Most Demanding Sprinkler Data Hose Streams
K-Factor at 500.00
Coverage Per Sprinkler Number Of Sprinklers Calculated Number Of Sprinklers Calculated
NA 0 0
System Pressure Demand System Flow Demand
234.940 750.00
Total Demand Pressure Result
Extinción Interconexión Caldas - La Estrella R2 Water Supply at Node 1 (750.00, 250.00, 140.000, 100.000)
Sabaneta
Address 2 Job Site/Building
Node Flow(gpm) 0 0 NA
Hose At Node 119 250.00 AutoPeak Results: Pressure For Remote Area(s) Adjacent To Most Remote Area
500.00
System Flow Demand Total Water Required (Including Hose Allowance)
750.00 750.00
Maximum Pressure Unbalance In Loops
0.000
Maximum Velocity Above Ground
260.67gal
Supplies
Hose Flow Static Residual Flow Available Total Demand Required Safety Margin
Node Name (gpm) (psi) (psi) @ (gpm) (psi) @ (gpm) (psi) (psi)
3 Carro 1 - 1000 GPM 285.000 150.000 1000.00 247.552 500.00 197.492 50.060
Contractor
Contractor Number Contact Name Contact Title
22
Name of Contractor: Phone Extension
EPM
Address 1 FAX
Medellín
Address 2 E-mail
Address 3 Web-Site
Hydraulic Graph
285.000
Residual: Pressure
150.000 @ 1000.00
Available Pressure at Time of Test
247.552 @ 500.00
System Demand
197.492 @ 500.00
System Demand (Including Hose Allowance at Source)
197.492 @ 500.00
• • • • • Route 2 • • • • •
FM 2.4690 250.00 16.75 120 0.706723 0.2m Pf 10.682
256 1.3m 250.00 107.503 Hose(-100.000)(9.4m) 14.9m Pe
253 1.3m 118.184 E(2.5m), T(3.7m) 15.1m Pv
FM 2.6350 250.00 14.71 120 0.514785 18.3m Pf 14.605
253 1.3m 118.184 10.0m Pe -6.401
238 5.8m 126.388 2E(2.5m), T(5.0m) 28.4m Pv
Equivalent Pipe Lengths of Valves and Fittings (C=120 only) C Value Multiplier
4.87
( )
Actual Inside Diameter Value Of C 100 130 140 150
= Factor
Schedule 40 Steel Pipe Inside Diameter Multiplying Factor 0.713 1.16 1.33 1.51
Sabaneta
Address 2 AHJ
Antioquia
Address 3 Job Site/Building
NA NA
Most Demanding Sprinkler Data Hose Streams
K-Factor at 500.00
Coverage Per Sprinkler Number Of Sprinklers Calculated Number Of Sprinklers Calculated
NA 0 0
System Pressure Demand System Flow Demand
224.219 750.00
Total Demand Pressure Result
Extinción Interconexión Caldas - La Estrella R2 Water Supply at Node 1 (750.00, 250.00, 140.000, 100.000)
Sabaneta
Address 2 Job Site/Building
Node Flow(gpm) 0 0 NA
Hose At Node 119 250.00 AutoPeak Results: Pressure For Remote Area(s) Adjacent To Most Remote Area
500.00
System Flow Demand Total Water Required (Including Hose Allowance)
750.00 750.00
Maximum Pressure Unbalance In Loops
0.000
Maximum Velocity Above Ground
260.67gal
Supplies
Hose Flow Static Residual Flow Available Total Demand Required Safety Margin
Node Name (gpm) (psi) (psi) @ (gpm) (psi) @ (gpm) (psi) (psi)
3 Carro 2 - 1200 GPM 285.000 150.000 1200.00 258.273 500.00 197.492 60.781
Contractor
Contractor Number Contact Name Contact Title
22
Name of Contractor: Phone Extension
EPM
Address 1 FAX
Medellín
Address 2 E-mail
Address 3 Web-Site
Hydraulic Graph
285.000
Residual: Pressure
150.000 @ 1200.00
Available Pressure at Time of Test
258.273 @ 500.00
System Demand
197.492 @ 500.00
System Demand (Including Hose Allowance at Source)
197.492 @ 500.00
• • • • • Route 2 • • • • •
FM 2.4690 250.00 16.75 120 0.706723 0.2m Pf 10.682
256 1.3m 250.00 107.503 Hose(-100.000)(9.4m) 14.9m Pe
253 1.3m 118.184 E(2.5m), T(3.7m) 15.1m Pv
FM 2.6350 250.00 14.71 120 0.514785 18.3m Pf 14.605
253 1.3m 118.184 10.0m Pe -6.401
238 5.8m 126.388 2E(2.5m), T(5.0m) 28.4m Pv
Equivalent Pipe Lengths of Valves and Fittings (C=120 only) C Value Multiplier
4.87
( )
Actual Inside Diameter Value Of C 100 130 140 150
= Factor
Schedule 40 Steel Pipe Inside Diameter Multiplying Factor 0.713 1.16 1.33 1.51
ELABORACIÓN Y APROBACIÓN
ELABORADO POR:
_______________________________________
Cristian Higuita
Ingeniero de proyectos
REVISADO POR:
_______________________________________
Alejando Echeverry
Ingeniera de proyectos
APROBADO POR:
_______________________________________
Carlos Agudelo
Líder Área Mecánica