4/2/24, 3:34 PM Change Order

PCO-052 Change ISSUED

Document number: PCO-052 Priority: Normal


Reference number: Date Required:
Contractor Ref.: RFI-205
Project number: 2015
Project title: Capilano University ECCE
Project location 2055 Purcell Way, North Vancouver, BC, CA, V7J 3H5

Prime Consultant: Owner: Contractor:


Jayleen Chivers Capilano University Daniel Metry
PUBLIC Architecture Capilano University Smith Bros. & Wilson (B.C.) LTD.
1495 Frances Street 2055 Purcell Way 9788 186 St.
Vancouver, BC North Vancouver, BC Surrey, BC, BC
V5L1Z1 V7J 3H5 V4N 3N7
Tel: 6047384323 Tel: 604-986-1911 Tel: 604-324-1155

Terms & Conditions:

PCO:Indicate within __ days of the above date the changes to the Contract Price and Contract Time for the following proposed change in the Work. Do not proceed with the change
without a Change Order or Change Directive authorizing a change in the Work..

Description Issued: 02/04/2024

Add Furring Wall Men's WC 223


As noted in RFI-205, the plumbing rough-in for sinks in Men's WC 223 conflicts with level 2 floor joists.

See attached drawings A103 and and A411: Add localized furring wall behind sinks, to height of toilet partition, for sink plumbing rough-in.

Requested By: Contractor

Reason:

Prepared by:
Prime Consultant, Jayleen Chivers

Recommended by the Prime Consultant Accepted by the Owner Accepted by the Contractor Recommended by the Project Manager

Name & Title (print) Name & Title (print) Name & Title (print) Name & Title (print)

Signature Signature Signature Signature

Date (DD-MM-YYYY) Date (DD-MM-YYYY) Date (DD-MM-YYYY) Date (DD-MM-YYYY)

https://publicdesign.rform.ca/documents/changeOrders/216636 1/2
4/2/24, 3:34 PM Change Order

Comments & History

History - 02/04/2024 03:34 PM PST


Proposed Change Order Issued to Prime Consultant Jayleen Chivers by Prime Consultant Jayleen Chivers The following people were notified
by Email: Jayleen Chivers.

History - 02/04/2024 03:33 PM PST


Change Order updated by Jayleen Chivers.

History - 02/04/2024 03:32 PM PST


Change Order created by Jayleen Chivers.

https://publicdesign.rform.ca/documents/changeOrders/216636 2/2
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.

ISSUES + REVISIONS
NO DATE DESCRIPTION
A Nov 03, 2020 Issued for SD Report
B Mar 24, 2021 Issued for Class B Costing
D Mar 31, 2021 Issued for DD
F June 15, 2021 Issued for 50% CD
G Sep 03, 2021 Issued for 75% CD
H Sep 30, 2021 Issued for Class A Costing
I June 01, 2022 Issued for BP Application (not issued)
J Oct 31, 2022 Issued for 95%CD
K Jan 26, 2023 Issued for BP Application
L Feb 02, 2023 Issued for Tender
M Feb 13, 2023 Issued for Tender Addendum TP-02
N April 19, 2023 IFT to IFC
O April 20, 2023 Issued for Construction
P Aug 08, 2023 CO-001 : Revised for BP
U Sep 29, 2023 CO-010 : Revised Elevator Pit
Z Dec 07, 2023 PCO-014 : Revised Millwork
AA Nov 6, 2023 RFI - 067 LVL 2 Washrooms
MM Feb 23, 2024 PCO-043 : Acoustic Walls + Floor
PP Mar 4, 2024 SI-013 Acoustic insulation reduction
A A' B C D E F G H J K K' L AAA Apr 2, 2024 PCO-052 Add Furring Wall Men's WC 223

Keynote Description
54900

3050 6100 6100 6100 6100 6100 6100 6100 6100 3050

ACOUSTIC NOTES
A2.01

2 ACOUSTIC WALL INSULATION

FRR NOTES

1 HR FRR

1'

1
framing
4 A4.20 2 centered on GL
222b 221b

3 E4a
P4b
framing W4a
1 centered on GL framing
centered on GL
Studio
4 A4.21 2
222 Classroom
56.7 m2/ 63.0 m² 6 218
3 A4.22 1
8112

3 P4b ECCE lab 104.5 m2

3800
A4.20 220
3 A4.23 4 2
P4a 210.8 m2/ 74.0 m²
AAA

2 P6a
A3.04
243
6100 7625
ECCE lab storage
221

1900
50.8 m2/ 30.0 m²
470

995

993
P3a
1931 4169
2 778 739 3096 W/D
570

570
Men's w/c Women's w/c
223 222a 221a 218a 1
ø 1800 217
19.0 m² / 15.4 m² A4.10
P3a 19.0 m² / 24.2 m²
1 ø 1500 P4a P5a

4949
FD
1200

FD
A4.11 1
300 P4a A4.32
1 1018
3957

Student study A4.33


20740

A3.04 223 217a


2 A4.24 5 219
600 1 60.0 m² / 138.0 m² 1
3 915 470 P4a 1
A4.32 A4.33 A2.02

1783
1
1500
1696

A2.02 2 P6a 2 3 P6a


A7.01 P4b A5.21 P4b
1095 1726 3312 2566

319
3 224b X01c

fur out wall X03b PS4 P4b P3a


vif 1219 213
1
2 A7.09
6 P4a P3a
Practicum
Stair 1 Stair 2
3792

meeting Elevator A4.33 5 ø 1200 4 A4.33 Open to


4 X01 A4.32 3 Open to below Open to below X03
224 9 A4.33 7 below
X02

DW
27.0 m² / 16.8 m²
26.0 m² / 20.7 m² 10.0 m² / 7.7 m² 6 A4.23
7 A4.26 5 4
8 1222 2685
2 10
P4a P5a PS4 fur out wall P4a
A3.03 6 A5.30
1
4 224a
1
X01b 6 ø 1800
Corridor
2
4 A4.25 11 A4.25
1220

1220
ø 1200 A4.25 2 ø 1200 10
1200

P4a P4b 225 P3a


A4.26 A4.32 A5.20 A4.33 A5.20
P4b 300 P4b
5 89.9 m2
3
5 226a 200a 201a 202a 203a 204a 205a 206a 207a 208a 209a 210a 211a 212a 213a 214a 215a 216a

165
600
A4.26 2
1500

E4a 3 3050 typ. 3050 typ. P4a


3660

1 1517
Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office L2 ?Comms
A3.03 Copy rm 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216
?
1495 FRANCES STREET
VANCOUVER BC V5L 1Z1
226 11.1 m² / 9.9 m² 11.1 m² / 9.7 m² 11.1 m² / 9.9 m² 11.1 m² / 9.3 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.7 m² 11.1 m² / 9.9 m² ? / ? m2
4.67 TEL 604 738 4323
WWW.PUBLICDESIGN.CA
4.74 m2

6 Capilano University
ECCE
C:\Users\jayleen\Documents\2015 CapU Childcare Post IFT_jayleenD4QHC.rvt

1 8 9
7 A4.09 A6.14
7
A6.14
A6.14

2055 Purcell Way, North Vancouver, BC


TRUE NORTH

PROJECT CODE
1 2 1 2
2015
A3.01 A3.01 A3.02 A3.02 SCALE
As indicated
1

A2.01

Reference plan - L2
4/2/2024 3:21:43 PM

SHEET

A1.03
Level 3 98320 Level 3 98320
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.

ISSUES + REVISIONS
NO DATE DESCRIPTION
B Mar 24, 2021 Issued for Class B Costing
D Mar 31, 2021 Issued for DD
F June 15, 2021 Issued for 50% CD
Align G Sep 03, 2021 Issued for 75% CD
H Sep 30, 2021 Issued for Class A Costing
I June 01, 2022 Issued for BP Application (not issued)
J Oct 31, 2022 Issued for 95%CD
K Jan 26, 2023 Issued for BP Application
L Feb 02, 2023 Issued for Tender
PTwh M Feb 13, 2023 Issued for Tender Addendum TP-02
PRT2
N April 19, 2023 IFT to IFC
O April 20, 2023 Issued for Construction
PTwh PRT2 PTwh PRT2 PTwh
Y Oct 06, 2023 CO-013 : Revised Washrooms
AA Nov 6, 2023 RFI - 067 LVL 2 Washrooms
AAA Apr 2, 2024 PCO-052 Add Furring Wall Men's WC 223

Level 2 94662 Level 2 94662

6 Interior elevation - rm 223 west 5 Interior elevation - rm 223 south


Keynote Description
2 / A1.14 1 : 25 2 / A1.14 1 : 25
Level 3 98320 Level 3 98320 CCT9 Solid surface countertop
FA4 Fire alarm horn - see elec
LT GLS3 Surface Mounted Mirror
FA4 LT Light - see elec
PRT2 Adults' wc partition
AAA PTblk Paint colour black
PTwh Paint colour white
WCA1.1 Toilet tissue dispenser - single roll
WCA2 Paper towel dispenser
WCA6 Soap dipenser
Align Furring wall for
plumbing aligned to
top of toilet partition
Align 610 610

EQEQ EQEQ

965
GLS3

1129
WCA2 PTwh PTwh PRT2 GLS3

PTwh PTblk

86
WCA2

86
CCT9

76
CCT9

76
WCA1.1 SK - see mech

900

838
PTwh SK - see mech

674
EQ EQ

Level 2 94662 Level 2 94662


WCA6
1044 600
WCA6 RCP legend
4 Interior elevation - rm 223 east 3 Interior elevation - rm 223 north Ceiling mounted duplex
2 / A1.14 1 : 25 2 / A1.14 1 : 25
P6a
B B EQ EQ WAP

EQ EQ EQ EQ
Occupancy sensor

AAA Sprinkler head


EQ

EQ EQ 391
Smoke detector

Suspended eyelet
C6c

1500
EQ

2438
1693

SK - see mech SK - see mech


2 2 1915

1590
EQ

C6x
Men's w/c
2720 223
EQ

391

0
75
R

r
ea
EQ

cl
FD
EQ

1495 FRANCES STREET


3 VANCOUVER BC V5L 1Z1
TEL 604 738 4323
PRT2 WWW.PUBLICDESIGN.CA
PRT2 6 A4.11 4
EQ

Align
Capilano University
159

ECCE
C:\Users\jayleen\Documents\2015 CapU Childcare Post IFT_jayleenD4QHC.rvt

EQ

EQ EQ EQ EQ

2055 Purcell Way, North Vancouver, BC

1413
EQ

C6c PROJECT CODE


2015
2438 SCALE
EQ

P6a
As indicated
175 X 343 glulam below - see structural

88 251
Enlarged drawing -
3 3 2360

EQ EQ
rm223 - men's wc
4/2/2024 3:21:43 PM

SHEET

2 Enlarged ceiling plan - rm 223 men's wc 1 Enlarged floor plan - rm223 men's wc
1 / A1.11 1 : 25 42 / A1.03 1 : 25
A4.11
Smith Bros & Wilson (BC) Ltd. Project: 23-02-CSB CAPILANO UNIVERSITY CENTER FOR
9788 186 Street CHILDHOOD STUDIES
Surrey, British Columbia V4N 3N7 2055 PURCELL WAY
P: 604-324-1155 NORTH VANCOUVER, British Columbia V7J 3H5
F: 604-325-3390

RFI #205: Plumbing Rough In above Floor Joist


Status Open

To Jayleen Chivers (PUBLIC DESIGN) From Kyle Casey (SMITH BROS. & WILSON (B.C) LTD)
9788 186 STREET
SURREY, British Columbia V4N 3N7

Date Initiated Mar 21, 2024 Due Date Mar 26, 2024

Location Project Stage Course of Construction

Cost Impact TBD Schedule Impact Yes (Unknown)

Spec Section Cost Code

Drawing Number Reference

Linked Drawings A1.03

Received From Jordan Challenger (TOTAL ENERGY SYSTEMS


LTD.)

Copies To Jeremy Berger (Core Project Management), Crystal


Brendzy (SMITH BROS. & WILSON (B.C) LTD),
Jayleen Chivers (PUBLIC DESIGN), Brandon Hunt
(SMITH BROS. & WILSON (B.C) LTD), Daniel Metry
(SMITH BROS. & WILSON (B.C) LTD), Alec Page
(Core Project Management), Brian Wakelin
(PUBLIC DESIGN)

Activity

Question Question from Kyle Casey SMITH BROS. & WILSON (B.C) LTD on Thursday, Mar 21, 2024 at 01:41 PM PDT
Please see attached marked up drawings A1.03, A4.11 and M202.

Plumbing rough in for sinks can not be installed as shown on drawings due to level 2 floor joist directly below wall.
Possible solution is to build localized firring wall behind sinks in order to bring plumbing pipe south of floor joist.

Please confirm this is acceptable.

Attachments
Plumbing Rough In above Floor Joist.pdf

Awaiting an Official Response

Smith Bros & Wilson (BC) Ltd. Page 1 of 1 Printed On: Apr 1, 2024 10:56 AM PDT
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.

ISSUES + REVISIONS
NO DATE DESCRIPTION
A Nov 03, 2020 Issued for SD Report
B Mar 24, 2021 Issued for Class B Costing
D Mar 31, 2021 Issued for DD
F June 15, 2021 Issued for 50% CD
G Sep 03, 2021 Issued for 75% CD
H Sep 30, 2021 Issued for Class A Costing
I June 01, 2022 Issued for BP Application (not issued)
J Oct 31, 2022 Issued for 95%CD
K Jan 26, 2023 Issued for BP Application
L Feb 02, 2023 Issued for Tender
M Feb 13, 2023 Issued for Tender Addendum TP-02
N April 19, 2023 IFT to IFC
O April 20, 2023 Issued for Construction
P Aug 08, 2023 CO-001 : Revised for BP
U Sep 29, 2023 CO-010 : Revised Elevator Pit
Z Dec 07, 2023 PCO-014 : Revised Millwork
AA Nov 6, 2023 RFI - 067 LVL 2 Washrooms
MM Feb 23, 2024 PCO-043 : Acoustic Walls + Floor

A A' B C D E F G H J K K' L
Keynote Description
54900

3050 6100 6100 6100 6100 6100 6100 6100 6100 3050

ACOUSTIC NOTES
A2.01 MM

2 ACOUSTIC WALL INSULATION

FRR NOTES

MM 1 HR FRR

1'

1
framing
4 A4.20 2 centered on GL
222b 221b

3 E4a
P4b
framing W4a
1 Wall and plumbing
centered on GL framing
centered on GL
Studio
4 A4.21 2
Rough in directly
222 Classroom
56.7 m 2/ 63.0 m²
above level 2 floor joist 6 3 A4.22 1
218
8112

3 P4b ECCE lab 104.5 m2

3800
A4.20 220
3 A4.23 4 2
P4a 210.8 m2/ 74.0 m²

2
A3.04
243
6100 7625
ECCE lab storage
221

1900
MM
50.8 m2/ 30.0 m²
470

995

993
P3a
1931 4169
2 778 739 3096 W/D
570

570
Men's w/c Women's w/c
223 222a 221a 218a 1
ø 1800 217
19.0 m² / 15.7 m² A4.10
P3a 19.0 m² / 24.2 m²
1 ø 1500 P4a P5a

4949
FD
1200

FD
A4.11 1
300 P4a A4.32
1 1018
3957

Student study A4.33


20740

A3.04 223 217a


2 A4.24 5 219
600 1 60.0 m² / 138.0 m² 1
3 915 588 P4a 1
A4.32 A4.33 A2.02

1783
1
1500
1696

A2.02 2 P6a 2 3 P6a


A7.01 P4b A5.21 P4b
1095 1726 3312 2566

319
3 224b X01c

fur out wall X03b PS4 P4b P3a


vif 1219 213
1
2 A7.09
MM 6 P4a P3a
Practicum
Stair 1 Stair 2
3792

meeting Elevator A4.33 5 ø 1200 4 A4.33 Open to


4 X01 A4.32 3 Open to below Open to below X03
224 9 A4.33 7 below
X02

DW
27.0 m² / 16.8 m²
26.0 m² / 20.7 m² 10.0 m² / 7.7 m² 6 A4.23
7 A4.26 5 4
8 1222 2685
2 10
P4a P5a PS4 fur out wall P4a
A3.03 6 A5.30
1
4 224a
1
X01b 6 ø 1800
Corridor
2
4 A4.25 11 A4.25
1220

1220
ø 1200 A4.25 2 ø 1200 10
1200

P4a P4b 225 P3a


A4.26 A4.32 A5.20 A4.33 A5.20
P4b 300 P4b
5 89.9 m2
3
5 226a 200a 201a 202a 203a 204a 205a 206a 207a 208a 209a 210a 211a 212a 213a 214a 215a 216a

165
600
A4.26 2
1500

E4a 3 3050 typ. 3050 typ. P4a


3660

1 1517
Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office L2 ?Comms
A3.03 Copy rm 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216
?
1495 FRANCES STREET
VANCOUVER BC V5L 1Z1
226 11.1 m² / 9.9 m² 11.1 m² / 9.7 m² 11.1 m² / 9.9 m² 11.1 m² / 9.3 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.9 m² 11.1 m² / 9.7 m² 11.1 m² / 9.9 m² ? / ? m2
4.67 TEL 604 738 4323
WWW.PUBLICDESIGN.CA
4.74 m2

6 Capilano University
7
1
A4.09
8
A6.14
7
9
A6.14
ECCE
A6.14
C:\Users\neil\Documents\2015 CapU Childcare Post IFT_neil96Z8Q.rvt

2055 Purcell Way, North Vancouver, BC


TRUE NORTH
MM

PROJECT CODE
1 2 1 2
2015
A3.01 A3.01 A3.02 A3.02 SCALE
As indicated
1

A2.01

Reference plan - L2
2024-02-23 8:42:40 AM

SHEET

A1.03
Level 3 98320 Level 3 98320
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.
ISSUES + REVISIONS
NO DATE DESCRIPTION
B Mar 24, 2021 Issued for Class B Costing
D Mar 31, 2021 Issued for DD
F June 15, 2021 Issued for 50% CD
Align G Sep 03, 2021 Issued for 75% CD
H Sep 30, 2021 Issued for Class A Costing
AA I June 01, 2022 Issued for BP Application (not issued)
J Oct 31, 2022 Issued for 95%CD
K Jan 26, 2023 Issued for BP Application
L Feb 02, 2023 Issued for Tender
PTwh M Feb 13, 2023 Issued for Tender Addendum TP-02
PRT2 PRT2
N April 19, 2023 IFT to IFC
O April 20, 2023 Issued for Construction
? PRT2 PTblk PRT2 PTwh
Y Oct 06, 2023 CO-013 : Revised Washrooms
AA Nov 6, 2023 RFI - 067 LVL 2 Washrooms

Level 2 94662 Level 2 94662

6 Interior elevation - rm 223 west 5 Interior elevation - rm 223 south


Keynote Description
2 / A1.14 1 : 25 2 / A1.14 1 : 25
Level 3 98320 Level 3 98320
CCT9 Solid surface countertop
LT FA4 Fire alarm horn - see elec
FA4 GLS3 Surface Mounted Mirror
LT Light - see elec
PRT2 Adults' wc partition
PTblk Paint colour black
PTwh Paint colour white
WCA1.1 Toilet tissue dispenser - single roll
WCA2 Paper towel dispenser
WCA6 Soap dipenser

Align 610 610

AA ?
EQEQ EQEQ

965
PRT2 GLS3

1129
WCA2 PTwh PTwh PRT2 GLS3

PTwh PTblk

86
WCA2

86
CCT9

76
CCT9

76
WCA1.1 SK - see mech

900

838
PTwh SK - see mech

674
EQ EQ

Level 2 94662 Level 2 94662


WCA6 WCA6
1200 600
RCP legend
4 Interior elevation - rm 223 east 3 Interior elevation - rm 223 north
2 / A1.14 1 : 25
Possible solution to 2 / A1.14 1 : 25
Ceiling mounted duplex

B build firring wall here B EQ EQ WAP


1609
1624
to bring plumbing to EQ EQ EQ EQ
Occupancy sensor
front side of joist.
EQ EQ Sprinkler head
EQ

307 EQ EQ 391
Smoke detector

Suspended eyelet
C6c
SK - see mech SK - see mech
1534

EQ

2438
2 2

PRT2
EQ

C6x
Men's w/c
2720 223
159

EQ

391

0
75
R

r
ea
EQ

cl
FD
EQ

1495 FRANCES STREET


3 VANCOUVER BC V5L 1Z1
TEL 604 738 4323
PRT2 WWW.PUBLICDESIGN.CA
PRT2 6 A4.11 4
EQ

Align
Capilano University
159

5
C:\Users\brian\Documents\2015 CapU Childcare Post IFT_brian@publicdesign.ca.rvt

Please provide updated ECCE


EQ

EQ EQ EQ EQ
AA
drawing sheet to show 2055 Purcell Way, North Vancouver, BC
firring wall and orientation

1413
EQ

of water closet. AA
C6c PROJECT CODE
2015
2438 SCALE
EQ

P6a
As indicated
175 X 343 glulam below - see structural

88 251
Enlarged drawing -
3 3 2360

EQ EQ
rm223 - men's wc
2023-11-06 12:44:48

SHEET

2 Enlarged ceiling plan - rm 223 men's wc 1 Enlarged floor plan - rm223 men's wc
A4.11
PM

1 / A1.11 1 : 25 42 / A1.03 1 : 25
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
PLUMBING KEY NOTES PLUMBING GENERAL NOTES drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.
1 DOMESTIC WATER PIPING BRANCHES TO NEARBY 1. REFER TO ARCHITECTURAL DRAWINGS FOR FINAL
ISSUES + REVISIONS
PLUMBING FIXTURES. REFER TO PLUMBING EQUIPMENT INSTALLATION LOCATIONS OF ALL PLUMBING FIXTURES,
NO DATE DESCRIPTION
SCHEDULE AND PLUMBING ROUGH-IN SCHEDULE FOR HOSE BIBS, AND FLOOR DRAINS.
CONNECTION SIZES. MAINS C/W ISOLATION VALVES. 1 2022-06-10 ISSUED FOR BUILDING PERMIT
2. REFER TO PLUMBING ROUGH-IN SCHEDULE ON M001 FOR 2 2022-10-21 ISSUED FOR 95% CD
PIPE SIZING TO INDIVIDUAL FIXTURES. 3 2022-12-19 ISSUED FOR TENDER
2 30Ø CONDENSATE FROM FAN COIL DRAIN TO NEARBY
SINK. 3. ALL FLOOR DRAINS SHALL BE TRAP PRIMED UNLESS NOTED 4 2023-01-23 REISSUED FOR TENDER
OTHERWISE. TRAP PRIMERS TO BE FLOW TYPE. 5 2023-01-23 REISSUED FOR BUILDING PERMIT
6 2023-02-01 ISSUED FOR TENDER
4. ALL SANITARY AND STORM PIPING TO BE SLOPED AT 2% 7 2023-04-14 ISSUED FOR CONSTRUCTION
UNLESS NOTED OTHERWISE.
8 2023-05-31 REISSUED FOR BUILDING PERMIT
5. ALL DOMESTIC HOT WATER RECIRC BALANCING VALVES TO 9 2023-11-27 ISSUED FOR MSI-002
BE BALANCED AT 0.032 LPS (0.5 GPM) UNLESS NOTED
OTHERWISE.

6. RPBP'S TO BE INSTALLED BETWEEN 760 MM (30") AND 1525


MM (60") A.F.F.

7. PROVIDE ISOLATION VALVES ON DOMESTIC HOT, COLD,


AND RECIRCULATION LINES IN EACH ROOM OR BY
INDIVIDUAL FIXTURE. PROVIDE HEAT TRACE FOR ALL PIPES
IN UNCONDITIONED SPACES.

B C D E F G H J K L

RD-1

RWL BY OTHERS RWL BY OTHERS


DOWN TO BELOW. DOWN TO BELOW.

Studio ECCE lab Classroom


222 220 218
ECCE lab storage
SK-1 221
SK-2
100Ø VENT (74.5
JS-1 FU) TO ABOVE
WD-1 C THROUGH ROOF.
100Ø VENT (107.5FU) FD-1
9
TO ABOVE 2
THROUGH ROOF.

V
W/D

2 2
2
WC-3 5@
Men's w/c Women's w/c
Student study
V

3@ WC-3

V
LAV-4 3@
223 100Ø VENT
2@ LAV-4 FD FD-1
FD (75.5FU) FROM 219 217
FD-1 BELOW.
Rough in
directly 30Ø ERV CONDENSATE
above level FROM ABOVE DRAIN TO
SINK.

2 floor joist
C

3
75Ø VENT (36.5 FU)
FROM BELOW.
Stair 1 Elevator
Practicum meeting X01 X02
CONTRACTOR TO DW-1
INSTALL AIR
SK-1

DW
ADMITTANCE VALVE
224

V
TO VENT SINK. SEE 6-M703 FOR DETAIL

PIPE TO RUN IN JOIST


CAVITY

4 Corridor
225
5

30Ø CONDENSATE Faculty office Faculty office Faculty office


DOWN TO BELOW. Faculty office Faculty office Faculty office Faculty office Faculty office
Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office Faculty office
204 205 206
208 209 211 212 214 75Ø VENT (2FU)
200 201 202 203 207 210 213 215
BIM 360://Capilano University Centre for Childhood Studies Building (ECCE )/261B002_CapU ECCE_Mech_R21.rvt

FROM BELOW.
1495 FRANCES STREET
VANCOUVER BC V5L 1Z1
L2 Comms 30Ø CONDENSATE TEL 604 738 4323
WWW.PUBLICDESIGN.CA
DOWN TO BELOW.
216
6 Capilano University
15Ø DHWR F/B
20Ø DHW DN
15Ø DHWR T/B
20Ø DHW F/B
ECCE
RWL BY OTHERS 50Ø DCW DN 50Ø DCW F/B RWL BY OTHERS
DOWN TO BELOW. 20Ø IR DN 20Ø IR F/B DOWN TO BELOW.
Monashee Drive, North Vancouver, BC

PROJECT CODE
261b-002-20
SCALE
1:75

PLUMBING-LEVEL 2
11/27/2023 3:37:54 PM

SHEET

M202