BASIC ENGINEERING
Document Number
P90-UL72-01-001
Sources:
MEG 22% will be produced through vapor compression process cooled by water cooled
chiller.
MEG 22% temperature at battery limits of the system will be 12 oC (in) and 5 oC (out)
Insulation of MEG lines will be done by PUF insulation joined with bitumen and cladded
with galvalume sheet.
MEG pumps Supply to plant will be HPS system.
Utility:
Cooling water for Chiller
Mechanical:
Construction
Skew Hermetic screw type system will be considered for the compressor
“Green” refrigerant will be used in the chiller (e.g. R-22, R-134 or R-407C).
Makeup will be done by adding MEG manually and water line will be provided.
System will be water cooled.
Hot well and cold well will be with 10% excess capacity over the entire system volume.
Both hot and cold well will be vertical rectangular vessels with flat bottom in SS304
construction.
System will have following in-built safeties
o Low cooling water pressure.
o Low coolant (MEG 22% from hot well) pressure.
o Antifreeze trip.
o High discharge pressure from compressor.
o Low suction pressure to compressor.
o Low oil pressure.
o Crank case heater is “ON” when chiller is not running
Piping
Two bucket filters; CS body with 24 mesh, SS304 filtering element will be used in the suction
of the circulation pumps to filter any contaminants. One filter will be in line while the other will
be a standby filter.
Pump suction and discharge pipes and pipe fittings will be C class, ERW. Pipe sizes will be
sized from detail engineering.
MEG 22% supply and return header at plant locations will have isolation valves.
Valves
Manually operated butterfly/Ball valves with SS304 body and neoprene seat will be used.
Gaskets
All gaskets used in MEG 22% line will be klinger make non-asbestos universal gaskets
Insulation
PUF insulation joined with bitumen and galvalume sheets will be used for chilled MEG 22%
applications.
Civil:
It will be discussed in separate concept notes
Electrical:
The system will be considered under non-flameproof area.
The motors used will be of IE3 class for all the running equipment.
It will have proper lighting arrangement for proper illumination in night.
All running equipment’s will have local emergency stop button with protection.
All the equipment and structure will have double earthing.
Further more details will be included in concept notes of electrical.
Instrumentation:
Safety:
Appropriate fire extinguishers and sand buckets will be provided.
Eye washer and hand shower will be provided
4.0 LAYOUT
Detailed layout will be shared once finalized