Staircase det-Model
Staircase det-Model
156
7
FLIGHT-3 FLIGHT-3
3 3 3 3 6
1404
5
4
1908
1908
Z BEAM 3
1725
1725
2
#12 @ 125 c/c 1
PL
#8@150 C/C
17 18 19 20 21 22 23 24 25 17 18 19 20 21 22 23 24 25
300
300
16 16
2125 2125 FLIGHT-1 DETAILS
Z BEAM
15 15
Binder to be inserted Sec-1-1
FLIGHT-2
FLIGHT-2
14 1815 14
1815
2100
2100
13
LIFT 13
LIFT 450mm in lift wall
12 12
11 11
10 10
9 8 7 6 5 4 3 2 1 9 8 7 6 5 4 3 2 1
1725 1725 1783
1 1 1 1 Landing lvl 17 300
1907
1907
1725
1725
16
1600
156
15
UP UP 14
1248
13
C1 FLIGHT-1
C1 FLIGHT-1 12
11
1907
C2 C2 Z BEAM 10
2652
9 Landing lvl
250X550
1850 2100 373 1850 2100 373 #8@150 C/C
1404
2 2 #12 @ 125 C/C
250
25
300
Floor lvl
24 156
23
22
=> 6 #20
550
1248
21
20
19
18
17 Landing lvl # 8 @100/125 C/C
#8@150 C/C at L/4 & mid span
3900
Height : 3900
Riser = @ 156 (total 25 riser) NOTES:
Main rod = #12 @ 125 c/c 6. CONCRETE COVER TO MAIN REINFORCEMENT: STAIRCASE DETAILS
a.) COLUMN = 40 MM.
Binder = #8 @ 150c/c b.) BEAM = 25 MM.
c.) SLAB = 20 MM.
DRG. NO.
SD -08(R2)
SCALE
SCALE TO FIT
DATE
04-08-2023
DRAWN BY-
DB
CHECKED BY-
Bhargav