Professional Documents
Culture Documents
Quality Engineering Week 1 Homework
Quality Engineering Week 1 Homework
740
900
1050
3345
13,300
530
70
61,313
3300
210
3200
5300
760
2750
3500
420
Prevention costs:
Quality planning
Vendor qualification (supplier certification)
Quality profiling (determining product specs to meet customer needs
Planning quality motivational programs
Process control engineering—QA department
Engineering department
QA department
Quality training
QA in no. 1, no. 2, lot analysis, instrument calibration, and aging checks
Production engineers on quality
Turnaround planning—Equipment (quality-related scheduled maintenance
Turnaround planning—Instruments (quality-related scheduled maintenance)
Quality task teams (special projects to rectify quality problems)
Process control engineering—Engineering department
Appraisal costs:
Acceptance inspection and test planning (planning for inspection)
Process equipment design for quality
Systems conformance (audit to verify system’s conformance)
Raw material acceptance testing
Process testing—Operators
Review production analysis data
Environmental testing (as it relates to product quality)
Quality statistics (collection of data and analysis)
Prevention
Appraisal
Total control costs:
Internal failure
External failure
Total failure costs:
Quality costs
$ 70
$ 7,150
$ 1,000
$ 170
$ 27,050
$ 740
$ 900
$ 1,050
$ 61,313
$ 70
$ 330
$ 650
$ 1,940
$ 12,500
$ 114,933
$ 100
$ 370
$ 70
$ 3,345
$ 13,300
$ 530
$ 70
$ 420
$ 18,205
$ 3,300
$ 3,200
$ 5,300
$ 210
$ 12,010
$ 760
$ 2,750
$ 3,500
$ 420
$ 7,430
$ 152,578
75%
12%
87% $ 133,138.00
8%
5%
13% $ 19,440.00
Percentage of sales
75%
12%
8%
5%