 2024 PCO-052 Add Furring Wall Men's WC 223
EQEQ EQEQ
965
GLS3
1129
WCA2 PTwh PTwh PRT2 GLS3
PTwh PTblk
86
WCA2
86
CCT9
76
CCT9
76
WCA1.1 SK - see mech
900
838
PTwh SK - see mech
674
EQ EQ
EQ EQ EQ EQ
Occupancy sensor
EQ EQ 391
Smoke detector
Suspended eyelet
C6c
1500
EQ
2438
1693
1590
EQ
C6x
Men's w/c
2720 223
EQ
391
0
75
R
r
ea
EQ
cl
FD
EQ
Align
Capilano University
159
ECCE
C:\Users\jayleen\Documents\2015 CapU Childcare Post IFT_jayleenD4QHC.rvt
EQ
EQ EQ EQ EQ
1413
EQ
P6a
As indicated
175 X 343 glulam below - see structural
88 251
Enlarged drawing -
3 3 2360
EQ EQ
rm223 - men's wc
4/2/2024 3:21:43 PM
SHEET
2 Enlarged ceiling plan - rm 223 men's wc 1 Enlarged floor plan - rm223 men's wc
1 / A1.11 1 : 25 42 / A1.03 1 : 25
A4.11
Smith Bros & Wilson (BC) Ltd. Project: 23-02-CSB CAPILANO UNIVERSITY CENTER FOR
9788 186 Street CHILDHOOD STUDIES
Surrey, British Columbia V4N 3N7 2055 PURCELL WAY
P: 604-324-1155 NORTH VANCOUVER, British Columbia V7J 3H5
F: 604-325-3390
To Jayleen Chivers (PUBLIC DESIGN) From Kyle Casey (SMITH BROS. & WILSON (B.C) LTD)
9788 186 STREET
SURREY, British Columbia V4N 3N7
Date Initiated Mar 21, 2024 Due Date Mar 26, 2024
Activity
Question Question from Kyle Casey SMITH BROS. & WILSON (B.C) LTD on Thursday, Mar 21, 2024 at 01:41 PM PDT
Please see attached marked up drawings A1.03, A4.11 and M202.
Plumbing rough in for sinks can not be installed as shown on drawings due to level 2 floor joist directly below wall.
Possible solution is to build localized firring wall behind sinks in order to bring plumbing pipe south of floor joist.
Attachments
Plumbing Rough In above Floor Joist.pdf
Smith Bros & Wilson (BC) Ltd. Page 1 of 1 Printed On: Apr 1, 2024 10:56 AM PDT
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.
ISSUES + REVISIONS
NO DATE DESCRIPTION
A Nov 03, 2020 Issued for SD Report
B Mar 24, 2021 Issued for Class B Costing
D Mar 31, 2021 Issued for DD
F June 15, 2021 Issued for 50% CD
G Sep 03, 2021 Issued for 75% CD
H Sep 30, 2021 Issued for Class A Costing
I June 01, 2022 Issued for BP Application (not issued)
J Oct 31, 2022 Issued for 95%CD
K Jan 26, 2023 Issued for BP Application
L Feb 02, 2023 Issued for Tender
M Feb 13, 2023 Issued for Tender Addendum TP-02
N April 19, 2023 IFT to IFC
O April 20, 2023 Issued for Construction
P Aug 08, 2023 CO-001 : Revised for BP
U Sep 29, 2023 CO-010 : Revised Elevator Pit
Z Dec 07, 2023 PCO-014 : Revised Millwork
AA Nov 6, 2023 RFI - 067 LVL 2 Washrooms
MM Feb 23, 2024 PCO-043 : Acoustic Walls + Floor
A A' B C D E F G H J K K' L
Keynote Description
54900
3050 6100 6100 6100 6100 6100 6100 6100 6100 3050
ACOUSTIC NOTES
A2.01 MM
FRR NOTES
MM 1 HR FRR
1'
1
framing
4 A4.20 2 centered on GL
222b 221b
3 E4a
P4b
framing W4a
1 Wall and plumbing
centered on GL framing
centered on GL
Studio
4 A4.21 2
Rough in directly
222 Classroom
56.7 m 2/ 63.0 m²
above level 2 floor joist 6 3 A4.22 1
218
8112
3800
A4.20 220
3 A4.23 4 2
P4a 210.8 m2/ 74.0 m²
2
A3.04
243
6100 7625
ECCE lab storage
221
1900
MM
50.8 m2/ 30.0 m²
470
995
993
P3a
1931 4169
2 778 739 3096 W/D
570
570
Men's w/c Women's w/c
223 222a 221a 218a 1
ø 1800 217
19.0 m² / 15.7 m² A4.10
P3a 19.0 m² / 24.2 m²
1 ø 1500 P4a P5a
4949
FD
1200
FD
A4.11 1
300 P4a A4.32
1 1018
3957
1783
1
1500
1696
319
3 224b X01c
DW
27.0 m² / 16.8 m²
26.0 m² / 20.7 m² 10.0 m² / 7.7 m² 6 A4.23
7 A4.26 5 4
8 1222 2685
2 10
P4a P5a PS4 fur out wall P4a
A3.03 6 A5.30
1
4 224a
1
X01b 6 ø 1800
Corridor
2
4 A4.25 11 A4.25
1220
1220
ø 1200 A4.25 2 ø 1200 10
1200
165
600
A4.26 2
1500
1 1517
Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office L2 ?Comms
A3.03 Copy rm 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216
?
1495 FRANCES STREET
VANCOUVER BC V5L 1Z1
226 11.1 m² / 9.9 m² 11.1 m² / 9.7 m² 11.1 m² / 9.9 m² 11.1 m² / 9.3 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.7 m² 11.1 m² / 9.9 m² ? / ? m2
4.67 TEL 604 738 4323
WWW.PUBLICDESIGN.CA
4.74 m2
6 Capilano University
7
1
A4.09
8
A6.14
7
9
A6.14
ECCE
A6.14
C:\Users\neil\Documents\2015 CapU Childcare Post IFT_neil96Z8Q.rvt
PROJECT CODE
1 2 1 2
2015
A3.01 A3.01 A3.02 A3.02 SCALE
As indicated
1
A2.01
Reference plan - L2
2024-02-23 8:42:40 AM
SHEET
A1.03
Level 3 98320 Level 3 98320
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.
ISSUES + REVISIONS
NO DATE DESCRIPTION
B Mar 24, 2021 Issued for Class B Costing
D Mar 31, 2021 Issued for DD
F June 15, 2021 Issued for 50% CD
Align G Sep 03, 2021 Issued for 75% CD
H Sep 30, 2021 Issued for Class A Costing
AA I June 01, 2022 Issued for BP Application (not issued)
J Oct 31, 2022 Issued for 95%CD
K Jan 26, 2023 Issued for BP Application
L Feb 02, 2023 Issued for Tender
PTwh M Feb 13, 2023 Issued for Tender Addendum TP-02
PRT2 PRT2
N April 19, 2023 IFT to IFC
O April 20, 2023 Issued for Construction
? PRT2 PTblk PRT2 PTwh
Y Oct 06, 2023 CO-013 : Revised Washrooms
AA Nov 6, 2023 RFI - 067 LVL 2 Washrooms
AA ?
EQEQ EQEQ
965
PRT2 GLS3
1129
WCA2 PTwh PTwh PRT2 GLS3
PTwh PTblk
86
WCA2
86
CCT9
76
CCT9
76
WCA1.1 SK - see mech
900
838
PTwh SK - see mech
674
EQ EQ
307 EQ EQ 391
Smoke detector
Suspended eyelet
C6c
SK - see mech SK - see mech
1534
EQ
2438
2 2
PRT2
EQ
C6x
Men's w/c
2720 223
159
EQ
391
0
75
R
r
ea
EQ
cl
FD
EQ
Align
Capilano University
159
5
C:\Users\brian\Documents\2015 CapU Childcare Post IFT_brian@publicdesign.ca.rvt
EQ EQ EQ EQ
AA
drawing sheet to show 2055 Purcell Way, North Vancouver, BC
firring wall and orientation
1413
EQ
of water closet. AA
C6c PROJECT CODE
2015
2438 SCALE
EQ
P6a
As indicated
175 X 343 glulam below - see structural
88 251
Enlarged drawing -
3 3 2360
EQ EQ
rm223 - men's wc
2023-11-06 12:44:48
SHEET
2 Enlarged ceiling plan - rm 223 men's wc 1 Enlarged floor plan - rm223 men's wc
A4.11
PM
1 / A1.11 1 : 25 42 / A1.03 1 : 25
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
PLUMBING KEY NOTES PLUMBING GENERAL NOTES drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.
1 DOMESTIC WATER PIPING BRANCHES TO NEARBY 1. REFER TO ARCHITECTURAL DRAWINGS FOR FINAL
ISSUES + REVISIONS
PLUMBING FIXTURES. REFER TO PLUMBING EQUIPMENT INSTALLATION LOCATIONS OF ALL PLUMBING FIXTURES,
NO DATE DESCRIPTION
SCHEDULE AND PLUMBING ROUGH-IN SCHEDULE FOR HOSE BIBS, AND FLOOR DRAINS.
CONNECTION SIZES. MAINS C/W ISOLATION VALVES. 1 2022-06-10 ISSUED FOR BUILDING PERMIT
2. REFER TO PLUMBING ROUGH-IN SCHEDULE ON M001 FOR 2 2022-10-21 ISSUED FOR 95% CD
PIPE SIZING TO INDIVIDUAL FIXTURES. 3 2022-12-19 ISSUED FOR TENDER
2 30Ø CONDENSATE FROM FAN COIL DRAIN TO NEARBY
SINK. 3. ALL FLOOR DRAINS SHALL BE TRAP PRIMED UNLESS NOTED 4 2023-01-23 REISSUED FOR TENDER
OTHERWISE. TRAP PRIMERS TO BE FLOW TYPE. 5 2023-01-23 REISSUED FOR BUILDING PERMIT
6 2023-02-01 ISSUED FOR TENDER
4. ALL SANITARY AND STORM PIPING TO BE SLOPED AT 2% 7 2023-04-14 ISSUED FOR CONSTRUCTION
UNLESS NOTED OTHERWISE.
8 2023-05-31 REISSUED FOR BUILDING PERMIT
5. ALL DOMESTIC HOT WATER RECIRC BALANCING VALVES TO 9 2023-11-27 ISSUED FOR MSI-002
BE BALANCED AT 0.032 LPS (0.5 GPM) UNLESS NOTED
OTHERWISE.
B C D E F G H J K L
RD-1
V
W/D
2 2
2
WC-3 5@
Men's w/c Women's w/c
Student study
V
3@ WC-3
V
LAV-4 3@
223 100Ø VENT
2@ LAV-4 FD FD-1
FD (75.5FU) FROM 219 217
FD-1 BELOW.
Rough in
directly 30Ø ERV CONDENSATE
above level FROM ABOVE DRAIN TO
SINK.
2 floor joist
C
3
75Ø VENT (36.5 FU)
FROM BELOW.
Stair 1 Elevator
Practicum meeting X01 X02
CONTRACTOR TO DW-1
INSTALL AIR
SK-1
DW
ADMITTANCE VALVE
224
V
TO VENT SINK. SEE 6-M703 FOR DETAIL
4 Corridor
225
5
FROM BELOW.
1495 FRANCES STREET
VANCOUVER BC V5L 1Z1
L2 Comms 30Ø CONDENSATE TEL 604 738 4323
WWW.PUBLICDESIGN.CA
DOWN TO BELOW.
216
6 Capilano University
15Ø DHWR F/B
20Ø DHW DN
15Ø DHWR T/B
20Ø DHW F/B
ECCE
RWL BY OTHERS 50Ø DCW DN 50Ø DCW F/B RWL BY OTHERS
DOWN TO BELOW. 20Ø IR DN 20Ø IR F/B DOWN TO BELOW.
Monashee Drive, North Vancouver, BC
PROJECT CODE
261b-002-20
SCALE
1:75
PLUMBING-LEVEL 2
11/27/2023 3:37:54 PM
SHEET
M202